Search NASA⌕ Search

SEARCH · Search NASA

Results for “COST ESTIMATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,621 records · Page 90

High Energy Storage Capacity Low Cost Iron Flow Battery

A new flow battery was proposed that utilizes low cost materials: iron as the only active element, cheap aqueous electrolytes, and inexpensive separators. During charging, ferrous iron (Fe 2+ ) is oxidized to ferric iron (Fe 3+ ) at the positive electrode while it (Fe 2+ ) is reduced to form iron metal (Fe 0 ) at the negative electrode. Because iron is plated at the negative electrode during charging, conventional electrode structures couple the energy storage capacity and the power rating of the battery. In order to decouple the energy and power ratings and regain the economic advantages of a flow battery, a slurry electrode design was proposed for use as the negative electrode. The slurry electrode is made by flowing electrically conductive particles in an electrolyte containing the dissolved iron species. On charging, iron is plated onto the particles. The particles can then carry the iron metal out of the cell to be stored in external reservoirs. This project looked to develop a slurry for the negative electrode of the all-iron flow battery that can operate at 200 mA/cm 2 with <100 mV overpotential, be pumped with parasitic energy costs < 10%, and promote plating on the particles. A scalable and stackable cell design of 1100 cm 2 was developed. The project was initially under contract in mid-January 2013. The project was converted from a one-year proof of concept seedling to an additional two-year program, then extended with an 18-month plus-up, and finally with an additional 6-month approved cost-overrun. During the seeding project, the concept of plating on carbon particles in a slurry was demonstrated. However, this was accomplished with high-cost multi-walled carbon nanotubes as the slurry material. The following two-year program discovered several low-cost carbon blacks that could also be used in this application. These findings were supported by an analysis that demonstrated the effectiveness of the carbon that takes into account not just the effective electronic conductivity of the slurry, but also the surface area per volume of the slurry. It was demonstrated that stable, flowable slurries could be created with these carbons, even when the carbons where fully loaded with iron during charging. During the two-year program, laboratory-scale 50 cm 2 single-cells demonstrated charge-discharge cycling at current densities of 150 mA/cm 2 and energy efficiencies of >50%. Meanwhile, cost modeling continued to show promise for this energy storage approach. Following the conversion period, the overall objective of the nominally 18-month plus up period was to close the technical gap of a 25X scale-up and reduce risk to enable commercial investment required to develop a slurry iron flow battery product. A specific objective was to demonstrate 150 cycles of performance exceeding 70% energy efficiency with a 10-cell stack of 1156 cm 2 cells operating at 100 mA/cm 2 . The 10-cell short stack was designed to have a power delivery rating of approximately 1 kW, which represents a size commensurate with the requirements of our commercialization partner at that time. A complete battery support system for the full-size cell was designed, fabricated, and tested. This includes pumps (multiple types were considered, and constant volume hose pumps were found to be acceptable for performance and cost), electrolyte rebalance reactor, and sensors and control systems. The support system proved to be well-behaved and worked well. A new low-cost membrane was developed for this system based on a microporous polymer support with a layer of hydrogel polymer. The membrane had low resistivity, and significantly reduced pressure driven fluid flow across the membrane (as compared to the un-coated microporous support). This membrane approach was scaled-up in conjunction with a commercial toll coating company, and a large amount of membrane was manufactured to support large cell and stack testing. A new concept for an electrolyte rebalance reactor to react hydrogen gas from the negative electrolyte (from plating inefficiency) with excess ferric ion in the positive electrolyte was developed. This design was very simple, low cost, and effective. The full scale 1156 cm 2 single-cell was designed, modeled, fabricated and tested. Modeling showed that uniform flow-distribution should be obtained with the designed flow distributor. The design took into consideration the need to stack the cells, and components were fabricated for a ten-cell stack. Testing of the cell for charge and discharge demonstrated current densities of 50 mA/cm 2 with efficiencies of 50%. However, optimization and long cycling could not be accomplished because the slurry electrode would plug within the cell and block the flow. This would shut down the cell after several charge-discharge cycles. Various approaches were pursued to address this problem with some progress. However, there was not adequate time to find solutions to the problem although several promising approaches were identified for future work. The final deliverable for this proposed 18-month effort was to be a 1 kW, 6 kWh slurry flow battery, with complete balance of plant, ready for testing at an ARPA-E ‘Charges’ site with an estimated capital cost less than $\$ $45/kWh for a six-hour system (excluding power electronics). The deliverable milestone was not achieved for reasons mentioned above related to the slurry plugging. At the completion of this project, it was determined that the cost targets are achievable. The cost estimate for a 1 MW system with a one-hour capacity was estimated at $\$ $140/kWh (including power electronics) and for a six-hour system was estimated at $\$ $40/kWh (including power electronics). These costs include the battery, the balance of plant, the power conditioning and a concrete pad. This program resulted in three patents including the slurry-based iron flow battery, the rebalance reactor, and the membrane separator. At the time of this report, slurry-based iron flow battery patents have been issued in the US, China, Japan, Korea, and Europe. The other patent applications were under various stages of examination. A licensee was identified and the company initiated a scale-up and development program to take this technology to the marketplace, and CWRU staff have transferred their know-how and knowledge base to the company. This technology will enhance the economic and energy security of the United States by enabling the use of intermittent renewable energy technology, such as wind and solar power, as dispatchable resources. This report summarizes the results of this research and development program.

25 ENERGY STORAGE↗

Regenerative Carbonate-Based Thermochemical Energy Storage System for Concentrating Solar Power

Southern Research has developed a thermochemical energy storage (TCES) technology that utilizes the endothermic-exothermic reversible carbonation of calcium oxide (lime) to store thermal energy at high-temperatures, such as those achieved by next generation concentrating solar power (CSP) facilities. The major challenges addressed in the development of this system include refining a high capacity, yet durable sorbent material and designing a low thermal resistance low-cost heat exchanger reactor system to move heat between the sorbent and a heat transfer fluid under conditions relevant for CSP operation (e.g., energy density, reaction kinetics, heat flow). The proprietary stabilized sorbent was developed by Precision Combustion, Inc. (PCI). A factorial matrix of sorbent compositions covering the design space was tested using accelerated high throughput screening in a thermo-gravimetric analyzer. Several promising formulations were selected for more thorough evaluation and one formulation with high capacity (0.38 g CO 2 /g sorbent) and durability (>99.7% capacity retention over 100 cycles) was chosen as a basis for further development of the energy storage reactor system. In parallel with this effort, a full range of currently available commercial and developmental heat exchange reactor systems and sorbent loading methods were examined through literature research and contacts with commercial vendors. Process models were developed to examine if a heat exchange reactor system and balance of plant can meet required TCES performance and cost targets, optimizing tradeoffs between thermal performance, exergetic efficiency, and cost. Reactor types evaluated included many forms, from microchannel reactor, to diffusion bonded heat exchanger, to shell and tube heat exchangers. The most viable design for application to a supercritical CO 2 power cycle operating at 200-300 bar pressure and >700°C was determined to be a combination of a diffusion bonded heat exchanger with a shell and tube reactor. A bench scale reactor system was then designed and constructed to test sorbent performance under more commercially relevant conditions. This system utilizes a tube-in tube reactor design containing approximately 250 grams sorbent and is able to operate under a wide range of temperature, pressure and flow conditions as needed to explore system performance under a variety of operating conditions. A variety of sorbent loading methods may be tested using the reactor design. Initial bench test results over 25 cycles showed very high sorbent stability (>99%) and sufficient capacity (>0.28 g CO 2 /g sorbent) for an economical commercial-scale system. Initial technoeconomic evaluation of the proposed storage system show that the sorbent cost should not have a significant impact on overall system cost, and that the largest cost impacts come from the heat exchanger reactor and balance of plant equipment, including compressors and gas storage, due to the high temperatures for sCO 2 cycles. Current estimated system costs are $47/kWhth based on current material and equipment cost estimates.

14 SOLAR ENERGY↗

NASA Instrument Cost/Schedule Model

NASA's Office of Independent Program and Cost Evaluation (IPCE) has established a number of initiatives to improve its cost and schedule estimating capabilities. 12One of these initiatives has resulted in the JPL developed NASA Instrument Cost Model. NICM is a cost and schedule estimator that contains: A system level cost estimation tool; a subsystem level cost estimation tool; a database of cost and technical parameters of over 140 previously flown remote sensing and in-situ instruments; a schedule estimator; a set of rules to estimate cost and schedule by life cycle phases (B/C/D); and a novel tool for developing joint probability distributions for cost and schedule risk (Joint Confidence Level (JCL)). This paper describes the development and use of NICM, including the data normalization processes, data mining methods (cluster analysis, principal components analysis, regression analysis and bootstrap cross validation), the estimating equations themselves and a demonstration of the NICM tool suite.

JCL↗

So how much will it cost to build a nuke?

Trying to get a better understanding of the different estimates of the cost of nuclear power, Prof. Francois Leveque of Mines ParisTech and Marcelo Saguan of Microeconomix examined seven studies published since 2000. They examined levelized cost, which captures the cost of electricity generation from nuclear reactors over the entire life cycle, including initial investment costs, operations and maintenance costs, cost of fuel, cost of capital, and decommissioning. The results, in 2007 euro/MWh, vary from 18 to 80. Making matters worse, more recent studies show an upward trend: the average value for studies published in 2003--05 is about 43 euro/MWh, while those published in 2007--09 average 63 euro2007/MWh. One reason for the different results is different assumptions about the main cost drivers and how they may vary over time. With the advent of third-generation nuclear reactors, numbers in the range of $1,000/kW (approx. 750 euro/kW) were being tossed around, suggesting a $1 billion investment for a 1,000 MW plant. A 2003 MIT study assumed an overnight cost of 1,750 euro/kW, with later studies raising the numbers to 3,000 euro/kW (approx. US$ 4,500). In 2008, Progress Energy Florida put the price tag for 2 new reactors it is planning to build on the Gulf Coast of Florida at $14 billion with another $3 billion for transmission and related expenses. Likewise, Florida Power & Light figures it would cost $20 billion for 2 new reactors at its Turkey Point site in Florida. These higher cost estimates and significant uncertainties about the true costs pose serious challenges to the competitiveness of nuclear power.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Summary and evaluation of the conceptual design study of a potential early commercial MHD power plant (CSPEC)

The conceptual design study of a potential early commercial MHD power plant (CSPEC) is described and the results are summarized. Each of two contractors did a conceptual design of an approximtely 1000 MWe open-cycle MHD/steam plant with oxygen enriched combustion air preheated to an intermediate temperatue in a metallic heat exchanger. The contractors were close in their overall plant efficiency estimates but differed in their capital cost and cost of electricity estimates, primarily because of differences in balance-of-plant material, contingency, and operating and maintenance cost estimates. One contractor concluded that its MHD plant design compared favorably in cost of electricity with conventional coal-fired steam plants. The other contractor is making such a comparison as part of a follow-on study. Each contractor did a preliminary investigation of part-load performance and plant availability. The results of NASA studies investigating the effect of plant size and oxidizer preheat temperature on the performance of CSPEC-type MHD plants are also described. The efficiency of a 1000 MWe plant is about three points higher than of a 200 MWe plant. Preheating to 1600 F gives an efficiency about one and one-half points higher than preheating to 800 F for all plant sizes. For each plant size and preheat temperature there is an oxidizer enrichment level and MHD generator length that gives the highest plant efficiency.

Staiger, P. J.↗

Parametric study of helicopter aircraft systems costs and weights

Weight estimating relationships (WERs) and recurring production cost estimating relationships (CERs) were developed for helicopters at the system level. The WERs estimate system level weight based on performance or design characteristics which are available during concept formulation or the preliminary design phase. The CER (or CERs in some cases) for each system utilize weight (either actual or estimated using the appropriate WER) and production quantity as the key parameters.

Beltramo, M. N.↗

N-Set: A NASA Research Project

This slide presentation reviews the research project named N-Set. The goal of this project is to create a user friendly tool for estimating the cost and size of software development. Using the historical experience which NASA has desire is to create a tool that will give an early Rough Order Magnitude (ROM) estimate of the cost and size of a software development task without using the lines of code as a primary input value.

software cost estimating tool↗

Planning and Estimation of Operations Support Requirements

Life Cycle Cost (LCC) estimates during the proposal and early design phases, as well as project replans during the development phase, are heavily focused on hardware development schedules and costs. Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead to de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Any LCC growth can directly impact the programs' ability to fund new missions, and even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations. The National Aeronautics and Space Administration (NASA) D&NF Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for 5 missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that 4 out of the 5 missions studied had significant overruns at or after launch due to underestimation of the complexity and supporting requirements for operations activities; the fifth mission had not launched at the time of the mission. The drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This paper updates the D&NF LCC study, looking at the operations (phase E) cost drivers in more detail and extending the study to include 2 additional missions and identifies areas for increased emphasis by project management in order to improve the fidelity of operations estimates.

Newhouse, Marilyn E.↗

Solar thermal technology development: Estimated market size and energy cost savings. Volume 2: Assumptions, methodology and results

Estimated future energy cost savings associated with the development of cost-competitive solar thermal technologies (STT) are discussed. Analysis is restricted to STT in electric applications for 16 high-insolation/high-energy-price states. Three fuel price scenarios and three 1990 STT system costs are considered, reflecting uncertainty over future fuel prices and STT cost projections. Solar thermal technology research and development (R&D) is found to be unacceptably risky for private industry in the absence of federal support. Energy cost savings were projected to range from $0 to $10 billion (1990 values in 1981 dollars), depending on the system cost and fuel price scenario. Normal R&D investment risks are accentuated because the Organization of Petroleum Exporting Countries (OPEC) cartel can artificially manipulate oil prices and undercut growth of alternative energy sources. Federal participation in STT R&D to help capture the potential benefits of developing cost-competitive STT was found to be in the national interest. Analysis is also provided regarding two federal incentives currently in use: The Federal Business Energy Tax Credit and direct R&D funding.

Gates, W. R.↗

Evaluation of Carbon Dioxide Capture From Existing Coal Fired Plants by Hybrid Sorption Using Solid Sorbents

A novel hybrid solid sorbent technology for CO₂ capture and separation from coal combustion-derived flue gas was evaluated. The technology – Capture of CO₂ by Hybrid Sorption (CACHYS™) – is a solid sorbent technology based on the following ideas: 1) reduction of energy for sorbent regeneration, 2) utilization of novel process chemistry, 3) contactor conditions that minimize sorbent-CO₂ heat of reaction and promote fast CO₂ capture, and 4) low-cost method of heat management. This report provides key information developed during the course of the project that includes sorbent performance, energy for sorbent regeneration, physical properties of the sorbent, the integration of process components, sizing of equipment, and overall capital and operational cost of the integrated CACHYS™ system. Seven sorbent formulations were prepared and evaluated at the lab-scale for energy requirements and CO₂ capture performance. Sorbent heat of regeneration ranged from 30-80 kJ/mol CO₂ and was found to be dependent on process conditions. Two sorbent formulations (designated HCK-4 & HCK-7) were down-selected for additional fixed-bed testing. Additional testing involved subjecting the sorbents to 100 continuous cycles in the fixed-bed reactor to determine performance as a function of time. The working capacity achieved for HCK-4 sorbent ranged from 5.5-8.0 g CO₂/100 g sorbent, while the HCK-7 typically ranged from 8.0-10.0 g CO₂/100 g sorbent. Overall, there was no deterioration in capacity with continuous cycling for either sorbent. The CACHYS™ bench-scale testing system designed and fabricated under this award consists of a dual circulating fluidized-bed adsorber and a moving-bed regenerator. The system takes a flue gas slipstream from the University of North Dakota’s coal-fired steam plant. Prior to being sent to the adsorber, the flue gas is scrubbed to remove SO₂ and particulate. During parametric testing of the adsorber, CO₂ capture achieved using the 2-bed configuration with recirculation in both beds was 65-70% with a high flue gas CO₂ loading (~7%) and up to 85% with a low flue gas CO₂ loading (~4%). A sorbent regenerator system consisting of a pre-heater, desorber, and cooler is used to heat the CO₂-rich sorbent with direct and indirect steam producing a nearly 100% pure stream of CO₂. Parametric testing of the regenerator system demonstrated the impact of process conditions on both desorption rate and the heat of regeneration. Clear evidence of the use of specific process conditions that lower the overall energy of desorption was identified. This observation validates measurements made at the laboratory-scale. Several longer-term continuous tests were conducted to evaluate the performance of the sorbent/process as a function of time. Using a 2-bed configuration, sustained capture efficiency of 40-60% with a high flue gas CO₂ loading (~8%) and 70-80% with a low flue gas CO₂ loading (~4%) were achieved. However, sorbent working capacity was found to be considerably lower than laboratory-scale measurements. The low working capacity is attributed to insufficient sorbent/gas contact time in the adsorber. Sorbent properties that had a significant impact on CO₂ capture performance were identified. The results show that controlling these sorbent properties substantially improves CO₂ capture performance, with preliminary estimates indicating that relative improvement of ~30% is possible. Testing culminated with an operationally trouble-free test of 15 hours with sustainable performance. Overall, several practical strategies to increase performance of the sorbent and process were identified. The initial technical and economic assessment of the CACHYS™ process estimated the cost of CO2 capture was $36.19/ton with a 48.6% increase in levelized cost of electricity (LCOE) for the 550 MWe net plant. Using additional data gathered over the course of the project, and with revised technical and economic assumptions, the estimated cost of CO₂ capture with the CACHYS™ process is $39/ton (only includes the cost of the CO2 capture system) with an increase in LCOE of 55.9%. Overall, CACHYS™ represents a significant improvement over the benchmark MEA system, and has demonstrated progress towards achieving DOE’s goals for CO₂ capture technologies.

01 COAL, LIGNITE, AND PEAT↗

Mechanical and Chemical Properties of Harvested Hypalon Cable Jacket Subjected to Accelerated Thermal Aging

For nuclear power plants (NPPs) that are considering second license renewal for their operation beyond 60 years, knowledge of long-term operation, condition monitoring, and viability for the reactor components including reactor pressure vessel, concrete structures, and cable systems is essential. Such knowledge will provide NPPs with a game plan to predict performance and to estimate costs that are associated with monitoring or replacement programs for the affected systems. For cable systems that encompass a wide variety of materials, manufacturers, and in-plant location, accelerated aging of harvested cable jacket and insulation can provide insight as to remaining useful life and methods for monitoring. Accelerated thermal aging in air at temperatures between 80°C and 120°C was carried out on a multi-conductor control rod cable that had been in-service for over 30 years and was made by Boston Insulated Wire with Hypalon cable jacket and ethylene-propylene rubber insulation. From elongation at break (EAB) measurements and supporting Arrhenius analysis of the jacket material, an activation energy of 97.84 kJ/mol was estimated and the time to degradation, as represented by 50% EAB at the expected maximum operating temperature of 45°C, was estimated as consistent with 80 years. These values were slightly below previous measurements and could either be attributed to in-service degradation or variations in material properties from a given manufacturer. In addition, results from indenter modulus measurements and Fourier transform infrared spectroscopy suggest possible markers that could be beneficial to monitor cable conditions.

cable aging, cable insulation, Hypalon, second lic↗

Reference Model 5 (RM5): Oscillating Surge Wave Energy Converter

This report is an addendum to SAND2013-9040: Methodology for Design and Economic Analysis of Marine Energy Conversion (MEC) Technologies. This report describes an Oscillating Water Column Wave Energy Converter (OSWEC) reference model design in a complementary manner to Reference Models 1-4 contained in the above report. A conceptual design for a taut moored oscillating surge wave energy converter was developed. The design had an annual electrical power of 108 kilowatts (kW), rated power of 360 kW, and intended deployment at water depths between 50 m and 100 m. The study includes structural analysis, power output estimation, a hydraulic power conversion chain system, and mooring designs. The results were used to estimate device capital cost and annual operation and maintenance costs. The device performance and costs were used for the economic analysis, following the methodology presented in SAND2013-9040 that included costs for designing, manufacturing, deploying, and operating commercial-scale MEC arrays up to 100 devices. The levelized cost of energy estimated for the Reference Model 5 OSWEC, presented in this report, was for a single device and arrays of 10, 50, and 100 units, and it enabled the economic analysis to account for cost reductions associated with economies of scale. The baseline commercial levelized cost of energy estimate for the Reference Model 5 device in an array comprised of 10 units is $1.44/kilowatt-hour (kWh), and the value drops to approximately $0.69/kWh for an array of 100 units.

16 TIDAL AND WAVE POWER↗

Humans to Mars Will Cost About "Half a Trillion Dollars" and Life Support Roughly Two Billion Dollars

A recent estimate of the cost of the first human mission to Mars suggests that it could cost half a trillion dollars. This estimate is consistent with most past estimates. A similar cost number can easily be derived using mass-cost estimating factors based on the International Space Station (ISS) and other experience. Using the same cost factors and life cycle cost estimating approach, the cost of the life support for the Mars mission could be two billion dollars or more. The cost to go to Mars is expected to be two or three times that of either Apollo, space shuttle, or ISS and could be as much as all three together.

Jones, Harry W.↗

Automated Estimation Of Software-Development Costs

COSTMODL is automated software development-estimation tool. Yields significant reduction in risk of cost overruns and failed projects. Accepts description of software product developed and computes estimates of effort required to produce it, calendar schedule required, and distribution of effort and staffing as function of defined set of development life-cycle phases. Written for IBM PC(R)-compatible computers.

Roush, George B.↗

Initial Engineering and Design for CO 2 Capture from Ethanol Facilities

The Energy & Environmental Research Center, in partnership with the U.S. Department of Energy (DOE) and North Dakota ethanol producer Red Trail Energy, LLC (RTE) and with technical support from Trimeric Corporation and the KLJ engineering firm, completed an initial engineering design (IED) for a hybrid capture system to estimate associated costs for retrofitting the operational RTE ethanol plant. The project goal supports the DOE objective to achieve negative emissions using commercially available technologies to attain Technology Readiness Level 6+ from a facility emitting >100,000 tonnes of carbon dioxide (CO 2 ) annually. The RTE CCS (carbon capture and storage) Project is currently operating a CO 2 capture facility, adjacent to the RTE ethanol facility in western North Dakota, and injecting the CO 2 more than a mile below RTE property for permanent storage. This novel hybrid capture system would process about 310,000 tonnes of CO 2 annually for the RTE host site and includes CO 2 capture and compression from bioprocessing as well as capturing CO 2 produced from natural gas boilers. The bioprocessing capture process, based on past RTE studies investigating ammonia liquefaction technology with CO 2 produced from natural gas boilers captured utilizing chemical absorption with amine, was shown to be technically feasible for the RTE site. Activities conducted to support the project goal included 1) designing a hybrid capture system using CO 2 emissions from both bioprocessing and heat production at the host site facility; 2) conducting a pre-front-end engineering and design analysis of the hybrid capture system to include environmental health and safety, a constructability report, identification of permits, and corporate approvals; and 3) performing a techno-economic assessment in accordance with DOE’s methodology, as demonstrated by the bituminous baseline study. In addition, a life cycle assessment (LCA) was completed for the RTE site to estimate the carbon life cycle for ethanol-CCS implementation using the designed hybrid capture system to determine potential for net-negative carbon emissions. Results of the IED showed the hybrid system to be technically viable, with a moderate estimated cost of $55/tonne CO 2 captured for the hybrid system. The cradle-to-gate LCA showed preliminary net-negative carbon emissions potential anticipated from implementing a hybrid CCS system at a commercial scale. Recommended next steps toward potential implementation include hybrid capture system demonstration testing for detailed engineering and LCA model comparisons with low-carbon fuel incentive programs for financial support.

01 COAL, LIGNITE, AND PEAT↗

Technology Estimating 2: A Process to Determine the Cost and Schedule of Space Technology Research and Development

As a leader in space technology research and development, NASA is continuing in the development of the Technology Estimating process, initiated in 2012, for estimating the cost and schedule of low maturity technology research and development, where the Technology Readiness Level is less than TRL 6. NASA' s Technology Roadmap areas consist of 14 technology areas. The focus of this continuing Technology Estimating effort included four Technology Areas (TA): TA3 Space Power and Energy Storage, TA4 Robotics, TA8 Instruments, and TA12 Materials, to confine the research to the most abundant data pool. This research report continues the development of technology estimating efforts completed during 2013-2014, and addresses the refinement of parameters selected and recommended for use in the estimating process, where the parameters developed are applicable to Cost Estimating Relationships (CERs) used in the parametric cost estimating analysis. This research addresses the architecture for administration of the Technology Cost and Scheduling Estimating tool, the parameters suggested for computer software adjunct to any technology area, and the identification of gaps in the Technology Estimating process.

Cole, Stuart K.↗

CSP Systems Analysis 2022-2024 (Final Technical Report)

The CSP Systems Analysis project estimates the current market cost of CSP subsystems and technologies for use by the DOE Program and within NREL analysis tools. The project addresses upgrades to NREL's System Advisor Model (SAM) related to CSP, as well as development of new modules within SAM to expand the types of CSP systems that can be simulated and new tools for evaluating CSP subsystem performance or optimizing CSP system layouts, for example, SolarPILOT and SolTrace. The project evaluates the potential cost and performance of new CSP-relevant technologies and generally includes assessment of CSP technologies in support of the DOE subprogram. A primary goal of the CSP System Analysis project is to provide timely and accurate cost data to the DOE to assess the current state of CSP technologies as well as predict performance and cost for pre-commercial and emerging technologies that may impact the industry. Prior work in this task has produced technology cost reports and roadmaps for DOE and highlighted promising research paths that could reduce overall CSP cost, such as the supercritical CO2 power cycle and molten-salt trough systems. CSP Systems Analysis produces modeling tools to evaluate the performance of CSP systems, subsystems, or components, and journal articles, conference papers, technical reports and databases to disseminate information to the CSP industry. CSP technology costs are estimated and tracked using these tools as well as analysis of literature and industry sources. The CSP modeling tools and NREL analysis results are used by researchers; government, financial, and industry analysts; and other CSP stakeholders. The purpose of this final technical report is to summarize the key accomplishments of the past three years of this project. The project was divided into seven separate tasks, and in what follows, we describe the background, objectives, key accomplishments, and path forward for each task within the project, with one section of this report summarizing each task.

14 SOLAR ENERGY↗