Search NASA⌕ Search

SEARCH · Search NASA

Results for “DOCUMENTATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,621 records · Page 90

Catalina Repower Feasibility Study: NREL Phases I & II Summary Report

Engineers at the National Renewable Energy Laboratory (NREL) supported Southern California Edison (SCE) and the United States Environmental Protection Agency (EPA) by conducting technical and economic analyses for energy systems at Santa Catalina (Catalina) Island, which is located 22 miles off the coast of Long Beach, California. This effort was part of a broader Repower Catalina Feasibility Study that was also supported by NV5, an engineering consulting firm and project partner to NREL for this analysis. This document describes NREL’s techno-economic modeling and optimization analysis for the first two phases of this project which focus on supply-side generation and energy storage options for Catalina. SCE’s goal for this analysis is to determine a strategy for electricity generation on Catalina Island that results in lower energy costs, improved energy resiliency, and reduced air emissions. EPA goals for this effort are to reduce emissions of air pollution and encourage renewable energy development on contaminated and formerly contaminated lands when such development is aligned with the community’s vision for the site. Currently, an on-island SCE power plant serves the Catalina Island electrical load with 6 reciprocating diesel generators totaling 9.4 MW; 23 propane-fueled microturbines totaling 1.5 MW; and a 1-MW, 7.2-MWh sodium sulfur battery energy storage system (BESS). In 2017, the electricity consumption on the island was 29.1 GWh, with an average load of 3.3 MW and peak load of approximately 5.5 MW. Considering new environmental standards on diesel generator emissions from California’s South Coast Air Quality Management District, a 60% renewable energy target for 2030 laid out in California’s Senate Bill 100, SCE’s Clean Power Electrification Pathway, and the characteristics of the island’s existing diesel generators, SCE is seeking to evaluate the technical and economic implications of different energy technology options to determine a path forward. Phases I and II of the Repower Catalina Feasibility Study, summarized in this document, evaluated the following: Interconnection with the mainland via an undersea cable; On-island fossil fuel generation, including diesel, propane, and/or liquified natural gas (LNG); On-island renewable energy (RE) technologies, including solar photovoltaics (PV), wind turbines, and wave energy devices; BESS to support the above generation technologies; Initial analysis of the potential impacts of implementing energy efficiency measures. Results indicate strong techno-economic potential for a mix of on-island diesel and/or propane generators, solar PV, BESS, and energy efficiency measures to help SCE and Catalina achieve their goals compliant with California’s emissions and clean energy standards while minimizing electricity life cycle costs (LCC) over the 30-year analysis period. This document summarizes the considerations and findings of Phases I and II, focusing on high-level takeaways from Phase I and more detailed results from Phase II, and discusses a potential path forward for Phase III.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Measuring aerosol collection efficiency for the Bladewerx “New Speclon TM 5” and the older “Speclon TM 5” filter

Bladewerx TM LLC (Rio Rancho, NM) manufactures instrumentation, neutron shielding and activation foils for the radiation protection industry. Specializing in portable alpha/beta air monitors and sample counters, Bladewerx is the source of Speclon TM PTFE filter media that they recommend for high-resolution alpha spectroscopy. Los Alamos National Laboratory (LANL) utilizes Speclon TM filter material in CAM (Continuous Air Monitor) samplers for workplace air monitoring. The LANL Aerosol Engineering Facility received air filter material from Bladewerx, referred to as “New Speclon 5” in this document, in order to distinguish from filter material that was previously received (referred to as “Speclon 5” in this document). In this document, the aerosol collection efficiency and airflow resistance (pressure drop) were measured for the New Speclon 5 filter material.

61 RADIATION PROTECTION AND DOSIMETRY↗

Deep Underground Neutrino Experiment (DUNE), Far Detector Technical Design Report (Volume II: DUNE Physics)

The Physics volume of the DUNE far detector (FD) Technical Design Report (TDR) presents the science program of DUNE. Within, we describe the array of identified scientific opportunities and key goals. Crucially, we also report our best current understanding of the capability of DUNE to realize these goals, along with the detailed arguments and investigations on which this understanding is based. In the context of the complete set of DUNE TDR volumes, a central role for this volume is to document the scientific basis underlying the conception and design of the LBNF/DUNE experimental configurations. As a result, it is the description of DUNE’s experimental capabilities that constitutes the bulk of the document. Key linkages between requirements for successful execution of the physics program and primary specifications of the experimental configurations are drawn and summarized. This document also serves a wider purpose as a statement on the scientific potential of DUNE as a central component within a global program of frontier theoretical and experimental particle physics research. Thus, the presentation also aims to serve as a resource for the particle physics community at large. In this chapter, the scientific goals, the methodologies utilized to obtain sensitivity projections, the corresponding results for selected elements of the scientific program, and the demands placed on the experiment design and performance are presented in summary form. Together with the two chapters that follow, this summary establishes the context for the detailed descriptions specific to each area of research that comprise the remaining chapters.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Risk-Informed and Performance-Based Evaluation of Defense-in-Depth Adequacy

This document supports the work contained in Nuclear Energy Institute (NEI) 18-04 “Risk-Informed Performance-Based Technology Inclusive Guidance for Advanced Reactor Licensing Basis Development” Revision 0. NEI 18-04 presents a modern, technology-inclusive, risk-informed, and performance-based (TI-RIPB) process for selection of Licensing Basis Events (LBEs); safety classification of structures, systems, and components (SSCs) and associated risk-informed special treatments; and determination of defense-in-depth (DID) adequacy for non-LWRs. The NEI guidance document provides one acceptable means for addressing the aforementioned topics as part of demonstrating a specific design provides reasonable assurance of adequate radiological protection. This report provides the framework and associated methodology guidelines and discussion for establishing, then evaluating, confirming, and documenting the adequacy of defense-in-depth (DID) for advanced non-light-water reactor technologies. It was developed as part of the Licensing Modernization Project led by Southern Company and cost-shared by the United States Department of Energy and has benefited from considerable NRC formal reviews and public workshops. The methodology converts the DID philosophy into a structured process that is implementable, embraces existing United States and international definitions and philosophies of DID that set the foundation for the process. It builds on the DID framework developed in the Department of Energy Next Generation Nuclear Plant Project and earlier works on this subject. The approach to establishing DID adequacy involves the incorporation of DID attributes into the plant capabilities and programmatic elements of DID. The integrated evaluation of DID adequacy includes both quantitative elements to incorporate risk-informed and performance-based (RIPB) considerations and qualitative elements that address uncertainties and limitations in the quantitative models and supporting data. Demonstration of DID adequacy ensures that there are multiple layers of defense for risk-significant challenges to the design and that the plant capabilities and programs that support each layer are provided in a manner that minimizes dependencies among these layers. The focus of this report is assurance of DID adequacy with respect to protection of the public from radiological exposures resulting from accidental releases of radioactive material. While other hazards are not specifically addressed, this methodology is expected to be beneficial for determining DID adequacy for them as well. Risk-informed evaluation of DID considers the integrated performance of all plant SSCs and associated programs to manage daily operational activities, transients, and accidents, including the evaluation of strategies for accident prevention and mitigation. The RIPB LBE scenario methodology used in this evaluation defines the challenges to the plant safety features included in the plant design basis and beyond, and the scope of all deterministic and probabilistic safety evaluations. By examining event sequences across the whole spectrum of LBEs, a systematic assessment of DID can be accomplished.

42 ENGINEERING↗

Transition Core Planning and Safety Analyses in Support of LEU Fuel Conversion of the University of Missouri Research Reactor (MURR)

The University of Missouri Research Reactor (MURR®) is one of six U.S. High Performance Research Reactors (USHPRR), including one critical facility, that is working with the National Nuclear Security Administration (NNSA) Office of Material Management and Minimization (M3) Reactor Conversion Program to convert from highly enriched uranium (HEU) to low-enriched uranium (LEU) fuel. The M3 Reactor Conversion USHPRR Project objectives include the development of LEU fuel element designs that will ensure safe reactor operations and to maintain the existing experimental performance of each facility. The work is being conducted through many inter-related activities being completed by four Project Pillars: Fuel Qualification (FQ), Fuel Fabrication (FF), Reactor Conversion (RC), and Cross Cutting (CC). A new type of LEU fuel based on an alloy of uranium-10 wt% molybdenum (U-10Mo) is expected to allow the conversion of those USHPRR, like MURR, requiring higher density fuels. The very-high-density LEU U-10Mo monolithic fuel is currently undergoing irradiation testing and post-irradiation examination under a planned and documented fuel qualification effort. The FQ Pillar will document fuel property and fuel performance data and qualify the fuel for use in these reactors. The FF Pillar is fabricating fuel for ongoing and future irradiation tests, as well as conducting fabrication demonstrations to validate or update preliminary fabrication assumptions. The FF Pillar is also working to develop and install commercial manufacturing capacity with the U-10Mo monolithic fuel to produce prototypic fuel. Working with the RC Pillar at Argonne, MURR has progressed through a preliminary fuel element design using preliminary data for the proposed monolithic alloy of U-10Mo. Analyses were completed in previous work that found for typical equilibrium operations with the preliminary LEU fuel element design, in conjunction with a power uprate to 12 MW and appropriate changes to the MURR Limiting safety system settings (LSSS), MURR will have adequate margins to safety for steady-state operations and postulated transient accidents and will have experimental performance in key locations that meets or exceeds current operations with HEU fuel. The purpose of this work is to develop a sequence of transition cycles that will enable MURR to transition from operation with the reactor core loaded with fresh LEU fuel elements only to typical equilibrium operations with mixed-burnup cores following conversion while meeting operational requirements on safety and experimental performance. It is expected that the use of fresh LEU fuel at conversion and subsequent low burnup of the LEU fuel elements that will initially be available for use following conversion will result in critical control blade positions that will substantially change the axial power distribution in the core and the neutron flux available in key experimental locations relative to equilibrium LEU operations. Given the constraints of MURR safety margins, operational practices, and production and research, a novel method has been developed to identify a transition sequence that minimizes the time MURR operates atypically compared to the current prototypic cycles using HEU fuel. The proposed transition sequence moves quickly to the same sort of equilibrium cycles for the LEU fuel that have already been evaluated in documented preliminary safety analyses. Although shifting the neutron flux peak to the lower half of the core during initial cycles with LEU at 12 MW reduces the experiment performance in some key locations relative to current HEU operations at 10 MW, all LEU cores provide an average performance that meets or exceeds that of HEU. An LEU cycle is reached that meets or exceeds the level of experimental performance predicted for current HEU and equilibrium LEU operations in more than 450 key locations identified by a reactor specialist at MURR by the 23rd cycle following conversion and that afterwards will enable MURR to consistently meet its experimental performance requirements. The proposed transition sequence only requires the fabrication of 34 fresh LEU elements in the first year of operation and does not exceed the anticipated availability of fresh elements that can be produced by the fuel fabricator. By the third year after conversion, 22 fresh LEU elements will be required each year, which is the same as expected for equilibrium LEU operations and the same as current operations with HEU fuel. The proposed transition sequence thus combines a relatively short time period before equilibrium burnup is achieved, a temporary increase of fuel elements needed annually relative to typical operations that are within the production capabilities of the fuel fabricator, and demonstrates comparable experimental performance of the LEU cores relative to current HEU operations. Further measures may be taken to reduce any initial experimental performance penalty even further, where possible, by repositioning certain experiments to leverage the increased performance in the lower axial experimental positions in the initial cycles following conversion or leaving the experiments in the irradiation facilities longer in order to achieve the required neutron fluence. This analysis may require refinement depending on the experimental facilities in use at the time of conversion. Nonetheless, the results presented here, including the experimental performance, core burnup, and critical control blade positions throughout the transition cycles, show that the proposed transition cycle fuel management patterns are consistent with what is expected and desired for MURR operation with LEU U-10Mo fuel. Detailed core power distributions from the neutronics models were also used to evaluate safety margins during steady-state operations for the selected transition cycles and the equilibrium LEU core. It is shown that there are adequate safety margins for both steady-state operations and postulated accident scenarios. For the steady-state operations with the preliminary LEU fuel element design the analysis predicts at least 2.49 MW margin to the onset of flow instability at the LSSS power of 15 MW. Considering the LSSS power is 125% of full license power, the margin to OFI is sufficient. In addition, the critical heat flux ratio at LSSS power is well above the requirement of CHFR > 2.0 from NUREG-1537 for all considered cases. For postulated transient accidents, the minimum margin to the fuel temperature safety limit is at least 109 °C. In summary, the proposed sequence of core loadings for MURR operations following conversion to LEU fuel and a power uprate to 12 MW provides sufficient safety margins for both steady-state operations and postulated transient accidents during a proposed sequence of transition cycles to equilibrium operations. Analysis has shown that there are some local experimental performance penalties during the initial cycles. Although there are local shifts in the experimental performance, on average all LEU cores at 12 MW have equal or higher performance than HEU at 10 MW. Temporary adjustments are being planned that will produce suitable experimental performance during these cycles. The results indicate that for the equilibrium LEU core the experimental performance exceeds that of current HEU operations in all key locations while also demonstrating sufficient safety margins.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Model Package Report: Central Plateau Vadose Zone Models

This model package report describes concisely the modeling objectives, conceptualization, implementation, uncertainty and sensitivity, configuration control, limitations, data needs, and recommendations for improvement of the Central Plateau Vadose Zone Models. This collection of models is developed to meet the vadose zone simulation needs of the Hanford Site Composite Analysis (CA), the Hanford Site Cumulative Impact Evaluation (CIE), and are expected to find other applications in Hanford Site remedial cleanup decision-making processes. This model package report describes and documents the development of the models themselves to fulfill technical approaches defined for the CA and the CIE. This report does not document any specific calculation using these models: instead, applications of individual vadose models to perform specific calculations will be documented in environmental calculation files, including inputs and results, as appropriate. Configuration management for the Central Plateau Vadose Zone Models is managed through assignment of unique sequential numerical version numbers and archival of the models in the Environmental Modeling Management Archive.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SIERRA Multimechanics Module: Aria Verification Manual - Version 4.58

Presented in this document is a portion of the tests that exist in the Sierra Thermal/Fluids verification test suite. Each of these tests is run nightly with the Sierra/TF code suite and the results of the test checked under mesh refinement against the correct analytic result. For each of the tests presented in this document the test setup, derivation of the analytic solution, and comparison of the code results to the analytic solution is provided. This document can be used to confirm that a given code capability is verified or referenced as a compilation of example problems.

97 MATHEMATICS AND COMPUTING↗

The Integrated Basin-Scale Opportunity Assessment Initiative, FY 2011 Year-End Report: Deschutes Basin Preliminary Hydropower Opportunity Assessment. Draft Report

This document reports on first-year progress of the Integrated Basin-Scale Opportunity Assessment Initiative, an action item of the March 24, 2010 Sustainable Hydropower Memorandum of Understanding (MOU) between the U.S. Department of Energy (DOE), U.S. Army Corps of Engineers, and the Bureau of Reclamation. As envisioned in the MOU, an integrated basin-scale opportunity assessment would take a system-scale approach to identifying opportunities and actions to both increase hydropower and enhance environmental conditions within the context of existing water uses in river basins of the United States. Assessments are intended to be collaborative processes that work with stakeholders at the basin scale to identify hydropower and environmental opportunity scenarios. Opportunity scenarios are analyzed, again in collaboration with stakeholders, through modeling and visualization software to assess tradeoffs and system-scale effects. Opportunity assessments are not intended to produce decisional documents or substitute for basin planning processes; assessments are instead intended to provide tools, information, and a forum for catalyzing conversation about scenarios where environmental and hydropower gains can both be realized within a given basin. In fiscal year 2011, DOE’s Energy Efficiency and Renewable Energy Water Power Team provided funding to Pacific Northwest National Laboratory, Oak Ridge National Laboratory, and Argonne National Laboratory to develop an assessment approach and toolbox, and carry out an initial pilot opportunity assessment. In February 2011, the Upper Deschutes/Crooked River Basin in central Oregon was selected as the pilot basin. Through establishment of stakeholder working groups, a technical site visit, a series of interviews, a stakeholder workshop, and identification of existing tools and data sets, initial opportunities have been identified and analytical tools selected to explore opportunity scenarios. This report documents project progress to date, describes the opportunity assessment approach, and establishes an agenda for analysis of stakeholder-identified opportunities in fiscal year 2012. Findings presented here are preliminary; the final Deschutes Basin pilot study report will be submitted at the end of fiscal year 2012.

13 HYDRO ENERGY↗

LANL Waste Management

All waste at Los Alamos National Laboratory (LANL or the Laboratory) is subject to one or more types of regulations and must be managed properly. This document describes LANL requirements for waste generated and managed by waste generators and Treatment and Storage Facilities (TSFs) to ensure compliance with legal mandates and Laboratory requirements as necessary to protect human health, safety, and the environment. This document has been revised as part of a process in which the Laboratory systematically plans, documents, executes, and evaluates its management of regulated waste streams.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

U.S. Industrial and Commercial Motor System Market Assessment Report Volume 1: Characteristics of the Installed Base

Motor systems are an integral part of our industrial and commercial facilities. They provide the motive force behind the fans, pumps, compressors, chillers, and conveyors in these facilities. Given their centrality to any facility’s operations, they are a critical energy end use to understand, particularly when developing technologies and policies to meet sustainability goals, improve productivity, and enhance resilience. In the late 1990s, the U.S. Department of Energy (DOE) conducted two seminal studies to better understand the installed stock and energy savings opportunities of industrial and commercial motor systems. In the industrial sector, The United States Industrial Electric Motor Systems Market Opportunities Assessment used primary data collected through onsite assessments and led to a greater understanding of the installed base of motor systems, their characteristics, and the opportunities for energy savings (U.S. Department of Energy, 2002). Notable findings included the following: Industrial motor systems consumed 679 billion kilowatt-hours (kWh) in 1994, representing 23 percent of U.S. electricity consumption. Cost-effective energy efficiency measures could result in 62-104 billion kWh of energy savings annually. Sixty-two percent of the energy savings potential was from fan, pump, and compressor end use equipment. Nearly half of motor system electricity consumption was attributable to approximately 3,500 facilities, or 1.5 percent of U.S. manufacturing facilities. Opportunities for Energy Savings in the Residential and Commercial Sectors with High Efficiency Electric Motors provided an evaluation of the installed stock of motor driven equipment in U.S. commercial and residential buildings and opportunities for utilization of high efficiency motors and variable speed technologies (Arthur D. Little, 1999). Notable findings included the following: Commercial motor systems consumed 343 billion kWh in 1995, with refrigeration and space conditioning constituting 93 percent of the total. Cost-effective energy efficiency measures could result in 51 billion kWh of energy savings annually. Due in no small part to these seminal studies, motor system technologies and usage characteristics have changed drastically since the late 1990s. Greater awareness of cost-effective strategies for reducing motor system electricity consumption have been developed and deployed. This includes several software tools, literature, and utility and government programs promoting energy efficiency improvements in motor driven systems. Additionally, several rounds of energy efficiency standards have been enacted, resulting in improved installed motor efficiency. The cost of variable speed drives has dropped substantially, and combined with utility rebate programs, has led to their greater adoption. Further, since these results were published, the U.S. manufacturing sector has undergone a massive transformation. Due to global competition, some sectors have relocated operations overseas. Others have brought operations onshore to avail low cost and abundant natural gas. Additionally, automation and robotics have pervaded the entire sector. Consequently, these two reports likely do not represent the current state of motor driven systems in U.S. industrial and commercial facilities. As cited in recent studies, the lack of current information on motor system electricity consumption and use characteristics limits the ability to conduct analysis on energy savings potential, develop technologies to address energy and productivity gaps, and develop programs to promote energy efficiency practices and technologies for motor systems (International Energy Agency, 2007; UNIDO, 2010; McKane and Hasanbeigi, 2011; Waide and Brunner, 2011). Specifically, the lack of information affects a range of stakeholders: Governments must rely on outdated information when setting research agendas, developing policies, and designing energy efficiency programs and offerings. Utilities and energy efficiency programs cannot identify the current market needs or potential impact when designing rebate and energy efficiency programs. Electric grid planners cannot identify motor system usage characteristics when developing plans to support the resilience of the electric grid. Manufacturers of motors, motor driven equipment, and drives are hampered when developing technologies to meet the needs of their market. Motor system end users are limited in their ability to identify energy saving opportunities within their own facilities because they do not have reliable benchmark information. In response to the lack of current information and analysis on industrial and commercial motor systems, the DOE initiated an update to these two studies. Launched in 2016 and led by Lawrence Berkeley National Laboratory (LBNL), the Motor System Market Assessment (MSMA) provides an updated, more comprehensive assessment of the installed stock of motor systems in both the industrial and commercial sectors, a review of the supply chains supporting motor and drives in the U.S., and the performance improvement opportunity available from using best available technologies and maintenance and operation practices. The outcomes of the MSMA are documented in three U.S. Industrial and Commercial Motor System Market Assessment reports, with this report being the first listed: 1. Volume 1: Characteristics of the Installed Base (this report) documents the findings on the installed base of motor systems in the U.S. industrial and commercial sectors. Quantification of energy savings potential is not documented in this report but in Volume 3. 2. Volume 2: Motors and Drives Supply Chain Review reviews the state of supply chains for motors and drives installed in U.S. industrial and commercial facilities, focusing on advanced motor and drive technologies and their constituent materials. 3. Volume 3: Energy Savings Opportunity analyzes the energy performance improvement opportunity for the installed base of U.S. industrial and commercial motor systems. This report has been prepared as a reference for motor system stakeholders. It provides factual information as could be best determined by the assessment results and avoids speculating on any findings.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Sierra/SolidMechanics 4.50. Capabilities in Development

This document is a user's guide for capabilities that are not considered mature but are available in Sierra/SolidMechanics (Sierra/SM) for early adopters. The determination of maturity of a capability is determined by many aspects: having regression and verification level testing, documentation of functionality and syntax, and usability are such considerations. Capabilities in this document are lacking in one or many of these aspects.

42 ENGINEERING↗

Existing Ocean Energy Performance Metrics

This document summarizes existing Marine and Hydrokinetic (MHK) performance metrics known to the United States Department of Energy and national laboratories. This document was updated based on feedback from the MHK Energy community, however, this summary still may not be exhaustive. There are a wide variety of needs and uses for metrics. All stakeholders, such as developers, funding agencies, investors, and researchers, have a need for metrics and their many uses. It is evident that the sector will benefit from clear techno economic performance metrics to guide development towards success. There are international efforts underway to bring the community together to (1) understand what metrics/approaches are being used currently and (2) reach a global framework on the approach to the measurement of success. This document serves to list existing metrics known to the U.S. at the present, and is not meant to represent international efforts or consensus.

16 TIDAL AND WAVE POWER↗

Sierra/SolidMechanics 4.52 Verification Tests Manual

Presented in this document is a small portion of the tests that exist in the Sierra/SolidMechanics (Sierra/SM) verification test suite. Most of these tests are run nightly with the Sierra/SM code suite, and the results of the test are checked versus the correct analytical result. For each of the tests presented in this document, the test setup, a description of the analytic solution, and comparison of the Sierra/SM code results to the analytic solution is provided. Mesh convergence is also checked on a nightly basis for several of these tests. This document can be used to confirm that a given code capability is verified or referenced as a compilation of example problems. Additional example problems are provided in the Sierra/SM Example Problems Manual. Note, many other verification tests exist in the Sierra/SM test suite, but have not yet been included in this manual.

97 MATHEMATICS AND COMPUTING↗

SIERRA Multimechanics Module: Aria Verification Manual - Version 4.52

Presented in this document is a portion of the tests that exist in the Sierra Thermal/Fluids verification test suite. Each of these tests is run nightly with the Sierra/TF code suite and the results of the test checked under mesh refinement against the correct analytic result. For each of the tests presented in this document the test setup, derivation of the analytic solution, and comparison of the code results to the analytic solution is provided. This document can be used to confirm that a given code capability is verified or referenced as a compilation of example problems.

42 ENGINEERING↗

V&V Integrated Program Planning for Wind Plant Performance

The Department of Energy Atmosphere to Electrons (A2e) initiative has undertaken an experimental planning process for a validation directed program and an experimental planning process directed at improving simulations of wind plant performance. The validation process has been divided into two main sections: Integrated Program Planning, and Integrated Experiment and Model Planning and Execution. This document covers the Integrated Program Planning process in detail as it has been applied to the validation and assessment of models of various fidelity to predict wind plant performance. Three main parts of this process are presented in this document: the Phenomenon Identification and Ranking Table, the Validation Hierarchy, and the Prioritized Phenomenon and Experiment Mapping table. The document concludes with a description of validation program process next steps, which includes the planning and execution of integrated experiment and model campaigns

17 WIND ENERGY↗

Preliminary Build Guide for the Geophysical Monitoring Systems Common Source Code. 2019 Release

The purpose of this document to provide an advance copy of a "Build Guide" for a Generic Runnable System (GRS) of the Geophysical Monitoring Systems' (GMS) common source code. This guide includes a list of software dependencies and licenses, hardware specifications, and related instructions for how to build the system from the source code. The document is written for individuals who are experienced as administrators of Linux systems. The intention is to support preparation activities prior to the open source release so that dependencies may be in place to build and run the system. This document will be updated and provided with the open source release on GitHub, accompanied by a "Run Guide" for the system. An additional "Configuration Guide" will also be provided after the open source release so that users may explore system configuration options.

58 GEOSCIENCES↗

MELCOR 2.2 Benchmarks of Peach Bottom NUREG/CR 7155 Uncertainty Analysis

The U.S. Nuclear Regulatory Commission (NRC) performed a first-of-a-kind uncertainty analysis (UA) of the accident progression, radiological releases, and offsite consequences for the State-of- the-Art Reactor Consequence Analyses (SOARCA) of an unmitigated long-term station blackout (LTSBO) severe accident scenario at the Peach Bottom Atomic Power Station. The objective of the UA was to evaluate the robustness of the SOARCA deterministic "best estimate results and conclusions documented in NUREG-1935, and to develop insight into the overall sensitivity of the SOARCA results to uncertainty in key modeling inputs. The study was completed in 2015 and documented in NUREG/CR-7155. Since 2015, two other SOARCA UAs were completed for two pressurized water reactor (PWR) plants. The PWR UAs incrementally updated the approach and methodology, including using the latest release of the MELCOR 2.2 computer code. There were also advances made in the state-of-the-art modeling related to NRC efforts using the Peach Bottom model in NUREG-2206, which provided the technical basis for the containment protection and release reduction rulemaking for boiling water reactors with Mark I and Mark II containments. This report documents the input model changes from the NUREG/CR-7155 study and performs a small number of reference calculations to assess the changes of the new computer code and the model input updates. The objective of the work is to verify whether the updated Peach Bottom MELCOR model and updated version of MELCOR support the conclusions formed in the Peach Bottom SOARCA UA by performing these representative calculations.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Advanced Energy Approaches for Mixed-Use Developments in the Front Range Urban Corridor

The primary objective of the document is to present example technical approaches and strategies that planners and developers can reference for all-electric mixed-use developments in the Rocky Mountain Front Range urban corridor that are considering advanced energy performance goals such as high levels of energy efficiency and renewable integration. The strategies are tailored toward the vision for a zero energy, all-electric, district thermal system-connected starter district. In this example, on-site solar generation is emphasized as a strategy that can be combined with electrical and thermal energy storage for enhanced community resilience and demand flexibility. Opportunities for utilizing or adapting these strategies include: sharing with vertical developers for potential integration of strategies into vertical design guidelines; incorporation into Owner Project Requirements (OPRs); providing example strategies to design teams as a starting point for design; informing structure of agenda for a building design charrette; comparing building designs to example strategies at various points in the design process to evaluate design progression. While the technical strategies outlined in this document can help inform the development of guidelines for projects in the Front Range urban corridor, this document does not set requirements for any rating, certification, program, or policy.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗