Search NASA⌕ Search

SEARCH · Search NASA

Results for “Generation scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,621 records · Page 90

Using Computer Simulation for Neurolab 2 Mission Planning

This paper presents an overview of the procedure used in the creation of a computer simulation video generated by the Graphics Research and Analysis Facility at NASA/Johnson Space Center. The simulation was preceded by an analysis of anthropometric characteristics of crew members and workspace requirements for 13 experiments to be conducted on Neurolab 2 which is dedicated to neuroscience and behavioral research. Neurolab 2 is being carried out as a partnership among national domestic research institutes and international space agencies. The video is a tour of the Spacelab module as it will be configured for STS-90, scheduled for launch in the spring of 1998, and identifies experiments that can be conducted in parallel during that mission. Therefore, this paper will also address methods for using computer modeling to facilitate the mission planning activity.

Sanders, Betty M.↗

Information Technology and the Autonomous Control of a Mars In-Situ Propellant Production System

With the rapidly increasing performance of information technology, i.e., computer hardware and software systems, as well as networks and communication systems, a new capability is being developed that holds the clear promise of greatly increased exploration capability, along with dramatically reduced design, development, and operating costs. These new intelligent systems technologies, utilizing knowledge-based software and very high performance computer systems, will provide new design and development tools, scheduling mechanisms, and vehicle and system health monitoring capabilities. In addition, specific technologies such as neural nets will provide a degree of machine intelligence and associated autonomy which has previously been unavailable to the mission and spacecraft designer and to the system operator. One of the most promising applications of these new information technologies is to the area of in situ resource utilization. Useful resources such as oxygen, compressed carbon dioxide, water, methane, and buffer gases can be extracted and/or generated from planetary atmospheres, such as the Martian atmosphere. These products, when used for propulsion and life-support needs can provide significant savings in the launch mass and costs for both robotic and crewed missions. In the longer term the utilization of indigenous resources is an enabling technology that is vital to sustaining long duration human presence on Mars. This paper will present the concepts that are currently under investigation and development for mining the Martian atmosphere, such as temperature-swing adsorption, zirconia electrolysis etc., to create propellants and life-support materials. This description will be followed by an analysis of the information technology and control needs for the reliable and autonomous operation of such processing plants in a fault tolerant manner, as well as the approach being taken for the development of the controlling software. Finally, there will be a brief discussion of the verification and validation process so crucial to the implementation of mission-critical software.

Gross, Anthony R.↗

The Successful Implementation of NASA Orbital Debris Requirements for the Retirement of TDRS-1

TDRS-1 was decommissioned on October 28th 2009 following more than 26 years of operation. The Grand Old Dame of the TDRSS constellation wa s launched aboard the maiden voyage of the Space Shuttle Challenger ( STS-6) in April 1983. TDRS-1 survived a malfunction of the Inertial Upper Stage eventually utilizing its own propulsion system to success fully reach its assigned station in geosynchronous orbit. The anomalo us beginning of the TDRS-1 mission was not without lasting consequenc es as the primary reaction control system (A-side) was completely di sabled with an apparent propellant leak and the secondary system (B-s ide) suffered damage to its negative roll thruster rendering the thru ster inoperable. Following decommissioning the challenge to completin g a successful TDRS-1 end-of-mission (EOM) was the implementation of the stringent orbital debris requirements of NPR 8715.6 with a parti ally functioning spacecraft not originally designed to meet those req uirements. The TDRS-1 EOM had three key goals: 1) removal of the spac ecraft from geosynchronous orbit; 2) depletion of the remaining prope llant; and 3) passivation of all other sources of energy storage or generation. The TDRS-1 EOM approach was one of minimizing risks while accomplishing the goals above. The orbit raising portion of EOM was accomplished using deltavelocity operations already proven during pre vious stationchanging maneuvers. The propellant depletion approach wa s necessarily more aggressive as over 20 hours of burn time was requ ired to deplete the remaining fuel. A novel approach utilizing a spin ning, thrusting, passively controlled spacecraft configuration was ut ilized to achieve reasonable burn durations that met schedule constra ints. This nonstandard configuration required careful analysis of ele ctrical, thermal, and communication subsystems. The configuration wa s thoroughly simulated prior to the start of operations and carefully characterized during the initial spin period and first burn. Passiva tion was by definition a unique operation not previously performed wi thin the TDRS 1-7 constellation. Use was made of a TDRS spacecraft si mulator to verify the operational procedure to mitigate risks and pro vide crew training. TDRS-1 orbit raising maneuvers commenced on June 5th 2010 and completed on June 14th with an apogee 370 km and a peri gee 352 km above geosynchronous altitude. 127 kg of propellant were e stimated to be remaining in the tanks at the completion of orbit rais ing. TDRS-1 was placed in its spinning orientation on June 16th and the first fuel depletion burn was performed the following day. A seri es of 10 depletion burns were performed ending on June 26th when both propellant tank pressures experienced dramatic drops. Final passivat ion was performed on June 27 th deactivating electronics, removing t he batteries from the bus and solar arrays, and disabling the space-t o-ground communications equipment. The Second TDRS Ground Terminal (S TGT) continued to open loop track TDRS-1 for several days attempting command reacquisition several times a day. All attempts were unsucce ssful confirming passivation was achieved. The TDRS-1 orbit at passiv ation was an orbital debris compliant 36,319 x 36,128 km in height. W hile differing spacecraft designs may preclude mimicking the exact TD RS-1 EOM approach, the TDRS-1 campaign serves to demonstrate that pr e-NPR 8715.6 designs can be made to meet the requirements resulting i n a reduced orbit debris environment for future missions

Mirczak, Walter↗

Performance Impacts to the NASA Artemis II Trajectory Correction Burn Placement

As NASA embarks to return humans to the lunar vicinity with the upcoming Artemis II mission, the selected free return trajectory taking the crew to the Moon in the Orion spacecraft is impacted by the execution of small trajectory correction burns to ensure the spacecraft stays on course for a successful return to Earth. The placement of these nominally zero translational maneuvers must account for the crew schedule, navigation tracking constraints, spacecraft venting, thermal and communication requirements, and a host of other programmatic factors. Understanding the influence the placement of these periodic burn corrections have on the integrated GN\&C performance can provide valuable insight to mission controllers and trajectory planning processes to untangle the complex trade space considered for both baseline and contingency scenarios. This sensitivity information can also be utilized to facilitate the optimized placement of these burns. This paper utilizes several techniques to systematically generate the performance impacts to the NASA Artemis II trajectory correction burn placement and demonstrate how to derive optimized locations that make the system robust to crew activity, maneuver execution errors, navigation uncertainty, orbit insertion errors, disturbance accelerations, and other system limitations.

GN&C↗

Predicting the Risk of Secondary Lung Malignancies Associated With Whole-Breast Radiation Therapy

Purpose: The risk of secondary lung malignancy (SLM) is a significant concern for women treated with whole-breast radiation therapy after breast-conserving surgery for early-stage breast cancer. In this study, a biologically based secondary malignancy model was used to quantify the risk of secondary lung malignancies (SLMs) associated with several common methods of delivering whole-breast radiation therapy (RT). Methods and Materials: Both supine and prone computed tomography simulations of 15 women with early breast cancer were used to generate standard fractionated and hypofractionated whole-breast RT treatment plans for each patient. Dose-volume histograms (DVHs) of the ipsilateral breast and lung were calculated for each patient on each plan. A model of spontaneous and radiation-induced carcinogenesis was used to determine the relative risks of SLMs for the different treatment techniques. Results: A higher risk of SLMs was predicted for supine breast irradiation when compared with prone breast irradiation for both the standard fractionation and hypofractionation schedules (relative risk [RR] = 2.59, 95% confidence interval (CI) = 2.30-2.88, and RR = 2.68, 95% CI = 2.39-2.98, respectively). No difference in risk of SLMs was noted between standard fractionation and hypofractionation schedules in either the supine position (RR = 1.05, 95% CI = 0.97-1.14) or the prone position (RR = 1.01, 95% CI = 0.88-1.15). Conclusions: Compared with supine whole-breast irradiation, prone breast irradiation is associated with a significantly lower predicted risk of secondary lung malignancy. In this modeling study, fractionation schedule did not have an impact on the risk of SLMs in women treated with whole-breast RT for early breast cancer.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Utility Sector Impacts of Reduced Electricity Demand: Updates to Methodology and Results

This report presents revisions to the methodology for estimating the utility sector impacts associated with electricity demand reductions, first published in our 2014 study. The earlier report described how to calculate utility impact factors based on data from the Energy Information Agency's Annual Energy Outlook (AEO) projections of electricity supply and demand. The 2014 methodology relied on data from the AEO Reference case, and side cases implementing demand-side policies with a substantial impact on total demand. Beginning in 2015, the AEO publication schedule was revised to limit the number of side cases published with each AEO, and no suitable demand-focused side cases have been released since 2014. Hence, this paper presents a generalization of the methodology that allows a uniform approach irrespective of the nature of the side cases published with the AEO. The impact factors we calculate represent coeffcients of variation between a unit reduction to site electricity demand and corresponding supply-side changes, including reductions to electric power generation and primary fuel consumption by fuel type, emissions of criteria pollutants (Hg, NO x and SO 2 ) and greenhouse gases (CO 2 , N 2 O and CH 4 ), and total installed capacity by plant type. The impact factors are time-dependent, and also depend on the demand sector and end use. In this report, we apply the methodology to all AEO publications from 2014-2019, and all scenarios. We quantify the variation in factors across different side cases within each AEO, and across different AEO publications, and compare this to the variation due to changes in methodology.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SCUC-DER Integration Report: Integrating Distributed Energy Resources (DER) Using Advanced Unit Commitment Models and DER Aggregation Methodologies

Distributed energy resources (DERs) are continuing to grow due to regulatory, policy, and market shifts, and it needs to be ensured that small DERs are given a level playing field with traditional resources. Legacy market processes such as unit-commitment problems were designed for a power grid consisting largely of centralized power plants. In contrast, DERs consist of many small devices with distinct operating characteristics that may or may not be connected at the transmission interconnection points, limiting their visibility to the independent system operators (ISOs) who operate wholesale electricity markets. This report details the development and initial results from a simulation platform that integrates state-of-the-art security-constrained unit commitment software, detailed feeder models, and a DER aggregator model to quantify potential DER integration issues. Quantitative results to date illustrate potential infeasible scheduling solutions from SCUC when the DERA includes aggregations of energy-limited energy storage resources. Likewise, if aggregations are not penalized for dispatch deviations, they may have incentives to deviate from the SCUC-determined resource schedules. Assumptions about the amount of aggregated demand response resources (DRRs) and the ability of DERAs to follow profit incentives have an important impact – DRRs have significant flexibility and can typically feasibly meet their SCUC schedule, but on the other hand, their profit incentives can cause unscheduled increases in load before and after DRR dispatch. Computation time results on the SCUC solver and simulation platform only show a modest increase in SCUC solution time as the number of DERAs is increased, but results to date only reflect the RTS-GMLC test system; results may show more significant solver slowdown in larger transmission systems. The largest contribution to simulation time is attributed to the DERA offer generation method, which is suggested for future improvements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Conceptual Evaluation for the Installation of Treatment Capability for Mixed Low Level Waste at the Nevada National Security Site

National Security Technologies, LLC, initiated an evaluation of treatment technologies that they would manage and operate as part of the mixed low-level waste (MLLW) disposal facilities at the Nevada National Security Site (NNSS). The NNSS Disposal Facility has been receiving radioactive waste from the U.S. Department of Energy (DOE) complex since the 1960s, and since 2005 the NNSS Disposal Facility has been receiving radioactive and MLLW for disposal only. In accordance with the Resource Conservation and Recovery Act (RCRA), all mixed waste must meet land disposal restrictions (LDRs) prior to disposal. Compliance with LDRs is attained through treatment of the waste to mitigate the characteristics of the listed waste hazard. Presently, most generators utilize commercial capacity for waste treatment prior to shipment to the NNSS Disposal Facility. The objectives of this evaluation are to provide a conceptual study of waste treatment needs (i.e., demand), identify potential waste treatment technologies to meet demand, and analyze implementation considerations for initiating MLLW treatment capacity at the NNSS Disposal Facility. A review of DOE complex waste generation forecast data indicates that current and future Departmental demand for mixed waste treatment capacity will remain steady and strong. Analysis and screening of over 30 treatment technologies narrowed the field of treatment technologies to four: • Macroencapsulation • Stabilization/microencapsulation • Sort and segregation • Bench-scale mercury amalgamation The analysis of treatment technologies also considered existing permits, current the NNSS Disposal Facility infrastructure such as utilities and procedures, and past experiences such as green-light and red-light lessons learned. A schedule duration estimate has been developed for permitting, design, and construction of onsite treatment capability at the NNSS Disposal Facility. Treatment capability can be ready in 20 months.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sampling Low-Level Waste - Building a Program - 16101

Low level radioactive waste is routinely sampled and analyzed to demonstrate compliance with Title 10 Code of Federal Regulations Part 61. The sample results are frequently used to create scaling factors to relate the activity of hard to detect (HDT) radionuclides to gamma emitting activity if there is a correlation between the key and scaled radionuclide pair. The activity of gamma emitters can be used with these scaling factors to calculate activity of the low level waste generated in the plant. Another method is to use the sample results directly and scale the total activity to the volume or weight of the waste in the container. Either method assumes that the sample results are representative of the total waste in the container. This requires that the waste streams be accurately defined and that the samples contain radionuclides at ratios that are representative of the bulk waste. This is not always the case and deviations between the sample results and the actual radionuclide concentrations in the waste can lead to miss-classification of the waste resulting in regulatory non-compliance, increased waste disposal costs or both. A deliberate sampling methodology that considers the context of the waste generation and the inherent limitations in practical sampling methodologies will enhance the licensee's ability to demonstrate the analytical results from the sample are representative and defendable. A good sampling program starts with the establishment of waste streams that are consistent with both production mechanisms and plant systems. Once waste streams have been established, data quality objectives can be determined and then the methods for obtaining an appropriate sample can be developed along with the identification of sample points and sample schedules. Sometimes it may not be practical or even possible to obtain a truly representative sample in which case the results from the measurement of the sample must be evaluated within the context of the expected values and the factors inhibiting the collection of a truly representative sample. This paper will explore objectives of a sampling program in relation to the regulations and identify methods that can be used to obtain and evaluate sample data that can be defended as 'representative'. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NTP Demonstration Vehicles and Mission Concepts for Generation 1

Nuclear thermal propulsion (NTP) maintains continued interest in support of NASA’s goal to produce a human rated spacecraft for Mars exploration. The NASA/DARPA DRACO effort aims to demonstrate the first nuclear thermal rocket through a flight in 2027. This paper considers the option of a follow-on in-space demonstration supported by a more extensive pre-flight ground test campaign. A concept of operations to accomplish the objectives is outlined and figures of merit for selection of a spacecraft concept are defined. Conceptual designs of various nuclear thermal propulsion demonstration vehicles are presented, spanning a wide trade space. Each concept differently balances performance capability and extensibility to operational missions with schedule, risk, cost of the ground and flight demonstration. Key attributes of notable concepts are provided, with these demonstrating the degree to which each concept can accomplish the objectives considered.

NTP↗

A Framework to Analyze the Requirements of a Multiport Megawatt-Level Charging Station for Heavy-Duty Electric Vehicles

Widespread adoption of heavy-duty (HD) electric vehicles (EVs) will soon necessitate the use of megawatt (MW)-scale charging stations to charge high-capacity HD EV battery packs. Such a station design needs to anticipate possible station traffic, average and peak power demand, and charging/wait time targets to improve throughput and maximize revenue-generating operations. High-power direct current charging is an attractive candidate for MW-scale charging stations at the time of this study, but there are no precedents for such a station design for HD vehicles. We present a modeling and data analysis framework to elucidate the dependencies of a MW-scale station operation on vehicle traffic data and station design parameters and how that impacts vehicle electrification. This framework integrates an agent-based charging station model with vehicle schedules obtained through real-world vehicle telemetry data analysis to explore the station design and operation space. A case study applies this framework to a Class 8 vehicle telemetry dataset and uses Monte Carlo simulations to explore various design considerations for MW-scale charging stations and EV battery technologies. The results show a direct correlation between optimal charging station placement and major traffic corridors such as cities with ports, e.g., Los Angeles and Oakland. Corresponding parametric sweeps reveal that while good quality of service can be achieved with a mix of 1.2-megawatt and 100-kilowatt chargers, the resultant fast charging time of 35–40 min will need higher charging power to reach parity with refueling times.

33 ADVANCED PROPULSION SYSTEMS↗

Ground data systems resource allocation process

The Ground Data Systems Resource Allocation Process at the Jet Propulsion Laboratory provides medium- and long-range planning for the use of Deep Space Network and Mission Control and Computing Center resources in support of NASA's deep space missions and Earth-based science. Resources consist of radio antenna complexes and associated data processing and control computer networks. A semi-automated system was developed that allows operations personnel to interactively generate, edit, and revise allocation plans spanning periods of up to ten years (as opposed to only two or three weeks under the manual system) based on the relative merit of mission events. It also enhances scientific data return. A software system known as the Resource Allocation and Planning Helper (RALPH) merges the conventional methods of operations research, rule-based knowledge engineering, and advanced data base structures. RALPH employs a generic, highly modular architecture capable of solving a wide variety of scheduling and resource sequencing problems. The rule-based RALPH system has saved significant labor in resource allocation. Its successful use affirms the importance of establishing and applying event priorities based on scientific merit, and the benefit of continuity in planning provided by knowledge-based engineering. The RALPH system exhibits a strong potential for minimizing development cycles of resource and payload planning systems throughout NASA and the private sector.

Berner, Carol A.↗

Design of P-3 Nadir Port

This project details the design and analysis of a structure to replace the interface of the P-3B nadir port with an optimized interface for science installations. A new nadir port plug has been designed to replace the OEM (Original Equipment Manufacturer) plug (Lockheed PN 910169) currently used in Nadir ports 1 and 2 on the NASA P-3B aircraft. The plug consists of a milled frame that can be outfitted with customizable flat plates to meet a broad range of science needs. The frame slides into place using the existing P-3B rail system using a lever and tie-rod assembly. The seal interface will contact the Fuselage skin of the aircraft and consists of a bulb E-seal that is riveted around the perimeter of the frame. The flat plate (20 inches x 31 inches) provides a large profile that can be outfitted based on science mission goals and requirements to attach multiple instruments. This is a significant increase to the aircraft capability. Previously, the OEM plug had to be modified to hold very small plates, windows, or instruments limiting the use of the ports.There were several challenges for this project that included a constrained schedule, lack of historical references, and reverse engineering. The unusually tight schedule for design, manufacture, and install limited potential approaches. In addition, design of a new interface to replace the existing plug, on an aircraft designed in the 1960's by Lockheed for the Navy with little to no documentation, required substantial reverse engineering. In order to accomplish this, a suitable method to determine interface requirements with the aircraft had to be solved. After several iterations, the solution was to implement laser scanning techniques to scan the aircraft and the OEM plug and generate a 3D model to capture the design envelope. The structure is designed to maintain a positive margin of safety when subjected to the inertial, pressure, and aerodynamic load requirements for an external installation on the P-3B, as described in the Wallops' P-3B Design Requirements 548-RQMT-0001 Rev. A . A finite element model is created in FEMAP (Finite Element Modeling And Postprocessing) and is run through NX Nastran solver to analyze the structure. After several iterations of analysis, the structure was enveloped to hold 115 pounds evenly distributed on the plate.

Chance, Monica↗

A novel method for co-optimizing battery sizing and charging strategy of battery electric bus fleets: An application to the city of Paris

Battery-electric buses (BEBs) are a promising technology for replacing diesel buses and reducing their environmental burden. However, their charging process can take several hours, depending on the charging technique and strategy, making them susceptible to schedule disruptions. Furthermore, the selection of the charging strategy and battery size can increase the total capital investment and operational expenses of a BEB fleet, which is a major obstacle to its adoption. Therefore, to minimize the total cost of ownership (TCO) and prevent schedule disruptions, it is essential to establish a well-defined approach to determine an appropriate battery size and charging strategy for BEB fleets. This paper presents a method for reducing the TCO of BEB by determining the optimal battery size and charging strategy for each bus while satisfying operating constraints. The method involves a two-step optimization algorithm that uses Dynamic Programming and Genetic Algorithm. Further, the study applies this approach to the bus fleet serving line 21 in Paris and generates the optimal battery sizing, charging strategy, and required charging infrastructure. The results indicate that 100 kWh batteries offer the best trade-off between capital and operational expenditure for the fleet deployment if used with 65–85 kW chargers at bus terminals.

33 ADVANCED PROPULSION SYSTEMS↗

Hierarchical Power Flow Control in Smart Grids: Enhancing Rotor Angle and Frequency Stability with Demand-Side Flexibility

Large-scale integration of renewables in power systems gives rise to new challenges for keeping synchronization and frequency stability in volatile and uncertain power flow states. To ensure the safety of operation, the system must maintain adequate disturbance rejection capability at the time scales of both rotor angle and system frequency dynamics. This calls for flexibility to be exploited on both the generation and demand sides, compensating volatility and ensuring stability at the two separate time scales. This article proposes a hierarchical power flow control architecture that involves both transmission and distribution networks as well as individual buildings to enhance both small-signal rotor angle stability and frequency stability of the transmission network. The proposed architecture consists of a transmission-level optimizer enhancing system damping ratios, a distribution-level controller following transmission commands and providing frequency support, and a building-level scheduler accounting for quality of service and following the distribution-level targets. Furthermore, we validate the feasibility and performance of the whole control architecture through real-time hardware-in-loop tests involving real-world transmission and distribution network models along with real devices at the Stone Edge Farm Microgrid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Component Applications using Metal Additive Manufacturing Techniques and Materials for Rocket Propulsion

The NASA Marshall Space Flight Center (MSFC) has been involved with various forms of metallic additive manufacturing for use in liquid rocket engine component design, development, and testing since 2010. These AM techniques have been demonstrated to significantly reduce hardware cost, shorten fabrication schedules, increase reliability by reducing the number of joints, and improve hardware performance by allowing fabrication of designs not feasible by conventional means. The focus at the NASA MSFC for these metal additive manufacturing techniques include laser powder-bed fusion (L-PBF), blown powder directed energy deposition (DED) and arc-based deposition. A variety of components have been evaluated and tested including thrust chamber injectors, injector components such as faceplates, regeneratively-cooled combustion chambers, regeneratively-cooled nozzles, gas generator and preburner hardware, and augmented spark igniters. To support these component applications in harsh environments, NASA has advanced a variety of “standard” additive manufacturing alloys such as those in the superalloy-family and also evolved new alloys including GRCop-84, GRCop-42, NASA HR-1, and JBK-75. The purpose of this presentation is to discuss the various programs at the NASA MSFC using AM to develop, fabricate, and test combustion devices hardware and the evolution of the new additive alloys. Additional information will be provided on the development of multi-metallic additive manufacturing, post-processing of AM techniques including surface enhancements (polishing) techniques, material and process characterization, future development programs, and dissemination of data to industry partners.

Additive Manufacturing↗

Parallel Asynchronous Distributed-Memory Maximal Independent Set Algorithm with Work Ordering

The maximal independent set (MIS) graph problem arises in many applications such as computer vision, information theory, molecular biology, and process scheduling. The growing scale of graph data suggests the use of distributed memory hardware as a cost-effective approach to providing necessary compute and memory resources. Existing distributed memory parallel MIS algorithms rely on synchronous communication and use techniques such as subgraph computations. In this paper, we present an asynchronous distributed-memory parallel graph algorithm that relies on a virtual directed acyclic graph (DAG) that is created during the algorithm execution. We introduce two additional algorithms that save computations by ordering generated work. The first algorithm applies ordering globally to reduce computations, and the second algorithm applies ordering locally at the level of threads to minimize the synchronization overhead. We use two different implementations of Luby’s algorithm variants as baseline to compare the performance of the presented algorithms: (1) vertex-centric Luby A and Luby B implementations, and (2) the CombBLAS linear-algebra Luby A implementation. Results show that proposed algorithms outperform both implementations of Luby algorithms, especially in distributed execution. Furthermore, we show that for low-diameter graphs the algorithm that applies global ordering scales better than other algorithms and for high diameter graphs the original asynchronous algorithm and thread-level ordering algorithm show better performance.

maximal independent set (MIS), distributed memory ↗

SIMULATION OF RADIATION BACKGROUNDS ASSOCIATED WITH NUCLEAR DIAGNOSTICS IN THE NATIONAL IGNITION FACILITY

Experiments resulting in a significant neutron yield are scheduled to start in 2010 at the National Ignition Facility (NIF). Several experiments utilizing Tritium-Hydrogen-Deuterium (THD) and Deuterium-Tritium (DT) targets are scheduled as part of the National Ignition Campaign (NIC). A wide range of diagnostics will be used to measure several parameters of implosion such as the core and fuel shape, temperatures and densities, and neutron yield. Accurate evaluations of the neutron and gamma backgrounds are important for several diagnostics, such as the High Energy X-ray Imager (HEXRI) and Neutron-Time-Of-Flight (nTOF). Several sources of neutron and gamma backgrounds will impact the accuracy of the diagnostics measurements. Fusion neutrons generated by fuel burn and secondary neutrons resulting from the fusion neutrons interaction with structures present inside and outside the Target Chamber (TC) contribute to the neutron background. In the meantime, X-rays emitted from the implosion, X-rays resulting from Laser Plasma Interaction (LPI) of NIF beams with the hohlraum, and gamma-rays induced by neutron interactions with different structures inside and outside the TC contribute to the gamma background. A detailed model has been developed of the NIF facility and all structures inside the TC. Several Monte-Carlo simulations were performed to identify the expected signal-to- background ratios at several potential locations for the HEXRI and nTOF diagnostics. Gamma backgrounds associated with HEXRI were significantly reduced by using a tungsten collimator. The collimator resulted in the reduction of the gamma background at the HEXRI scintillator by more than an order of magnitude during the first 40 ns following a THD shot. The nTOF20 detectors inside the Neutron Spectrometry room are exposed to low levels of neutron and gamma background during yield shots.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗