Search NASA⌕ Search

SEARCH · Search NASA

Results for “Integrated Simulation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,621 records · Page 90

The NASA Auralization Framework and Plugin Architecture

NASA has a long history of investigating human response to aircraft flyover noise and in recent years has developed a capability to fully auralize the noise of aircraft during their design. This capability is particularly useful for unconventional designs with noise signatures significantly different from the current fleet. To that end, a flexible software architecture has been developed to facilitate rapid integration of new simulation techniques for noise source synthesis and propagation, and to foster collaboration amongst researchers through a common releasable code base. The NASA Auralization Framework (NAF) is a skeletal framework written in C++ with basic functionalities and a plugin architecture that allows users to mix and match NAF capabilities with their own methods through the development and use of dynamically linked libraries. This paper presents the NAF software architecture and discusses several advanced auralization techniques that have been implemented as plugins to the framework.

Aumann, Aric R.↗

Validation of High Speed Earth Atmospheric Entry Radiative Heating from 9.5 to 15.5 km/s

This paper presents an overview of the analysis and measurements of equilibrium radiation obtained in the NASA Ames Research Center's Electric Arc Shock Tube (EAST) facility as a part of recent testing aimed at reaching shock velocities up to 15.5 km/s. The goal of these experiments was to measure the level of radiation encountered during high speed Earth entry conditions, such as would be relevant for an asteroid, inter-planetary or lunar return mission. These experiments provide the first spectrally and spatially resolved data for high speed Earth entry and cover conditions ranging from 9.5 to 15.5 km/s at 13.3 and 26.6 Pa (0.1 and 0.2 Torr). The present analysis endeavors to provide a validation of shock tube radiation measurements and simulations at high speed conditions. A comprehensive comparison between the spectrally resolved absolute equilibrium radiance measured in EAST and the predictive tools, NEQAIR and HARA, is presented. In order to provide a more accurate representation of the agreement between the experimental and simulation results, the integrated value of radiance has been compared across four spectral regions (VUV, UV/Vis, Vis/NIR and IR) as a function of velocity. Results have generally shown excellent agreement between the two codes and EAST data for the Vis through IR spectral regions, however, discrepancies have been identified in the VUV and parts of the UV spectral regions. As a result of the analysis presented in this paper, an updated parametric uncertainty for high speed radiation in air has been evaluated to be [9.0%, -6.3%]. Furthermore, due to the nature of the radiating environment at these high shock speeds, initial calculations aimed at modeling phenomena that become more significant with increasing shock speed have been performed. These phenomena include analyzing the radiating species emitting ahead of the shock and the increased significance of radiative cooling mechanisms.

Equilibrium↗

The Impact of Harness Impedance on Hall Thruster Discharge Oscillations

Hall thrusters exhibit characteristic discharge voltage and current oscillations during steady-state operation. The lower frequency breathing-mode current oscillations are inherent to each thruster and could impact thruster operation and power processing unit (PPU) design. The design of the discharge output filter, in particular, the output capacitor is important because it supplies the high peak current oscillations that the thruster demands. However, space-rated, high-voltage capacitors are not readily available and can have significant mass and volume. So, it is important for a PPU designer to know what is the minimum amount of capacitance required to operate a thruster. Through Simulation Program with Integrated Circuit Emphasis modeling and electrical measurements on the Hall Effect Rocket with Magnetic Shielding thruster, it was shown that the harness impedance between the power supply and the thruster is the main contributor towards generating voltage ripple at the thruster. Also, increasing the size of the discharge filter capacitor, as previously implemented during thruster tests, does not reduce the voltage oscillations. The electrical characteristics of the electrical harness between the discharge supply and the thruster is crucial to system performance and could have a negative impact on performance, life and operation.

hollow cathodes↗

The Impact of Harness Impedance on Hall Thruster Discharge Oscillations

Hall thrusters exhibit characteristic discharge voltage and current oscillations during steady-state operation. The lower frequency breathing-mode current oscillations are inherent to each thruster and could impact thruster operation and power processing unit (PPU) design. The design of the discharge output filter, in particular, the output capacitor is important because it supplies the high peak current oscillations that the thruster demands. However, space-rated, high-voltage capacitors are not readily available and can have significant mass and volume. So, it is important for a PPU designer to know what is the minimum amount of capacitance required to operate a thruster. Through Simulation Program with Integrated Circuit Emphasis modeling and electrical measurements on the Hall Effect Rocket with Magnetic Shielding thruster, it was shown that the harness impedance between the power supply and the thruster is the main contributor towards generating voltage ripple at the thruster. Also, increasing the size of the discharge filter capacitor, as previously implemented during thruster tests, does not reduce the voltage oscillations. The electrical characteristics of the electrical harness between the discharge supply and the thruster is crucial to system performance and could have a negative impact on performance, life and operation.

ion engines↗

Rapid Trajectory Prediction for a Fixed-Wing UAS in a Uniform Wind Field with Specified Arrival Times

This paper presents an algorithm to rapidly generate trajectories for a kinematic fixed-wing Unmanned Aircraft System (UAS) model flying at constant altitude in a uniform wind field. Arrival times are specified by operators and rapid generation is accomplished via an elliptic integral problem formulation. Simulations are provided that illustrate this approach in the context of NASA's UAS Traffic Management Project.

trajectory↗

Demonstrating Early-Adopter Benefits of Submitting Multiple Trajectory Options for Airlines

A workshop at NASA Ames Research Center was held with airline industry stakeholders to demonstrate the impact of using Trajectory Options Sets (TOSs) during a Collaborative Trajectory Options Program (CTOP) for severe weather operations. The demonstration was conducted using apart-task Human-in-the-Loop (HITL) simulation of the Integrated Demand Management (IDM) concept, which is an air traffic management method that uses CTOP to deliver preconditioned traffic to the Time-Based Flow Management (TBFM) region. The demonstration addressed the following research objectives: first, determine who receives a greater benefit, TOS-participating or TOS-excluded airlines? Second, determine which method of trajectory selection yields a better solution, human/manual selection or automation? Finally, obtain feedback from stakeholders on their impression of the concept and recommendations for future work. The results showed that TOS-participating airlines received greater benefit in terms of total ground delay, ground delay savings, number of reroute options, and additional flight time, compared to TOS-excluded airlines. However, this result was dependent on the situational context, such as the number and location of flights. We found that all airlines benefitted when just a subset of airlines submitted TOS, but the greatest benefit went to the TOS-participating airlines. These benefits to the TOS-participating airlines were diminished as the number of TOS-participants in the system increased. Therefore, there was an “early-adopter” effect that suggested airlines could benefit by becoming the first to equip TOS without causing unfair disadvantages to those who do not equip TOS. In addition, we found that manual selection of trajectory options performed similarly to CTOP, but the CTOP solution was more efficient in terms of number of reroutes, additional flight time, and average ground delay for rerouted flights. Feedback from the stakeholders was solicited, and their overall impressions of the demonstrations were positive. They remarked that CTOP could do a better job than current day solutions, and they thought airlines could benefit from continuing to develop TOS capabilities.

Integrated Demand Management↗

Preparing for Human Missions to Mars: The role of ISS and Artemis as Analogs for Research and Technology Testing

The hazards of spaceflight to the human system are present in in varying degrees on different spaceflight platforms: altered gravity, isolation and confinement, distance from Earth, radiation, and hostile closed environments. A strategic view of the fidelity of hazards experienced on different platforms can shape the testing plans for human research and technology demonstration related to crew health and performance. Working across the international partnership, the International Space Station (ISS) is planning periods of modified operations to improve the fidelity of Mars simulations. To understand transit durations as an independent variable, a series of 1-year, 6-month and 30-45 day missions are being planned on ISS. Standard measurements across ISS missions of different durations, lunar missions and ground analogs offers the opportunity to distinguish different hazards and their effects in the context of the relevance to future mission concepts. The ISS partnership is planning for additional test cases that are aligned with Mars mission plans. (1) Evaluating crew performance capabilities when transitioning to gravity after long durations in microgravity representative of a Mars transit. (2) Simulating crew medical care under Mars-like autonomous operations. (3) Identification and testing of operations under communications delay and autonomy expected for Mars missions and the linked effects on behavioral health and performance of the crew. Artemis missions serve as a valuable analogs for Mars surface operations, with partial gravity and deep space radiation hazards, but with crewmembers that are probably more physically capable than their counterparts would be after a Mars transit. Getting unobtrusive data from early Artemis missions, and knowledge gained from operational experience as Artemis operations develop can improve engineering design, medical requirements and countermeasures, and ultimately ensure mission success on Mars. Linking Mars architectures with the plans and capabilities for ISS and Artemis allows us to plan to most operationally relevant tests of crew health and performance on current spaceflight missions to inform planning for future missions to Mars. By using human spaceflight platforms as well as ground simulation in an integrated way, the international community can improve exploration readiness, develop countermeasures and reduce risks of future human space missions.

International Space Station↗

Flight and Direct to Earth/Space Relay Communication System Architecture for GSFC CubeSat Missions

The CubeSat platform is finding increasing use in space science applications due to its low cost and comparative ease of launch. It is becoming a key scientific discovery tool in low Earth orbit (LEO) and beyond, including geosynchronous equatorial orbit (GEO), the Lagrange Points, Lunar missions, and more. The increasing complexity of these missions and their scientific goals must be supported by equal advancements in communications technology. Higher data rates and greater reliability are required every year. However, the reduced Size, Weight, and Power (SWaP) constraints of CubeSat platforms introduce unique challenges in the area of satellite communications. There is currently a lack of communication equipment tailored specifically to the CubeSat platform. This lack of standardized, tested equipment extends development time and reduces mission confidence. Furthermore, missions utilizing the CubeSat platform are often subject to more difficult design constraints. Antenna placement, size, and pointing are often subordinate to the requirements of the payload instruments and mission goals. Traditional link margin estimation techniques are insufficient in these cases, as they emphasize worst case scenarios. In reality the actual link parameters may vary widely even during a single pass. This presents new challenges in predicting communications performance and scheduling ground station contacts, but also new opportunities for improving efficiency. This paper presents the integration, testing, and validation process for a new software defined radio (SDR) designed for the CubeSat platform in conjunction with Vulcan Wireless, Inc. The SDR is planned for use on 5 upcoming CubeSat missions at NASAs Goddard Space Flight Center (GSFC) including a Geosynchronous Transfer Orbit (GTO) mission and it may also serve as a standard and well-tested option for future missions by enabling a standardized, rapid and low cost CubeSat communication system network integration process. Detailed simulations have been developed to estimate the communication performance of these missions, taking the unique antenna placements and attitude behavior of each satellite into account. These simulations allow a much more accurate analysis of the expected link margin, which varies considerably during each pass for the NASA Space Relay (SR) and Direct to Earth (DTE) network. The modelling procedures are outlined, and the results are used to predict communications performance of the missions.

Space Networks↗

Uncrewed Lunar Surface Operations and Support Activities

This presentation summarizes the contents of the uncrewed lunar surface operations and support activities paper. It outlines the functions, features, and capabilities that support sustained human and robotic surface operations. It summarizes the complexities associated with the development and operation of autonomous systems and discusses a simulation tool for integrated surface operations planning.

Lunar↗

Flight Mechanics Analysis of Low-Earth Orbit Flight Test of an Inflatable Decelerator

The Low-Earth Orbit Flight Test of an Inflatable Decelerator (LOFTID) successfully demonstrated the capability of an inflatable aeroshell. Prior to launch, flight mechanics analysis was conducted to better understand the predicted splashdown point of the re-entry vehicle and ejectable data recorder. Best estimated trajectory separation states were utilized to understand the LOFTID trajectory over the entire 36 minute launch window. Weather forecasting model were integrated into the simulation to improve trajectory prediction accuracy. Automation tools were developed to facilitate the rapid generation of trajectory predictions during operations. The resulting improvements to the flight mechanics modeling and simulation allowed for pre-launch splashdown point to be within 3 nautical miles of the actual splashdown point.

Rohan G Deshmukh↗

Modeling Uprighting of the Orion Crew Module using a Finite Element Method with Wave Coupling and Structural Deformability

The Crew Module Uprighting System (CMUS) for the Orion Crew Module (CM) includes five bags that inflate after splashdown to rotate and upright the CM as necessary. Wave conditions can be severe enough to damage the bags and tethers, which could make the recovery operation hazardous. The CMUS therefore has design limits that ultimately constrain where the CM can land based upon sea conditions. This manuscript describes a full fluid-structure interaction computational model being used for the CMUS. It is a finite element model that uses explicit time integration to directly simulate uprighting, a computational approach usually reserved for short duration, highly transient phenomena and novelly applied here. The goal of this current effort is to determine the feasibility of this approach for CMUS uprighting, and to estimate the loads the CMUS bags experience in different wave conditions. The results from this work will be used to supplement other experimental and computational data in support of NASA’s Artemis program.

John Puryear↗

Progressive Development of Fleet Management Capabilities for a High Density Vertiplex Environment

The High Density Vertiplex (HDV) Sub-Project, as part of NASA’s Advanced Air Mobility (AAM) Project, has been developing a reference automation architecture with a far-term view of scalable, high-density operations in and around vertiport terminal areas. One of the components of that architecture under development has been focused on fleet management capabilities to support the management of multiple AAM operations from a supervisory role of a fleet manager. This capability relies on connectivity and information exchanges with other services for airspace and vertiport management as well as with flight crews responsible for operation execution. This paper will present this capability with a focus on its user interface developments as well as its integration into the simulation and flight testing performed as part of the HDV research roadmap.

AAM↗

Flight Mechanics Analysis of Low-Earth Orbit Flight Test of an Inflatable Decelerator (LOFTID)

The Low-Earth Orbit Flight Test of an Inflatable Decelerator (LOFTID) successfully demonstrated the capability of an inflatable aeroshell. Prior to launch, flight mechanics analysis was conducted to better understand the predicted splashdown point of the re-entry vehicle and ejectable data recorder. Best estimated trajectory separation states were utilized to understand the LOFTID trajectory over the entire 36 minute launch window. Weather forecasting model were integrated into the simulation to improve trajectory prediction accuracy. Automation tools were developed to facilitate the rapid generation of trajectory predictions during operations. The resulting improvements to the flight mechanics modeling and simulation allowed for pre-launch splashdown point to be within 3 nautical miles of the actual splashdown point.

Rohan Deshmukh↗

Progressive Development of Fleet Management Capabilities for a High Density Vertiplex Environment

The High Density Vertiplex (HDV) Sub-Project, as part of NASA’s Advanced Air Mobility (AAM) Project, has been developing a reference automation architecture with a far-term view of scalable, high-density operations in and around vertiport terminal areas. One of the components of that architecture under development has been focused on fleet management capabilities to support the management of multiple AAM operations from a supervisory role of a fleet manager. This capability relies on connectivity and information exchanges with other services for airspace and vertiport management as well as with flight crews responsible for operation execution. This paper will present this capability with a focus on its user interface developments as well as its integration into the simulation and flight testing performed as part of the HDV research roadmap.

high density vertiport↗

Efficient Modeling of Laser-Plasma Accelerators with INF&RNO

The numerical modeling code INF&RNO (INtegrated Fluid& paRticle simulatioN cOde, pronounced"inferno") is presented. INF&RNO is an efficient 2D cylindrical code to model the interaction of a short laser pulse with an underdense plasma. The code is based on an envelope model for the laser while either a PIC or a fluid description can be used for the plasma. The effect of the laser pulse on the plasma is modeled with the time-averaged poderomotive force. These and other features allow for a speedup of 2-4 orders of magnitude compared to standard full PIC simulations while still retaining physical fidelity. The code has been benchmarked against analytical solutions and 3D PIC simulations and here a set of validation tests together with a discussion of the performances are presented.

43 PARTICLE ACCELERATORS↗

An Overview of the Cooperative Effort between the United States Department of Energy and the China Atomic Energy Authority to Enhance MPC&A Inspections for Civil Nuclear Facilities in China

The United States Department of Energy, National Nuclear Security Administration (DOE/NNSA) and the China Atomic Energy Authority (CAEA) are cooperating to enhance the domestic regulatory inspections capacity for special nuclear material protection, control and accounting (MPC&A) requirements for civil nuclear facilities in China. This cooperation is conducted under the auspices of the Agreement between the Department of Energy of the United States of America and the State Development and Planning Commission of the People s Republic of China on Cooperation Concerning Peaceful Uses of Nuclear Technology. This initial successful effort was conducted in three phases. Phase I focused on introducing CAEA personnel to DOE and U. S. Nuclear Regulatory Commission inspection methods for U. S. facilities. This phase was completed in January 2008 during meetings in Beijing. Phase II focused on developing physical protection and material control and accounting inspection exercises that enforced U. S. inspection methods identified during Phase 1. Hands on inspection activities were conducted in the United States over a two week period in July 2009. Simulated deficiencies were integrated into the inspection exercises. The U. S. and Chinese participants actively identified and discussed deficiencies noted during the two week training course. The material control and accounting inspection exercises were conducted at the Paducah Gaseous Diffusion Plant (PGDP) in Paducah, KY. The physical protection inspection exercises were conducted at the Oak Ridge National Laboratory (ORNL) in Oak Ridge, TN. Phase III leveraged information provided under Phase I and experience gained under Phase II to develop a formal inspection guide that incorporates a systematic approach to training for Chinese MPC&A field inspectors. Additional hands on exercises that are applicable to Chinese regulations were incorporated into the Phase III training material. Phase III was completed in May 2010 at the China Institute of Atomic Energy (CIAE) in Beijing. This paper provides details of the successful cooperation between DOE/NNSA and CAEA for all phases of the cooperative effort to enhance civil domestic MPC&A inspections in China.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Advanced regulatory control and coordinated plant-wide control strategies for IGCC targeted towards improving power ramp-rates

As part of ongoing R&D activities at the National Energy Technology Laboratory's (NETL) Advanced Virtual Energy Simulation Training & Research (AVESTAR™) Center, this paper highlights strategies for enhancing low-level regulatory control and system-wide coordinated control strategies implemented in a high-fidelity dynamic simulator for an Integrated Gasification Combined Cycle (IGCC) power plant with carbon capture. The underlying IGCC plant dynamic model contains 20 major process areas, each of which is tightly integrated with the rest of the power plant, making individual functionally-independent processes prone to routine disturbances. Single-loop feedback control although adequate to meet the primary control objective for most processes, does not take into account in advance the effect of these disturbances, making the entire power plant undergo large offshoots and/or oscillations before the feedback action has an opportunity to impact control performance. In this paper, controller enhancements ranging from retuning feedback control loops, multiplicative feed-forward control and other control techniques such as split-range control, feedback trim and dynamic compensation, applicable on various subsections of the integrated IGCC plant, have been highlighted and improvements in control responses have been given. Compared to using classical feedback-based control structure, the enhanced IGCC regulatory control architecture reduces plant settling time and peak offshoots, achieves faster disturbance rejection, and promotes higher power ramp-rates. In addition, improvements in IGCC coordinated plant-wide control strategies for “Gasifier-Lead”, “GT-Lead” and “Plantwide” operation modes have been proposed and their responses compared. The paper is concluded with a brief discussion on the potential IGCC controller improvements resulting from using advanced process control, including model predictive control (MPC), as a supervisory control layer.

97 MATHEMATICS AND COMPUTING↗

Enhanced IGCC regulatory control and coordinated plant-wide control strategies for improving power ramp rates

As part of ongoing R&D activities at the National Energy Technology Laboratory’s (NETL) Advanced Virtual Energy Simulation Training & Research (AVESTAR™) Center, this paper highlights strategies for enhancing low-level regulatory control and system-wide coordinated control strategies implemented in a high-fidelity dynamic simulator for an Integrated Gasification Combined Cycle (IGCC) power plant with carbon capture. The underlying IGCC plant dynamic model contains 20 major process areas, each of which is tightly integrated with the rest of the power plant, making individual functionally-independent processes prone to routine disturbances. Single-loop feedback control although adequate to meet the primary control objective for most processes, does not take into account in advance the effect of these disturbances, making the entire power plant undergo large offshoots and/or oscillations before the feedback action has an opportunity to impact control performance. In this paper, controller enhancements ranging from retuning feedback control loops, multiplicative feed-forward control and other control techniques such as split-range control, feedback trim and dynamic compensation, applicable on various subsections of the integrated IGCC plant, have been highlighted and improvements in control responses have been given. Compared to using classical feedback-based control structure, the enhanced IGCC regulatory control architecture reduces plant settling time and peak offshoots, achieves faster disturbance rejection, and promotes higher power ramp-rates. In addition, improvements in IGCC coordinated plant-wide control strategies for “Gasifier-Lead”, “GT-Lead” and “Plantwide” operation modes have been proposed and their responses compared. The paper is concluded with a brief discussion on the potential IGCC controller improvements resulting from using advanced process control, including model predictive control (MPC), as a supervisory control layer.

20 FOSSIL-FUELED POWER PLANTS↗