Search NASA⌕ Search

SEARCH · Search NASA

Results for “MONITOR PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,621 records · Page 90

Overview of Hanford Single Shell Tank (SST) Structural Integrity

To improve the understanding of the single-shell tanks (SSTs) integrity, Washington River Protection Solutions, LLC (WRPS), the USDOE Hanford Site tank contractor, developed an enhanced Single-Shell Tank Integrity Project (SSTIP) in 2009. An expert panel on SST integrity, consisting of various subject matters experts in industry and academia, was created to provide recommendations supporting the development of the project. This panel developed 33 recommendations in four main areas of interest: structural integrity, liner degradation, leak integrity and prevention, and mitigation of contamination migration, Seventeen of these recommendations were used to develop the basis for the M-45-10-1 Change Package for the Hanford Federal Agreement and Compliance Order, which is also known as the Tri-Party Agreement. The structural integrity of the tanks is a key element in completing the cleanup mission at the Hanford Site. There are eight primary recommendations related to the structural integrity of Hanford Single-Shell Tanks. Six recommendations are being implemented through current and planned activities. The structural integrity of the Hanford is being evaluated through analysis, monitoring, inspection, materials testing, and construction document review. Structural evaluation in the form of analysis is performed using modern finite element models generated in ANSYS. The analyses consider in-situ, thermal, operating loads and natural phenomena such as earthquakes. Structural analysis of 108 of 149 Hanford Single-Shell Tanks has concluded that the tanks are structurally sound and meet current industry standards. Analysis of the remaining Hanford Single-Shell Tanks is scheduled for FY2014. Hanford Single-Shell Tanks are monitored through a dome deflection program. The program looks for deflections of the tank dome greater than 1/4 inch. No such deflections have been recorded. The tanks are also subjected to visual inspection. Digital cameras record the interior surface of the concrete tanks, looking for cracks and other surface conditions that may indicate signs of structural distress. The condition of the concrete and rebar of the Hanford Single-Shell Tanks is currently being tested and planned for additional activities in the near future. Concrete and rebar removed from the dome of a 65 year old tank was tested for mechanics properties and condition. Results indicated stronger than designed concrete with additional Petrographic examination and rebar completed. Material properties determined from previous efforts combined with current testing and construction document review will help to generate a database that will provide indication of Hanford Single-Shell Tank structural integrity.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

System and method to determine electric motor efficiency using an equivalent circuit

A system and method for determining electric motor efficiency includes a monitoring system having a processor programmed to determine efficiency of an electric motor under load while the electric motor is online. The determination of motor efficiency is independent of a rotor speed measurement. Further, the efficiency is based on a determination of stator winding resistance, an input voltage, and an input current. The determination of the stator winding resistance occurs while the electric motor under load is online.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

SRS 2022 Annual Site Environmental Report (ASER)

ASER stands for the Annual Site Environmental Report and is the primary document that the U.S. Department of Energy uses to inform the public of environmental performance and conditions at SRS. • ASERs are required by U.S. Department of Energy to provide the public and stakeholders information on: – Environmental program performance – Site wide environmental monitoring and surveillance effectiveness – Compliance status with environmental standards and requirements • SRS published its first ASER in 1959

DAVIS, COLLEEN↗

Indoor Sampler Siting

Contaminant releases in or near a building can lead to significant human exposures unless prompt response is taken. U.S. Federal and local agencies are implementing programs to place air-monitoring samplers in buildings to quickly detect biological agents. We describe a probabilistic algorithm for siting samplers in order to detect accidental or intentional releases of biological material. The algorithm maximizes the probability of detecting a release from among a suite of realistic scenarios. The scenarios may differ in any unknown, for example the release size or location, weather, mode of building operation, etc. The algorithm also can optimize sampler placement in the face of modeling uncertainties, for example the airflow leakage characteristics of the building, and the detection capabilities of the samplers. In an illustrative example, we apply the algorithm to a hypothetical 24-room commercial building, finding optimal networks for a variety of assumed sampler types and performance characteristics. We also discuss extensions of this work for detecting ambient pollutants in buildings, and for understanding building-wide airflow, pollutant dispersion, and exposures.

54 ENVIRONMENTAL SCIENCES↗

Basic Data Report for Well Plugging and Abandonment and Reconfiguration Activities for Fiscal Year 2005 (Rev. 1)

The Waste Isolation Pilot Plant (WIPP) is a U.S. Department of Energy (DOE) facility disposing of transuranic and mixed waste under a permit issued by the New Mexico Environment Department (NMED). WIPP is located 26 miles east of Carlsbad, New Mexico, in eastern Eddy County (Figure 1). Disposal panels are mined in the Permian Salado Formation at a depth of about 2,150 feet below ground surface (bgs). Over the years a number of groundwater monitor wells have been installed for site characterization and to monitor temporal and spatial changes in groundwater elevation and chemistry at WIPP. Many of the wells in the fiscal year (FY) 2005 program were selected for plugging and abandonment (P&A) due to redundancy. In other words, the well pads have multiple wells that monitor the Culebra ("Culebra") Member of the Rustler Formation when only one is necessary. These multi-well locations are a relic of various aquifer testing programs associated with the site characterization of WIPP. Additionally, the multi-well locations had wells that were completed in both the Culebra and the Magenta ("Magenta") Members of the Rustler Formation for dual monitoring of these intervals. The intervals were separated by inflatable packers used as bridge plugs, and over the years these packers have aged and their integrity compromised. For these wells, the packers were removed and the wells were converted to Magenta-only monitor wells. The FY 2005 program was initiated on March 31, 2005, and concluded on July 16, 2005. The FY 2005 program initially included 25 wells requiring workover (P&A, Magenta reconfiguration, cleaning and keeping). During the process, the U.S. Bureau of Land Management (BLM) requested transfer of two wells (H-7c and H-8c) to their ownership for future livestock watering. These wells were transferred to the BLM through execution of Form wr-03, Declaration of Owner of Underground Water Rights, between the New Mexico Office of the State Engineer (NMOSE), the BLM, and the DOE Carlsbad Field Office (CBFO). One well (H-2b2) was cleaned and retained as a Culebra monitor well for continued use. One well (H-3d) was converted to a shallow well to monitor the formational contact between the Dewey Lake Redbeds Formation and the Santa Rosa Formation in support of the DP-831 discharge permit monitoring program. Nine dual-completion wells were reconfigured as Magenta-only monitor wells, and 12 wells were plugged and abandoned permanently. This report presents the summary in the same order that the wells were worked in the field.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Comparison of Satellite Observations of Aerosol Optical Depth to Surface Monitor Fine Particle Concentration

Under NASA's Earth Science Applications Program, the Infusing satellite Data into Environmental Applications (IDEA) project examined the relationship between satellite observations and surface monitors of air pollutants to facilitate a more capable and integrated observing network. This report provides a comparison of satellite aerosol optical depth to surface monitor fine particle concentration observations for the month of September 2003 at more than 300 individual locations in the continental US. During September 2003, IDEA provided prototype, near real-time data-fusion products to the Environmental Protection Agency (EPA) directed toward improving the accuracy of EPA s next-day Air Quality Index (AQI) forecasts. Researchers from NASA Langley Research Center and EPA used data from the Moderate Resolution Imaging Spectroradiometer (MODIS) instrument combined with EPA ground network data to create a NASA-data-enhanced Forecast Tool. Air quality forecasters used this tool to prepare their forecasts of particle pollution, or particulate matter less than 2.5 microns in diameter (PM2.5), for the next-day AQI. The archived data provide a rich resource for further studies and analysis. The IDEA project uses data sets and models developed for tropospheric chemistry research to assist federal, state, and local agencies in making decisions concerning air quality management to protect public health.

Kleb, Mary M.↗

Improving DOE Project Performance Using the DOD Integrated Master Plan - 12481

DOE O 413 measures a project's progress to plan by the consumption of funding, the passage of time, and the meeting of milestones. In March of 2003, then Under Secretary, Energy, Science, Card received a memo directing the implementation of Project Management and the Project Management Manual, including the Integrated Master Plan and Integrated Master Schedule. This directive states 'the integrated master plan and schedule tie together all project tasks by showing their logical relationships and any constraints controlling the start or finish of each task. This process results in a hierarchy of related functional and layered schedules derived from the Work Breakdown Structure that can be used for monitoring and controlling project progress'. This paper shows how restoring the IMP/IMS paradigm to DOE program management increases the probability of program success in ways not currently available using DOD O 413 processes alone. Using DOE O 413 series guidance, adding the Integrated Master Plan and Integrated Master Schedule paradigm would provide a hierarchical set of performance measures for each 'package of work,' that provides measurable visibility to the increasing maturity of the project. This measurable maturity provides the mechanism to forecast future performance of cost, schedule, and technical outcomes in ways not available using just the activities in DOE O 413. With this information project managers have another tool available to address the issues identified in GAO-07-336 and GAO-09-406. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Revised Master Plan for the Hood River Production Program, Technical Report 2008.

The Hood River Production Program (HRPP) is a Bonneville Power Administration (BPA) funded program initiated as a mitigation measure for Columbia River hydrosystem effects on anadromous fish. The HRPP began in the early 1990s with the release of spring Chinook and winter steelhead smolts into the basin. Prior to implementation, co-managers, including the Confederated Tribes of the Warm Springs Reservation and the Oregon Department of Fish and Wildlife drafted the Hood River Production Master Plan (O'Toole and ODFW 1991a; O'Toole and ODFW 1991b) and the Pelton Ladder Master Plan (Smith and CTWSR 1991). Both documents were completed in 1991 and subsequently approved by the Council in 1992 and authorized through a BPA-led Environmental Impact Statement in 1996. In 2003, a 10-year programmatic review was conducted for BPA-funded programs in the Hood River (Underwood et al. 2003). The primary objective of the HRPP Review (Review) was to determine if program goals were being met, and if modifications to program activities would be necessary in order to meet or revise program goals. In 2003, an agreement was signed between PacifiCorp and resource managers to remove the Powerdale Dam (RM 10) and associated adult trapping facility by 2010. The HRPP program has been dependant on the adult trap to collect broodstock for the hatchery programs; therefore, upon the dam's removal, some sort of replacement for the trap would be needed to continue the HRPP. At the same time the Hood River Subbasin Plan (Coccoli 2004) was being written and prompted the co-managers to considered future direction of the program. This included revising the numerical adult fish objectives based on the assimilated data and output from several models run on the Hood River system. In response to the Review as well as the Subbasin Plan, and intensive monitoring and evaluation of the current program, the HRPP co-managers determined the spring Chinook program was not achieving the HRPP's defined smolt-to-adult (SAR) survival rate guidelines. The observed low SAR was due to precocity, straying, and incidence of BKD in the spring Chinook program; which ultimately led to the program's inability to achieve the subbasin's overly optimistic biological fish objectives. The summer steelhead hatchery program was not providing the fishery or population benefits anticipated and will be discontinued. The winter steelhead program was performing as planned and no changes are foreseen. This updated Master Plan addresses the several proposed changes to the existing HRPP, which are described.

13 HYDRO ENERGY↗

AGC-3 Experiment Irradiation Monitoring Data Qualification Final Report

The Graphite Technology Development Program will run a series of six experiments to quantify the effects of irradiation on nuclear-grade graphite. The third experiment, Advanced Graphite Creep 3 (AGC-3), began with Advanced Test Reactor (ATR) Cycle 152B on November 27, 2012, and ended with ATR Cycle 155B on April 23, 2014. This report documents qualification of AGC-3 experiment irradiation monitoring data for use by the Very High Temperature Reactor (VHTR) Technology Development Office (TDO) Program for research and development activities required to design and license the first VHTR nuclear plant. Qualified data meet the requirements for data collection and use as described in the experiment planning and quality assurance documents. Failed data do not meet the requirements. Trend data may not meet the requirements, but may still provide some useable information. The report documents qualification of AGC-3 experiment irradiation monitoring data following MCP-2691. This report also documents whether AGC-3 experiment irradiation monitoring data meet the requirements for data collection as specified in technical and functional requirements documents and quality assurance (QA) plans. Data handling is described showing how data are passed from the data collection experiment to the Nuclear Data Management and Analysis System (NDMAS) team. The data structure is described, including data batches, components, attributes, and response variables. The description of the approach to data qualification includes the steps taken to qualify the data and the specific tests used to verify that the data meet requirements. Finally, the current status of the data received by NDMAS from the AGC-3 experiment is presented with summarized information on test results and resolutions. This report addresses all of the irradiation monitoring data collected during the AGC-3 experiment.

36 MATERIALS SCIENCE↗

Framework for Structural Online Health Monitoring of Aging and Degradation of Secondary Systems due to some Aspects of Erosion

This report describes the current state of research related to critical aspects of erosion and selected aspects of degradation of secondary components in nuclear power plants. The report also proposes a framework for online health monitoring of aging and degradation of secondary components. The framework consists of an integrated multi-sensor modality system which can be used to monitor different piping configurations under different degradation conditions. The report analyses the currently known degradation mechanisms and available predictive models. Based on this analysis, the structural health monitoring framework is proposed. The Light Water Reactor Sustainability Program began to evaluate technologies that could be used to perform online monitoring of piping and other secondary system structural components in commercial NPPs. These online monitoring systems have the potential to identify when a more detailed inspection is needed using real-time measurements, rather than at a pre-determined inspection interval. This transition to condition-based, risk informed automated maintenance will contribute to a significant reduction of operations and maintenance costs that account for the majority of nuclear power generation costs. There is unanimous agreement between industry experts and academic researchers that identifying and prioritizing inspection locations in secondary piping systems (for example, in raw water piping or diesel piping) would eliminate many excessive in-service inspections. The proposed structural health monitoring framework takes aim at answering this challenge by combining long-range guided wave technologies with other monitoring techniques, which can significantly increase the inspection length and pinpoint the locations that degraded the most. More widely, the report suggests research efforts aimed at developing, validating, and deploying online corrosion monitoring techniques for complex geometries, which are pervasive in NPPs.

47 OTHER INSTRUMENTATION↗

ISIS and META projects

The ISIS project has developed a new methodology, virtual synchony, for writing robust distributed software. High performance multicast, large scale applications, and wide area networks are the focus of interest. Several interesting applications that exploit the strengths of ISIS, including an NFS-compatible replicated file system, are being developed. The META project is distributed control in a soft real-time environment incorporating feedback. This domain encompasses examples as diverse as monitoring inventory and consumption on a factory floor, and performing load-balancing on a distributed computing system. One of the first uses of META is for distributed application management: the tasks of configuring a distributed program, dynamically adapting to failures, and monitoring its performance. Recent progress and current plans are reported.

Birman, Kenneth↗

The JPL Trajectory System

Description of the jpl space trajectory program, and description of the jpl trajectory monitor system

TRAJECTORY MEASURING SYSTEM↗

Progress on an Electron Beam Profile Monitor at the Fermilab Main Injector

The current program at Fermilab involves the construction of a new superconducting linear accelerator (LINAC) to replace the existing warm version. The new LINAC, together with other planned improvements, is in support of proton beam intensities in the Main Injector (MI) that will exceed 2 MW. Measuring the transverse profiles of these high intensity beams in a ring requires non-invasive techniques. The MI uses ionization profile monitors as its only profile system. An alternative technique involves measuring the deflection of a probe beam of electrons with a trajectory perpendicular to the proton beam. This type of device was installed in MI and initial studies of it have been previously presented. This paper will present the status and recent studies of the device utilizing different techniques.

43 PARTICLE ACCELERATORS↗

Progress on an Electron Beam Profile Monitor at the Fermilab Main Injector

The current program at Fermilab involves the construction of a new superconducting linear accelerator (LINAC) to replace the existing warm version. The new LINAC, together with other planned improvements, is in support of proton beam intensities in the Main Injector (MI) that will exceed 2 MW. Measuring the transverse profiles of these high intensity beams in a ring requires non-invasive techniques. The MI uses ionization profile monitors as its only profile system. An alternative technique involves measuring the deflection of a probe beam of electrons with a trajectory perpendicular to the proton beam. This type of device was installed in MI and initial studies of it have been previously presented. This paper will present the status and recent studies of the device utilizing different techniques.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Guidance for Integrating Energy Justice and Equity in Building Technology Deployment Programs: Tracking, Reporting, and Maximizing the Flow of Benefits from Building System Technology Deployment Activities to Disadvantaged Communities and Target Sectors

The Federal Justice40 Initiative directs at least 40% of the overall benefits of certain clean energy investments to flow to disadvantaged communities and requires that all federal programs covered by Justice40 consult stakeholders to determine the program benefits, and that the flow of benefits to disadvantaged communities is tracked and reported. Unequal distribution of benefits, in terms of access to clean energy research, design, development, and deployment, can disproportionately benefit or burden certain communities. This can result in higher rates of pollution, negative health effects, and increased energy burdens and insecurities in disadvantaged communities. Programs focused on decarbonizing the built environment can enhance health, quality of life, and economic opportunities for impacted communities. This guidance document, developed by Pacific Northwest National Laboratory and funded by the U.S. Department of Energy’s Building Technologies Office, provides best practices and approaches for incorporating energy justice and equity principles into building technology deployment activities. It provides best practices and recommendations for communicating with and involving disadvantaged communities and target building sectors in program activities, along with methods to monitor and report the distribution of benefits to these sectors. This document lays out a set of strategies, metrics, and best practices that can be implemented over time to apply energy justice and equity approaches, whether the program is just starting out or ongoing. Although this guidance was designed for Building Technologies Office technology deployment programs, the best practices, recommendations, and methods can be valuable to any program concerned with the equitable deployment of clean energy technologies. The goal of this project is to enable the equitable development, deployment, and adoption of clean energy technologies and practices.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Hanford Internal Dosimetry Program Manual, PNL-MA-552

This manual is a guide to the services provided by the Hanford Internal Dosimetry Program (IDP), which is operated by the Pacific Northwest National Laboratory.( ) for the U.S. Department of Energy Richland Operations Office, Office of River Protection and their Hanford Site contractors. The manual describes the roles of and relationships between the IDP and the radiation protection programs of the Hanford Site contractors. Recommendations and guidance are also provided for consideration in implementing bioassay monitoring and internal dosimetry elements of radiation protection programs.

61 RADIATION PROTECTION AND DOSIMETRY↗

Wilson Corners Solid Waste Management Unit (SWMU) 001: 2021 Annual Long-Term Monitoring Report, Kennedy Space Center, Florida

This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2021 at Wilson Corners, Solid Waste Management Unit (SWMU) 001, at Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Adaptive site management is being utilized through ongoing assessment, design, and interim measures (IM). Annual LTM of the groundwater is also being conducted at the site. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code (F.A.C.). The goal of LTM at this site is threefold: to determine groundwater flow characteristics, monitor the downgradient concentration trends, and monitor select locations internal to the groundwater plume. Every 5 years, upgradient and side-gradient monitoring wells are sampled to verify delineation. The last time this was performed was in 2015. The sampling of these wells in 2020 was replaced with the direct push technology (DPT) investigations completed in October 2020 and April 2021. This DPT groundwater data was presented in an Advance Data Package (ADP) in September 2021 and discussed in the Implementation Work Plan (IWP) dated November 2021 for installation of an air sparge (AS) system. Based on results from groundwater sampling activities performed during the previous reporting period, including the 2020 and 2021 DPT groundwater sampling, it was determined that the LTM sampling plan was no longer meeting the goal of LTM because delineation was not verified. The 2021 LTM sampling plan was modified to include the sampling of monitoring wells located around the perimeter of the low concentration plume (LCP); the area with concentrations of contaminants of concern [COCs] greater than Groundwater Cleanup Target Levels [GCTLs]), and sampling of 10 monitoring wells proposed for installation (April 2021 KSC Remediation Team (KSCRT) Meeting, Decision 2104-D32). The modified LTM plan received team consensus at the September 2021 KSCRT Meeting (Decision Number 2109-D03), and sampling of the existing monitoring wells was completed in December 2021. The proposed monitoring wells are planned for installation in late 2022, concurrent with ongoing IM construction activities. December 2021 LTM data was presented at the May 2022 KSCRT Meeting, and activities are summarized in this report. The activities presented in this report include the December 2021 groundwater gauging of 42 monitoring wells and sampling of 44 monitoring wells. During the December 2021 event, the low flow sampling method was used, and samples were analyzed for a select list of volatile organic compounds (VOCs), including 1,1,2-trichloro-1,2,2-trifluoroethane (Freon 113). The following conclusions can be made based on the 2021 LTM results: - In December 2021, groundwater flow for the site was generally to the west at all intervals. This is generally consistent with historical observations at the site, with the exception of a southwest and southeast flow component observed at 34 to 48 feet below land surface (bls). - The vertical extent of VOCs was historically delineated by monitoring wells screened greater than 48 feet bls. The results from the two vertical extent monitoring wells, WILC-MW0078 (screened 65 to 70 feet bls) and WILC-MW0130 (screened 56 to 66 feet bls) that were sampled during the 2021 LTM indicate that groundwater vinyl chloride (VC) concentrations in both wells were greater than the GCTL. The Remediation Team has previously agreed to delay deeper DPT investigations in this area to prevent the creation of additional pathways for vertical migration. - The LCP continues to extend both horizontally, predominantly to the west, and vertically beyond the current monitoring well network, with some retraction observed to the southeast. Evaluation of this data combined with data from the 2020 and 2021 DPT sampling event indicate that the LCP encompasses an estimated 20.7 acres based on an expanded sampling area, as compared to the 2020 LCP footprint of 17.0 acres. - Freon 113 was not detected above GCTLs during the 2021 LTM event. Based on groundwater sampling activities performed in 2021, including April 2021 DPT groundwater sampling, the following recommendations are provided: - Perform the next LTM sampling event, targeted to occur in 2023, concurrently with the IM baseline sampling prior to AS system installation; - Include sampling from nine monitoring wells that are planned to be installed in late 2022, concurrent with upcoming IM construction activities. Installation of one deep vertical well, screened 70 to 80 feet bls, will be delayed to prevent the creation of an additional pathway for vertical migration; - Continue to sample under the modified annual LTM plan as presented in Table 4-1 concurrently with IM baseline sampling; and - Once the AS system install and start-up is complete, select monitoring wells from the LTM program will transition into the performance monitoring plan, and LTM will be temporarily discontinued. Performance monitoring will be performed quarterly, and the monitoring well network will be evaluated following the first performance monitoring sampling event.

long-term monitoring (LTM)↗

Integration of SARS-CoV-2 testing and genomic sequencing into influenza sentinel surveillance in Uganda, January to December 2022

The Uganda Virus Research Institute, National Influenza Center laboratory integrated SARS-CoV-2 polymerase chain reaction testing and genomic sequencing into the influenza surveillance program that was established in 2007. A total of 7,698 nasopharyngeal/oropharyngeal (NP/OP) swab samples were collected and analyzed from ILI/SARI sentinel sites across the country from January to December 2022. All samples were tested for influenza and SARS-CoV-2. Of these, 252 (3.3%), 162 (2.1%), and 589 (7.7%) were positive for influenza A, influenza B, and SARS-CoV-2, respectively. Out of 414 influenza-positive samples, 122 (29.5%) were AH1pdm09, 130 (31.4%) were AH3, and 162 (39.1%) were B-Victoria. All SARS-CoV-2 sequenced samples were of the Omicron variant, with subvariants of concern known to evade the immune system being detected, such as BQ.1 and XBB.2. Other SARS-CoV-2 positive samples collected from other health centers in the community outside the surveillance sites were included into SARS-CoV-2 genomic sequencing with similar patterns with respect to variants. In all, the ILI/SARI surveillance system has shown to be an efficient, cost-effective, and sustainable program, providing a ready platform to monitor the circulation of SARS-CoV-2 in communities at the national level while remaining vigilant for the persistent threat of influenza. The integration of SARS-CoV-2 detection and genomic surveillance into the influenza surveillance program will strengthen the laboratory response capacity, as well as facilitate the timely release of SARS-CoV-2 genomic information to be used to complement the multiple response strategies for COVID-19 pandemic mitigation.

59 BASIC BIOLOGICAL SCIENCES↗