Search NASA⌕ Search

SEARCH · Search NASA

Results for “POWER FACTOR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,621 records · Page 90

Positioning the Indian coal-power sector for carbon mitigation: key policy options

The report continues the series of Pew Center papers that explore strategies for addressing CO{sub 2} emissions from using coal to provide electricity. The domestic and international steps outlined in this paper could greatly advance the development and implementation of a GHG-mitigation strategy in the Indian coal-power sector, while allowing the sector to contribute suitably to the country's energy needs. The key to success will be adopting a deliberate approach, with short- and long-term perspectives in mind, that allows for the development of an integrated energy and climate policy. 58 refs., 2 tabs.

01 COAL, LIGNITE, AND PEAT↗

Loss Factor Estimation Using the Impulse Response Decay Method on a Stiffened Structure

High-frequency vibroacoustic modeling is typically performed using energy-based techniques such as Statistical Energy Analysis (SEA). Energy models require an estimate of the internal damping loss factor. Unfortunately, the loss factor is difficult to estimate analytically, and experimental methods such as the power injection method can require extensive measurements over the structure of interest. This paper discusses the implications of estimating damping loss factors using the impulse response decay method (IRDM) from a limited set of response measurements. An automated procedure for implementing IRDM is described and then evaluated using data from a finite element model of a stiffened, curved panel. Estimated loss factors are compared with loss factors computed using a power injection method and a manual curve fit. The paper discusses the sensitivity of the IRDM loss factor estimates to damping of connected subsystems and the number and location of points in the measurement ensemble.

Cabell, Randolph↗

Turbulent entrainment in finite-length wind farms

In this article, we present an entrainment-based model for predicting the flow and power output of finite-length wind farms. The model is an extension of the three-layer approach of Luzzatto-Fegiz & Caulfield ( Phys. Rev. Fluids , vol. 3, 2018, 093802) for wind farms of infinite length, and assumes dependence of key flow quantities, such as the wind farm bulk velocity, on the streamwise distance from the farm entrance. To assist our analysis and validate the proposed model, we undertake a series of large-eddy simulations with different turbine spacing arrangements and layouts. Comparisons are also made with the top-down model with entrance effects of Meneveau ( J. Turbul. , vol. 13, 2012, N7) and data from the literature. The finite-length entrainment model is shown to be capable of capturing the power drop between contiguous rows of turbines as well as describing the advection and turbulent transport of kinetic energy in both the entrance and fully developed regions. The fully developed regime is approximated only deep in the wind farm, after approximately 15 rows of turbines. Our data suggest that for the cases considered in this study, the empirical coefficients that can be used to describe turbulent entrainment and transfers above the wind farm exhibit little dependence on the farm layout and may be considered constant for modelling purposes. However, the flow field within the wind farm layer can be strongly modulated by the turbine density (spacing) as well as the array layout, and to that extent it can be argued that they are both primary factors determining the wind farm power output.

17 WIND ENERGY↗

Role of Alternative Energy Sources: Solar Thermal Technology Assessment [Slides]

This peer-reviewed analysis is one of a series of Technology Assessments of power production and evaluates the role of solar thermal power in the future energy portfolio of the U.S. Solar thermal power is evaluated with respect to resource base, growth potential, environmental profile, costs, barriers, risks, and expert opinions. Solar thermal power is viewed as a clean, renewable alternative to conventional fossil fuels for electricity generation. However, the resource base of solar thermal power is limited by several factors that inform the availability of direct sunlight at any given location. The high cost of solar collectors to support utility level output, water scarcity in areas of high solar potential, and lack of proximity of resources to population centers make it likely that high-quality solar thermal resources are expected to remain untapped for the foreseeable future.

14 SOLAR ENERGY↗

The spatial resolving power of earth resources satellites: A review

The significance of spatial resolving power on the utility of current and future Earth resources satellites is critically discussed and the relative merits of different approaches in defining and estimating spatial resolution are outlined. It is shown that choice of a particular measure of spatial resolution depends strongly on the particular needs of the user. Several experiments have simulated the capabilities of future satellite systems by degradation of aircraft images. Surprisingly, many of these indicated that improvements in resolution may lead to a reduction in the classification accuracy of land cover types using computer assisted methods. However, where the frequency of boundary pixels is high, the converse relationship is found. Use of imagery dependent upon visual interpretation is likely to benefit more consistently from higher resolutions. Extraction of information from images will depend upon several other factors apart from spatial resolving power: these include characteristics of the terrain being sensed, the image processing methods that are applied as well as certain sensor characteristics.

Townshend, J. R. G.↗

An FPGA computing demo core for space charge simulation

In accelerator physics, space charge simulation requires large amount of computing power. In a particle system, each calculation requires time/resource consuming operations such as multiplications, divisions, and square roots. Because of the flexibility of field programmable gate arrays (FPGAs), we implemented this task with efficient use of the available computing resources and completely eliminated non-calculating operations that are indispensable in regular micro-processors (e.g. instruction fetch, instruction decoding, etc.). We designed and tested a 16-bit demo core for computing Coulomb's force in an Altera Cyclone II FPGA device. To save resources, the inverse square-root cube operation in our design is computed using a memory look-up table addressed with nine to ten most significant non-zero bits. At 200 MHz internal clock, our demo core reaches a throughput of 200 M pairs/s/core, faster than a typical 2 GHz micro-processor by about a factor of 10. Temperature and power consumption of FPGAs were also lower than those of micro-processors. Fast and convenient, FPGAs can serve as alternatives to time-consuming micro-processors for space charge simulation.

99 GENERAL AND MISCELLANEOUS↗

Effect of chemical disorder on the electronic stopping of solid solution alloys

The electronic stopping power of nickel-based equiatomic solid solutions alloys NiCr, NiFe and NiCo for protons and alpha projectiles is investigated in detail using real-time time-dependent density functional theory over a wide range of velocities. Recently developed numerical electronic structure methods are used to probe fundamental aspects of electron-ion coupling non-perturbatively and in a fully atomistic context, capturing the effect of the atomic scale disorder. The effects of particular electronic band structures and density of states reflect in the low velocity limit behavior. We compare our results for the alloys with those of a pure nickel target to understand how alloying affects the electronic stopping. We discover that NiCo and NiFe have similar stopping behavior as Ni while NiCr has an asymptotic stopping power that is more than a factor of two larger than its counterparts for velocities below 0.1 a.u.. Overall, we show that the low-velocity limit of electronic stopping power can be manipulated by controlling the broadening of the d-band through the chemical disorder. In this regime, the Bragg’s additive rule for the stopping of composite materials also fails for NiCr.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Study on divertor detachment and pedestal characteristics in the DIII-D upper closed divertor

Abstract Experiments performed in DIII-D demonstrate that higher plasma current and heating power combined with impurity seeding facilitate the achievement of divertor detachment with a higher pedestal pressure and higher plasma performance in H-mode plasmas with a baffled closed divertor compared with an open divertor. Dedicated experiments were carried out to study the impact of power, plasma current and impurity seeding on divertor detachment with ion B × ∇ B directed into the divertor favorable for the L–H transition. With a factor of three variation in heating power and with only D 2 puffing, no significant difference in the separatrix density at detachment onset was found. The higher heating power leads to higher impurity concentration and wider scrape-off layer (SOL) width, and reduces the detachment onset density to one similar to that in lower-power plasmas. Higher current requires higher pedestal and line-averaged densities to achieve divertor detachment; however, the increase in separatrix density at increasing plasma current is found to be less pronounced. Initial calculations found that both power scan and plasma current scan datasets are qualitatively consistent with theory after considering the change in impurity concentration and heat flux width. This also motivates the future extensive study of transport and divertor impurity behavior in order to have a quantitative comparison between experiment and theory. Compared with an open divertor, a closed divertor facilitates detachment onset at ∼40% lower line-averaged plasma density. Additional N 2 seeding facilitates the achievement of detachment at a lower separatrix density and thus a higher pedestal temperature, which is beneficial for advanced tokamak scenarios. Higher heating power requires a higher N 2 puffing rate to achieve the same degree of detachment, while a higher N 2 puffing rate leads to lower detachment onset line-averaged density, both of which agree with theory. In contrast to the narrower pedestal in an open divertor approaching detachment, the pedestal density width in a closed divertor increases with density. The density gradient increases with line-averaged density at higher plasma current, but remains nearly unchanged at lower plasma current. In particular, compared with discharges with low power, at high heating power the pedestal density gradient is much weaker, while the SOL density is significantly higher and wider. At the same plasma current, both pedestal pressure gradient and temperature gradient decrease linearly with the line-averaged density but remain similar across different heating powers. Even with different plasma current and heating power, the normalized pressure gradient remains identical. As a result, achievement of divertor detachment with a higher pedestal pressure and higher plasma performance is shown in a closed divertor, which is important for improving core–edge integration as one of the critical issues for future tokamak fusion reactors.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Baseline Evaluations to Support Control Room Modernization at Nuclear Power Plants

For any major control room modernization activity at a commercial nuclear power plant (NPP) in the U.S., a utility should carefully follow the four phases prescribed by the U.S. Nuclear Regulatory Commission in NUREG-0711, Human Factors Engineering Program Review Model. These four phases include Planning and Analysis, Design, Verification and Validation, and Implementation and Operation. While NUREG-0711 is a useful guideline, it is written primarily from the perspective of regulatory review, and it therefore does not provide a nuanced account of many of the steps the utility might undertake as part of control room modernization. The guideline is largely summative—intended to catalog final products—rather than formative—intended to guide the overall modernization process. In this paper, we highlight two crucial formative sub-elements of the Planning and Analysis phase specific to control room modernization that are not covered in NUREG-0711. These two sub-elements are the usability and ergonomics baseline evaluations. A baseline evaluation entails evaluating the system as-built and currently in use. The usability baseline evaluation provides key insights into operator performance using the control system currently in place. The ergonomics baseline evaluation identifies possible deficiencies in the physical configuration of the control system. Both baseline evaluations feed into the design of the replacement system and subsequent summative benchmarking activities that help ensure that control room modernization represents a successful evolution of the control system.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Effects of the q profile on toroidal rotation in Alcator C-Mod LHCD plasmas

Changes in the core toroidal rotation profiles following injection of lower hybrid (LH) waves have been documented in Alcator C-Mod plasmas. Shot by shot scans of LH input power have been performed at fixed magnetic field and electron density for several plasma currents. For sawtoothing target plasmas, if the input power is low enough that the central safety factor q 0 remains below 1, the change in the core rotation is in the counter-current direction, consistent in sign, magnitude and LH power scaling with direct momentum input from the LH waves. If the power level is high enough that there are significant changes to the q profile, including the termination of sawtooth oscillations, the change in the toroidal rotation is in the co-current direction, consistent with changes in the momentum flux through its dependence on the current density profile. Further, the direction of the rotation changes depends on whether q 0 is below or above unity, and seemingly not on the magnetic shear, nor the Ohmic confinement regime of the target plasma.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Advanced Power System Analysis Capabilities

As a continuing effort to assist in the design and characterization of space power systems, the NASA Lewis Research Center's Power and Propulsion Office developed a powerful computerized analysis tool called System Power Analysis for Capability Evaluation (SPACE). This year, SPACE was used extensively in analyzing detailed operational timelines for the International Space Station (ISS) program. SPACE was developed to analyze the performance of space-based photovoltaic power systems such as that being developed for the ISS. It is a highly integrated tool that combines numerous factors in a single analysis, providing a comprehensive assessment of the power system's capability. Factors particularly critical to the ISS include the orientation of the solar arrays toward the Sun and the shadowing of the arrays by other portions of the station.

Source record↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Analysis of the Breakout Time

The motivation to precisely determine breakout time is to better understand initial motion. An analysis on the baseline is conducted to determine breakout time. The power in the baseline drops by a factor of ~6 after the breakout time occurs. The characteristic rounded step function of the baseline power can be modeled to calculate the breakout time. The characteristic rounded step function of the phase change in the baseline can be modeled to calculate the breakout time. Power and phase both seem to be viable sources that can be used to find breakout time effectively. The phase and power methods complement one another, so whenever one method does not work, the other can still be used. In some cases, the breakout time can be slightly shifted between phase and power. In the future, it would be good to develop a way to quantify the breakout time as well as the associated precision and accuracy.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Facile integration of low-cost black phosphorus in solution-processed organic solar cells with improved fill factor and device efficiency

Black phosphorus (BP) as a promising two-dimensional (2D) material has gained great attention in nanoelectronic devices because of its intrinsic semiconductor characteristics. However, the poor material availability and solution processability have been major roadblocks that hinder its wider application in microelectronics. Herein, readily available, lost-cost BP was utilized as an effective component that was integrated via a facile solution process for the fabrication of bulk heterojunction organic solar cells (OSCs). An impressive fill factor (FF) of 74.2% and power conversion efficiency (PCE) of 10.5% were realized in the OSCs incorporating 10 wt% of BP in the active layer of the benchmark polymer donor PTB7-Th and PC71BM acceptor, corresponding to a 20% PCE enhancement compared to the BP-free binary devices. The efficiency enhancement can be attributed to BP's high hole carrier mobility that facilitates better carrier extraction and suppression of the recombination. BP has been further demonstrated to be effective in additional solar cells based on other photovoltaic (PV) materials, including non-fullerene OSCs. The successful incorporation of the inexpensive BP in the solution-based fabrication of OSCs opens the door for its application in high performance, low cost flexible electronics.

14 SOLAR ENERGY↗

Cost-Disruptive, Low Impact, Modular Form Factor Low-Head Hyropower System

Littoral Power Systems, Inc. (LPS) is writing a new story when it comes to turning the natural power of water into electricity. h-Modulor™ is a new way of designing and building hydropower plants that addresses the crucial issues of cost, environmental impact and regulatory time frames. For decades hydropower developers, owners and operators have struggled to build new or expanded facilities that didn’t cost so much, were friendlier to the environment and didn’t take so much time to license or build. The problem is particularly acute in smaller installations. The burdensome regulatory pathway for projects under 10MW in capacity have eased the licensing requirements for small hydro projects. But in small projects are still very hard, because capital costs are a much larger percentage of the generation revenues than they are in large facilities. There is an acute need for a cost effective solution. Understanding this need and opportunity, LPS conceived a new type of hydropower equipment – a kit of standard, pre-fabricated modular parts for dam safety, power generation, spill control and other hydropower facility functions to be used to build and operate a hydro plant at substantially lower costs than are currently achievable. This system of prefabricated parts also showed promise to reduce environmental impacts, reduce engineering time involved in the licensing process, and possibly provide a new way for regulators to think about licensing that could lead to reduced regulatory timeframes. Because of this invention’s compelling and intriguing promise the Department of Energy’s (DOE) Water Power Technology Office (WPTO) awarded funding to LPS through the Office of Energy Efficiency and Renewable Energy (EERE) to develop this new type of hydropower equipment to meet a levelized cost of energy (LCOE) goal and analyze it for dam safety. LPS teamed with professional engineers, PhDs, and geotechnical consultants from GZA GeoEnvironental, Inc. (GZA), Alden Research Laboratory (Alden), University of Massachusetts – Dartmouth (UMass-D), the National Renewable Energy Laboratory (NREL) and AECOM. In collaboration with the engineers and managers at the WPTO and EERE they matured the concepts through substantial design shifts. The project exceeded the original goals and delivered designs beyond the proof-of-concept stage backed up by thorough professional engineering analysis of stability, seepage, and structural integrity. A full-scale section with seals successfully retained water in full-head leakage tests. Construction plans and professional engineering cost estimates indicated an LCOE half of the original LCOE goal. A system of these modules is now on track to be used in a 4.5 MW commercial installation.

13 HYDRO ENERGY↗

High Performance Computing Peak Shaving for Microreactor Operation

There are multiple nuclear microreactors currently under development that are designed to provide autonomous power for as many as ten or more years without refueling and are designed to power high performance computing (HPC) datacenters. But the load-follow speeds for a nuclear microreactor will be much slower than grid power and slower than the power variance typical of a HPC system. HPC datacenters experience peak power load variance driven by several factors ranging from the operation of cooling systems to remove heat from the servers to supporting a wide range of user application workflows and architectures each with different power signatures. One mechanism to support the limited load-follow of a microreactor is peak shaving where an energy storage mechanism is used to shed peak load and reduce significant power variance. This work explores peak electrical load shaving using uninterruptible power supply (UPS) systems designed for HPC support in the context of peak shaving when operating using a nuclear microreactor with a load-follow limited to 10% of load per minute. Using a self contained HPC datacenter complete with stand-alone cooling system and provisioned with an x86 cluster, an ARM cluster, and a graphics processing unit (GPU) cluster, peak shaving for microreactor operation using the UPS battery backup is explored while running two classes of typical HPC user applications. HPC architecture suitability for microreactor operation under this type of peak shaving is examined.

97 MATHEMATICS AND COMPUTING↗

Human Factors Principles in Information Dashboard Design

When planning for control room upgrades, nuclear power plants have to deal with a multitude of engineering and operational impacts. This will inevitably include several human factors considerations, including physical ergonomics of workstations, viewing angles, lighting, seating, new communication requirements, and new concepts of operation. In helping nuclear power utilities to deal with these challenges, the Idaho National Laboratory (INL) has developed effective methods to manage the various phases of the upgrade life cycle. These methods focus on integrating human factors engineering processes with the plant’s systems engineering process, a large part of which is the development of end-state concepts for control room modernization. Such an end-state concept is a description of a set of required conditions that define the achievement of the plant’s objectives for the upgrade. Typically, the end-state concept describes the transition of a conventional control room, over time, to a facility that employs advanced digital automation technologies in a way that significantly improves system reliability, reduces human and control room-related hazards, reduces system and component obsolescence, and significantly improves operator performance. To make the various upgrade phases as concrete and as visible as possible, an end-state concept would include a set of visual representations of the control room before and after various upgrade phases to provide the context and a framework within which to consider the various options in the upgrade. This includes the various control systems, human-system interfaces to be replaced, and possible changes to operator workstations. This paper describes how this framework helps to ensure an integrated and cohesive outcome that is consistent with human factors engineering principles and also provide substantial improvement in operator performance. The paper further describes the application of this integrated approach in the strategic modernization program at a nuclear power plant where legacy systems are upgraded to advanced digital technologies through a systematic process that links human factors principles to the systems engineering process. This approach will help to create an integrated control room architecture beyond what is possible for individual subsystem upgrades alone. In addition, several human factors design and evaluation methods were used to develop the end-state concept, including interactive sessions with operators in INL’s Human System Simulation Laboratory, three-dimensional modeling to visualize control board changes.

3D Modeling↗

ADVANCED RADIOISOTOPE HEAT SOURCE AND PROPULSION SYSTEMS FOR PLANETARY EXPLORATION

The exploration of planetary surfaces and atmospheres may be enhanced by increasing the range and mobility of a science platform. Fundamentally, power production and availability of resources are limiting factors that must be considered for all science and exploration missions. A novel power and propulsion system is considered and discussed with reference to a long-range Mars surface exploration mission with in-situ resource utilization. Significance to applications such as sample return missions is also considered. Key material selections for radioisotope encapsulation techniques are presented.

99 GENERAL AND MISCELLANEOUS↗