Search NASA⌕ Search

SEARCH · Search NASA

Results for “Projection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,621 records · Page 90

Analyzing How We Do Analysis and Consume Data, Results from the SciDAC-Data Project

One of the main goals of the Dept. of Energy funded SciDAC-Data project is to analyze the more than 410,000 high energy physics datasets that have been collected, generated and defined over the past two decades by experiments using the Fermilab storage facilities. These datasets have been used as the input to over 5.6 million recorded analysis projects, for which detailed analytics have been gathered. The analytics and meta information for these datasets and analysis projects are being combined with knowledge of their part of the HEP analysis chains for major experiments to understand how modern computing and data delivery is being used. We present the first results of this project, which examine in detail how the CDF, D0, NOvA, MINERvA and MicroBooNE experiments have organized, classified and consumed petascale datasets to produce their physics results. The results include analysis of the correlations in dataset/file overlap, data usage patterns, data popularity, dataset dependency and temporary dataset consumption. The results provide critical insight into how workflows and data delivery schemes can be combined with different caching strategies to more efficiently perform the work required to mine these large HEP data volumes and to understand the physics analysis requirements for the next generation of HEP computing facilities. In particular we present a detailed analysis of the NOvA data organization and consumption model corresponding to their first and second oscillation results (2014-2016) and the first look at the analysis of the Tevatron Run II experiments. We present statistical distributions for the characterization of these data and data driven models describing their consumption

Ding, P.↗

Summary of Carbon Storage Incentives and Potential Legislation: East Sub-Basin Project Task 3.1 Business and Financial Case Study

The CarbonSAFE Illinois – East Sub-Basin project is conducting a pre-feasibility assessment for commercial-scale CO2 geological storage complexes. The project aims to identify sites capable of storing more than 50 million tons of industrially-sourced CO2. To support the business development assessment of the economic viability of potential sites in the East Sub-Basin and explore conditions under which a carbon capture and storage (CCS) project therein might be revenue positive, this document provides a summary of carbon storage incentives and legislation of potential relevance to the project.

01 COAL, LIGNITE, AND PEAT↗

Projected WIMP Sensitivity of the LUX-ZEPLIN (LZ) Dark Matter Experiment

LUX-ZEPLIN (LZ) is a next generation dark matter direct detection experiment that will operate 4850 feet underground at the Sanford Underground Research Facility (SURF) in Lead, South Dakota, USA. Using a two-phase xenon detector with an active mass of 7 tonnes, LZ will search primarily for low-energy interactions with Weakly Interacting Massive Particles (WIMPs), which are hypothesized to make up the dark matter in our galactic halo. In this paper, the projected WIMP sensitivity of LZ is presented based on the latest background estimates and simulations of the detector. For a 1000 live day run using a 5.6 tonne fiducial mass, LZ is projected to exclude at 90% confidence level spin-independent WIMP-nucleon cross sections above $1.6 \times 10^{-48}$ cm$^{2}$ for a 40 $\mathrm{GeV}/c^{2}$ mass WIMP. Additionally, a $5\sigma$ discovery potential is projected reaching cross sections below the existing and projected exclusion limits of similar experiments that are currently operating. For spin-dependent WIMP-neutron(-proton) scattering, a sensitivity of $2.7 \times 10^{-43}$ cm$^{2}$ ($8.1 \times 10^{-42}$ cm$^{2}$) for a 40 $\mathrm{GeV}/c^{2}$ mass WIMP is expected. With construction well underway, LZ is on track for underground installation at SURF in 2019 and will start collecting data in 2020.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

An Overview of the EGS Collab Project: Field Validation of Coupled Process Modeling of Fracturing and Fluid Flow at the Sanford Underground Research Facility, Lead, SD

Enhanced Geothermal Systems (EGS) development will require an ability to accurately predict the flow rates and temperatures of the production wells. While simple in concept, complex heterogeneous fracture pathways can lead to channeling, short-circuiting, and premature thermal breakthrough complicating EGS. The EGS Collab project will establish a suite of intermediate-scale (~10-20 m) field test beds coupled with stimulation and interwell flow tests to provide a basis to better understand the fracture geometries and processes that control heat transfer between rock and stimulated fractures. These experiments will provide a means of testing tools, codes, and concepts that could later be employed under geothermal reservoir conditions at FORGE and in EGS. We will perform well-controlled, in situ experiments focused on rock fracture behavior and permeability enhancement. Pre- and post-test modeling of each test will allow for model prediction and validation. Comprehensive instrumentation will be used to collect high-quality, high-resolution geophysical and fracture characterization and fluid flow data. ,These data will be analyzed and compared with models and field observations to further elucidate the basic relationships between stress, induced seismicity, and permeability enhancement. To the maximum extent achievable, we will observe and quantify other key governing parameters that impact permeability, and attempt to understand how these parameters might change throughout the development and operation of an EGS project with the goal of enabling commercial viability of EGS. The Sanford Underground Research Facility (SURF) in South Dakota was selected as the EGS Collab project experimental site based on the evaluation of information from several sites. Our team has designed and constructed the first field experiment planned for this project, which is supported by the US Department of Energy’s Geothermal Technologies Office.

EGS, FORGE, field fracture stimulation and flow ex↗

The EGS Collab Project: Stimulation and Simulation

Development of Enhanced Geothermal Systems (EGS) requires accurate predictions of flow rates and temperatures at production wells over time. The concept of EGS is simple; however, complications from heterogeneity and complexity of fracture pathways may lead to channeling, short-circuiting, and premature thermal breakthrough. In the EGS Collab project, we are establishing a suite of highly monitored and well characterized intermediate-scale (~10-20 m) field test beds along with fracture stimulation and interwell flow tests to better understand processes that control formation of effective subsurface heat exchangers. EGS Collab experiments will provide a means of testing tools and concepts that could later be employed under geothermal reservoir conditions at FORGE or elsewhere. Key to the project is using numerical simulations in the experiment design and interpretation of results. Our tests will be well-controlled, in situ experiments focused on rock fracture behavior and permeability enhancement. Our pre- and post-test modeling results of each field experiment compared with detailed measurements will allow for improved model prediction and validation. We will use comprehensive instrumentation to collect high-quality and high-resolution geophysical and other fracture characterization and fluid flow data. We will analyze these data and compare them with models and field observations to further elucidate the basic relationships between stress, induced seismicity, and permeability enhancement. We will also observe and quantify other key governing parameters that impact permeability, and will attempt to understand how these parameters might change throughout the development and operation of an EGS project with the ultimate goal of enabling commercial viability of EGS. Our first set of experiments will be performed at the Sanford Underground Research Facility (SURF) in South Dakota. Our team is well underway with building the first field experiment test bed planned for this project, which is supported by the US Department of Energy’s Geothermal Technologies Office.

EGS Collab↗

EGS Collab Project: Accomplishments and Plan

To better understand stimulation and inter-well flow in crystalline rock with the goal of developing and improving subsurface heat exchangers for enhanced geothermal energy recovery, the EGS (Enhanced Geothermal Systems) Collab project is developing highly monitored, well- characterized intermediate scale (~10-20 m) field test beds, stimulating, and performing flow tests. These tests provide the ability to evaluate concepts, data to test and validate models, and tools to be used for EGS development, which may be evaluated at DOE’s Frontier Observatory for Research in Geothermal Energy (FORGE) project. Numerical simulation is key to the project, for experiment design and interpretation of results. Testbed characterization included optical and acoustic televiewers, full waveform seismic, electromagnetic, gamma, and temperature. The test block was further characterized using seismic tomography (p- and s-), electrical resistance tomography (ERT), and hydrologic characterization including tracer tests. Coupled process models are constrained by the detailed site characterization data. Installed monitoring systems include: 1) passive seismic/acoustic emissions; 2) continuous active source seismic; 3) ERT, with dynamic imaging using high contrast fluids; and 4) distributed acoustic, temperature, and strain fiber optic sensors. During flow and stimulation tests, fracture aperture strain monitoring is performed using the Step-rate Injection Method for Fracture In-situ Properties (SIMFIP) tool. Pressure and flow in the injection and production boreholes are monitored, and tracer tests and wavefield imaging and inversion are performed to provide additional constraints. Stimulations have been performed at several locations, connecting our injection and production wells. An overview of the EGS Collab project is presented to provide a framework for other EGS Collab presentations, along with results from numerical simulations and experiments performed at the Sanford Underground Research Facility in South Dakota.

Enhanced Geothermal Systems, EGS Collab, stimulati↗

Societal impacts of particle physics projects

Large particle physics projects funded by the U.S. Government require an evaluation and mitigation of each project’s potential impacts on the local communities. However, beyond meeting governmental requirements, particle physics projects stand to play an essential role in local decision-making, building relationships, and framing discussions about key projects by becoming meaningfully engaged in their local communities. In this white paper for the U.S. Particle Physics Community Planning Exercise (“Snowmass"), we examine several local community engagement efforts made by three facilities: Lawrence Berkeley National Laboratory (Berkeley Lab), Fermi National Accelerator Laboratory (Fermilab), and the Sanford Underground Research Facility (SURF). Although each facility focuses on a different endeavor in varying types of communities, each study highlights the importance and benefits of employing consistent outreach techniques, promoting diversity, establishing lasting relationships, and creating environments for open and honest communication.

Zens, Rochelle↗

Progress on the Proton Power Upgrade Project at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion of the project, 2 MW of beam power will be available for neutron production at the existing first target station with the remaining beam power available for the future second target station. The project will install seven superconducting RF cryomodules and supporting RF power systems and ancillaries to increase the beam energy to 1.3 GeV . The injection and extraction region of the accumulator ring will be upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. Equipment is being received from vendors and partner laboratories, and installation is underway with three major installation outages planned in 2022-2024. The project is planned to be completed in 2025.

Barbier, Charlotte↗

Management and integration of engineering and construction activities: Lessons learned from the AP1000{sup R} nuclear power plant China project

The lessons learned during the early phase of design engineering and construction activities for the AP1000 China Project can be applied to any project involving multiple disciplines and multiple organizations. Implementation of a first-of-a-kind design to directly support construction activities utilizing resources assigned to design development and design delivery creates challenges with prioritization of activities, successful closure of issues, and communication between site organizations and the home office. To ensure successful implementation, teams were assigned and developed to directly support construction activities including prioritization of activities, site communication and ensuring closure of site emergent issues. By developing these teams, the organization is better suited to meet the demands of the construction schedule while continuing with design evolution of a standard plant and engineering delivery for multiple projects. For a successful project, proper resource utilization and prioritization are key for overcoming obstacles and ensuring success of the engineering organization. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The Euratom-Rosatom ERCOSAM-SAMARA projects on containment thermal-hydraulics of current and future LWRs for severe accident management

During a postulated severe accident with core degradation, hydrogen would form in the reactor pressure vessel mainly due to high temperatures zirconium-steam reaction and flow together with steam into the containment where it will mix with the containment atmosphere (steam-air). The hydrogen transport into the containment is a safety concern because it can lead to explosive mixtures through the associated phenomena of condensation, mixing and stratification. The ERCOSAM and SAMARA projects, co-financed by the European Union and the Russia, include various experiments addressing accident scenarios scaled down from existing plant calculations to different thermal-hydraulics facilities (TOSQAN, MISTRA, PANDA, SPOT). The tests sequences aim to investigate hydrogen concentration build-up and stratification during a postulated accident and the effect of the activation of Severe Accident Management systems (SAMs), e.g. sprays, coolers and Passive Auto-catalytic Recombiners (PARs). Analytical activities, performed by the project participants, are an essential component of the projects, as they aim to improve and validate various computational methods. They accompany the projects in the various phases; plant calculations, scaling to generic containment and to the different facilities, planning pre-test and post-test simulations are performed. Code benchmark activities on the basis of conceptual near full scale HYMIX facility will finally provide a further opportunity to evaluate the applicability of the various methods to the study of scaling issues. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

One System Integrated Project Team: Retrieval and Delivery of Hanford Tank Wastes for Vitrification in the Waste Treatment Plant - 13234

The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety-conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines for retrieving the tank wastes and for building and operating the WTP. The tank wastes are the result of Hanford's nearly fifty (50) years of plutonium production. In the intervening years, waste characteristics have been increasingly better understood. However, waste characteristics that are uncertain and will remain as such represent a significant technical challenge in terms of retrieval, transport, and treatment, as well as for design and construction of WTP. What also is clear is that the longer the waste remains in the tanks, the greater the risk to the environment and the people of the Pacific Northwest. The goal of both projects - tank operations and waste treatment - is to diminish the risks posed by the waste in the tanks at the earliest possible date. About two hundred (200) WTP and TOC employees comprise the IPT. Individual work groups within One System include Technical, Project Integration and Controls, Front-End Design and Project Definition, Commissioning, Nuclear Safety and Engineering Systems Integration, and Environmental Safety and Health and Quality Assurance (ESH and QA). Additional functions and team members will be added as the WTP approaches the operational phase. The team has undertaken several initiatives since its formation to collaborate on issues: (1) alternate scenarios for delivery of wastes from the tank farms to WTP; (2) improvements in managing Interface Control Documents; (3) coordination on various technical issues, including the Defense Nuclear Facilities Nuclear Safety Board's Recommendation 2010-2; (4) deployment of the SmartPlant{sup R} Foundation-Configuration Management System; and (5) preparation of the joint contract deliverable of the Operational Readiness Support Plan. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Natural Resource Damages Settlement Projects at the Fernald Preserve - 12316

This paper describes the development and implementation of two ecological restoration projects at the Fernald Preserve that are funded through a CERCLA natural resource damage settlement. The Paddys Run Tributary Project involves creation of vernal pool wetland habitat with adjacent forest restoration. The Triangle Area Project is a mesic tall-grass prairie establishment, similar to other efforts at the Fernald Preserve. The goal of the Fernald Natural Resource Trustees is to establish habitat for Ambystomatid salamander species, as well as grassland birds. Planning and implementation of on-property ecological restoration projects is one component of compensation for natural resource injury. As with the rest of the Fernald Preserve, ecological restoration has helped turn a DOE liability into a community asset. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

On-line fission products measurements during a PWR severe accident: the French DECA-PF project

Following the Fukushima accident, a lot of recommendations was drawn by international organizations (IAEA, OECD, NUGENIA network...) in order to improve the safety in such accidental conditions and mitigate their consequences. One of these recommendations was to improve the robustness of the instrumentation, which was dramatically lacking at Fukushima, as well as to better determine the Source Term involved in nuclear accident. The DECA-PF project (Diagnosis of a degraded reactor core through Fission Product measurements) was elaborated in this context and selected as one of 21 collaborative R and D projects in the field of nuclear safety and radioprotection, funded in May 2013 by the French National Research Agency. Over the months following the Fukushima accident, a CEA crisis team was held in order to analyze on-line the situation taking into account the data delivered by TEPCO and other organizations. Despite the difficulties encountered concerning the reliability of these data, the work performed showed the high capacity of Fission Products (FP) measurements to get a diagnosis relative to the status of the reactors and the spent fuel pools (SFP). Based on these FP measurements, it was possible to conclude that the main origin of the releases was coming from the cores and not from the SFP, in particular for SFP-4 which was of high concern, and that the degradation level of the reactors was very large, including probably an extensive core melting. To improve the reliability of this kind of diagnosis, the necessity to get such measurements as soon as possible after the accident and as near as possible from the reactor was stressed. In this way the present DECA-PF project intends to develop a new and innovative instrumentation taking into account the design of the French nuclear power plants on which sand bed filters have been implemented for severe accident management. Three complementary techniques, devoted to measure the FP release on-line, are being studied: - Gamma spectrometry, with an industrial objective to build a prototype aimed at improving the capacity of the present radiation monitoring system, - Gas chromatography, for the quantification of the fission gases (Xe, Kr) as well as potential carbon oxides produced in case of Molten Corium Concrete Interaction, - Optical absorption spectroscopy, the objective of this most innovative technique being to quantify the tetra-oxide of ruthenium, which could be produced in case of lower head failure, and the gaseous forms of iodine (molecular and organic) released in the environment. A global description and the present status of this project is presented, focusing on the Source Term establishment at the outlet stack of the sand bed filters and on the perspectives of implementation of the on-line gamma spectrometry equipment. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

DOE Bioenergy Technologies Office (BETO) 2023 Project Peer Review: WBS 2.4.1.100 Bench Scale Research & Development

Bench Scale Integration develops and optimizes fermentation processes to produce bio-based fuels and chemicals for commercial scale-up. The project uses fermentation science to achieve high titers and production rates by, for example, manipulating how the microorganisms are fed biomass sugars and nutrients, modifying fermentation conditions (pH, temperature, aeration) or developing online control strategies for better fermentation operations and high titer, rates, and yield (TRY). For this period of performance, we continued our development of a commercial-ready 2,3-butanediol (BDO) fermentation from biomass sugars utilizing NREL's proprietary Zymomonas mobilis microorganism. The engineered Z. mobilis can use all the main sugars in corn stover biomass, which are glucose, xylose, and arabinose. BDO is a versatile, low-carbon chemical which can be catalytically upgraded to a variety of hydrocarbon fuels and chemicals. The project had three goals during this review period; evaluate the technical feasibility of using whole slurry pretreated corn stover to achieve the techno-economic analysis (TEA) performance goals, continue optimizing a liquor-based fed-batch fermentation process for high titer, and develop strategies to enable scale-up. After evaluating different iterations of a whole slurry fermentation that did not meet the TEA goals, a Go/No-Go decision was made to pivot to liquor-only with new TEA performance targets, the main one being 140 g/L titer. We successfully met this goal, producing 141 g/L BDO at 1 g/L-hr productivity and 84% process yield. This titer and productivity attracted industrial interest to scale the fermentation resulting in a Technology Commercialization Fund project award in 2022. We used an NREL developed near-infra red (NIR) spectroscopy method for rapid analysis which allowed for changes to aeration levels and sugar feeding during the fermentation to maximize BDO production. The NIR analysis can be done using a hand-held spectrometer, essentially taking the analysis on to the plant floor during scale-up and preliminary work shows the feasibility of using an online probe for continuous monitoring and control. The other scale-up tool is mapping oxygen transfer coefficient (kLa) and oxygen transfer rate (OTR) in various vessels to find conditions that match the optimized 500 mL vessels. Showing a correlation to the mapping work, which is done with water and a dissolved oxygen probe, can reduce the risk of failed fermentations during scale-up. Our end-of-project goal is to meet the design target BDO titer (140-150 g/L) from DMR corn stover liquor at 1000L or larger scale to demonstrate BDO process design case and transfer the technology to industrial fermentation stakeholders for commercialization.

2 3-butanediol↗

Progress Updates for the Hanford Waste Treatment and Immobilization Plant Project - 17275

The Waste Treatment and Immobilization Plant (WTP) Project is vital to the U.S. Department of Energy's (DOE) mission to cleanup radioactive waste at the Hanford Site, located in southeastern Washington State. The overall WTP Project objective is to design, build, and commission the facilities and systems that will treat and immobilize approximately 211 983 m{sup 3} (56 million gallons) of radioactive waste stored in Hanford's 177 underground storage tanks. The combination of technologies in the WTP makes it a first-of-a-kind facility at a scale larger than ever built for radioactive waste processing. In 2012, DOE suspended production work on the WTP's Pretreatment (PT) Facility and to a lesser degree the High-Level Waste (HLW) Facility because of unresolved technical issues associated with those facilities. DOE is proceeding with its approach to complete the WTP Project in phases, which includes the following principal actions: - Completing construction of the Low-Activity Waste (LAW) Facility, Balance of Facilities (BOF), and Analytical Laboratory (LAB), collectively known as LBL; - Implementing a direct-feed low-activity waste (DFLAW) process to treat low-activity waste independent of the PT Facility; - Completing the design and construction of the HLW Facility; - Resolving the technical issues associated with the PT Facility; - Completing all WTP facilities to enable integrated WTP operations. In March 2016, a federal judge amended the 2010 Consent Decree, establishing revised milestone dates for the Hanford WTP that generally align with DOE's plans for completing the WTP facilities in sequence. In December 2016, DOE executed a contract modification and approved a change to the project's performance baseline to complete the LBL facilities and incorporate modifications needed to accommodate direct feed of low-activity waste to the LAW Facility. The contract modification and revised performance baseline support completion of hot commissioning of the WTP facilities needed for DFLAW operations no later than December 31, 2023. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Port Hope Areas Initiative's Port Granby Project: Radiation Protection Program - 17446

The Port Granby Project is large remediation project currently underway. A comprehensive and effective radiation protection program has been developed and implemented for the Port Granby Project. The potential radiation hazards associated with this project include: external (gamma) radiation, radon, inhalation, contamination and ingestion. Processes to address each of these potential hazards are identified. Measures of the effectiveness of the radiation protection program are also included. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Latest experience from Jose Cabrera reactor vessel dismantling project - 15214

Westinghouse is performing a decommissioning project at the Jose Cabrera NPP in Spain. The project was awarded in June 2013 and the main scope is to cut and package the reactor vessel and the reactor vessel head. The project is performed in the necessary sequential steps needed to prepare, segment, separate, and package the individual component segments using under water mechanical techniques. The first activities to be performed on site included e.g. cutting of all pipe penetrations on the reactor, sealing of some of the pipe penetrations, lifting and transportation of the reactor and sealing of the reactor pit. The results of these activities were very good and gave a perfect foundation for the cutting and packaging of the reactor vessel. Cutting of the reactor vessel head and the reactor vessel is made with different types of Westinghouse designed cutting equipment. The flexible nature of the cutting equipment has proved to be very valuable for the execution of the cutting work. The project is planned to be finalized in April 2014. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A 'Method Based Survey' Succeeds in a Spanish Scrap Clearance Project - 15664

During the last years, a Waste Minimization Project has been implemented in Cofrentes NPP in a collaborative effort performed by IBERDROLA and ENRESA. The final result has been more than 760 t of metallic scrap including containerised materials but also massive surface contaminated objects have been managed and finally cleared. The initial project scope included 10 spent fuel pool racks weighting 130 tones but limited testing demonstrated they presented high contamination levels and were managed as radwaste including down-sizing and conditioning in ENRESA standard radwaste containers for metallic scrap (CMT's). This project started in 2008 and finished just in the summer of 2014. During these years planning and licensing, procurement, execution, including, a huge effort in decontamination and clearance measurement, was developed. The project closure is developing actually. The residual materials were stored and initially characterized previously its down-sizing and decontamination using chemical baths (warm diluted sulfuric acid and ultrasounds) , blasting (water jetting with iron grit) and in special cases mopping using industrial cleaners). Some big items were decontaminated previously its down-sizing. The materials were cleared using an approach similar to MARSAME approach based in MARSSIM guidelines. The 160 containers needed six in situ gamma spectrometry measurements each and 115 massive (from 0.45 t to 13.7 t) items need at least so many measurements as total surface in square meters. In total 763 t were cleared with only 0.6 t rejected and treated as radwaste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗