Search NASA⌕ Search

SEARCH · Search NASA

Results for “START Program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,621 records · Page 90

Computational physics and applied mathematics capability review June 8-10, 2010 (Advance materials to committee members)

Los Alamos National Laboratory will review its Computational Physics and Applied Mathematics (CPAM) capabilities in 2010. The goals of capability reviews are to assess the quality of science, technology, and engineering (STE) performed by the capability, evaluate the integration of this capability across the Laboratory and within the scientific community, examine the relevance of this capability to the Laboratory's programs, and provide advice on the current and future directions of this capability. This is the first such review for CPAM, which has a long and unique history at the laboratory, starting from the inception of the Laboratory in 1943. The CPAM capability covers an extremely broad technical area at Los Alamos, encompassing a wide array of disciplines, research topics, and organizations. A vast array of technical disciplines and activities are included in this capability, from general numerical modeling, to coupled mUlti-physics simulations, to detailed domain science activities in mathematics, methods, and algorithms. The CPAM capability involves over 12 different technical divisions and a majority of our programmatic and scientific activities. To make this large scope tractable, the CPAM capability is broken into the following six technical 'themes.' These themes represent technical slices through the CP AM capability and collect critical core competencies of the Laboratory, each of which contributes to the capability (and each of which is divided into multiple additional elements in the detailed descriptions of the themes in subsequent sections): (1) Computational Fluid Dynamics - This theme speaks to the vast array of scientific capabilities for the simulation of fluids under shocks, low-speed flow, and turbulent conditions - which are key, historical, and fundamental strengths of the laboratory; (2) Partial Differential Equations - The technical scope of this theme is the applied mathematics and numerical solution of partial differential equations (broadly defined) in a variety of settings, including particle transport, solvers, and plasma physics; (3) Monte Carlo - Monte Carlo was invented at Los Alamos, and this theme discusses these vitally important methods and their application in everything from particle transport, to condensed matter theory, to biology; (4) Molecular Dynamics - This theme describes the widespread use of molecular dynamics for a variety of important applications, including nuclear energy, materials science, and biological modeling; (5) Discrete Event Simulation - The technical scope of this theme represents a class of complex system evolutions governed by the action of discrete events. Examples include network, communication, vehicle traffic, and epidemiology modeling; and (6) Integrated Codes - This theme discusses integrated applications (comprised of all of the supporting science represented in Themes 1-5) that are of strategic importance to the Laboratory and the nation. The laboratory has in approximately 10 million source lines of code in over 100 different such strategically important applications. Of these themes, four of them will be reviewed during the 2010 review cycle: Themes 1, 2, 3, and 6. Because these capability reviews occur every three years, Themes 4 and 5 will be reviewed in 2013, along with Theme 6 (which will be reviewed during each review, owing to this theme's role as an integrator of the supporting science represented by the other 5 themes). Yearly written status reports will be provided to the Capability Review Committee Chair during off-cycle years.

99 GENERAL AND MISCELLANEOUS↗

Computational physics and applied mathematics capability review June 8-10, 2010

Los Alamos National Laboratory will review its Computational Physics and Applied Mathematics (CPAM) capabilities in 2010. The goals of capability reviews are to assess the quality of science, technology, and engineering (STE) performed by the capability, evaluate the integration of this capability across the Laboratory and within the scientific community, examine the relevance of this capability to the Laboratory's programs, and provide advice on the current and future directions of this capability. This is the first such review for CPAM, which has a long and unique history at the Laboratory, starting from the inception of the Laboratory in 1943. The CPAM capability covers an extremely broad technical area at Los Alamos, encompassing a wide array of disciplines, research topics, and organizations. A vast array of technical disciplines and activities are included in this capability, from general numerical modeling, to coupled multi-physics simulations, to detailed domain science activities in mathematics, methods, and algorithms. The CPAM capability involves over 12 different technical divisions and a majority of our programmatic and scientific activities. To make this large scope tractable, the CPAM capability is broken into the following six technical 'themes.' These themes represent technical slices through the CPAM capability and collect critical core competencies of the Laboratory, each of which contributes to the capability (and each of which is divided into multiple additional elements in the detailed descriptions of the themes in subsequent sections), as follows. Theme 1: Computational Fluid Dynamics - This theme speaks to the vast array of scientific capabilities for the simulation of fluids under shocks, low-speed flow, and turbulent conditions - which are key, historical, and fundamental strengths of the Laboratory. Theme 2: Partial Differential Equations - The technical scope of this theme is the applied mathematics and numerical solution of partial differential equations (broadly defined) in a variety of settings, including particle transport, solvers, and plasma physics. Theme 3: Monte Carlo - Monte Carlo was invented at Los Alamos. This theme discusses these vitally important methods and their application in everything from particle transport, to condensed matter theory, to biology. Theme 4: Molecular Dynamics - This theme describes the widespread use of molecular dynamics for a variety of important applications, including nuclear energy, materials science, and biological modeling. Theme 5: Discrete Event Simulation - The technical scope of this theme represents a class of complex system evolutions governed by the action of discrete events. Examples include network, communication, vehicle traffic, and epidemiology modeling. Theme 6: Integrated Codes - This theme discusses integrated applications (comprised of all of the supporting science represented in Themes 1-5) that are of strategic importance to the Laboratory and the nation. The Laboratory has in approximately 10 million source lines of code in over 100 different such strategically important applications. Of these themes, four of them will be reviewed during the 2010 review cycle: Themes 1,2, 3, and 6. Because these reviews occur every three years, Themes 4 and 5 will be reviewed in 2013, along with Theme 6 (which will be reviewed during each review, owing to this theme's role as an integrator of the supporting science represented by the other five themes). Yearly written status reports will be provided to the CPAM Committee Chair during off-cycle years.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

OPERATIONAL TOPOLOGY ESTIMATION OF THREE PHASE UNBALANCED POWER DISTRIBUTION SYSTEMS WITH OUTAGES

Distribution grid, in general, is constructionally loopy but a radially operated network. Opening and closing of suitable tie-switches allows transition from one radial topology to another. Tie-switches ensure reliability and provide restoration paths when faults (outages) occur. The estimation of the system's current operational topology is a precursor to implementing any optimal control actions (during normal operation) or restorative actions (during outage condition). The existing literature in topology detection suffers with several limitations including: (1) computationally intensive nonlinear formulations that are not scalable for large distribution systems, (2) methods requiring exhaustive search for the correct topology by enumerating the complete topological search space, and (3) approaches requiring large volumes of time-series measurements and are not applicable for estimating continuously changing operational topology. Furthermore, the existing literature on distribution grid topology estimation cannot be extended to estimate the operational topology during outage conditions. For operational topology estimation during outages, our objective is to estimate both energized radial feeder and the outaged sections. Starting with a radial topology, these methods identify outaged feeder sections and hence, are inapplicable when the current radial operational topology is not known. In this work, we present a mathematical programming approach to estimate the operational topology of a three-phase unbalanced power distribution system under both outage and normal operating conditions. The aforementioned limitations of existing literature were countered by modeling the problem as a mixed-integer linear programming (MILP) problem which minimizes the errors in available measurements while satisfying the power flow and structural constraints of the system. Specically, a minimum weighted least absolute value estimator is proposed that uses the instantaneous line flow measurements, historical/ forecasted load data, and ping measurements from a limited set of smart meters and solves an MILP to identify the operational topology based on a linearized three-phase unbalanced power flow model. The proposed approach is tested on IEEE 123-bus feeder and 1069 bus multi-feeder test system and the numerical results prove the applicability of the proposed method to large three phase unbalanced grids with high errors in measurements. It is observed that the approach performs well even at high percentages of measurement errors.

GANDLURU NAGA, ANANDINI↗

2016 Nuclear Energy Voucher Pilot Program Final Summary

In March 2016, the Department of Energy Office of Nuclear Energy (DOE-NE) Gateway for Accelerated Innovation in Nuclear (GAIN) initiative launched the NE Voucher pilot program for small businesses that develop advanced nuclear technologies. The intent of this program is to provide access to unique physical and intellectual capital that exists within the DOE National Laboratory complex for private-sector developers of innovative nuclear energy technologies. Vouchers allow recipients to have work performed on their behalf at select DOE laboratory facilities. The work is funded by DOE-NE and must be completed within approximately 12 months of the award date. Awards for the pilot had values of $50,000–300,000 each, depending on the complexity of the task requested. The program requires a 20% cost share by voucher recipients. In addition to providing the technical assistance sought by the awardees, the 2016 pilot award cycle showed that the program fosters relationships between these businesses and DOE laboratory staff, serving the GAIN mission to develop a private-public partnership framework that will enable accelerated commercialization of innovative concepts. For the inaugural voucher program, DOE-NE made a total of $2M available. In total, twenty-nine proposals were received and eight (Table 1) were chosen for award based on several criteria, including technical quality, level of innovation, commercialization potential, and relevance to the DOE-NE mission. After the review process, cooperative agreements were finalized, and work on all eight vouchers started in September 2016 and all but one were completed by the end of September, 2017. The single exception was completed in December, 2017.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Deep Space Test Bed

The DSTB Facility provides a new capability for the National Aeronautics and Space Administration s (NASA s) Space Radiation Shielding Project (SRSP). The objective of the DSTB is to provide a platform to conduct radiation shielding investigations in an environment more similar to deep space than most Low Earth orbits or is achievable at a particle accelerator. The DSTB provides a means to experimentally test radiation shielding effectiveness of various materials and to test the accuracy of radiation transport code predictions in the deep space cosmic ray environment more frequently and at a lower cost compared to space flight missions. New spectrometers, dosimeters and other techniques may be exercised and verified using the DSTB before space flight. The DSTB will be implemented through NASA s National Scientific Balloon Facility (NSBF) which provides polar balloon flights that lift science payloads to high altitude (120,000 A. (36.58km)) to escape much of the shielding effects of the Earth s atmosphere and magnetosphere. Polar flights are conducted through NSBF in coordination with the United States Polar Program. The DSTB will be launched on a Long Duration Balloon (LDB) from McMurdo, Antarctica (77.86 degrees south latitude) for circumpolar flights, nominally 20 days, traveling to the west and typically bounded between 73 to 82 degrees south latitude. Float altitudes for these balloons with payload are 115,000 to 130,000 feet (35.05 to 39.62km). The DSTB will be able to accommodate up to 20 investigations per flight. Annual flight opportunities are planned starting in December 2005. Balloon campaigns in Antarctica occur in December and January during the Austral summer. Since a key goal of the DSTB facility is to efficiently serve the varied needs of the radiation shielding community; it must be designed with a flexible architecture. By implementing the DSTB facility with NASA s balloon program, which operates under reduced formalities compared to space flight, the DSTB facility can adjust for different investigation priorities on successive flights. This flexibility in the DSTB will be applied at several levels; in the distribution of the shared resources for each flight; addressing the payload configuration on a system level for each flight; and utilizing a selection process for investigations that considers yearly flight opportunities as well as the possibility for repeated flights. This approach for operating the DSTB facility will allow it to handle a wide range of investigations.

Milton, Martha E.↗

Security Technology Demonstration and Validation Sustainability Plan

This report describes the process of creating continuity and sustainability for demonstration and validation (DEMVAL) assets at the National Security Technology Incubator (NSTI). The DEMVAL asset program is being developed as part of the National Security Preparedness Project (NSPP), funded by Department of Energy (DOE)/National Nuclear Security Administration (NNSA). The mission of the NSTI program is to identify, incubate, and accelerate technologies with national security applications at various stages of development by providing hands-on mentoring and business assistance to small businesses and emerging or growing companies. Part of this support is envisioned to be research and development of companies’ technology initiatives, at the same time providing robust test and evaluation of actual development activities. This program assists companies in developing technologies under the NSTI program through demonstration and validation of technologies applicable to national security created by incubators and other sources. The NSPP also will support the creation of an integrated demonstration and validation environment. Development of the commercial potential for national security technologies is a significant NSTI focus. As part of the process of commercialization, a comprehensive DEMVAL program has been recognized as an essential part of the overall incubator mission. A number of resources have been integrated into the NSTI program to support such a DEMVAL program.

99 GENERAL AND MISCELLANEOUS↗

CyOTE ASSET OWNER ENGAGEMENT – SIDE CHANNEL POWER ANALYSIS PROTOTYPE

The U.S. Department of Energy’s (DOE) Office of Cybersecurity, Energy Security, and Emergency Response (CESER), through the Cybersecurity for the Operational Technology Environment (CyOTE) Program, worked with energy sector asset owners and operators (AOOs), partners, and Idaho National Laboratory (INL) to develop capabilities for AOOs to independently identify adversarial tactics, techniques, and procedures (TTPs) within their operational technology (OT) environments. The CyOTE methodology seeks to identify adversarial techniques within an AOO OT environment that could result in physical disruptions to energy flow or damage to equipment. CyOTE provides a general roadmap for AOOs, starting from a triggering event, or the point in time and space they perceive an anomalous event or condition meriting investigation, and culminating when the AOO has sufficient confidence to make a business risk decision on the appropriate resolution. This paper outlines the results of one such engagement with the New York Power Authority (NYPA), where the CyOTE program partnered with an AOO to develop a design specification for a power side channel detector to identify anomalous changes to device load. It describes the goal of developing this capability, the development process, the challenges the technical teams faced and the future steps an AOO will need to take to install and use this detector in its OT environment.

99 GENERAL AND MISCELLANEOUS↗

Status of PLS-II Upgrade Program

The Pohang Light Source (PLS) at the Pohang Accelerator Laboratory has been operated first at 2.0 GeV since 1995, and later was upgraded to 2.5 GeV. During this time, 6 insertion devices like undulators and multipole wigglers have been put into operation to produce special photon beams, with a total of 27 beamlines installed and 3 beamlines under construction. Recently, Korea synchrotron user's community is demanding high beam stability, higher photon energies as well as more straight sections for insertion devices in the PLS. To meet the user requirements, the PLS-II upgrade program has been launched in January, 2009, incorporating a modified chromatic version of Double Bend Achromat (DBA) to achieve almost twice as many straight sections as the current PLS with a design goal of the relatively low emittance, {epsilon}, of 5.9 nm{center_dot}rad. In the PLS-II, the top-up injection using full energy linac is planned for much higher stable beam as well and thus the production of hard x-ray undulator radiation of 8 to 13 keV is anticipated to allow for the successful research program namely Protein Crystallography. The PLS-II machine components of storage ring, linear accelerator and photon beamlines will be partly dismantled and reinstalled in a 6-months shutdown beginning January, 2011 and then the PLS-II upgrade be started the initial commissioning with a 100 mA beam current from July in 2011.

43 PARTICLE ACCELERATORS↗

SU-E-T-562: Motion Tracking Optimization for Conformal Arc Radiotherapy Plans: A QUASAR Phantom Based Study

Purpose: This study is to use plan parameters optimization (Dose rate, collimator angle, couch angle, initial starting phase) to improve the performance of conformal arc radiotherapy plans with motion tracking by increasing the plan performance score (PPS). Methods: Two types of 3D conformal arc plans were created based on QUASAR respiratory motion phantom with spherical and cylindrical targets. Sinusoidal model was applied to the MLC leaves to generate motion tracking plans. A MATLAB program was developed to calculate PPS of each plan (ranges from 0–1) and optimize plan parameters. We first selected the dose rate for motion tracking plans and then used simulated annealing algorithm to search for the combination of the other parameters that resulted in the plan of the maximal PPS. The optimized motion tracking plan was delivered by Varian Truebeam Linac. In-room cameras and stopwatch were used for starting phase selection and synchronization between phantom motion and plan delivery. Gaf-EBT2 dosimetry films were used to measure the dose delivered to the target in QUASAR phantom. Dose profiles and Truebeam trajectory log files were used for plan delivery performance evaluation. Results: For spherical target, the maximal PPS (PPSsph) of the optimized plan was 0.79: (Dose rate: 500MU/min, Collimator: 90°, Couch: +10°, starting phase: 0.83π). For cylindrical target, the maximal PPScyl was 0.75 (Dose rate: 300MU/min, Collimator: 87°, starting phase: 0.97π) with couch at 0°. Differences of dose profiles between motion tracking plans (with the maximal and the minimal PPS) and 3D conformal plans were as follows: PPSsph=0.79: %ΔFWHM: 8.9%, %Dmax: 3.1%; PPSsph=0.52: %ΔFWHM: 10.4%, %Dmax: 6.1%. PPScyl=0.75: %ΔFWHM: 4.7%, %Dmax: 3.6%; PPScyl=0.42: %ΔFWHM: 12.5%, %Dmax: 9.6%. Conclusion: By achieving high plan performance score through parameters optimization, we can improve target dose conformity of motion tracking plan by decreasing total MLC leaf travel distance and leaf speed.

61 RADIATION PROTECTION AND DOSIMETRY↗

Speed vs Accuracy: Effect on Ligand Pose Accuracy of Varying Box Size and Exhaustiveness in AutoDock Vina

Abstract Structure‐based virtual high‐throughput screening involves docking chemical libraries to targets of interest. A parameter pertinent to the accuracy of the resulting pose is the root mean square deviation (RMSD) from a known crystallographic structure, i. e., the ‘docking power’. Here, using a popular algorithm, Autodock Vina, as a model program, we evaluate the effects of varying two common docking parameters: the box size (the size of docking search space) and the exhaustiveness of the global search (the number of independent runs starting from random ligand conformations) on the RMSD from the PDBbind v2017 refined dataset of experimental protein‐ligand complexes. Although it is clear that exhaustiveness is an important parameter, there is wide variation in the values used, with variation between 1 and >100. We, therefore, evaluated a combination of cubic boxes of different sizes and five exhaustiveness values (1, 8, 25, 50, 75, 100) within the range of those commonly adopted. The results show that the default exhaustiveness value of 8 performs well overall for most box sizes. In contrast, for all box sizes, but particularly for large boxes, an exhaustiveness value of 1 led to significantly higher median RMSD (mRMSD) values. The docking power was slightly improved with an exhaustiveness of 25, but the mRMSD changes little with values higher than 25. Therefore, although low exhaustiveness is computationally faster, the results are more likely to be far from reality, and, conversely, values >25 led to little improvement at the expense of computational resources. Overall, we recommend users to use at least the default exhaustiveness value of 8 for virtual screening calculations.

Agarwal, Rupesh↗

Leveraging the Run 3 experience for the evolution of the ATLAS software-based readout towards HL-LHC

The High-Luminosity Large Hadron Collider (HL-LHC), scheduled to start operating in 2030, aims to increase the instantaneous luminosity by a factor of 10 compared to the LHC. To match this increase, the ATLAS experiment has been implementing a major upgrade program divided into two phases. The first phase (Phase-I), completed in 2022, introduced new trigger and detector systems that have been used during the Run 3 data taking period which began in July 2022. These systems have been used in conjunction with the new Data Acquisition (DAQ) Readout system, based on a software application called Software Readout Driver (SW ROD). SW ROD receives and aggregates data from the front-end electronics via the Front-End Link eXchange (FELIX) system and passes aggregated data fragments to the High-Level Trigger (HLT) system. During Run 3, SW ROD operates in parallel with the legacy Readout System (ROS) at an input rate of 100 kHz. For the Phase-II, the legacy ROS will be completely replaced with a new system based on the next generation of FELIX and an evolution of the SW ROD application called Data Handler. Data Handler has the same functional requirements as SW ROD but must be able to operate at an input rate of 1 MHz. To facilitate this evolution the SW ROD has been implemented using plugin architecture. This contribution presents the design and implementation of the SW ROD application for Run 3, along with the strategy for its evolution to the Phase-II Readout system. It discusses the lessons learned during Run 3 and describes the challenges that have been addressed to accomplish the demanding performance requirements of HL-LHC.

Kolos, Serguei [Univ. of California, Irvine, CA (U↗

A Mulit-State Model for Catalyzing the Home Energy Efficiency Market

The RePower Kitsap partnership sought to jump-start the market for energy efficiency upgrades in Kitsap County, an underserved market on Puget Sound in Washington State. The Washington State Department of Commerce partnered with Washington State University (WSU) Energy Program to supplement and extend existing utility incentives offered by Puget Sound Energy (PSE) and Cascade Natural Gas and to offer energy efficiency finance options through the Kitsap Credit Union and Puget Sound Cooperative Credit Union (PSCCU). RePower Kitsap established a coordinated approach with a second Better Buildings Neighborhood Program project serving the two largest cities in the county – Bainbridge Island and Bremerton. These two projects shared both the “RePower” brand and implementation team (Conservation Services Group (CSG) and Earth Advantage).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Best Practices in Promoting Utility-based Energy Efficiency and Renewable Energy: Policy Options for Ukraine

The report summarizes best practices in utility obligations and energy efficiency resource standards, drawing lessons that can be helpful for the Ukrainian government in its ongoing reform efforts. This report describes the experience of the United States and European Union member states with instruments such as energy efficiency obligations, energy efficiency resource standards, and renewable portfolio standards. This report consists of two parts. The first part covers the utility-based energy efficiency requirements (called energy efficiency obligations in Europe and energy efficiency resource standards in the U.S.). Structurally and conceptually, energy efficiency obligations and energy efficiency resource standards are similar even though they carry different names in different countries. These mechanisms place obligations on utilities to find energy savings equivalent to a certain percentage of their energy sales; depending on the program design, utilities can invest in end-use efficiency with their customers, or purchase energy savings from third parties. Some schemes also allow for trading of the energy savings. The report provides an overall description of these mechanisms, key elements as well as best practices in program design. The second part of the report provides a brief overview of U.S. renewable portfolio standards, which are structurally similar to utilities’ energy efficiency requirements, but for renewable energy. This part starts with a general overview of promotion of utility renewable energy requirements and proceeds with a description of the main components of the scheme.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy Storage for Social Equity Roundtable Report

In support of the Office of Electricity Energy Storage program, Pacific Northwest National Laboratory (PNNL), hosted a roundtable to explore the relationship between energy equity and energy storage. Flexible and available at any scale, energy storage offers a useful framework and starting point in a larger conversation around energy equity. Through storage, we can imagine more broadly how improvements and investments in the grid can respond to social and health challenges and increase affordability, reliability, and community value in the future. The roundtable featured keynotes and conversations with people leading the charge in transitioning our energy system to a more equitable, affordable, accessible, and sustainable future. This event was presented in collaboration with Sandia National Laboratories.

25 ENERGY STORAGE↗

Supersonic turbine design and performance

Methods for designing supersonic stator and rotor blading corrected for boundary layer displacement thickness are summarized. Computer programs based on these methods have been reported in NASA publications. Analytical blade losses for blading of this type are presented and design limitations resulting from consideration of flow separation and supersonic starting are discussed. In addition, a summary of the experimental performance of a single-stage turbine designed by these methods is given.

Goldman, L. J.↗

Military needs for orbital power

Results of the DoD/ERDA (now Department of Energy) Space Power Study completed in October 1977 are presented. The major new thrust of Air Force Advanced Technology Plans center on the development of military solar power systems which will extend capabilities to the 10 - 50 KW sub e power range for new classes of missions while maintaining technology applicability to the 0.5 - 10 KW sub e present mission class. The status of FY78 efforts for Project 682J (Air Force Space Power Advanced Development Program) are reported. Project 682J is divided into the following tasks: (1) high efficiency solar panel; (2) nickel-hydrogen battery; (3) gallium arsenide solar concentrator hardness study; and (4) new-start nuclear dynamic power system applications/integration study.

Massie, L. D.↗

Non-isolated 30 kW class arcjet PCU

A 30 kW class arcjet Power Conditioning Unit, PCU, was built and tested during this Phase 2 SBIR contract. The PCU is an improved version of two previously developed PCU's. All of these units are 3-phase, 20 kHz buck regulators with current mode feed back to modulate the duty cycle to control the arcjet current at any selected operating point. The steady state control can assure arcjet stability despite the negative dynamic resistance of the arc discharge. The system also has a circuit to produce a high voltage start pulse to breakdown the gas and initiate the arc. The start pulse is formed by temporarily switching a short current path across the output terminals with a special solid state switching array. The switches then open rapidly, and the energy stored in the output inductors of the buck regulator produces a pulse of approximately 2500 V for approximately 500 nsec. The system was tested and modified until the transition to steady operation occurred after start up with a very small surge current overshoot. The system also can withstand a direct short circuit across the output without damage. The automatic feed back control simply reduces the duty cycle to hold the current at the set point. When the short is removed the full power output is immediately restored. This latest version arcjet PCU is conduction cooled to remove waste heat by conduction to the base plate. This unit is closer to flight a type of design than the previous functional bread boards. Waste heat is small because the PCU has a very high efficiency, 296 percent. The PCU was extensively tested with resistor loads to simulate operation with an arcjet. The unit was tested with ammonia arcjets at the Jet Propulsion Laboratory. Approximately 400 hours of testing were completed, with several starts. Many hours were also demonstrated with resistive loads. Some testing with hydrogen arcjets was also carried out at NASA LeRC. This system concept is now the design base for the ATTD program.

Wong, See-Pok↗

Active Control of the Operating Temperature in a Loop Heat Pipe with Two Evaporators and Two Condensers

The operating temperature of a loop heat pipe (LHP) with multiple evaporators is a function of the total heat load, heat load distribution among evaporators, condenser temperature and ambient temperature. Because of the many variables involved, the operating temperature also showed more hystereses than an LHP with a single evaporator. Tight temperature control can be achieved by controlling its compensation chamber (CC) temperatures at the desired set point. This paper describes a test program on active control of the operating temperature in an LHP with two evaporators and two condensers. Temperature control was achieved by heating one or both CC's. Tests performed included start-up, power cycle, sink temperature cycle, CC temperature cycle, and capillary limit. Test results show that, regardless one or two CC's were heated to the set point temperature, one of CC's was always flooded with liquid. The loop could operate successfully at the desired set point temperature under most conditions, including some fast transients. At low heat loads, however, the CC temperature could suddenly increase above the set point temperature, possibly due to a sudden change of the vapor content inside the evaporator core.

Ku, Jentung↗