Search NASA⌕ Search

SEARCH · Search NASA

Results for “programmatic”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,621 records · Page 90

Examining Supply Chain Resilience for the Intermodal Shipment of Spent Nuclear Fuel and High Level Radioactive Materials

The U.S. Department of Energy (DOE) has a significant programmatic interest in the safe and secure routing and transportation of Spent Nuclear Fuel (SNF) and High Level Waste (HLW) in the United States, including shipments entering the country from locations outside U.S borders. In any shipment of SNF/HLW, there are multiple chains; a jurisdictional chain as the material moves between jurisdictions (state, federal, tribal, administrative), a physical supply chain (which mode), as well as a custody chain (which stakeholder is in charge/possession) of the materials being transported. Given these interconnected networks, there lies vulnerabilities, whether in lack of communication between interested stakeholders or physical vulnerabilities such as interdiction. By identifying key links and nodes as well as administrative weaknesses, decisions can be made to harden the physical network and improve communication between stakeholders. This paper examines the parallel chains of oversight and custody as well as the chain of stakeholder interests for the shipments of SNF/HLW and the potential impacts on systemic resiliency. Using the Crystal River shutdown location as well as a hypothetical international shipment brought into the United States, this paper illustrates the parallel chains and maps them out visually.

law↗

Transition and Transfer of Remediated Formerly Utilized Sites Remedial Action Program (FUSRAP) Sites from U.S. Army Corps of Engineers (USACE) to U.S. Department of Energy (DOE)

The US Department of Energy (DOE) expects to receive the transfer of 10 FUSRAP Sites from the US Army Corps of Engineers (USACE) over the next 10 years; however, the timing of the transfers is highly dependent upon federal funding of the ongoing remedial actions. When remediation for each site is complete and the 2-year operations and maintenance period has concluded, each site will transfer from USACE to DOE for long-term surveillance and maintenance (LTS&M). US DOE’s Office of Legacy Management (LM) will accept program responsibility for these sites and conduct LTS&M activities required to maintain protectiveness, preserve site-specific knowledge, and retain the cleanup and stewardship records while keeping stakeholders informed. Since the last FUSRAP site transfer occurred in 2007, LM in coordination with USACE intends to establish a transition process to promote the seamless transfer of sites from the time when the first record of decision is signed to the completion of FUSRAP activities. The approach to transfer active FUSRAP sites to completed sites status has been historically outlined in foundational documents such as the 1999 Memorandum of Understanding and supporting letters of agreement between the two agencies. As more complex FUSRAP sites are completed, this transition process will provide a model between the two agencies to communicate future long-term care liabilities. Ultimately, the FUSRAP transition process is structured to acquire and preserve site knowledge and information necessary for protecting the environment and public health. As of 2015, LM has transitioned and accepted programmatic responsibility for over 90 sites. From LM’s perspective, successful transition of any site includes understanding the long-term environmental liabilities. LM uses site transition framework requirements from past transitions to develop site-specific transition plans. Site-specific transition plans are developed by LM in coordination with USACE and executed during the 2-year operations and maintenance period. An integrated project team of subject matter experts is assembled to address the conditions of the transitioning site; acquire a site records collection; evaluate site operations and final site conditions and associated risks; identify and contact stakeholders; and document the basis for site LTS&M requirements. While the majority of the transition activities are completed by LM, close coordination between US DOE LM and USACE throughout this process is essential for an effective and seamless transfer to assure that there is no lapse in site protectiveness.

54 ENVIRONMENTAL SCIENCES↗

Examining supply chain resilience for the intermodal shipment of spent nuclear fuel and high level radioactive materials-16309

The U.S. Department of Energy (DOE) has a significant programmatic interest in the safe and secure routing and transportation of Spent Nuclear Fuel (SNF) and High Level Waste (HLW) in the United States, including shipments entering the country from locations outside U.S borders. In any shipment of SNF/HLW, there are multiple chains; a jurisdictional chain as the material moves between jurisdictions (state, federal, tribal, administrative), a physical supply chain (which mode), as well as a custody chain (which stakeholder is in charge/possession) of the materials being transported. Given these interconnected networks, there lies vulnerabilities, whether in lack of communication between interested stakeholders or physical vulnerabilities such as interdiction. By identifying key links and nodes as well as administrative weaknesses, decisions can be made to harden the physical network and improve communication between stakeholders. This paper examines the parallel chains of oversight and custody as well as the chain of stakeholder interests for the shipments of SNF/HLW and the potential impacts on systemic resiliency. Here, by using the Crystal River shutdown location as well as a hypothetical international shipment brought into the United States, this paper illustrates the parallel chains and maps them out visually.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

DoSSiER: Database of scientific simulation and experimental results

The Geant4, GeantV and GENIE collaborations regularly perform validation and regression tests for simulation results. DoSSiER (Database of Scientific Simulation and Experimental Results) is being developed as a central repository to store the simulation results as well as the experimental data used for validation. DoSSiER can be easily accessed via a web application. In addition, a web service allows for programmatic access to the repository to extract records in json or xml exchange formats. In this paper, we describe the functionality and the current status of various components of DoSSiER as well as the technology choices we made.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

A Framework for Daylighting Optimization in Whole Buildings with OpenStudio

We present a toolkit and workflow for leveraging the OpenStudio (Guglielmetti et al. 2010) platform to perform daylighting analysis and optimization in a whole building energy modeling (BEM) context. We have re-implemented OpenStudio's integrated Radiance and EnergyPlus functionality as an OpenStudio Measure. The OpenStudio Radiance Measure works within the OpenStudio Application and Parametric Analysis Tool, as well as the OpenStudio Server large scale analysis framework, allowing a rigorous daylighting simulation to be performed on a single building model or potentially an entire population of programmatically generated models. The Radiance simulation results can automatically inform the broader building energy model, and provide dynamic daylight metrics as a basis for decision. Through introduction and example, this paper illustrates the utility of the OpenStudio building energy modeling platform to leverage existing simulation tools for integrated building energy performance simulation, daylighting analysis, and reportage.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Evaluating the Maturity of Cybersecurity Programs for Building Control Systems

The cyber-physical security threat to buildings is complex, non-linear, and rapidly evolving as operational and information technologies converge and connect buildings to cyberspace. Cyberattacks on buildings can exploit smart building controls and breach corporate networks, causing financial and reputational damage. This may result in the loss of sensitive building information or the disruption of, or damage to, the systems necessary for the safe and efficient operation of buildings. For the buildings and facility infrastructure, there is a need for a robust national cybersecurity strategy for buildings, guidance on the selection and implementation of appropriate cybersecurity controls for buildings, an approach to evaluate the maturity and adequacy of the cybersecurity programs. To provide an approach for evaluating the maturity of the cybersecurity programs for building control systems, the US Department of Energy’s widely used Cybersecurity Capability and Maturity Model (C2M2) has been adapted into a building control systems version. The revised model, the Buildings-C2M2 (B-C2M2) provides maturity level indicators for cybersecurity programmatic domains. A “B-C2M2 Lite” version allows facility managers and building control system engineers, or information technology personnel to perform rapid self-assessments of their cybersecurity program. Both tools have been pilot tested on several facilities. This paper outlines the concept of a maturity model, describes the B-C2M2 tools, presents results and observations from the pilot assessments, and lays out plans for future work.

Glantz, Clifford S.↗

Assessment of Needs for Further Research to Understand the Role of Governments in Supporting Geothermal Exploration

This paper looks at financing barriers to geothermal resource exploration in the United States (U.S.) for electricity generation projects and analyzes why the market is not developing as quickly as foreign geothermal markets or as quickly as other renewable energy technologies in the U.S. Research opportunities and approaches to understanding these discrepancies are discussed, particularly whether government policies and programs are spurring development activities. Further analysis to understand policies, programmatic cost efficiencies, potential project revenues, and other economic impacts are recommended together with the preliminary conclusions.

15 GEOTHERMAL ENERGY↗

Lawrence Berkeley National Laboratory 2016 Annual Financial Report

FY2016 was a year of significant change and progress at Berkeley Lab. In March, Laboratory Director Michael Witherell assumed his new role when former Lab Director Paul Alivisatos became Vice Chancellor for Research at UC Berkeley. Dr. Witherell has solidified the Lab’s strategy, with a focus on long term science and technology priorities. Large-scale science efforts continued to expand at the Lab, including the Dark Energy Spectroscopic Instrument now heading towards construction, and the LUX-ZEPLIN dark matter detector to be built underground in South Dakota. Another proposed project, the Advanced Light Source-Upgrade, was given preliminary approval and will be the Lab’s largest scientific investment in years. Construction of the Integrative Genomics Building began, and will bring together researchers from the Lab’s Joint Genome Institute, now based in Walnut Creek, and the Systems Biology Knowledgebase (K-Base) under one roof. Investment in the Lab’s infrastructure also continues, informed by the Lab’s Infrastructure Strategic Plan. Another important focus is on developing the next generation of scientists with the talent and diversity needed to sustain Berkeley Lab’s scientific leadership and mission contributions to DOE and the Nation. Berkeley Lab received $897.5M in new FY2016 funding, a 12.5% increase over FY2015, for both programmatic and infrastructure activities. While the Laboratory experienced a substantial increase in funding, it was accompanied by only a modest increase in spending, as areas of growth were partially offset by the completion of several major efforts in FY2015. FY2016 costs were $826.9M, an increase of 1.9% over FY2015. Similar to the prior year, the indirect-funded Operations units worked with generally flat budgets to yield more funding for strategic needs. A key challenge for Berkeley Lab continues to be achieving the best balance to fund essential investments, deliver highly effective operational mission support and remain cost-competitive. Through a comprehensive approach to prioritize competing needs, the Lab ended the year in a favorable financial position. The Office of the Chief Financial Officer (OCFO) played a key role in providing analysis and decision support to Executive Leadership, enabling the Lab to enhance its financial management strategies. In FY2016, the OCFO updated its analytic approaches and models to enhance long term financial projections under various funding and investment scenarios, and to assess total cost of ownership for major proposed investments. These improvements provided the new Lab Director and Senior Leadership with more comprehensive information and analytic support for planning and prioritization efforts. Within the OCFO, we focused on core operations and key initiatives defined in our OCFO Strategic Roadmap. The Lab’s Financial System transitioned from stabilization to optimization, with a focus on expanding the financial reporting capabilities considerably. We completed implementation of the eCommerce platform, achieving a notable outcome for the Lab in close partnership with DOE’s Office of Science. In other accomplishments, we launched a financial literacy program to enable Lab managers and staff to understand and execute their financial management and stewardship responsibilities more effectively; made substantial progress in enhancing our Field Finance model that provides financial support to client divisions and areas; developed a business process governance model to define OCFO business processes, clarify roles, and strengthen service delivery; and implemented a Partners in Leadership training program to build leadership capacity among our staff. We completed a ‘refresh’ of our Strategic Roadmap, which now defines our priorities for FY2017-FY2019. As a part of this effort, we made a subtle but important change to the OCFO mission statement to call out the Lab’s research and stewardship mission to sustain the Lab’s science and technology capabilities now and into the future. Berkeley Lab’s FY2016 progress on all fronts - scientific, operations, and financial management – position the Lab to continue bringing science solutions to the world as we charge into the 21st Century.

Source record↗

Special Actinide Recovery from Mark-18A Target Material

The US Department of Energy (DOE) manages an inventory of materials that contains a range of long-lived radioactive isotopes that were produced from the 1960s through the 1980s by irradiating targets in production reactors at the Savannah River Site (SRS) to produce special heavy isotopes for DOE programmatic use, scientific research, and industrial and medical applications. During the late 1960s, one of the production reactors was configured to operate in a very high flux mode, and >8 kg of 242Pu plutonium contained in Mark-18A (Mk-18A) targets was irradiated to produce 252Cf for use in neutron source applications. Twenty-one targets were processed at the Oak Ridge National Laboratory (ORNL) to recover the 252Cf, heavy curium (i.e., curium rich in 246Cm through 248Cm), and 244Pu. Sixty-five of the Mark-18A targets were not processed and are currently in wet storage at SRS. DOE’s Office of Nuclear Materials Integration (ONMI) established a Mk-18A Target Material Recovery Program (MTMRP) to separate and preserve the unique materials in these targets. Evaluations are also under way to determine whether additional rare long-half-life fission product isotopes present in the targets in much smaller quantities, such as 93Zr, can be economically recovered. These evaluations include assessment of the quality, value, and demand of the materials; process modifications required to facilitate recovery; and the incremental costs for their recovery from the Mk-18A targets.

Patton, Bradley↗

2017 Grid Modernization Peer Review Report; Foundational Projects and Technical Area Portfolio Review

In April 2017, the U.S. Department of Energy’s (DOE’s) Grid Modernization Initiative (GMI) conducted its first external peer review of the projects awarded to the Grid Modernization Laboratory Consortium (GMLC) to execute a diverse portfolio of technologies to modernize the nation’s grid. The six technology areas reviewed during the 2017 Project Peer Review were: Design and Planning Tools; Devices and Integrated Systems; Institutional Support, Security and Resilience; Sensing and Measurement; and System Operations, Power Flow, and Control. Results of the 2017 Peer Review have been, and will be, used to help inform programmatic decision making, modify or discontinue existing projects, guide future funding opportunities, and support other budget and strategic planning objectives.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Planning for Receipt of Mk-18A Recovered Nuclear Material at Oak Ridge National Laboratory

Oak Ridge National Laboratory (ORNL) ships and receives a wide variety of radioisotopes. These shipments will include the Mark-18A high-burnup targets, which are being processed at Savannah River National Laboratory to recover valuable isotopes that will then be shipped to ORNL for programmatic use. The Mark-18A targets will be processed to recover two products: a plutonium oxide stream and an oxide material that will contain the americium, curium, and lanthanides. A Type A shipping package has been designed, fabricated, and certified to transport the americium/curium/lanthanide oxide product in special form capsules. The package was designed with both gamma and neutron shielding for contents reading up to 5,000 R/hour. The plutonium stream will be shipped to ORNL in a Model 9975 Type B transport cask. A new content envelope for the Type B cask is being developed. This paper discusses the preparation underway at ORNL to receive the packages and transfer the material into hot cell processing and storage facilities for subsequent use in research and development applications and as feedstock for heavy actinide production.

Patton, Bradley↗

Minor Actinide Production at Oak Ridge National Laboratory

The U.S. Department of Energy (DOE) manages an inventory of nuclear materials containing a range of long-lived radioactive isotopes. They were produced from the 1960s through the 1980s by irradiating targets in production reactors and in the High Flux Isotope Reactor, a research reactor commissioned at Oak Ridge National Laboratory (ORNL) in 1967, to produce special heavy isotopes for DOE programmatic use, scientific research, and industrial and medical applications. ORNL uses these transuranium isotopes (plutonium through californium) for the heavy-element research program and other R&D needs. As a result, ORNL has extensive experience in the production of transuranium isotopes. An effort is under way to review and document the techniques for the production of minor actinides, which are the actinide elements in used fuels other than uranium and plutonium (e.g., neptunium, americium, curium) at ORNL.

Patton, Bradley↗

The Need for Minor Actinide Production

The US Department of Energy (DOE) manages an inventory of materials that contains a range of long-lived radioactive isotopes that were produced from the 1960s through the 1980s by irradiating targets in production reactors to produce special heavy isotopes for DOE programmatic use, scientific research, and industrial and medical applications. Oak Ridge National Laboratory (ORNL) used many of these materials as feedstock in the calutron Electromagnetic Isotope Enrichment Facility (EIEF), one of only two facilities in the world with capabilities to enrich radioisotopes in multigram quantities. Both the production reactors and enrichment facilities have been shut down, and many of these unique materials will never be produced again. ORNL maintains a major portion of the United States’ inventory of these materials and uses them in DOE’s center for production, storage, and distribution of transuranium isotopes (plutonium through californium) to the user community. The US inventory of enriched actinides is being depleted, and attempts for over a decade to obtain critical supplies from foreign sources have been unsuccessful. Significant strides have been made recently in the development of new and improved enrichment technologies to replace the previous electromagnetic separations techniques. This paper summarizes the US’s need for production of high-purity enriched actinides by national security, nuclear nonproliferation, and basic research programs.

Robinson, Sharon↗

2019 Wireless Test Bed Range Manual

Idaho National Laboratory (INL), Next Generation Wireless Test Bed (NGWTB) program, is part of the Critical Infrastructure Protection (CIP) initiative. Our nation’s reliance on wireless and Internet technology is rapidly evolving as more corporations and government agencies, employees, and handheld devices include mobile connectivity for both voice and data. The competitive advantage offered by a mobile workforce is leading many corporations to make wireless integration and convergence a top business priority. Similarly, military systems worldwide are rapidly embracing next-generation commercial technologies to accelerate network-centric capabilities and provide enhanced situational awareness. While handheld devices such as laptops, BlackBerrys, and cell phones once had limited mobility and range, they are rapidly incorporating new and multiple protocols such as Bluetooth, Wi-Fi, Satellite, and broadband cellular (3G/4G) on a single platform to increase their effectiveness and agility. Worldwide there is exponential growth in public Wi-Fi and/or Satellite connectivity access nodes, and 3G/4G cellular continues to evolve and expand the range and speed of these devices. Additionally, critical infrastructure networks, previously isolated or connected with dedicated wireline circuits, are incorporating Zigbee for wireless sensor networks, wireless LANs for maintenance functions, and cellular or Internet based backhaul to manage control centers. Yet with all the build-up surrounding wireless technology, few understand the complexities surrounding wireless protocols and security, the risks of converged network infrastructures, need for interoperability of communication systems, or mitigation measures to safely use and improve new technologies in both commercial and military environments. With no single vendor source for all the telecommunications equipment needed for wireless infrastructure upgrades, and no one entity providing end-to-end testing or independent validation, the INL's NGWTB program fulfills a niche for facilitating integrated testing of multiple technologies, across multiple wireless domains, of next generation wireless telecommunications systems. NGWTB engineers and technicians have constructed and operate domain infrastructure in the Wireless Personal Area Network (WPAN), Wireless Local Area Network (WLAN), Wireless Metropolitan Area Networks (WMAN), and Wireless Wide Area Networks (WWAN). Advantages that make the INL's NGWTB the place to conduct project and programmatic testing include: • NTIA Experimental Station authority • Geographically isolated and low-noise radio frequency (RF) test areas located on a 890 sm DOE reservation • Access to isolated high-speed LAN and FOT networks The rollout of next-generation networks will involve deploying new technologies at every level including new: handsets, frequencies, antenna arrays, cell configurations that are optimized for both data and voice, massive upgrade of cell controllers’ “land-line” phone links from low bandwidth connections to higher capacity fiber or wireless backhaul, and integration of voice switching and Internet/data network protocols (Voice-Over-IP, Web phones). These systems are expected to greatly transform our nation's communications infrastructure and the types of services it provides.

2G↗

White Paper on DOE-HEP Accelerator Modeling Science Activities

Toward the goal of maximizing the impact of computer modeling on the design of future particle accelerators and the development of new accelerator techniques & technologies, this white paper presents the rationale for: (a) strengthening and expanding programmatic activities in accelerator modeling science within the Department of Energy (DOE) Office of High Energy Physics (HEP) and (b) increasing the community-wide coordination and integration of code development.

Vay, Jean-Luc↗

IMPLEMENTING CYBERSECURITY INTO AN EXISTING NATIONAL NUCLEAR NON-PROLIFERATION PROGRAMME – A CASE STUDY

Cyber threat profiling and risk mitigation is critical to any nuclear state organization and should be considered as part of any comprehensive nuclear security programme. Defining and evaluating the impact of the cyber threat to mission can be challenging. An existing national nuclear non-proliferation organization undertook an effort to incorporate computer security activities into its programme to address cyber risk. One of the primary goals of this endeavour was to develop a set of prioritised recommendations for organizational follow-through. The organization dedicated subject matter expert resources in the form of a cyber task force to support this goal. Opportunities were identified where computer security could be built into each programme including office-level strategies and tools. Of course, no new identified threat vector is easily considered and incorporated into existing programmes without impact. There are many obstacles to be overcome. Technically literate subject matter experts are difficult to find, management has comparatively less experience applying computer security into its programmes, and trying to change the culture to consider computer security risk at policy and programmatic levels takes time and management attention. As an outcome of this process, a roadmap for program integration was developed, including the establishment of a cyber support team. This paper will discuss the challenges and successes associated with establishing such a team.

Cyber Security, Nuclear, Non-proliferation↗

Assessment of Survey Results from Advanced Reactor Industry Domain Experts on Nonlinear Soil-Structure Interaction Analysis Software Verification and Validation

The seismic load case has a significant impact on the design and cost of nuclear power plants. Given the need to substantially reduce cost, advanced reactor designers are looking to leverage numerical tools that enable seismic analysis of an integrated vessel/support/structure/soil system. Modern nonlinear analysis tools provide a solution, capturing dynamic coupling between components (including soil-structure interaction (SSI)) concurrent with nonlinear behavior in one or more parts of the system. Although these methods have a rich history of technical development and implementation, software quality assurance (SQA) following nuclear industry standards remains a significant burden for those wishing to adopt such methods for advanced reactor design and licensing. To reduce the SQA burden, this project will develop the guidance for SQA verification and validation (V&V) of coupled nonlinear SSI analysis tools, to include a test matrix of software features and test problems to support commercial grade dedication (CGD). The guidance is intended to be technology-neutral: supporting designers of all advanced reactors. To maximize the value of the project to reactor designers, the project team performed focused surveys of and interviews with advanced reactor designers. Additionally, the project surveyed members of the broader industry involved in reactor design and licensing. The aggregated industry feedback consists of written survey responses, live polling responses, focused interviews, and informal feedback provided after outreach presentations, collectively referred to as “survey results”. Herein, the survey results are reported, reviewed, and assessed to inform follow-on project activities. The survey results confirmed the familiarity of the industry with the coupled nonlinear SSI analysis. They also affirm the project need based upon the expressed intent to (1) incorporate nonlinear features and (2) pursue the coupled nonlinear SSI analysis to reduce seismic demands and construction costs. All reactor designers indicated their intent to incorporate two or more nonlinear features, and all reactor designer respondents opined that the coupled nonlinear SSI analysis would allow for the optimization of the reactor design and construction. However, the programmatic challenges, whether real or perceived, present a significant barrier to reactor designers. The barrier most commonly identified by the reactor designer population was regulatory risk, with 70% citing this as a reason not to pursue the approach. The perceived regulatory risk identified by the reactor designers underscores the importance of regulator engagement and dialogue in this project. Additionally, half of the reactor designers identified cost and lack of guidance as a deterrent. The survey results also provide insights to tailor specific aspects of the guidance document and test matrix. The project plans to prepare both a formal referenceable guidance document and a collaborative, web-based test matrix and problem set. The project will focus on more complete test problem definitions for the prioritized nonlinear features over shallower problem descriptions for a larger set of features. The nonlinearities prioritized as high based upon survey feedback include fluid-structure interaction and seismic isolation and energy dissipation devices. The nonlinearities prioritized as intermediate include nonlinear geomaterials, nonlinear concrete, nonlinear steel, and interface/contact nonlinearity. Deep embedment and the associated nonlinear phenomena are assigned the lowest priority based upon survey feedback.

42 ENGINEERING↗

Real-time series resistance monitoring in photovoltaic systems

A device includes at least one processor configured to determine a target irradiance value based on an operating current value of a photovoltaic (PV) device, a short-circuit current value of the PV device, and an operating irradiance value of the PV device. The at least one processor is also configured to determine an open-circuit voltage value of the PV device at the target irradiance value, determine a series resistance value of the PV device based on an operating voltage value of the PV device, the operating current value, and the open-circuit voltage value at the target irradiance value, and execute at least one programmatic action based on the series resistance value.

14 SOLAR ENERGY↗