Search NASA⌕ Search

SEARCH · Search NASA

Results for “test support”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,621 records · Page 90

Mechanisms test bed math model modification and simulation support

This report summarizes the work performed under contract NAS8-38771 in support of the Marshall Space Flight Center Six Degree of Freedom Motion Facility and Flight Robotics Laboratory. The contract activities included the development of the two flexible body and Remote Manipulator System simulations, Dynamic Overhead Target Simulator control system and operating software, Global Positioning System simulation, and Manipulator Coupled Spacecraft Controls Testbed. Technical support was also provided for the Lightning Imaging Sensor and Solar X-Ray Imaging programs. The cover sheets and introductory sections for the documentation written under this contract are provided as an appendix.

Gilchrist, Andrea C.↗

CFM Analysis, Documentation, and Planning Support

The Multipurpose Hydrogen Test Bed (MHTB) Test Readiness Review (TRR), in preparation for upcoming thermodynamic vent system testing with LN2 (an LO2 simulant), was conducted on Aug 10 with no significant concerns or open action items. The 21 day test series, designed to evaluate the spray bar mixer/vent system concept suitability for zero-g operation began on August 19. The testing is progressing very well and results indicate that the Moog latching valve is more effective than the Castor solenoid valve in reducing pressure during the vent/mixing cycles. Testing with self-pressurization is expected to be completed on September 3 and testing with helium pressurization will be initiated on September 4 or 5. Additional activities during first half of August included coordination of Notification of Intent (NOI) to propose letters involving CFM in response to the HR&T BAA for Extramural Proposals.

Hastings, Leon J.↗

Spacesuit Portable Life Support System Breadboard (PLSS 1.0) Development and Test Results

A multi-year effort has been carried out at NASA-JSC to develop an advanced Extravehicular Activity (EVA) PLSS design intended to further the current state of the art by increasing operational flexibility, reducing consumables, and increasing robustness. Previous efforts have focused on modeling and analyzing the advanced PLSS architecture, as well as developing key enabling technologies. Like the current International Space Station (ISS) Extravehicular Mobility Unit (EMU) PLSS, the advanced PLSS comprises of three subsystems required to sustain the crew during EVA including the Thermal, Ventilation, and Oxygen Subsystems. This multi-year effort has culminated in the construction and operation of PLSS 1.0, a test rig that simulates full functionality of the advanced PLSS design. PLSS 1.0 integrates commercial off the shelf hardware with prototype technology development components, including the primary and secondary oxygen regulators, ventilation loop fan, Rapid Cycle Amine (RCA) swingbed, and Spacesuit Water Membrane Evaporator (SWME). Testing accumulated 239 hours over 45 days, while executing 172 test points. Specific PLSS 1.0 test objectives assessed during this testing include: confirming key individual components perform in a system level test as they have performed during component level testing; identifying unexpected system-level interactions; operating PLSS 1.0 in nominal steady-state EVA modes to baseline subsystem performance with respect to metabolic rate, ventilation loop pressure and flow rate, and environmental conditions; simulating nominal transient EVA operational scenarios; simulating contingency EVA operational scenarios; and further evaluating individual technology development components. Successful testing of the PLSS 1.0 provided a large database of test results that characterize system level and component performance. With the exception of several minor anomalies, the PLSS 1.0 test rig performed as expected; furthermore, many system responses trended in accordance with pre-test predictions.

Vogel, Matt R.↗

Spacesuit Portable Life Support System Breadboard (PLSS 1.0) Development and Test Results

A multi-year effort has been carried out at the Johnson Space Center to develop an advanced EVA PLSS design intended to further the current state of the art by increasing operational flexibility, reducing consumables, and increasing robustness. This multi-year effort has culminated in the construction and operation of PLSS 1.0, a test rig that simulates full functionality of the advanced PLSS design. PLSS 1.0 integrates commercial off-the-shelf hardware with prototype technology development components, including the primary and secondary oxygen regulators, ventilation loop fan, Rapid Cycle Amine (RCA) swingbed, and Spacesuit Water Membrane Evaporator (SWME). PLSS 1.0 was tested from June 17th through September 30th, 2011. Testing accumulated 233 hours over 45 days, while executing 119 test points. An additional 164 hours of operational time were accrued during the test series, bringing the total operational time for PLSS 1.0 testing to 397 hours. Specific PLSS 1.0 test objectives assessed during this testing include: (1) Confirming prototype components perform in a system level test as they have performed during component level testing, (2) Identifying unexpected system-level interactions (3) Operating PLSS 1.0 in nominal steady-state EVA modes to baseline subsystem performance with respect to metabolic rate, ventilation loop pressure and flow rate, and environmental conditions (4) Simulating nominal transient EVA operational scenarios (5) Simulating contingency EVA operational scenarios (6) Further evaluating prototype technology development components Successful testing of the PLSS 1.0 provided a large database of test results that characterize system level and component performance. With the exception of several minor anomalies, the PLSS 1.0 test rig performed as expected. Documented anomalies and observations include: (1) Ventilation loop fan controller issues at high fan speeds (near 70,000 rpm, whereas the fan speed during nominal operations would be closer to 35,000 rpm) (2) RCA performance at boundary conditions, including carbon dioxide and water vapor saturation events, as well as reduced vacuum quality (3) SWME valve anomalies (4 documented cases where the SWME failed to respond to a control signal or physically jammed, preventing SWME control) (4) Reduction of SWME hollow fiber hydrophobicity and significant reduction of the SWME degassing capability after significant accumulated test time.

Watts, Carly A.↗

Instabilities orginating from suction holes used for Laminar Flow Control (LFC)

A small-scale wind tunnel previously used for turbulent boundary layer studies has been modified for experiments in laminar flow control. The facility incorporates suction through interchangeable porous test surfaces which are used to stabilize the boundary layer and delay transition to turbulent flow. The thin porous test surfaces are supported by a baffled plenum chamber box which also acts to gather the flow through the surface into tubes which are routed to a high pressure fan. An elliptic leading edge is attached to the assembly to establish a new layer on the test plate. A slot is used to remove the test section flow below the leading edge. The test section was lengthened and fitted with a new ceiling. Substantial modifications were also made to the 3D probe traverse. Detailed studies have been made using isolated holes to explore the underlying instability mechanisms. The suction is perturbed harmonically and data are averaged on the basis of the phase of the disturbance. Conditions corresponding to strong suction and without suction have been studied. In both cases, 3D contour surfaces in the vicinity of the hole show highly three-dimensional T-S waves that fan out away from the hole with streamwise distance. With suction, the perturbations on the centerline are much stronger and decay less rapidly, while the far field is similar to the case without suction. Downstream the contour surfaces of the bow-shaped TS waves develop spanwise irregularities which eventually form into clumps. The contours remain smooth when suction is not applied. Even without suction, the harmonic point source is challenging for CFD; e.g. DNS has been used for streamwise growth. With suction, grid resources are consumed by the hole and this makes DNS even more expensive. Limited DNS results so far indicate that the vortices which emanate from suction holes appear to be stable. The spanwise clumping observed in the experiment is evidence of a secondary instability that could be associated with suction vortices. A typical porous surface for LFC consists of 0.002 inch diameter holes with 0.020 inch grid spacing L, which is too small to resolve disturbances. A 20:1 scale porous test surface has been machined for improved spatial resolution while the L/d is still representative of flight conditions. Designers of porous surfaces use Goldsmith's criterion to minimize crossstream interaction. However nothing is known about the streamwise interactions. Results using two holes, aligned but displaced in the streamwise direction, indicate that partial TS wave cancellation is possible, depending on the hole spacing and disturbance frequency. Using DNS for streamwise interaction studies will be prohibitively expensive if linear superposition cannot be used for the multiple holes.

Watmuff, Jonathan H.↗

Real-Time Radiographic In-Situ Characterization Of Ply Lift In Composite Aerospace Materials

The problem of ply lifting in composite materials is a significant issue for various aerospace and military applications. A fundamental element in the prevention or mitigation of ply lift is determination of the timing of the ply lifting event during exposure of the composite material to flight conditions. The Marshall Space Flight Center s Nondestructive Evaluation Team developed a real-time radiographic technique for the detection of ply lift in carbon phenolic ablative materials in situ during live firings of subscale test motors in support of NASA s Reusable Solid Rocket Motor program, using amorphous silicon detector panels. The radiographic method has successfully detected ply lifting in seven consecutive carbon phenolic converging cones attached to solid fuel torches, providing the time of ply lift initiation in each test. Post-processing of the radiographic images improved the accuracy of timing measurements and allowed measurement of the ply lifting height as a function of time. Radiographic data correlated well with independent pressure and temperature measurements that indicate the onset of ply lift in the nozzle material.

Beshears, Ronald D.↗

A Status Report on the Parachute Development for NASA's Next Manned Spacecraft

NASA has determined that the parachute portion of the Landing System for the Crew Exploration Vehicle (CEV) will be Government Furnished Equipment (GFE). The Earth Landing System has been designated CEV Parachute Assembly System (CPAS). Thus a program team was developed consisting of NASA Johnson Space Center (JSC) and Jacobs Engineering through their Engineering and Science Contract Group (ESCG). Following a rigorous competitive phase, Airborne Systems North America was selected to provide the parachute design, testing and manufacturing role to support this team. The development program has begun with some early flight testing of a Generation 1 parachute system. Future testing will continue to refine the design and complete a qualification phase prior to manned flight of the spacecraft. The program team will also support early spacecraft system testing, including a Pad Abort Flight Test in the Fall of 2008

Sinclair, Robert↗

Satellite Broadcast of Graphical Weather Data Flight Tested

NASA Glenn Research Center at Lewis Field's aviation Weather Information Communications (WINCOMM) and NASA Langley Research Center's Aviation Weather Information (AWIN) programs collaborated in a flight test and evaluation of a worldwide weather data-link capability using satellites. This successful flight testing moves NASA closer to its goal of developing advanced communications and information technologies to enable high-quality and timely dissemination of aviation weather information to all relevant users on the aviation information network. Recognized as a major contributing factor in aviation accidents and incidents, weather contributes directly or indirectly to nearly 80 percent of fatal general aviation (small private aircraft) accidents. In 1997, the Aeronautics Safety Investment Strategy Team s weather team produced a prioritized list of investment areas under weather accident prevention. Weather data dissemination is the most critical and highest ranked priority on the list. NASA's Aviation Safety Program founded the Aviation Weather Information initiative to focus efforts on significantly reducing the number of weather-related aviation fatalities. Access to accurate and timely weather data could contribute to a major reduction of weather-related incidents and accidents. However, a cost-effective solution has eluded most general aviation pilots because of the high cost of onboard weather radar equipment. Rockwell Collins, through a contract with NASA and in cooperation with WorldSpace Corporation, successfully completed ground and flight testing of a receiver and antenna in Johannesburg, South Africa. This NASA/Rockwell Collins project is an evaluation of worldwide weather data-link capability using transmissions from the Satellite Digital Audio Radio Services (S DARS) AfriStar satellite. Owned and operated by WorldSpace, AfriStar is a geostationary satellite that broadcasts commercial digital audio services to stationary and mobile platforms. S DARS satellites are the most powerful communications satellites produced to date, allowing users to receive signals using simple, low-cost patch antennas instead of more expensive, beam-steered antenna arrays. Engineers connected an inexpensive, commercially available radio receiver to a laptop computer and an antenna designed and built by Rockwell Collins, enabling them to receive WorldSpace signals from the AfriStar satellite during flight tests. WorldSpace broadcast their composite color graphical weather data files, which were multiplexed with normal audio streams, to the flat patch antenna mounted on a single-engine aircraft. The aircraft was equipped with a modified commercial S-DARS receiver, a Global Positioning Satellite (GPS) receiver, and a laptop computer with color display. Continuous data reception occurred during normal aircraft maneuvers performed throughout takeoff, cruise, and landing operations. In addition, engineers monitored receiver power levels during steep turns and banks. In most instances, the receiver was able to maintain acceptable power levels during all phases of flight and to obtain weather data with little or with the successful completion of ground and flight testing of a receiver and antenna in Johannesburg, South Africa, the team has started to prepare for experiments using highspeed aircraft in areas of the world with limited access to timely weather data. NASA plans to provide a more advanced antenna design and consultation support. This successful test of real-time aviation-related weather data is a positive step toward solving communications-specific issues associated with the dissemination of weather data directly to the cockpit.

Mallasch, Paul G.↗

Stirling Research Laboratory Providing Independent Performance Verification of Convertors for a Stirling Radioisotope Generator

The Department of Energy (DOE), Germantown, Maryland, Stirling Technology Company (STC), Kennewick, Washington, and NASA Glenn Research Center are developing a free-piston Stirling convertor for a high-efficiency Stirling Radioisotope Generator for NASA Space Science missions. This generator is being developed for multimission use, including providing electric power for unmanned Mars rovers and for deep space missions. STC is developing the 55-W Technology Demonstration Convertor (TDC) under contract to DOE. Glenn is conducting an in-house technology project to assist in developing the convertor for readiness for space qualification and mission implementation. As part of this effort, a Stirling Research Laboratory was established to test the TDC's and related technologies. A key task is providing an independent verification and validation of the TDC performance. Four TDC's are now being tested at Glenn. Acceptance testing has been completed for all convertors, and in general, performance agreed well with that achieved by STC prior to the delivery of the convertors. Performance mapping has also been completed on two of the convertors over a range of hot-end temperatures (450 to 650 C), cold-end temperatures (80 to 120 C), and piston amplitudes (5.2 to 6.2 mm). These test data are available online at http://www.grc.nasa.gov/WWW/tmsb/. The TDC's can be tested in either a horizontal orientation with dual-opposed convertors or in a vertical orientation with a single convertor. Synchronized dual-opposed pairs are used for dynamically balanced operation that results in very low levels of vibration. The Stirling Research Laboratory also supports launch environment testing of the TDC's in Glenn's Structural Dynamics Laboratory and electromagnetic interference and electromagnetic compatibility characterization and reduction efforts. In addition, the TDC's will be used for long-term endurance testing, and preparations are underway for unattended operation.

Thieme, Lanny G.↗

Cryogenic Testing of the Thermal Vacuum Chamber and Ground Support Equipment for the James Webb Space Telescope in Chamber A at Johnson Space Center

The James Webb Space Telescope (JWST) is the largest cryogenic instrument telescope to be developed for space flight. The telescope will be passively cooled to 50 K and the instrument package will be at 40 K with the mid-infrared instrument at 6 K. The final cryogenic test of the Optical Telescope Element (OTE) and Integrated Science Instrument Module (ISIM) as an assembly (OTE + ISIM OTIS) will be performed in the largest 15 K chamber in the world, Chamber A at Johnson Space Center. The planned duration of this test will be 100 days in the middle of 2017. Needless to say, this ultimate test of OTIS, the cryogenic portion of JWST will be crucial in verifying the end-to-end performance of JWST. A repeat of this test would not only be expensive, but would delay the launch schedule (currently October 2018). Therefore a series of checkouts and verifications of the chamber and ground support equipment were planned and carried out between 2012 and 2016. This paper will provide a top-level summary of those tests, trades in coming up with the test plan, as well as some details of individual issues that were encountered and resolved in the course of testing.

thermal vacuum chamber↗

Flow Sensor Test Article (F-STAr) - Status Report for FY2021

This report will review updates on the status of F-STAr. First, the report will describe a general overview of the test article and how each component interacts. Then, each main component will be discussed in a deep dive section which will review the design and other relevant details. F-STAr components which are discussed in more detail include the 120 GPM-pump, the support structure and test sections, 5 kW-heater, the 2 kW-cooler and cooling system, and the submersible flowmeter. Finally, this report will conclude with a brief recap and a bulleted outline of the path moving forward.

42 ENGINEERING↗

Space radiation studies

Two Active Radiation Dosimeters (ARD's) flown on Spacelab 1, performed without fault and were returned to Space Science Laboratory, MSFC for recalibration. During the flight, performance was monitored at the Huntsville Operations Center (HOSC). Despite some problems with the Shuttle data system handling the verification flight instrumentation (VFI), it was established that the ARD's were operating normally. Postflight calibrations of both units determined that sensitivities were essentially unchanged from preflight values. Flight tapes were received for approx. 60 percent of the flight and it appears that this is the total available. The data was analyzed in collaboration with Space Science Laboratory, MSFC. Also, the Nuclear Radiation Monitor (NRM) was assembled and tested at MSFC. Support was rendered in the areas of materials control and parts were supplied for the supplementary heaters, dome gas-venting device and photomultiplier tube housing. Performance characteristics of some flight-space photomultipliers were measured. The NRM was flown on a balloon-borne test flight and subsequently performed without fault on Spacelab-2. This data was analyzed and published.

Source record↗

Integration of CFD and Wind-Tunnel Testing at NASA

The debate over when wind-tunnel testing will be replaced by Computational Fluid Dynamics (CFD) comes and goes. More recently, however, the debate has subsided with a more collaborative spirit between practitioners of these two disciplines. Combining these complementary disciplines has led to significant improvements in both as well as better understanding of aero- and fluid dynamics. Also, as CFD codes become more accurate, the need for comparisons with experimental data has increased. New measurement techniques, pressure-sensitive paint and off-body velocity measurements for example, have provided detailed, high-quality data for the comparisons. In-tunnel CFD simulations are also providing more direct comparisons between predicted and measured flows. Given this newenvironment, a concerted effort is now underway to facilitate in-tunnel CFD for the 12 major wind tunnels operated by NASA.The Aerosciences Evaluation and Test Capabilities Portfolio (AETC) manages the major aerodynamic ground-testing facilities within NASA. This group is responsible for the operation, maintenance, and improvement of the wind-tunnel facilities and their capabilities. AETC has recently added a project to integrate CFD and wind-tunnel testing to better support customers of the NASA wind tunnels and to better understand the flow in the wind tunnels themselves. Being able to perform CFD simulations of wind-tunnel models in the wind tunnel environment providesthe cleanest way to assess the accuracy of the simulations relative to test data. AETC plans to provide accurate geometry and guidance to wind-tunnel customers who request it, to facilitate in-tunnel simulations. How this effort got started will be presented along with the status and plans for the project.

CFD↗

UTM UAS Service Supplier Development: Sprint 2 Toward Technical Capability Level 4

NASA's UAS Traffic Management (UTM) Project has been tasked with developing concepts and initial implementations for integrating and managing small unmanned aircraft systems (UAS) into the low altitude airspace. To accomplish this task, the UTM Project planned a phased approach based on four Technical Capability Levels (TCLs). As of this writing, TCL4 is currently in development for a late Spring 2019 flight demonstration. This TCL is focused on operations in an urban environment and includes the handling of high density environments, large-scale off-nominal conditions, vehicle-to-vehicle communications, detect-and-avoid technologies, communication requirements, public safety operations, airspace restrictions, and other related goals. Through research and testing to date, NASA has developed an architecture for UTM that depends on commercial entities collaboratively providing services that are traditionally provided by the Air Navigation Service Provider (ANSP) in manned aviation. A key component of this architecture is the UAS Service Supplier (USS), which acts as a communications bridge between UAS operators and the ANSP when necessary. In addition, the collection of USSs form a USS Network to collaboratively manage the airspace through the sharing of data and the adherence to a standard or set of standards required to participate in this USS Network. This document provides a record of the second of four planned steps in the development of interoperable USSs that will ultimately support TCL4 flight testing and formalization of the overall UTM concept. To develop these USSs and their underlying specifications, NASA has planned a series of "Sprints" to work with industry partners in implementing the features and develop proposed specifications for USSs in order to to participate in TCL4. This report describes Sprint Two. In this Sprint, there was a major theme with four goals. The theme was the development and testing of a new USS discovery system, to better enable USSs to find and communicate with each other. The goals supporting this theme were: participants needed to implement and exercise the discovery service for USS-USS communications; USSs needed to demonstrate strategic deconfliction through operation sharing; the systems were to use discovery to aid in handling off-nominal operations; and finally, there was an investigation of an initial off-nominal reporting capability.

software engineering↗