Search NASA⌕ Search

SEARCH · Search NASA

Results for “COST ESTIMATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,639 records · Page 91

Cost details from front-end engineering design of piperazine with the advanced stripper

This Front-End Engineering Design (FEED) was funded by the U.S. Department of Energy (DOE) to estimate the cost to capture and compress 90% of the CO 2 from an existing natural gas combined cycle (NGCC) in Denver City, Texas, USA. The FEED used the PZAS (Piperazine with the Advanced Stripper) 2G amine scrubbing technology developed and modeled by The University of Texas at Austin. This FEED is unique in providing more public cost details than other FEEDs funded by DOE. The primary objective of the FEED was to provide a comprehensive estimate for the total installed cost of the capture plant. The estimated capital cost of NGCC at the Mustang Station is $\$727$ million for a capacity of 460 MW and 1.6 million tonnes CO 2 /yr. This includes a contingency of $\$104.6$ million and a contractor’s profit of $\$60.1$ million. The total direct field cost is $\$384.1$ million. With an optimistic fuel value of $\$3$/MMBtu, the estimated cost of capture varies from $\$85$/t at 4% IRR/85% load to $\$170$/t at 10% IRR/52% load. Air cooling is technically feasible but expensive. The air cooling systems for the water wash and pump-around intercooling account for 23.4% of the direct cost. The gas-fired boilers represent only 4% of the direct costs, but steam extraction would reduce energy cost, free up cooling water, and reduce the direct costs of processing additional flue gas and CO 2 from the boilers. The absorbers represent 9.6% of the direct cost in this FEED with no direct contact cooler and only 7.6 m of packing. Furthermore, the solvent cross exchangers are less expensive than expected (2.5% of direct costs). Doubling the number of these exchangers could reduce the heat duty from 3.0 to 2.5 GJ/t CO 2 .

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Cost of Using Laser Powder Bed Fusion to Fabricate a Molten Salt-to-Supercritial Carbon Dioxide Heat Exchanger for Concentrating Solar Power

Advances in manufacturing technologies and materials are crucial to the commercial deployment of energy technologies. We present the case of concentrating solar power (CSP) with molten salt (MS) thermal storage, where low-cost, high-efficiency heat exchangers (HXs) are needed to achieve cost competitiveness. Here, the materials required to tolerate the extreme operating conditions in CSP systems make it difficult or infeasible to produce them using conventional manufacturing processes. Although it is technically possible to produce HXs with adequate performance using additive manufacturing, specifically laser powder bed fusion (LPBF), here we assess whether doing so is cost-effective. We describe a process-based cost model (PBCM) to estimate the cost of fabricating a MS-to-supercritical carbon dioxide HX using LPBF. The PBCM is designed to identify modifications to designs, process choices, and manufacturing innovations that have the greatest effect on manufacturing cost. Our PBCM identified HX design and LPBF process modifications that reduced projected HX cost from $\$750$ per kilo-Watt thermal (kW-th) ($\$8$ /cm 3 ) to $\$350$ /kW-th ($\$6/$ cm 3 ) using currently available LPBF technology, and down to $\$220$ /kW-th ($\$4$ /cm 3 ) with improvements in LPBF technology that are likely to be achieved in the near term. The PBCM also informed a redesign of the HX design that reduced projected costs to $\$140$ –160/kW-th ($\$3$ /cm 3 ).

36 MATERIALS SCIENCE↗

Study of an evolutionary interim earth orbit program

An evolutionary, gradual, and step-wise spacecraft systems technology development from those used on the Apollos and Skylab 1 to that required for the space station was considered. The four mission spacecraft were dry workshop versions of the Saturn 4-B stage, and each individually configured, outfitted and launched by INT-21 vehicles. These spacecraft were evaluated for crews of three, six and nine men and for mission lifetimes of one year. Two versions of the Apollo CSM, a three man and a four man crew, were considered as the logistic vehicle. The solar cell electrical power system of the first mission evolves into a light weight panel system supplemented by an operating isotope-Brayton system on the later missions. The open life support system of the first mission evolves to a system which recovers both water and oxygen on the last mission. The data handling, communications, radiation shielding, micrometeoroid protection, and orbit keeping systems were determined. The program costs were estimated and, excluding operational costs, the cost for each mission would average about $2 billion of which one-sixth would be for development, one-fourth for experiments, and the balance for vehicle acquisition.

Anderson, J. L.↗

Data distribution satellite

A description is given of a data distribution satellite (DDS) system. The DDS would operate in conjunction with the tracking and data relay satellite system to give ground-based users real time, two-way access to instruments in space and space-gathered data. The scope of work includes the following: (1) user requirements are derived; (2) communication scenarios are synthesized; (3) system design constraints and projected technology availability are identified; (4) DDS communications payload configuration is derived, and the satellite is designed; (5) requirements for earth terminals and network control are given; (6) system costs are estimated, both life cycle costs and user fees; and (7) technology developments are recommended, and a technology development plan is given. The most important results obtained are as follows: (1) a satellite designed for launch in 2007 is feasible and has 10 Gb/s capacity, 5.5 kW power, and 2000 kg mass; (2) DDS features include on-board baseband switching, use of Ku- and Ka-bands, multiple optical intersatellite links; and (3) system user costs are competitive with projected terrestrial communication costs.

Price, Kent M.↗

Final design proposal: Theta Group-The Hotbox. A proposal in response to a commercial air transportation study

The Hotbox is a 40 passenger commercial aircraft designed to have a minimum range of 5500 ft and cruise at a velocity of 30 ft/sec. The aircraft is designed to serve the longer range overseas market in Aeroworld. In order to serve all the airports in the overseas market, the Hotbox was required to be able to use a five foot gate. A weight requirement was set a 4.5 lbs in order to maximize aircraft efficiency. Finally, a single engine system was chosen because it minimized system weight, complexity and cost. The Hotbox is estimated to cost $152,000 Aeroworld dollars and will sell for $200.000. The propulsion system for the Hotbox consists of a nose mounted Astro 15 electric powered motor and a Top Flight 12-6 propeller. A Spica airfoil was selected for the Hotbox based on the ease of construction of its flat bottom and its positive lift and drag characteristics. A fuselage of rectangular cross section will internally contain the propulsion system, control system, and a passenger bay with 2x20 seating. A combination of directional and longitudinal control will enable the Hotbox to maneuver. The final design of the Hotbox provides for takeoff distance in 26.5 ft and normal cruise range of 17,000 ft.

Source record↗

The Joint Confidence Level Paradox: A History of Denial

This paper is intended to provide a reliable methodology for those tasked with generating price tags on construction (C0F) and research and development (R&D) activities in the NASA performance world. This document consists of a collection of cost-related engineering detail and project fulfillment information from early agency days to the present. Accurate historical detail is the first place to start when determining improved methodologies for future cost and schedule estimating. This paper contains a beneficial proposed cost estimating method for arriving at more reliable numbers for future submits. When comparing current cost and schedule methods with earlier cost and schedule approaches, it became apparent that NASA's organizational performance paradigm has morphed. Mission fulfillment speed has slowed and cost calculating factors have increased in 21st Century space exploration.

Butts, Glenn↗

Levelized Cost of Electricity (LCOE) Content Model for Design of High Deflection Foils for MHK Applications

The LCOE Content Model provides data submitters with an easy and consistent means of uploading data that can be used to calculate the levelized cost of energy for MHK devices. These data are important to DOE and will be used to develop data products that provide quantitative information to guide and support programmatic decisions. Data will also be used to evaluate MHK products and determine costs and can help data users compare the combination of capital costs and operations and maintenance over time. The ultimate goal is to use these data to perform research and tailor programs to best benefit the industry.

16 TIDAL AND WAVE POWER↗

A Reduced-form Cost Model for Prefeasibility Analysis of Hydropower at Non-Powered Dams

This study presents a reduced-form model to support a better understanding of the capacity potential and drivers of costs for hydropower development at U.S. non-powered dams (NPD), which are existing dams that are not currently used for hydropower. With information on nineteen reference sites, a set of reduced-form design and cost equations were estimated to enable rapid assessments of aggregate costs and their components for a large number of NPD sites. The model was then applied to 36,000+ potential U.S. NPD sites using the limited data commonly available. Although the cost estimates span a wide range, there exists a significant amount of U.S. NPD hydropower capacity potential, which are considered cost-competitive in the current market using baseline technologies.

13 HYDRO ENERGY↗

Space Station Facility government estimating

This new, unique Cost Engineering Report introduces the 800-page, C-100 government estimate for the Space Station Processing Facility (SSPF) and Volume IV Aerospace Construction Price Book. At the January 23, 1991, bid opening for the SSPF, the government cost estimate was right on target. Metric, Inc., Prime Contractor, low bid was 1.2 percent below the government estimate. This project contains many different and complex systems. Volume IV is a summary of the cost associated with construction, activation and Ground Support Equipment (GSE) design, estimating, fabrication, installation, testing, termination, and verification of this project. Included are 13 reasons the government estimate was so accurate; abstract of bids, for 8 bidders and government estimate with additive alternates, special labor and materials, budget comparison and system summaries; and comments on the energy credit from local electrical utility. This report adds another project to our continuing study of 'How Does the Low Bidder Get Low and Make Money?' which was started in 1967, and first published in the 1973 AACE Transaction with 18 ways the low bidders get low. The accuracy of this estimate proves the benefits of our Kennedy Space Center (KSC) teamwork efforts and KSC Cost Engineer Tools which are contributing toward our goals of the Space Station.

Brown, Joseph A.↗

LANDSAT D user data processing study

The major expected users of the LANDSAT D system and a preliminary system design of their required facilities are investigated. This system design will then be costed in order to provide an estimate of the incremental user costs necessitated by LANDSAT D. One major use of these cost estimates is as part of an overall economic cost/benefit argument being developed for the LANDSAT D system. The implication of this motive is key; the system design (and corresponding cost estimates) must be a credible one, but not necessarily an optimum one.

Source record↗

Degradation of Poly- and Perfluoroalkyl Substances (PFAS) in Water via High Power, Energy-Efficient Electron Beam Accelerator

The goal of the 2-year workplan was to see if electron beam (EB) could be used to break down a sub-set of the larger chemical family of per and polyfluoroalkylated substances (PFAS) in an energy efficient and economical manner when compared to conventional water treatment technologies. Year one (Y1) work focused on sample EB treatment work in the Fermi National Accelerator Laboratory’s (FNALs) Accelerator Applications Demonstration and Development (A2D2) EB accelerator. While there are reportedly thousands of types of PFAS, for the point of most of the work herein, a small subset was examined, typically perfluorooctane sulfonate (PFOS) and perfluorooctanoate (PFOA). PFOA and PFOS are two of the most well studied PFAS and are studied for baseline evaluations and are considered most useful. The work from Y1 provided information about the optimal operating parameters and additives to use when treating PFOS and PFOA via EB. The data were then used to see where in a water treatment system an EB accelerator would be best suited to treat PFAS. A conventional water treatment technology, GAC, was then compared to e-beam treatment technology with respect to energy and costs for treatment. In year two (Y2), several conventional e-beam accelerator designs, and FNAL’s developmental compact SRF accelerator design, were evaluated for their suitability in PFAS treatment, from an energy efficiency and cost standpoint. Several EB parameters were evaluated and optimized for the removal of PFOA and PFOS from water at normal pressure and temperature, measured as total PFAS removal. Under the optimized test conditions both PFOA showed complete destruction to inorganic fluoride, and PFOS to inorganic fluoride and sulfate, with mass balance. The effect on PFAS removal relative to solution pH, total EB dose, EB dose rate, dissolved oxygen concentration (DO), temperature, and initial PFAS concentration were evaluated. In general, PFOA was easier to destroy than PFOS. Degradation products, typically observed under less-than-optimal EB conditions, provided insight to degradation mechanisms. Products were identified to rule out possible deleterious biproduct formation. The water radiolysis radical reaction kinetics with PFOS and PFOA were not dependent on the initial concentration over 5-orders of magnitude from 2 μg/L to 20 mg/L. This is thought to be because there was an overabundance of the reactive water radiolysis radicals relative to PFAS molecules and largely attributed to aqueous electrons. The reaction rates appeared to be diffusion limited. Testing at higher concentrations (100-200 mg/L) showed a decrease in removal efficiency, suggesting alternative kinetics, possibly second order rates, at higher concentrations. In all, we successfully defined a set of optimal EB parameters to treat PFOA and PFOS at concentrations of 20 mg/L in water with destruction efficiencies near 100%. We further tested the optimized EB parameters with other types of PFAS, including shorter and longer fluorocarbon chain homologs of PFOA and PFOS, and PFAS with alternative functional groups such as sulfonamides. Based on our results EB can be optimized as an effective destructive technology for removing PFAS from water. The conditions optimized for PFOA and PFOS were less effective with ultra-short fluorocarbon compounds like TFMS, PFES, PFPS and PFBS, and likely require re-optimization of parameters to them. In all, it was determined that from a cost and energy efficiency standpoint, EB would be best applied to waste streams with relatively high concentrations of PFOS and PFOA and is not as cost effective as GAC treatment for removing low concentrations of PFAS from water. Higher concentrations of PFAS can be found in the wastewater of conventional treatment processes such as RO and IE and therefore EB may be used to supplement such treatment technologies. Some real-world IE regeneration wash water and RO reject water containing higher concentrations of PFAS and obtained from pilot scale industrial wastewater treatment system at a fluorochemical manufacturing facility, showed that EB could remove PFAS from such types of wastewaters. The IE regenerant wash water appeared to be the most efficient of the two types of wastewaters tested. However, some further optimization of the EB parameters for the specific PFAS types present in those wastewaters may be required. Also, the effects of co-present TOC and mineral salts should be considered during such optimization efforts. From the experimental Y1 results it was seen that the aqueous electron drives degradation of the PFAS. In a hypothetical water treatment skid using EB for PFAS destruction the parameters of the system should be optimized to promote aqueous electron production. Before EB treatment, the PFAS should be preconcentrated when possible, the pH should be raised to pH 10 or higher to enhance aqueous electron production, and the water should be nitrogen purged to remove dissolved oxygen to minimize aqueous electron scavenging. An excel spreadsheet was created that calculates optimal conditions based on inlet PFAS concentration and desired outlet concentration, by optimizing the accelerator power, dose rate, water treatment rate, pH and dissolved oxygen levels to reach the desired endpoint. Given this information on accelerator operating conditions five different EB accelerator systems were compared. One EB system was a continuous-wave, linear superconducting accelerator being designed at Fermilab. Three other EB systems (IMPELA at 5% and 25% duty factor and the ILU-14) were normal conducting pulsed linear accelerators. The fifth system was an IBA Rhodotron which is a normal conducting, circular, continuous-wave accelerator. The accelerator efficiency (% of the incoming power that is used in water treatment) was the dominating factor in accelerator choice. The radio frequency (RF) power supply and the accelerator design (superconducting versus warm technology) drive the accelerator efficiency. The IBA Rhodotron was seen to be the most energy efficient commercially available technology with a wall-plug (total) power efficiency of 43% at 400 kW. The Fermilab design, with a prototype for a different application currently being fabricated, was the most energy efficient at 55% when driven by a Klystron RF power supply and as high as 77% when powered by a magnetron. As the Fermilab design was the most energy efficient by approximately 10-30%, further design work was done on the accelerator and beam delivery system specific to the destruction of PFAS in water. The Fermilab design is unique from industrial accelerators in that is superconducting. Superconducting technology allows for the acceleration of electrons without losses. The accelerator must be cooled to below the point where it is superconducting and is operated around 4 degrees Kelvin. The bulk of the design work for the accelerator is on making the accelerator as energy efficient as possible so that it does not require liquid helium and can be cooled with conduction cooling via cryocoolers. Final design work resulted in an EB accelerator that would operate at minimally 200 kW and 10 MeV. Prototype construction would cost $\$ $7.8 million dollars when driven by a Klystron power supply. A second version of the same accelerator would cost $\$ $5.5 million dollars when driven by a magnetron that is still under development. The commercially available 300 kW IBA Rhodotron cost was estimated at approximately $\$ $9 million. While it is hard to directly compare, an operational GAC system used by 3M for groundwater treatment capital cost (2022 dollars) was estimated to cost $\$ $3.3 million. While the capital expense of the EB accelerator systems was higher than GAC, the accelerator EB treatment would result in destruction of the PFAS and not just sequestration of PFAS to form a new waste stream that requires further treatment or disposal. The operating cost to destroy the PFAS via 400 kw EB system was less than $\$ $1000/kg of PFAS destroyed when treating at a 20 mg/L PFAS concentration, compared to GAC with operating costs that calculated at $\$ $27,530 per kg of PFAS sequestered when treating 100 μg/L PFOA and PFOS combined concentration.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

First Measurements of Ambient PM2.5 in Kinshasa, Democratic Republic of Congo and Brazzaville, Republic of Congo Using Field-calibrated Low-cost Sensors

Estimates of air pollution mortality in sub-Saharan Africa are limited by a lack of surface observations of fine particulate matter (PM2.5). Despite being large metropolises, Kinshasa, Democratic Republic of the Congo (DRC), population 14.3 million, and Brazzaville, Republic of the Congo (ROC), population 2.4 million, have no reference air pollution monitors at the time of writing. Recently, a few reference monitors have been deployed in other parts of sub-Saharan Africa, including Kampala, Uganda. A low-cost PurpleAir PM2.5 monitor was collocated next to the Kampala US Embassy BAM-1020 (Met One Beta Attenuation Monitor) starting in August 2019. Raw PurpleAir data are strongly correlated with the BAM (r(exp 2) = 0.88), but have a mean absolute error of approximately 14 μg/cu.m. Two calibration models, multiple linear regression and a random forest approach, decrease mean absolute error (MAE) from 14.3 μg/cu.m to 3.4 µg/cu.m or less and improve the the r(exp 2) from 0.88 to 0.96. Given )the similarity in climate and emissions in Kampala, we apply the collocated field correction factors to four PurpleAir sensors in Kinshasa, DRC and one in neighboring Brazzaville, ROC deployed beginning April 2018. Annual average PM2.5 for 2019 in Kinshasa is estimated at 43.5 µg/cu.m, more than 4 times higher than WHO Interim Target 1 of 10 µg/cu.m. Surface PM2.5 and aerosol optical depth were each about 40% lower during the 2020 COVID19 lockdown period compared to the same time period in 2019, which cannot be explained by changes in meteorology or wildfire emissions alone. Our results highlight the need for clean air solutions implementation in the Congo.

Celeste McFarlane↗

Costs and benefits of a school-based health intervention in Portugal

Abstract School-based programmes for preventing childhood obesity have been shown to be effective in improving eating habits and nutritional status, but few intervention programmes with a controlled design have included an economic evaluation. In this study, we conducted a cost-consequence analysis to evaluate the costs and the health benefits of the ‘Planning Health in School’ programme (PHS-pro) implemented in the Northern region of Portugal to 449 children of 10–14 years old. Previous study has showed that after PHS-pro, several anthropometric measures significantly improved in the intervention group (height, waist circumference and waist-height ratio) compared with the control group, followed by significant improvements on soft drinks, fruit and vegetables daily consumptions. Costs were estimated according the two phases of the programme: designing and preparation of schools, and school setting implementation, and included all the direct costs on human and material resources. PHS-pro total costs were estimated as 7915.53€/year with an intervention cost of 36.14€/year/child attending the programme. This is much lower than the direct costs for treating an obese adult in Portugal, which was calculated as 3849.15€/year. A scale-up costing projection for implementing the PHS-pro to a larger young population was estimated to be even lower: 18.18€/year/child. This cost-consequence analysis provided evidence that the PHS-pro was economically feasible especially if compared with the medical costs for treating adult obesity. The PHS-pro can be a beneficial investment and may give a promising contribution to addressing overweight over childhood and adolescence, which are developmental stages that determine adulthood chronic diseases.

Vieira, Margarida↗

Uncertainty Quantification for Capacity Expansion Planning

This report quantifies the uncertainty in output decisions from a Capacity Expansion Planning (CEP) model. The need to understand how uncertainties within CEP models and modeling assumptions affect Quantities of Interest (QoIs) such as expansion and operating costs, as well as expansion decisions remains an ongoing challenge in scientific research and industrial operations. This area of research is particularly important for models which seek to capture how large networks will evolve and operate under increased sources of variable generation, i.e., higher penetration of renewable technologies such as solar and wind generators. Uncertainty quantification (UQ) of CEP models which estimate expansion costs and decisions, and production cost models which estimate operating costs and dispatch decisions, is a key focus of research at NREL. The Regional Energy Deployment System (ReEDS) represents a state-of-the-art CEP model and considers a range of possible grid evolutions in an attempt to identify key drivers, ramifications, and decisions which contribute to better informed investment and policy decisions. However, research to quantify how uncertainties and model assumptions, such as unit commitment (UC), within ReEDS may be affecting its outputs remains challenging due to to size and complexity of the model

24 POWER TRANSMISSION AND DISTRIBUTION↗

An assessment of the benefits of the use of NASA developed fuel conservative technology in the US commercial aircraft fleet

Cost and benefits of a fuel conservative aircraft technology program proposed by NASA are estimated. NASA defined six separate technology elements for the proposed program: (a) engine component improvement (b) composite structures (c) turboprops (d) laminar flow control (e) fuel conservative engine and (f) fuel conservative transport. There were two levels postulated: The baseline program was estimated to cost $490 million over 10 years with peak funding in 1980. The level two program was estimated to cost an additional $180 million also over 10 years. Discussions with NASA and with representatives of the major commercial airframe manufacturers were held to estimate the combinations of the technology elements most likely to be implemented, the potential fuel savings from each combination, and reasonable dates for incorporation of these new aircraft into the fleet.

Source record↗

The geospatial and economic viability of CO 2 storage in hydrocarbon depleted fractured shale formations

Hydrocarbon depleted fractured shale (HDFS) formations could be attractive for geologic carbon dioxide (CO 2 ) storage. Shale formations may be able to leverage existing infrastructure, have larger capacities, and be more secure than saline aquifers. We compared regional storage capacities and integrated CO 2 capture, transport, and storage systems that use HDFS with those that use saline aquifers in a region of the United States with extensive shale development that overlies prospective saline aquifers. We estimated HDFS storage capacities with a production-based method and costs by adapting methods developed for saline aquifers and found that HDFS formations in this region might be able to store with less cost an estimated ~14× more CO 2 on average than saline aquifers at the same location. The potential for smaller Areas of Review and less investment in infrastructure accounted for up to 84% of the difference in estimated storage costs. We implemented an engineering-economic geospatial optimization model to determine and compare the viability of storage capacity for these two storage resources. Across the state-specific and regional scenarios we investigated, our results for this region suggest that integrated CCS systems using HDFS could be more centralized, require less pipelines, prioritize different routes for trunklines, and be 6.4–6.8% ($5-10/tCO 2 ) cheaper than systems using saline aquifers. In conclusion, overall, CO 2 storage in HDFS could be technically and economically attractive and may lower barriers to large scale CO 2 storage if they can be permitted.

42 ENGINEERING↗

U.S. Department of Energy Energy Efficiency Conservation Block Grant (Better Buildings Neighborhood Program Report) [Slides]

The Wisconsin Energy Efficiency (WE2) Program delivered residential and commercial programming for the City of Milwaukee (Me2) and the City of Madison (Green Madison) as well as commercial only programming for the City of Racine (Re2). Direct incentives and loan products for homeowners and business owners were offered, with the goal to achieve at least 15 percent in energy savings. At the time of this report, there were more than 2,000 residential energy efficiency upgrades completed and more than 300 commercial energy efficiency upgrades completed. The average energy savings for the WE2 Program’s portfolio of residential and commercial projects exceeds 15 percent and is closer to 30 percent energy savings. Combined energy savings of both residential and commercial activities were: 20,937,369 kWh; 1,018,907 Therms; and 31,655 gallons of heating oil; or at least 332,788 MMBTUs; or at least $\$3,444,828$ in estimated energy costs saved. Conservative economic impact estimates include the employment of more than 100 residential auditors and contractors, more than 90 commercial contractors, and more than $\$41$ million in total project costs expended in the targeted communities.

99 GENERAL AND MISCELLANEOUS↗