Search NASA⌕ Search

SEARCH · Search NASA

Results for “Ground Operational Support System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,639 records · Page 91

Analysis of space network loading

The NASA Space Network (SN) consists of several geosynchronous communications satellites, in addition to ground support facilities. Space Network management must predict years in advance what network resources are necessary to adequately satisfy all SN users. Similarly, users of the Space Network must know throughout all stages of mission planning and operations to what extent their communication support requirements can be met. NASA, at the Goddard Space Flight Center, performs Space Network and Mission Modeling using The Network Planning and Analysis System (NPAS), to determine the answers to these questions.

Simons, Mark↗

Test Results for an Off-the-Shelf GPS/INS During Approach and Landing Testing of the X-40A

The X-37 is an unpiloted, reusable space vehicle that will be launched into space, orbit the Earth, reenter the atmosphere, and land autonomously. At the heart of the Guidance, Navigation and Control (GN&C) will be the Space Integrated GPS/INS (SIGI) system, an off the shelf navigation grade GPS/INS that has been enhanced for space and reentry environments. SIGI will provide both navigation and flight control data to the X-37's GN&C. The X-40A is an unpiloted experimental vehicle whose shape and performance are similar to the X-37's and was flown earlier this year to develop and test the approach and landing phase of X-37. On board the X-40A is the X-37's SIGI, which is riding along as an experiment. The X-40A SIGI experiment provided early characterization of SIGI operation and performance with differential GPS (Global Positioning System) during real world approach and landing. Characterization testing was geared toward assessment of reliability and performance of the system. The objectives were to demonstrate performance levels sufficient to meet the X-37 requirements for automatic, autonomous approach and landing, demonstrate reliability over repeated ground and flight tests, and reduce risk for integration of SIGI into the vehicle and support environment. This paper presents a summary of this testing and the results to date.

Childers, Dave↗

In-Space Cryogenic Propellant Depot (ISCPD) Architecture Definitions and Systems Studies

The objectives of the ISCPD Architecture Definitions and Systems Studies were to determine high leverage propellant depot architecture concepts, system configuration trades, and related technologies to enable more ambitious and affordable human and robotic exploration of the Earth Neighborhood and beyond. This activity identified architectures and concepts that preposition and store propellants in space for exploration and commercial space activities, consistent with Exploration Systems Research and Technology (ESR&T) objectives. Commonalities across mission scenarios for these architecture definitions, depot concepts, technologies, and operations were identified that also best satisfy the Vision of Space Exploration. Trade studies were conducted, technology development needs identified and assessments performed to drive out the roadmap for obtaining an in-space cryogenic propellant depot capability. The Boeing Company supported the NASA Marshall Space Flight Center (MSFC) by conducting this Depot System Architecture Development Study. The primary objectives of this depot architecture study were: (1) determine high leverage propellant depot concepts and related technologies; (2) identify commonalities across mission scenarios of depot concepts, technologies, and operations; (3) determine the best depot concepts and key technology requirements and (4) identify technology development needs including definition of ground and space test article requirements.

Fikes, John C.↗

Options for Staging Orbits in Cis-Lunar Space

NASA has been studying options to conduct missions beyond Low Earth Orbit, but within the Earth‐Moon system, in preparation for deep space exploration including human missions to Mars. Referred to as the Proving Ground, this arena of exploration activities will enable the development of human spaceflight systems and operations to satisfy future exploration objectives beyond the cis‐lunar environment. One option being considered includes the deployment of a habitable element or elements, which could be used as a central location for aggregation of supplies and resources for human missions in cis‐lunar space and beyond. Characterizing candidate orbit locations for this asset and the impacts on system design and mission operations is important in the overall assessment of the options being considered. The orbits described in this paper were initially selected by taking advantage of previous studies conducted by NASA and the work of other authors. In this paper orbits are assessed for their relative attractiveness based on various factors. A set of constraints related to the capability of the combined Orion and SLS system to deliver humans and cargo to and from the orbit are evaluated. Deployed assets intended to spend multiple years in the Proving Ground would ideally require minimal station keeping costs to reduce the mass budget allocated to this function. Additional mission design drivers include eclipse frequency, potential for uninterrupted communication with deployed assets, thermal, attitude control, communications, and other operational implications. Also the ability to support potential lunar surface activities and excursion missions beyond Earth‐Moon space is considered. The results of the characterization and evaluation of the selected orbits indicate a Near Rectilinear Orbit (NRO) is an attractive candidate as an aggregation point or staging location for operations. In this paper, the NRO is further described in terms which balance a number of key attributes that favor a variety of mission classes to meet multiple, sometimes competing, constraints.

Martinez, Roland↗

Usability Evaluation of Fleet Management Interface for High Density Vertiplex Environments

To meet the rising demand for an Advanced Air Mobility (AAM) (i.e. urban and rural unmanned aircraft systems) ecosystem, the NASA Aeronautics Research Mission Directorate (ARMD) is hosting a series of simulations and flight tests under the High Density Vertiplex sub-project (HDV) to prototype and study the effectiveness AAM capabilities under various operational contexts. HDV aims to develop an integrated automation architecture to support terminal area flight operations. The HDV simulations and flight tests address safety, integration, and operational challenges, while integrated systems and software demonstrate design readiness, robustness, and interoperability. During the initial HDV simulation in 2021, a prototype traffic management tool developed by NASA called the Fleet Management Interface (FMI) was tested. FMI was designed to introduce an advanced level of human-automation interaction to aid both Ground Control Station Operators (GCSOs) and Fleet Managers (FMs) in remotely managing flights under their ownership. In a human-in-the-loop simulation, a usability study was conducted with the FMI to identify optimal approaches for displaying information to human operators using subjective measures of usability, workload, situation awareness, risk, and trust, along with qualitative feedback. This study consisted of task analysis in which GCSO and FM subjects used an Urban Air Mobility (UAM) environment to develop and execute a plan for two different traffic scenarios of remotely controlled vehicles. In each scenario, a remotely controlled vehicle completed a takeoff, active flight, and landing sequence while simulated traffic flew in the background at a rate of 20 operations per hour. In the first scenario, the controlled vehicle flew a nominal route with takeoff and landing at the same vertiport. In the second scenario, the controlled vehicle started on the nominal route, then diverted to an unplanned location mid-flight. Results showed that self- reported performance, usability, trust, and situation awareness ratings of FMI were moderately to strongly high. There were small differences between scenarios, with Scenario 2 being perceived as more unstable, complex, variable, risky, and potentially harmful than Scenario 1. Furthermore, participants described improvements that could be made to create a better user experience. For example, users suggested customizable interfaces to accommodate information display preferences, and the ability to review routes before assigning them. The results from this study will inform future development of the FMI with the end goal of creating a reference automation tool for airspace management procedures in AAM. The FMI could serve to reduce dependency on traditional air navigation services through increased automation in high density vertiplex environments.

Fleet manager↗

Hanford's Double-Shell Tank AY-102 Recovery Project - 17416

Since at least August 2012, Hanford Tank 241-AY-102 (AY-102) has been leaking from its primary tank into its secondary containment. A pumping plan was developed in 2013 to provide a path forward for recommended remediation actions to be implemented as part of the AY-102 Recovery Project. On March 21, 2014, the Washington State Department of Ecology issued Administrative Order No. 10618 requiring Washington River Protection Solutions and the United States Department of Energy to conduct actions related to and including the removal of waste from AY-102. The three parties agreed to resolve the appeal of the Administrative Order through a Settlement Agreement which addresses the remaining requirements and implements enforceable milestone dates, including initiation of waste retrieval by March 4, 2016 and completion of waste retrieval operations by March 4, 2017. The AY-102 Recovery Project was developed to address the Settlement Agreement requirements. While retrieval of waste from Single-Shell Tanks has been performed at Hanford for decades, retrieval from Double-Shell Tank AY-102 required adaptation of the existing technologies to a new environment on a larger scale than previously encountered. A significant number of obstructions and in-tank equipment limit accessibility to the high source term AY-102 waste and the location of the selected receiver tank required installation of an extensive, heavily-shielded above-ground transfer line. Despite countless challenges and obstacles encountered throughout, the project successfully completed system design, fabrication, installation, testing, and the first phase of operations within a highly compressed, aggressive schedule. Waste retrieval operations in AY-102 commenced on March 3, 2016 and the initial operating phase concluded on April 30. Additional sluicing capability was required to complete the mission and four Extended Reach Sluicers were installed to support the second operating phase, which began on December 8, 2016. As of December 31, 2016, approximately 97% of the original waste volume had been removed, resulting in an estimated remaining waste volume of about 75,000 liters. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transportable Payload Operations Control Center reusable software: Building blocks for quality ground data systems

The Mission Operations Division (MOD) at Goddard Space Flight Center builds Mission Operations Centers which are used by Flight Operations Teams to monitor and control satellites. Reducing system life cycle costs through software reuse has always been a priority of the MOD. The MOD's Transportable Payload Operations Control Center development team established an extensive library of 14 subsystems with over 100,000 delivered source instructions of reusable, generic software components. Nine TPOCC-based control centers to date support 11 satellites and achieved an average software reuse level of more than 75 percent. This paper shares experiences of how the TPOCC building blocks were developed and how building block developer's, mission development teams, and users are all part of the process.

Mahmot, Ron↗

The Impact of Delayed Communications on NASA's Human-Systems Operations: Preliminary Results of a Systematic Review

Throughout the history of human spaceflight, NASA has relied on a team of ground-based experts on Earth to manage its missions, vehicles, and crews to ensure crew safety and mission success. However, as missions progress beyond low-Earth orbit (LEO), this paradigm of dependence on ground must evolve. Beyond LEO, in missions to the moon and Mars, crews will confront new challenges: limited evacuation options, reduced resupply capabilities, and significant communication delays that impede real-time support from experts on the ground. This reduction in ground support amplifies the likelihood that crews will be unable to adequately respond to unanticipated, safety-critical events. Understanding the scope of these risks and identifying effective countermeasures hinges on understanding the impact of communication delays on complex operations, especially in urgent, unforeseen events. Real-time communication currently provides the crew with continuous access to a large, extensively resourced ground team skilled in anomaly resolution. However, as communication delays grow, the need to transfer some responsibilities from ground experts to onboard crew becomes evident. NASA has been exploring this shift in operational responsibilities and its effectiveness in managing complex operations for decades. Nevertheless, a comprehensive understanding of the specific challenges posed by communication delays and the necessary countermeasures to mitigate them remains a gap. In this paper, we present an update on our systematic review of the literature on communication delays, the first in-depth review since 2013 (Rader et al.). We introduce a coding taxonomy to capture key constructs from papers of interest and discuss preliminary findings. These preliminary results suggest two significant research gaps: limited studies have been conducted 1) with lunar-like latencies and 2) on problem-solving strategies for the maximum latencies expected in Mars missions. We outline plans and propose recommendations to address these gaps through ongoing and future research.

earth-independence↗

Launch Pad Flame Trench Refractory Materials

The launch complexes at NASA's John F. Kennedy Space Center (KSC) are critical support facilities for the successful launch of space-based vehicles. These facilities include a flame trench that bisects the pad at ground level. This trench includes a flame deflector system that consists of an inverted, V-shaped steel structure covered with a high temperature concrete material five inches thick that extends across the center of the flame trench. One side of the "V11 receives and deflects the flames from the orbiter main engines; the opposite side deflects the flames from the solid rocket boosters. There are also two movable deflectors at the top of the trench to provide additional protection to shuttle hardware from the solid rocket booster flames. These facilities are over 40 years old and are experiencing constant deterioration from launch heat/blast effects and environmental exposure. The refractory material currently used in launch pad flame deflectors has become susceptible to failure, resulting in large sections of the material breaking away from the steel base structure and creating high-speed projectiles during launch. These projectiles jeopardize the safety of the launch complex, crew, and vehicle. Post launch inspections have revealed that the number and frequency of repairs, as well as the area and size of the damage, is increasing with the number of launches. The Space Shuttle Program has accepted the extensive ground processing costs for post launch repair of damaged areas and investigations of future launch related failures for the remainder of the program. There currently are no long term solutions available for Constellation Program ground operations to address the poor performance and subsequent failures of the refractory materials. Over the last three years, significant liberation of refractory material in the flame trench and fire bricks along the adjacent trench walls following Space Shuttle launches have resulted in extensive investigations of failure mechanisms, load response, ejected material impact evaluation, and repair design analysis (environmental and structural assessment, induced environment from solid rocket booster plume, loads summary, and repair integrity), assessment of risk posture for flame trench debris, and justification of flight readiness rationale. Although the configuration of the launch pad, water and exhaust direction, and location of the Mobile Launcher Platform between the flame trench and the flight hardware should protect the Space Vehicle from debris exposure, loss of material could cause damage to a major element of the ground facility (resulting in temporary usage loss); and damage to other facility elements is possible. These are all significant risks that will impact ground operations for Constellation and development of new refractory material systems is necessary to reduce the likelihood of the foreign object debris hazard during launch. KSC is developing an alternate refractory material for the launch pad flame trench protection system, including flame deflector and flame trench walls, that will withstand launch conditions without the need for repair after every launch, as is currently the case. This paper will present a summary of the results from industry surveys, trade studies, life cycle cost analysis, and preliminary testing that have been performed to support and validate the development, testing, and qualification of new refractory materials.

Calle, Luz M.↗

Integrated operations/payloads/fleet analysis. Volume 5: Mission, capture and operations analysis

The current baseline mission model consists of the DOD Option B prepared for space transportation system mission analysis and a NASA model prepared for the integrated operations /payloads/ fleet analysis. Changes from the previous mission model are discussed, and additional benefits of the reusable space shuttle system are identified. The methodology and assumptions used in the capture analysis are described, and satellite and launch vehicle traffic models for the current and low cost expendable launch vehicle systems and the reusable space shuttle system are presented. The areas of fleet sizing, limitations and abort modes, system ground support requirements, and ground support systems assessment are covered. Current and extended launch azimuth limitations used for both ETR and WTR are presented for the current and low cost expendable vehicles and also the reusable space shuttle system. The results of a survey of launch support capability for the launch vehicle fleets are reported.

Source record↗

Ground data systems resource allocation process

The Ground Data Systems Resource Allocation Process at the Jet Propulsion Laboratory provides medium- and long-range planning for the use of Deep Space Network and Mission Control and Computing Center resources in support of NASA's deep space missions and Earth-based science. Resources consist of radio antenna complexes and associated data processing and control computer networks. A semi-automated system was developed that allows operations personnel to interactively generate, edit, and revise allocation plans spanning periods of up to ten years (as opposed to only two or three weeks under the manual system) based on the relative merit of mission events. It also enhances scientific data return. A software system known as the Resource Allocation and Planning Helper (RALPH) merges the conventional methods of operations research, rule-based knowledge engineering, and advanced data base structures. RALPH employs a generic, highly modular architecture capable of solving a wide variety of scheduling and resource sequencing problems. The rule-based RALPH system has saved significant labor in resource allocation. Its successful use affirms the importance of establishing and applying event priorities based on scientific merit, and the benefit of continuity in planning provided by knowledge-based engineering. The RALPH system exhibits a strong potential for minimizing development cycles of resource and payload planning systems throughout NASA and the private sector.

Berner, Carol A.↗

Challenges for deep space communications in the 1990s

The discussion of NASA's Deep Space Network (DSN) examines the evolving character of aerospace missions and the corresponding changes in the DSN architecture. Deep space missions are reviewed, and it is noted that the two 34-m and the 70-m antenna subnets of the DSN are heavily loaded and more use is expected. High operational workload and the challenge of network cross-support are the design drivers for a flexible DSN architecture configuration. Incorporated in the design are antenna arraying for aperture augmentation, beam-waveguide antennas for frequency agility, and connectivity with non-DSN sites for cross-support. Compatibility between spacecraft and ground-facility designs is important for establishing common international standards of communication and data-system specification.

Dumas, Larry N.↗

Second tracking and data relay satellite system (TDRSS) ground terminal - STGT

The STGT will provide high availability command and control and improved services to users of NASA's Space Network in the 1990s and beyond. The Space Network, comprising the TDRSS, will be the primary communications gateway for Space Station Freedom and other user's spacecraft and their ground support elements. The STGT will contain a redundant, distributed computer system providing configuration and control of redundant RF to baseband equipment chains for throughput of user data, for user tracking services and for control and monitoring of the TDR Satellites. An interface with NASA's Network Control Center, located at the Goddard Space Flight Center, provides automated scheduling and control of the STGT. A local TDRSS Operations Control Center for local monitoring and back-up control and an interface with the Domestic Satellite for data distribution will be provided by the STGT. This paper describes the STGT, with emphasis on configuration, control and monitoring of those elements providing TDRSS services to user spacecraft.

Berndt, Allen K.↗

An Autonomous Control System for an Intra-Vehicular Spacecraft Mobile Monitor Prototype

This paper presents an overview of an ongoing research and development effort at the NASA Ames Research Center to create an autonomous control system for an internal spacecraft autonomous mobile monitor. It primary functions are to provide crew support and perform intra- vehicular sensing activities by autonomously navigating onboard the International Space Station. We describe the mission roles and high-level functional requirements for an autonomous mobile monitor. The mobile monitor prototypes, of which two are operational and one is actively being designed, physical test facilities used to perform ground testing, including a 3D micro-gravity test facility, and simulators are briefly described. We provide an overview of the autonomy framework and describe each of its components, including those used for automated planning, goal-oriented task execution, diagnosis, and fault recovery. A sample mission test scenario is also described.

Dorais, Gregory A.↗

Systems Integration Processes for NASA Ares I Crew Launch Vehicle

NASA's Exploration Initiative will require development of many new elements to constitute a robust system of systems. New launch vehicles are needed to place cargo and crew in stable Low Earth Orbit (LEO). This paper examines the systems integration processes NASA is utilizing to ensure integration and control of propulsion and nonpropulsion elements within NASA's Crew Launch Vehicle (CLV), now known as the Ares I. The objective of the Ares I is to provide the transportation capabilities to meet the Constellation Program requirements for delivering a Crew Exploration Vehicle (CEV) or other payload to LEO in support of the lunar and Mars missions. The Ares I must successfully provide this capability within cost and schedule, and with an acceptable risk approach. This paper will describe the systems engineering management processes that will be applied to assure Ares I Project success through complete and efficient technical integration. Discussion of technical review and management processes for requirements development and verification, integrated design and analysis, integrated simulation and testing, and the integration of reliability, maintainability and supportability (RMS) into the design will also be included. The Ares I Project is logically divided into elements by the major hardware groupings, and associated management, system engineering, and integration functions. The processes to be described herein are designed to integrate within these Ares I elements and among the other Constellation projects. Also discussed is launch vehicle stack integration (Ares I to CEV, and Ground and Flight Operations integration) throughout the life cycle, including integrated vehicle performance through orbital insertion, recovery of the first stage, and reentry of the upper stage. The processes for decomposing requirements to the elements and ensuring that requirements have been correctly validated, decomposed, and allocated, and that the verification requirements are properly defined to ensure that the system design meets requirements, will be discussed.

Taylor, James L.↗

Scalable Integrated Multi-Mission Support System Simulator Release 3.0

The Scalable Integrated Multi-mission Support System (SIMSS) is a tool that performs a variety of test activities related to spacecraft simulations and ground segment checks. SIMSS is a distributed, component-based, plug-and-play client-server system useful for performing real-time monitoring and communications testing. SIMSS runs on one or more workstations and is designed to be user-configurable or to use predefined configurations for routine operations. SIMSS consists of more than 100 modules that can be configured to create, receive, process, and/or transmit data. The SIMSS/GMSEC innovation is intended to provide missions with a low-cost solution for implementing their ground systems, as well as significantly reducing a mission s integration time and risk.

Kim, John↗

Command and Control System Automated Testing

To support the National Aeronautics and Space Administration’s (NASA) Space Launch System (SLS) rocket, Kennedy Space Center (KSC) has developed the Spaceport Command and Control System (SCCS) to monitor and control the pre-launch and launch operations. Within SCCS, the Launch Control System (LCS) is designed to allow console engineers to control and monitor the status of the launch and flight hardware, as well as issue commands to ground control systems and launch vehicles. The display software of the LCS is responsible for visualizing the various data that can be received from the hardware and software components of the LCS. Since this system is providing critical information to engineers in the firing room, the visualization of data across the system must be easy to understand, but also reliable and accurate.

Software↗

Parametric Cost Model for Ground and Space Telescopes

Parametric cost models can be used by designers and project managers to compare cost between major architectural cost drivers and allow high-level design trades; enable cost-benefit analysis for technology development investment; and, provide a basis for estimating total project cost between related concepts. The NASA Marshall Space Flight Center has developed a 5-parameter first-article optical telescope assembly cost model OTA$ (FY17) = $20M x 30(S/G)x D(1.7)x λ(-0.5)x T(-0.25)x e(-0.028) (Y-1960)Where S/G = 1 for space and 0 for ground telescopes, D = diameter, λ= diffraction limited wavelength, T = operating temperature and Y = year of development. The model explains 92% (Adjusted R2) of the cost variation in a database of 47 total ground and space telescope assemblies (OTA). The MSFC model estimates the most likely cost for only the OTA. Where an OTA is defined as the subsystem which collects electromagnetic radiation and focuses it (focal) or concentrates it (afocal) into the science instruments. An OTA consists of the primary mirror, secondary mirror, auxiliary optics and support structure (such as optical bench or truss structure, primary support structure, secondary support structure or spiders, straylight baffles, mechanisms for adjusting the optical components, electronics or power systems for operating these mechanisms, etc.). Finally, duplication only reduces cost for the manufacture of identical systems(i.e. multiple aperture sparse arrays or interferometers). And, while duplication does reduce the cost of manufacturing the mirrors of segmented primary mirror, this cost savings does not appear to manifest itself in the final primary mirror assembly(presumably because the structure for a segmented mirror is more complicated than for a monolithic mirror).

Space Telescope Cost Model, Parametric Cost Model↗