Search NASA⌕ Search

SEARCH · Search NASA

Results for “Ground Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,639 records · Page 91

Standard Operating Procedure (SOP) for Preparation of an Operation & Configuration Control Plan (OCCP) of "Category B" Pressure Vessels/Systems

This Standard Operating Procedure (SOP) describes the requirements and methodology for preparation of an Operation & Configuration Control Plan (OCCP) as required by JPR 1710.13 to assure safe ground pressurization and pressurization during aircraft operations of “Category B” Pressure Vessels/Systems (PV/S) at Johnson Space Center (JSC), Ellington Field (EFD) and associated NASA spaceflight/aircraft operations facilities. An OCCP is a written assessment showing that a “Category B” PV/S is safe for ground pressurization and pressurization during aircraft operations, within the bounds established by the OCCP.

Nathanael J Greene↗

Calculation of Operations Efficiency Factors for Mars Surface Missions

For planning of Mars surface missions, to be operated on a sol-by-sol basis by a team on Earth (where a "sol" is a Martian day), activities are described in terms of "sol types" that are strung together to build a surface mission scenario. Some sol types require ground decisions based on a previous sol's results to feed into the activity planning ("ground in the loop"), while others do not. Due to the differences in duration between Earth days and Mars sols, for a given Mars local solar time, the corresponding Earth time "walks" relative to the corresponding times on the prior sol/day. In particular, even if a communication window has a fixed Mars local solar time, the Earth time for that window will be approximately 40 minutes later each succeeding day. Further complexity is added for non-Mars synchronous communication relay assets, and when there are multiple control centers in different Earth time zones. The solution is the development of "ops efficiency factors" that reflect the efficiency of a given operations configuration (how many and location of control centers, types of communication windows, synchronous or non-synchronous nature of relay assets, sol types, more-or-less sustainable operations schedule choices) against a theoretical "optimal" operations configuration for the mission being studied. These factors are then incorporated into scenario models in order to determine the surface duration (and therefore minimum spacecraft surface lifetime) required to fulfill scenario objectives. The resulting model is used to perform "what-if" analyses for variations in scenario objectives. The ops efficiency factor is the ratio of the figure of merit for a given operations factor to the figure of merit for the theoretical optimal configuration. The current implementation is a pair of models in Excel. The first represents a ground operations schedule for 500 sols in each operations configuration for the mission being studied (500 sols was chosen as being a long enough time to capture variations in relay asset interactions, Earth/Mars time phasing, and seasonal variations in holidays). This model is used to estimate the ops efficiency factor for each operations configuration. The second model in a separate Excel spreadsheet is a scenario model, which uses the sol types to rack up the total number of "scenario sols" for that scenario (in other words, the ideal number of sols it would take to perform the scenario objectives). Then, the number of sols requiring ground in the loop is calculated based on the soil types contained in the given scenario. Next, the scenario contains a description of what sequence of operations configurations is used, for how many days each, and this is used with the corresponding ops efficiency factors for each configuration to calculate the "ops duration" corresponding to that scenario. Finally, a margin is applied to determine the minimum surface lifetime required for that scenario. Typically, this level of analysis has not been performed until much later in the mission, and has not been able to influence mission design. Further, the notion of moving to sustainable operations during Prime Mission - and the effect that that move would have on surface mission productivity and mission objective choices - has not been encountered until the most recent rover missions (MSL and Mars 2018).

Layback, Sharon L.↗

Teamwork in the Terminal Area: Organizational Issues and Solutions

Dynamic growth and technology advances in commercial aviation have turned the terminal area into a complex, multi-organization workplace which requires the smooth coordination of many operational teams. In addition to pilots, cabin crew, air traffic controllers, and dispatch (who nominally work together throughout a flight), surface operations additionally involve local, ground and ramp controllers, ramp agents, maintenance, dozens of service contractors, and any number of teams who are responsible for airport operations. Under abnormal or emergency conditions, even more teams become actively involved. In order to accommodate growth and to meet productivity and safety challenges, numerous changes are being made in surface operations. Unfortunately, it is often the case that changes in technologies, organizational roles, procedures, and training are developed and implemented in isolated and piecemeal fashion without regard to cross organizational impact. Thus, there is a need for evaluation methodologies which assure integrated system safety for all organizations. Such methodologies should aid the understanding of how organizations work together and how changes in one domain affects the next. In this study, we develop one approach toward addressing these organizational issues. Examples of surface operations in abnormal situations are examined in regard to their impact on personnel in the terminal area. Timelines are given for the responses to incidents, along with the necessary communication links, the specific roles that members of terminal teams have, and any overlapping responsibilities. Suggestions to improve cross-operational teamwork are given. Methods of graphic representation are explored, both in regards to human links and access to information. The outcome of such an approach should enhance the understanding which is critical for resolving organizational conflicts and maximizing system effectiveness.

Parke, Bonny K.↗

Surface Systems Capability Gaps for Enabling NASA’s Sustainable Lunar Operations

This paper discusses the NASA Ground, Test, and Surface Systems Taxonomy (TX-13) related capability gaps, including details of architecture, technology, engineering, and policy gaps for enabling sustainable lunar surface operations and subsequent Mars missions. Architecture gaps include standardized architectures and interfaces, multi-element systems engineering and integration, design for supportability, and nuclear payload processing and launch approach. Technology gaps, primarily focused on uncrewed surface operations, include automated/autonomous cryogenic loading, transfer, servicing, and storage of commodities; health determination and fault management; automated/autonomous planning and scheduling; automated/autonomous inspection, maintenance and repair; logistics management and reliability; launch and landing site preparation; commodity management; and advanced umbilicals and dust tolerant interfaces. Engineering gaps include high-purity propellant production for ground and surface applications and large-scale xenon servicing capabilities. The policy gap includes nuclear propulsion acceptance testing and qualification approach. Strategically identifying human/automation roles and tasks and infusing automation and autonomy practices early in a system’s lifecycle is essential for achieving the mission objectives for a sustainable human lunar presence, improving performance and mission effectiveness, reducing operations costs and reliance on humans to perform tasks, and accommodating ground communication delays.

Surface Systems↗

The GRO remote terminal system

In March 1992, NASA HQ challenged GSFC/Code 531 to propose a fast, low-cost approach to close the Tracking Data Relay Satellite System (TDRSS) Zone-of-Exclusion (ZOE) over the Indian Ocean in order to provide global communications coverage for the Compton Gamma Ray Observatory (GRO) spacecraft. GRO had lost its tape recording capability which limited its valuable science data return to real-time contacts with the TDRS-E and TDRS-W synchronous data relay satellites, yielding only approximately 62 percent of the possible data obtainable. To achieve global coverage, a TDRS spacecraft would have to be moved over the Indian Ocean out of line-of-sight control of White Sands Ground Terminal (WSGT). To minimize operations life cycle costs, Headquarters also set a goal for remote control, from the WSGT, of the overseas ground station which was required for direct communications with TDRS-1. On August 27, 1992, Code 531 was given the go ahead to implement the proposed GRO Relay Terminal System (GRTS). This paper describes the Remote Ground Relay Terminal (RGRT) which went operational at the Canberra Deep Space Communications Complex (CDSCC) in Canberra, Australia in December 1993 and is currently augmenting the TDRSS constellation in returning between 80-100 percent of GRO science data under the control of a single operator at WSGT.

Zillig, David J.↗

Lunar Explorer Instrument for space biology Applications (LEIA): An overview of planned science concept of operations

Radiation and reduced gravity pose biological risks to crewed deep space exploration. To better understand deep space radiation biology, the LEIA mission will measure charged particles and fast neutrons as well as yeast growth, metabolic rate, and bioengineered production of carotenoids at the lunar surface. LEIA will be delivered to the south polar region of the Moon by the Commercial Lunar Payload Services (CLPS) program. The LEIA science concept of operations was developed to isolate radiation and partial gravity from other environmental conditions experienced by the payload. Due to CLPS integration requirements, there will be at least eight months from loading yeast into the payload until activation on the lunar surface. Replicate yeast strains will be loaded in a randomized complete block design to minimize batch differences in desiccation tolerance and positional effects in the microfluidics culture system. Temperature and relative humidity will be controlled throughout integration and flight to maintain yeast viability and to enable measurement of yeast growth parameters within the lunar surface operations timeframe, with the ground control matching environmental conditions where possible. LEIA is co-manifested with the European Space Agency’s PROSPECT mission, which will be operating a drill during yeast growth. Vibration translated through the lunar lander will be mitigated and quantified to account for potential impacts on LEIA optical measurements and yeast growth rate. Total space radiation dose, including the transit exposure from Earth to the Moon, will be measured to obtain more accurate charged particle and fast neutron dose rates on the lunar surface. These radiation data will also yield ground truth radiation dose experienced by the yeast during the mission. Quantifying these environmental factors impacting the LEIA payload will allow more accurate ground control experiments to better isolate the biological responses to radiation and reduced gravity at the lunar surface.

Lunar Surface Mission↗

View graphs for GSFC Colloquium on OFMspert

Viewgraphs providing an overview of activities concerned with the development and testing of the Operator Function Model (OFM) expert system (OFMspert) are presented. The OFM is a mathematical tool for representing operator interaction with predominantly automated space ground control systems. OFM provides cognitive task analysis and served as the basis for the design of an intelligent operator's associate called OMFspert. An experimental implementation of OFMspert, referred to as Ally, was developed. An empirical evaluation of Ally was conducted to determine the effectiveness of a supervisory control team consisting of a human operator and Ally versus a control team consisting of two human operators. The experiment was carried out in the GT-MSOCC (Georgia Tech MultiSatellite Operations Control Center) domain, a research tool consisting of a high fidelity implementation of the operator interface to a GSFC ground control system. The viewgraphs outline the experimental design, operator performance measures, and preliminary results.

Mitchell, Christine M.↗

Space Telescope design status and operations

The Space Telescope design concept is described in the context of the basic mission objectives. The orbiting telescope is designed to have 10 times better resolution, to see 50 times fainter stars and to have a much broader spectral range than the best existing ground observatories. The project is on schedule for launch in early 1985. Hardware assembly and test has started on the optical system, and the primary and secondary mirrors have been polished and coated. The five scientific instruments are beginning hardware assembly. The last major design review for the spacecraft has been completed, and good progress has been accomplished with the implementation of the pointing control system. The mission operations ground system has been defined and is under development. Control center design is complete and the science institute is under construction. The Space Telescope is designed to be serviceable in orbit and will be capable of return to the ground for refurbishment.

Speer, F. A.↗

RWPV bioreactor mass transport: earth-based and in microgravity

Mass transport and mixing of perfused scalar quantities in the NASA Rotating Wall Perfused Vessel bioreactor are studied using numerical models of the flow field and scalar concentration field. Operating conditions typical of both microgravity and ground-based cell cultures are studied to determine the expected vessel performance for both flight and ground-based control experiments. Results are presented for the transport of oxygen with cell densities and consumption rates typical of colon cancer cells cultured in the RWPV. The transport and mixing characteristics are first investigated with a step change in the perfusion inlet concentration by computing the time histories of the time to exceed 10% inlet concentration. The effects of a uniform cell utilization rate are then investigated with time histories of the outlet concentration, volume average concentration, and volume fraction starved. It is found that the operating conditions used in microgravity produce results that are quite different then those for ground-based conditions. Mixing times for microgravity conditions are significantly shorter than those for ground-based operation. Increasing the differential rotation rates (microgravity) increases the mixing and transport, while increasing the mean rotation rate (ground-based) suppresses both. Increasing perfusion rates enhances mass transport for both microgravity and ground-based cases, however, for the present range of operating conditions, above 5-10 cc/min there are diminishing returns as much of the inlet fluid is transported directly to the perfusion exit. The results show that exit concentration is not a good indicator of the concentration distributions in the vessel. In microgravity conditions, the NASA RWPV bioreactor with the viscous pump has been shown to provide an environment that is well mixed. Even when operated near the theoretical minimum perfusion rates, only a small fraction of the volume provides less than the required oxygen levels. 2002 Wiley Periodicals, Inc.

Models, Biological↗

MOS 2.0: The Next Generation in Mission Operations Systems

A Mission Operations System (MOS) or Ground System constitutes that portion of an overall space mission Enterprise that resides here on Earth. Over the past two decades, technological innovations in computing and software technologies have allowed an MOS to support ever more complex missions while consuming a decreasing fraction of Project development budgets. Despite (or perhaps, because of) such successes, it is routine to hear concerns about the cost of MOS development. At the same time, demand continues for Ground Systems which will plan more spacecraft activities with fewer commanding errors, provide scientists and engineers with more autonomous functionality, process and manage larger and more complex data more quickly, all while requiring fewer people to develop, deploy, operate and maintain them. One successful approach to such concerns over this period is a multimission approach, based on the reuse of portions (most often software) developed and used in previous missions. The Advanced Multi-Mission Operations System (AMMOS), developed for deep-space science missions, is one successful example of such an approach. Like many computing-intensive systems, it has grown up in a near-organic fashion from a relatively simple set of tools into a complexly interrelated set of capabilities. Such systems, like a city lacking any concept of urban planning, can and will grow in ways that are neither efficient nor particularly easy to sustain. To meet the growing demands and unyielding constraints placed on ground systems, a new approach is necessary. Under the aegis of a multi-year effort to revitalize the AMMOS's multimission operations capabilities, we are utilizing modern practices in systems architecting and model-based engineering to create the next step in Ground Systems: MOS 2.0. In this paper we outline our work (ongoing and planned) to architect and design a multimission MOS 2.0, describe our goals and measureable objectives, and discuss some of the benefits that this top-down, architectural approach holds for creating a more flexible and capable MOS for Missions while holding the line on cost.

ground systems↗

Pyrotechnic Simulator/Stray-Voltage Detector

The concept for a dual test item has been developed for use in simulating live initiators/detonators during ground testing to verify the proper operation of the safing and firing circuitry for ground and flight systems ordnance as well as continuous monitoring for any stray voltages. Previous ordnance simulators have consisted of fuses, flash bulbs, inert devices with bridge wires, and actual live ordnance items mounted in test chambers. Stray voltage detectors have included devices connected to the firing circuits for continuous monitoring and a final no-voltage test just prior to ordnance connection. The purpose of this combined ordnance simulation and stray-voltage detection is to provide an improved and comprehensive method to ensure the ordnance circuitry is verified safe and operational.

Greenfield, Terry↗

Photo-absorption sum rules σ{sub –1} in different environments (Atoms, nuclei, nucleons)

Combining the spin-dependent dispersion GDH-sum rule, the isotopic-spin-dependent Cabibbo-Radicati sum rule, and the relativistic dipole-moment-fluctuation (i.e. generalized Gottfried) sum rule with the three valence quark configuration of nucleons taken into account for the composition of the ground and the excited states of the nucleon, the relevant moments of the distribution and correlation functions of the quark electric dipole moment operators in the nucleon ground state are expressed via the experimentally measurable nucleon resonance photo-excitation amplitudes.These functions are of interest for checking detailed quark-configuration structure of the nucleon state vector. Within the non-relativistic approach to photo-absorption sum rules for the 3N-nuclei a new σ{sub –1} sum rule proposed which is based on general charge-symmetry (CS) consequences for the “CS-conjugated” triton and {sup 3}He.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Damage Detection Response Characteristics of Open Circuit Resonant (SansEC) Sensors

The capability to assess the current or future state of the health of an aircraft to improve safety, availability, and reliability while reducing maintenance costs has been a continuous goal for decades. Many companies, commercial entities, and academic institutions have become interested in Integrated Vehicle Health Management (IVHM) and a growing effort of research into "smart" vehicle sensing systems has emerged. Methods to detect damage to aircraft materials and structures have historically relied on visual inspection during pre-flight or post-flight operations by flight and ground crews. More quantitative non-destructive investigations with various instruments and sensors have traditionally been performed when the aircraft is out of operational service during major scheduled maintenance. Through the use of reliable sensors coupled with data monitoring, data mining, and data analysis techniques, the health state of a vehicle can be detected in-situ. NASA Langley Research Center (LaRC) is developing a composite aircraft skin damage detection method and system based on open circuit SansEC (Sans Electric Connection) sensor technology. Composite materials are increasingly used in modern aircraft for reducing weight, improving fuel efficiency, and enhancing the overall design, performance, and manufacturability of airborne vehicles. Materials such as fiberglass reinforced composites (FRC) and carbon-fiber-reinforced polymers (CFRP) are being used to great advantage in airframes, wings, engine nacelles, turbine blades, fairings, fuselage structures, empennage structures, control surfaces and aircraft skins. SansEC sensor technology is a new technical framework for designing, powering, and interrogating sensors to detect various types of damage in composite materials. The source cause of the in-service damage (lightning strike, impact damage, material fatigue, etc.) to the aircraft composite is not relevant. The sensor will detect damage independent of the cause. Damage in composite material is generally associated with a localized change in material permittivity and/or conductivity. These changes are sensed using SansEC. The unique electrical signatures (amplitude, frequency, bandwidth, and phase) are used for damage detection and diagnosis. An operational system and method would incorporate a SansEC sensor array on select areas of the aircraft exterior surfaces to form a "Smart skin" sensing surface. In this paper a new method and system for aircraft in-situ damage detection and diagnosis is presented. Experimental test results on seeded fault damage coupons and computational modeling simulation results are presented. NASA LaRC has demonstrated with individual sensors that SansEC sensors can be effectively used for in-situ composite damage detection of delamination, voids, fractures, and rips. Keywords: Damage Detection, Composites, Integrated Vehicle Health Monitoring (IVHM), Aviation Safety, SansEC Sensors

Dudley, Kenneth L.↗

Modernization of the Cassini Ground System

The Cassini Spacecraft and its ground system have been operational for over 16 years. Modernization presents several challenges due to the personnel, processes, and tools already invested and embedded into the current ground system structure. Every mission's ground system has its own unique complexities and challenges, involving various organizational units. As any mission from its inception to its execution, schedules are always tight. This forces GDS engineers to implement a working ground system that is not necessarily fully optimized. Ground system challenges increase as technology evolves and cyber threats become more sophisticated. Cassini's main challenges were due to its ground system existing before many security requirements were levied on the multi-mission tools and networks. This caused a domino effect on Cassini GDS tools that relied on outdated technological features. In the aerospace industry reliable and established technology is preferred over innovative yet less proven technology. Loss of data for a spacecraft mission can be catastrophic; therefore, there is a reluctance to make changes and updates to the ground system. Nevertheless, all missions and associated teams face the need to modernize their processes and tools. Systems development methods from well-known system analysis and design principles can be applied to many missions' ground systems. Modernization should always be considered, but should be done in such a way that it does not affect flexibility nor interfere with established practices. Cassini has accomplished a secure and efficient ground data system through periodic updates. The obstacles faced while performing the modernization of the Cassini ground system will be outlined, as well as the advantages and challenges that were encountered.

Razo, Gus↗

Modernization of the Cassini Ground System

The Cassini Spacecraft and its ground system have been operational for over 16 years. Modernization presents several challenges due to the personnel, processes, and tools already invested and embedded into the current ground system structure. Every mission's ground system has its own unique complexities and challenges, involving various organizational units. As any mission from its inception to its execution, schedules are always tight. This forces GDS engineers to implement a working ground system that is not necessarily fully optimized. Ground system challenges increase as technology evolves and cyber threats become more sophisticated. Cassini's main challenges were due to its ground system existing before many security requirements were levied on the multi-mission tools and networks. This caused a domino effect on Cassini GDS tools that relied on outdated technological features. In the aerospace industry reliable and established technology is preferred over innovative yet less proven technology. Loss of data for a spacecraft mission can be catastrophic; therefore, there is a reluctance to make changes and updates to the ground system. Nevertheless, all missions and associated teams face the need to modernize their processes and tools. Systems development methods from well-known system analysis and design principles can be applied to many missions' ground systems. Modernization should always be considered, but should be done in such a way that it does not affect flexibility nor interfere with established practices. Cassini has accomplished a secure and efficient ground data system through periodic updates. The obstacles faced while performing the modernization of the Cassini ground system will be outlined, as well as the advantages and challenges that were encountered.

Razo, Gus↗

Spacecraft-Initiated Scheduling of Commercial Communications Services

We propose a software framework enabling a spacecraft in Earth orbit to schedule its own access to space communications services via ground stations and relay satellites. All operations are automated, without a human in the loop, allowing for highly responsive service to meet time-varying needs. We describe a modular software architecture allowing the framework to interface with the scheduling systems of several providers - both government and commercial. Specifically, we present the results of an experiment with Amazon Web Services (AWS) Ground Station, an operational commercial service provider. Proposed software executed scheduling of a ground station antenna with minimal lead time (less than 20 minutes before the start of a pass). During the contact AWS cloud infrastructure was used to demodulate, process, and distribute data products from an orbiting satellite. We believe this work demonstrates the framework's ability to interface with additional providers and potential to integrate more complex decision-making in the future to schedule optimal contacts.

Scheduling↗

A scientific operations plan for the large space telescope

The paper describes an LST ground system which is compatible with the operational requirements of the LST. The goal of the approach is to minimize the cost of post launch operations without seriously compromising the quality and total throughput of LST science. Attention is given to cost constraints and guidelines, the telemetry operations processing systems (TELOPS), the image processing facility, ground system planning and data flow, and scientific interfaces.

West, D. K.↗