Joint Estimation of Operational Topology and Outages for Unbalanced Power Distribution Systems
Not provided.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Not provided.
This paper presents a comprehensive scheduling framework for residential demand response (DR) programs considering both the day-ahead and real-time electricity markets. In the first stage, residential customers determine the operating status of their responsive devices such as heating, ventilation, and air conditioning (HVAC) systems and electric water heaters (EWHs), while the distribution system operator (DSO) computes the amount of electricity to be purchased in the day-ahead electricity market. In the second stage, the DSO purchases insufficient (or sells surplus) electricity in the real-time electricity market to maintain the supply-demand balance. Due to its computational complexity and data privacy issues, the proposed model cannot be directly solved in a centralized manner, especially with a large number of uncertain scenarios. Therefore, this paper proposes a combination of stochastic programming (SP) and the alternating direction method of multipliers (ADMM) algorithm, called SP-ADMM, to decompose the original model and then solve each sub-problem in a distributed manner while considering multiple uncertain scenarios. The simulation study is performed on the IEEE 33-bus system including 121 residential houses. Here, the results demonstrate the effectiveness of the proposed approach for large-scale residential DR applications under weather and consumer uncertainties.
During June-August 1997 Dr. Jonathan Miles participated in the ASEE-sponsored summer faculty research program at NASA Langley Research Center (LaRC). The Aerospace Electronic Systems Division (AESD), Sensor Systems Branch (SSB), at NASA LARC had proposed a new mission, GEOstationary TROpospheric Pollution SATellite (GEO TROPSAT), to address critical science questions of tropospheric chemistry. The troposphere is a complex system, comprising "point" and distributed sources of natural and anthropogenic origin; complicated transport processes, both lateral and vertical; and photochemistry driven by UV flux, temperature, atmospheric composition, and other variables. GEO TROPSAT would be implemented about a geostationary Earth orbital (GEO) position at the equator between 600 and 80" West longitude to observe the Americas and large portions of the oceans of either coast. This mission would advance our knowledge of the atmosphere by capturing the wide temporal and spatial variability of tropospheric phenomena which is undetectable from low Earth orbit. A pre-prototype imaging carbon monoxide (CO) imaging system operating within a narrow waveband about 4.7 [Lm was built, demonstrated, and evaluated. This system applies the gas-filter correlation radiometry (GFCR) technique and produces digitized images comprising 4096 pixels, each representing a single CO mixing ratio measurement inferred from radiometric data. Associated tasks accomplished included specification for the next-generation prototype system to operate in the 2.3-@tm waveband; characterization of a 64x64, InSb focal-plane-array (FPA) imager; design, fabrication, and assembly of a filter wheel; and software development. Laboratory evaluation of this system involved imaging of a test cell placed in the path of radiant flux emanating from a blackbody source used to simulate the radiant energy reflected by Earth in real application. The cell was evacuated for system balancing and then charged with measured quantities of CO to provide a means for system characterization. Two related research efforts were undertaken during the term of the study reported here - continued development of an atmospheric CO imaging instrument and characterization of diode-laser beams. Both efforts were successful and are described within the body of this report. A second objective was to provide a means for undergraduate ISAT majors to become involved with the research described, to be afforded the opportunity to learn the technologies associated with the work performed. Two ISAT students gained a comprehensive understanding and interest in missions supported by NASA through direct involvement in this project. Many more students were exposed to these technologies through demonstrations, laboratory tours, and explanations provided in lectures.
Globally, power system operators are exploring ways to leverage the capabilities of smart meters to implement fine-grained demand side management (DSM). Here this paper presents a new simulation tool to evaluate operating strategies for smart-meter-enabled (SME) islanded microgrids being advanced for sustainable rural electrification in emerging economies. Based on MATLAB/Simulink, the tool's component-level models of small microgrids can be easily configured. Alternative rule-based operating strategies are implemented with controllable supply and storage components as well as other components driven by external factors (e.g., weather and time of day). To account for the wide range of possible operating conditions in real-world applications, statistical metrics can be evaluated using Monte Carlo (MC) methods based on user-defined, time-dependent probability distributions for demands, supplies, and environmental variables. Features of the tool are demonstrated with case studies for a representative microgrid in rural Rwanda.
TRENDS, an engineering-test database operating system developed by NASA to support rotorcraft flight tests, is described. Capabilities and characteristics of the system are presented, with examples of its use in recalling and analyzing rotorcraft flight-test data from a TRENDS database. The importance of system user-friendliness in gaining users' acceptance is stressed, as is the importance of integrating supporting narrative data with numerical data in engineering-test databases. Considerations relevant to the creation and maintenance of flight-test database are discussed and TRENDS' solutions to database management problems are described. Requirements, constraints, and other considerations which led to the system's configuration are discussed and some of the lessons learned during TRENDS' development are presented. Potential applications of TRENDS to a wide range of aeronautical and other engineering tests are identified.
An operational system for extracting ice-motion information from synthetic aperture radar (SAR) imagery is being developed as part of the Alaska SAR Facility. This geophysical processing system (GPS) will derive ice-motion information by automated analysis of image sequences acquired by radars on the European ERS-1, Japanese ERS-1, and Canadian RADARSAT remote sensing satellites. The algorithm consists of a novel combination of feature-based and area-based techniques for the tracking of ice floes that undergo translation and rotation between imaging passes. The system performs automatic selection of the image pairs for input to the matching routines using an ice-motion estimator. It is designed to have a daily throughput of ten image pairs. A description is given of the GPS system, including an overview of the ice-motion-tracking algorithm, the system architecture, and the ice-motion products that will be available for distribution to geophysical data users.
We propose the development of a highly reliable high efficiency RF source for JLAB with a lower lifetime cost operating at 80% efficiency with system operating costs of about 0.7M$/year for the 6 GeV machine. The design of the RF source will be based upon two injection locked magnetrons in a novel combining architecture for amplitude modulation and a cross field amplifier (CFA) as an output tube for the 12 GeV upgrade. A cost analysis including efficiency and reliability will be performed to determine the optimum system architecture. Several different system architectures will be designed and evaluated for a dual injection locked magnetron source using novel combining techniques and possibly a CFA as the output tube. A paper design for the 1497 MHz magnetron system will be completed. The optimum system architecture with all relevant specifications will be completed so that a prototype can be built.
In 2000-01, two years after introducing a competitive wholesale power auction in California - with a separate day-ahead zonal market operated by the California Power Exchange and a zonal market for ancillary services and balancing energy operated by the California Independent System Operator (CAISO) - the California market collapsed from exorbitant prices, flagrant gaming, and abuse of market power. Nine years later, CAISO introduced a nodal pricing auction for the wholesale market in April, replacing the zonal scheme, which was among many causes of the original market's demise. With nearly 3,000 nodes on the network, high prices in one region do not affect prices everywhere on the system. After investing some $200 million to upgrade the software, countless delays, and 18 months of market simulation and testing, the new auction was introduced and nothing unusual happened.
The results of an investigation on the SEU sensitivity for a fiber optic operating system are reported. Measurements were made on the upset cross sections for the system in static and dynamic modes of operation. The heavy ion SEU test facility at Brookhaven and the proton facility at Harvard University were used in this study. Cross sections were obtained for Honeywell transmitter and reciever devices operating in a system at a frequency of 100 kHz. Both devices were independently irradiated. The results show that the dynamic mode was the worst case, and the receiver was the most sensitive part type in the system. The threshold linear energy transfer (LET) for the receiver was determined to be 1.6 MeV sq cm/mg for the three input signals used in the tests, which were: a continuous high state, a low state, and a 100 kHz square wave.
An expert system is being developed to support vehicle anomaly diagnosis for the Hubble Space Telescope (HST). Following a study of safemode entry analyses, a prototype system was developed which reads engineering telemetry formats, and when a safemode event is detected, extracts telemetry from the downlink and writes it into a knowledge base for more detailed analyses. The prototype then summarizes vehicle events (limits exceeded, specific failures). This prototype, the Telemetry Analysis Logic for Operations Support (TALOS) uses the Lockheed Expert System (LES) shell, and includes over 1600 facts, 230 rules, and 27 goals. Although considered a prototype, it is already an operationally useful system. The history leading into the TALOS prototype will be discussed, an overview of the present TALOS system will be presented, and the role of the TALOS system in contingency planning will be delineated.
To address Alarm Station operator performance, Portable Intrusion Detection System team gathered information concerning AS operator data needs when assessing alarms. The purpose was to improve the Portable Intrusion Detection System operator interface to ensure that critical information was quickly presented and easily accessible. To gather the data, the team used a Goal Directed Task Analysis approach. The method of analysis was to prepare a set of interview questions, interview selected AS operator experts, conduct the interviews, create a goal/decision/information hierarchy based on information gathered, and then apply the results to the operator interface. In applying the results, the team had to consider not only the Goal Directed Task Analysis -determined information needs of the Alarm Station operator end-user population, but also account for customer requirements and differences in domain. The constraints in implementing all situation awareness recommendations are summarized and initial potential solutions presented.
Global Positioning System (GPS) simulation is an important activity in the development or qualification of GPS signal receivers for space flight. Because a GPS simulator is a critical resource it is highly desirable to develop a set of field operational procedures to supplement the basic procedures provided by most simulator vendors. Validated field procedures allow better utilization of the GPS simulator in the development of new test scenarios and simulation operations. These procedures expedite simulation scenario development while resulting in scenarios that are more representative of the true design, as well as enabling construction of more complex simulations than previously possible, for example, spacecraft maneuvers. One difficulty in the development of a simulation scenario is specifying various modes of test vehicle motion and associated maneuvers requiring that a user specify some (but not all) of a few closely related simulation parameters. Currently this can only be done by trial and error. A stand-alone procedure that implements the simulator maneuver motion equations and solves for the motion profile transient times, jerk and acceleration would be of considerable value. Another procedure would permit the specification of some configuration parameters that would determine the simulated GPS signal composition. The resulting signal navigation message, for example, would force the receiver under test to use only the intended C-code component of the simulated GPS signal. A representative class of GPS simulation-related field operational procedures is described in this paper. These procedures were developed and used in support of GPS integration and testing for many successful spacecraft missions such as SAC-A, EO-1, AMSAT, VCL, SeaStar, sounding rockets, and by using the industry standard Spirent Global Simulation Systems Incorporated (GSSI) STR series simulators.
The rapid deployment of renewable sources of electricity (RES-E) is transforming power systems globally. This trend is likely to continue with large increases in investment and deployment of RES-E capacity over the coming decades. Several countries now have penetration levels of variable RES-E generation (i.e., wind and solar) in excess of 15% of their annual electricity generation; and many jurisdictions (e.g., Spain, Portugal, Ireland, Germany, and Denmark; and, in the United States, Colorado) have experienced instantaneous penetration levels of more than 50% variable generation.1 These penetration levels of variable RES-E have prompted many jurisdictions to begin modifying practices that evolved in an era of readily dispatchable, centralised power systems. Providing insights for the transition to high levels of variable RES-E generation is the focus of this document, which is the final report of the RES-E-NEXT project commissioned by the International Energy Agency’s implementing agreement on Renewable Energy Technology Deployment (IEA-RETD). It presents a comprehensive assessment of issues that will shape power system evolution during the transition to high levels of variable RES-E generation. While policy will be a central tool to sustain the growth of RES-E capacity and to enable power system transitions, the scope of the report extends beyond policy considerations to include the related domains of regulation, power market design, and system operation protocols. This broad scope is in recognition that a changing resource mix with greater penetration levels of variable RES-E has broad implications for grid operations, wholesale and retail power markets, and infrastructure needs. The next decade will be a critical transition period for power system stakeholders, as global deployment of RES-E capacity (and especially variable RES-E capacity) continues to scale-up in many regions of the world. To address increased penetration levels of RES-E in power systems and the new challenges that could emerge, coordinated portfolios of policies, market designs, regulations, and operational protocols are essential. The goal for policymakers is to facilitate investment in RES-E technologies and to enable efficient and reliable system operation, costeffective service delivery, and continued public acceptance. Although the factors that impact the speed and scale of RES-E deployment manifest uniquely in each power system, in the transition to high shares of variable RES-E this report identifies four critical domains and the changing drivers that will shape next-generation policy for each. These domains are introduced in Table I, and comprise the major sections of this report.
Visionary concepts of the operational environmental satellite system of the 1990's are presented. These exploit planned and anticipated advances in technology. The system comprises 8 Low Earth Orbitors (LEOS) at 500 km height for global coverage at 3 hourly intervals and 3 Geosynchronous Earth Orbitors (GEOS) for Western Hemisphere coverage with stereo capability and near simultaneous viewing of several regional areas. The LEOS emphasize passive and active microwave and Lidar sensing; the GEOS focus on high resolution visible and IR imaging and passive soundings. The GEOS also serve as data relays from the LEOS and as data collection platforms for hazard-related data. An integrated data management system ties the space fleet together and blends the data with that from all other observing systems to process and distribute the data and products to all users.
Engineering and operations of modern engineered systems depend critically upon detailed design and operations knowledge that is accurate and authoritative. A design and operations knowledge support system (DOKSS) is a modern computer-based information system providing knowledge about the creation, evolution, and growth of an engineered system. The purpose of a DOKSS is to provide convenient and effective access to this multifaceted information. The complexity of Space Station Freedom's (SSF's) systems, elements, interfaces, and organizations makes convenient access to design knowledge especially important, when compared to simpler systems. The life cycle length, being 30 or more years, adds a new dimension to space operations, maintenance, and evolution. Provided here is a review and discussion of design knowledge support systems to be delivered and operated as a critical part of the engineered system. A concept of a DOKSS for Space Station Freedom (SSF) is presented. This is followed by a detailed discussion of a DOKSS for the Lyndon B. Johnson Space Center and Work Package-2 portions of SSF.
Distribution system operators (DSOs) world-wide foresee a rapid roll-out of distributed energy resources. From the system perspective, their reliable and cost effective integration requires accounting for their physical properties in operating tools used by the DSO. This work describes an decomposable approach to leverage the dispatch flexibility of thermostatically controlled loads (TCLs) for operating distribution systems with a high penetration level of photovoltaic resources. Each TCL ensemble is modeled using the Markov Decision Process (MDP). The MDP model is then integrated with a chance constrained optimal power flow that accounts for the uncertainty of PV resources. Since the integrated optimization model cannot be solved efficiently by existing dynamic programming methods or off-the-shelf solvers, this paper proposes an iterative Spatio-Temporal Dual Decomposition algorithm (ST-D2). Finally, we demonstrate the merits of the proposed integrated optimization and ST-D2 algorithm on the IEEE 33-bus test system.
Results of implementing an SPPA-T3000-based unified distributed control system for thermal and mechanical and electrical equipment at the South-West CHP are discussed. Hardware solutions for integration with local control systems, control of electrical equipment in compliance with the standards IEC 61850, Modbus RTU, and communication between the plant control system and the System Operator of the Unified Power System are described.
This paper presents a detailed analysis of the energy and economic performance of desiccant cooling systems (DEC) equipped with both single glazed standard air and hybrid photovoltaic/thermal (PV/t) collectors for applications in hot and humid climates. The use of 'solar cogeneration' by means of PV/t hybrid collectors enables the simultaneous production of electricity and heat, which can be directly used by desiccant air handling units, thereby making it possible to achieve very energy savings. The present work shows the results of detailed simulations conducted for a set of desiccant cooling systems operating without any heat storage. System performance was investigated through hourly simulations for different systems and load combinations. Three configurations of DEC systems were considered: standard DEC, DEC with an integrated heat pump and DEC with an enthalpy wheel. Two kinds of building occupations were considered: office and lecture room. Moreover, three configurations of solar-assisted air handling units (AHU) equipped with desiccant wheels were considered and compared with standard AHUs, focusing on achievable primary energy savings. The relationship between the solar collector's area and the specific primary energy consumption for different system configurations and building occupation patterns is described. For both occupation patterns, sensitivity analysis on system performance was performed for different solar collector areas. Also, this work presents an economic assessment of the systems. The cost of conserved energy and the payback time were calculated, with and without public incentives for solar cooling systems. It is worth noting that the use of photovoltaics, and thus the exploitation of related available incentives in many European countries, could positively influence the spread of solar air cooling technologies (SAC). An outcome of this work is that SAC systems equipped with PV/t collectors are shown to have better performance in terms of primary energy saving than conventional systems fed by vapour compression chillers and coupled with PV cells. All SAC systems present good figures for primary energy consumption. The best performances are seen in systems with integrated heat pumps and small solar collector areas. The economics of these SAC systems at current equipment costs and energy prices are acceptable. They become more interesting in the case of public incentives of up to 30% of the investment cost (Simple Payback Time from 5 to 10 years) and doubled energy prices. (author)