Search NASA⌕ Search

SEARCH · Search NASA

Results for “Resource scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,639 records · Page 91

Overview of NASA's Break the Ice Lunar Challenge

The goal of NASA’s Artemis program is to return to the Moon and put in place a sustainable infrastructure that will enable permanent presence on the Moon. In-Situ Resource Utilization (ISRU) is critical in making the permanent presence on the Moon possible. One of the most important of these resources is water. On the Moon, water is trapped in icy regolith at the lunar poles, including inside permanently dark and cold craters. Excavating icy regolith and extracting water from it needs development of technologies that can operate reliably in the extreme lunar environmental conditions. Prize competitions are a well-known way of accelerating the development of new technologies and have been successfully used throughout the history. NASA’s Centennial Challenges Program(CCP) has been developing and executing prize competitions for past 15 years. Several of these competitions resulted in breakthrough technologies for in-space and terrestrial applications. In 2019, NASA Space Technology Mission Directorate (STMD) tasked CCP to develop a challenge to address the technology gaps in the areas of Lunar Excavation, Manufacturing, and Construction. This paper provides the background, status and ongoing plans by CCP in developing “Break the Ice Lunar Challenge”. The challenge is scheduled to open for registration in late 2020. This challenge will enable the development of excavation technologies that can operate in the extreme conditions on the Moon.

centennial challenges↗

Lead-Lag Control for Helicopter Vibration and Noise Reduction

As a helicopter transitions from hover to forward flight, the main rotor blades experience an asymmetry in flow field around the azimuth, with the blade section tangential velocities increasing on the advancing side and decreasing on the retreating side. To compensate for the reduced dynamic pressure on the retreating side, the blade pitch angles over this part of the rotor disk are increased. Eventually, a high enough forward speed is attained to produce compressibility effects on the advancing side of the rotor disk and stall on the retreating side. The onset of these two phenomena drastically increases the rotor vibratory loads and power requirements, thereby effectively establishing a limit on the maximum achievable forward speed. The alleviation of compressibility and stall (and the associated decrease in vibratory loads and power) would potentially result in an increased maximum forward speed. In the past, several methods have been examined and implemented to reduce the vibratory hub loads. Some of these methods are aimed specifically at alleviating vibration at very high flight speeds and increasing the maximum flight speed, while others focus on vibration reduction within the conventional flight envelope. Among the later are several types passive as well as active schemes. Passive schemes include a variety of vibration absorbers such as mechanical springs, pendulums, and bifilar absorbers. These mechanism are easy to design and maintain, but incur significant weight and drag penalties. Among the popular active control schemes in consideration are Higher Harmonic Control (HHC) and Individual Blade Control (IBC). HHC uses a conventional swash plate to generate a multi-cyclic pitch input to the blade. This requires actuators capable of sufficiently high power and bandwidth, increasing the cost and weight of the aircraft. IBC places actuators in the rotating reference frame, requiring the use of slip rings capable of transferring enough power to the actuators. Both schemes cause an increase in pitch link loads. Trailing Edge Flap (TEF) deployment can also used to generate unsteady aerodynamic forces and moments that counter the original vibratory loads, and thereby reduce rotor vibrations. While the vibrations absorbers, HHC, IBC, and TEF concepts discussed above attempt to reduce the vibratory loads, they do not specifically address the phenomena causing the vibrations at high advance ratios. One passive method that attempts to directly alleviate compressibility and stall, instead of reducing the ensuing vibrations, is the use of advanced tip designs. Taper, sweep, anhedral, and the manipulation of other geometric properties of the blade tips can reduce the severity of stall and compressibility effects , as well as reduce rotor power. A completely different approach to solve these problems is the tiltrotor configuration. As the forward velocity of the aircraft increases, the rotors, in this case, are tilted forward until they are perpendicular to the flow and act as propellers. This eliminates the edgewise flow encountered by conventional rotors and circumvents all the problems associated with flow asymmetry. However, the success involves a tremendous increase in cost and complexity of the aircraft. Another possible approach that has been proposed for the alleviation of vibratory loads at high forward flight speeds involves the use of controlled lead-lag motions to reduce the asymmetry in flow. A correctly phased 1/rev controlled lag motion could be introduced such that it produces a backward velocity on the advancing side and a forward velocity on the retreating side, to delay compressibility effects and stall to a higher advance ratio. Using a large enough lead-lag amplitude, the tip velocities could be reduced to levels encountered in hover. This concept was examined by two groups in the 1950's and early 1960's. In the United States, the Research Labs Division of United Aircraft developed a large lead-lag motion rotor, meant to achieve lag motion amplitudes up to 45 degrees. In order to reduce the required actuation force, the blade hinges were moved to 40% of the blade radius to increase the rotating lag frequency to approximately 1/rev. The blade hinges were redesigned to produce a flap-lag coupling so the large flapwise aerodynamic loads could be exploited to actuate the blades in the lag direction. A wind tunnel test of this rotor concept revealed actuation and blade motion scheduling problems. The project was eventually discontinued due to these problems and high blade stresses. Around the same time, at Boelkow in Germany, a similar lead-lag rotor program was conducted under the leadership of Hans Derschmidt. Here, too, the blade hinges were moved outboard to 34% radius to reduce the actuation loads. The main difference between this and the United Aircraft program was the use of a mechanical actuation scheme with maximum lead-lag motions of 400. This program was also discontinued for unclear reasons. The present study is directed toward conducting a comprehensive analytical examination to evaluate the effectiveness of controlled lead-lag motions in reducing vibratory hub loads and increasing maximum flight speed. Since both previous studies on this subject were purely experimental, only a limited data set and physical understanding of the problem was obtained. With the currently available analytical models and computational resources, the present effort is geared toward developing an in-depth physical understanding of the precise underlying mechanisms by which vibration reduction may be achieved. Additionally, in recognition of the fact that large amplitude lead-lag motions would - (i) be difficult to implement, and (ii) produce very large blade stresses; the present study examines the potential of only moderate-to-small lead-lag motions for reduction of vibratory hub loads. Using such an approach, the emphasis is not on eliminating the periodic variations in tangential velocity at the blade tip, but at best reducing these variations slightly so that compressibility and stall are delayed to slightly higher advance ratios. This study was conducted in two steps. In the first step, a hingeless helicopter rotor was modeled using rigid blades undergoing flap-lag-torsion rotations about spring restrained hinges and bearings. This model was then modified by separating the lead-lag degree of freedom into two components, a free and a prescribed motion. Using this model, a parametric study of the effect of phase and amplitude of a prescribed lead-lag motion on hub vibration was conducted. The data gathered was analyzed to obtain an understanding of the basic physics of the problem and show the capability of this method to reduce vibration and expand the flight envelope. In the second half of the study, the similar analysis was conducted using an elastic blade model to confirm the effects predicted by the simpler model.

Gandhi, Farhan↗

Shuttle Propulsion System Major Events and the Final 22 Flights

Numerous lessons have been documented from the Space Shuttle Propulsion elements. Major events include loss of the Solid Rocket Boosters (SRB's) on STS-4 and shutdown of a Space Shuttle Main Engine (SSME) during ascent on STS-51F. On STS-112 only half the pyrotechnics fired during release of the vehicle from the launch pad, a testament for redundancy. STS-91 exhibited freezing of a main combustion chamber pressure measurement and on STS-93 nozzle tube ruptures necessitated a low liquid level oxygen cut off of the main engines. A number of on pad aborts were experienced during the early program resulting in delays. And the two accidents, STS-51L and STS-107, had unique heritage in history from early program decisions and vehicle configuration. Following STS-51L significant resources were invested in developing fundamental physical understanding of solid rocket motor environments and material system behavior. And following STS-107, the risk of ascent debris was better characterized and controlled. Situational awareness during all mission phases improved, and the management team instituted effective risk assessment practices. The last 22 flights of the Space Shuttle, following the Columbia accident, were characterized by remarkable improvement in safety and reliability. Numerous problems were solved in addition to reduction of the ascent debris hazard. The Shuttle system, though not as operable as envisioned in the 1970's, successfully assembled the International Space Station (ISS). By the end of the program, the remarkable Space Shuttle Propulsion system achieved very high performance, was largely reusable, exhibited high reliability, and was a heavy lift earth to orbit propulsion system. During the program a number of project management and engineering processes were implemented and improved. Technical performance, schedule accountability, cost control, and risk management were effectively managed and implemented. Award fee contracting was implemented to provide performance incentives. The Certification of Flight Readiness and Mission Management processes became very effective. A key to the success of the propulsion element projects was related to relationships between the MSFC project office and support organizations with their counterpart contractor organizations. The teams worked diligently to understand and satisfy requirements and achieve mission success.

Owen, James W.↗

Long-term Engagement in Authentic Research with NASA (LEARN): Innovative Practices Suggested by a New Model for Teacher Research Experiences

NASA's LEARN Project is an innovative program that provides long-term immersion in the practice of atmospheric science for middle and high school in-service teachers. Working alongside NASA scientists and using authentic NASA Science Mission Directorate research data, teachers develop individual research topics of interest during two weeks in the summer while on-site at NASA Langley. With continued, intensive mentoring by NASA scientists, the teachers further develop their research throughout the academic year through virtual group meetings and data team meetings mirroring scientific collaborations. At the end of the first year, LEARN teachers present scientific posters. The LEARN experience has had such an impact that multiple teachers from the first two cohorts have elected to continue their research. The LEARN project evaluation has provided insights into particularly effective elements of this new approach. Findings indicate that teachers? perceptions of the scientific enterprise have changed, and that LEARN provided substantial resources to help them take real-world research to their students. This presentation will focus on key factors from LEARN?s implementation that inform best practices for the incorporation of authentic scientific research into teacher professional development experiences. We suggest that these factors should be considered in the development of other such experiences, including: (1) The involvement of a single scientist as both the project leader/manager and the project scientist, to ensure that the project can meet teachers? needs. (2) An emphasis on framing and approaching scientific research questions, so that teachers can learn to evaluate the feasibility of studies based on scope, scale, and availability of data. (3) Long term, ongoing relationships where teachers and scientists work as collaborators, beyond the workshop ?mold.? (4) A focus on meeting the needs of individual teachers, whether their needs relate to elements of research and analysis, or to their tight professional schedules. (5) Above all, flexibility and patience. LEARN builds relationships with teachers slowly, over a long period of time. In the middle, life often intervenes. LEARN has emphasized that teachers? success is more important than deadlines or following a rigid protocol.

M Pippin↗

Using an Automated Air Traffic Simulation Capability for a Parametric Study in Traffic Flow Management

Flight delays occur when demand for capacity-constrained airspace or airports exceeds predicted capacity. Demand for capacity-constrained airspace or airports can be controlled by a series of Traffic Management Initiatives (TMIs), which use departure and airborne delays, as well as pre-departure and airborne reroutes, to manage access to the constrained resources. Two systems exist in current and planned future operations to address imbalances between demand and capacity. The Collaborative Trajectory Options Program (CTOP) reduces demand to constrained resources by assigning strategic departure delay and pre-departure reroutes. Reroutes are selected from Trajectory Options Sets (TOSs) submitted by airlines. As flights approach the constrained resource, the Time-Based Flow Management System (TBFM) is used to assign tactical delay to satisfy constraints. This paper describes experiments performed to study the impact of varying levels of airline participation in CTOP via submission of TOSs on ground delay and flight time, and the impact of departure uncertainty on TBFM delays. Results suggest that as CTOP participation increases, average ground delays decrease for all airlines, but to the greatest extent for airlines participating in CTOP. A threshold in CTOP participation, which varies with the constraint capacity, is identified beyond which there is relatively little further reduction in average ground delays. Similarly, given the likely level of CTOP participation, the capacity reduction for which CTOP would be an appropriate TMI is also identified. Results also suggest that high average departure errors and high variability in departure error can make the prioritization of TBFM internal departures in TBFM metering and scheduling infeasible. Departure errors at current levels are, however, acceptable.

CTOP↗

Using an Automated Air Traffic Simulation Capability for a Parametric Study in Traffic Flow Management

Flight delays occur when demand for capacity-constrained airspace or airports exceeds predicted capacity. Demand for capacity-constrained airspace or airports can be controlled by a series of Traffic Management Initiatives (TMIs), which use departure and airborne delays, as well as pre-departure and airborne reroutes, to manage access to the constrained resources. Two systems exist in current and planned future operations to address imbalances between demand and capacity. The Collaborative Trajectory Options Program (CTOP) reduces demand to constrained resources by assigning strategic departure delay and pre-departure reroutes. Reroutes are selected from Trajectory Options Sets (TOSs) submitted by airlines. As flights approach the constrained resource, the Time-Based Flow Management System (TBFM) is used to assign tactical delay to satisfy constraints. This paper describes experiments performed to study the impact of varying levels of airline participation in CTOP via submission of TOSs on ground delay and flight time, and the impact of departure uncertainty on TBFM delays. Results suggest that as CTOP participation increases, average ground delays decrease for all airlines, but to the greatest extent for airlines participating in CTOP. A threshold in CTOP participation, which varies with the constraint capacity, is identified beyond which there is relatively little further reduction in average ground delays. Similarly, given the likely level of CTOP participation, the capacity reduction for which CTOP would be an appropriate TMI is also identified. Results also suggest that high average departure errors and high variability in departure error can make the prioritization of TBFM internal departures in TBFM metering and scheduling infeasible. Departure errors at current levels are, however, acceptable.

integrated demand management↗

Federal Aviation Administration Vertiport Electrical Infrastructure Study

In this detailed analysis, the authors assess the charging infrastructure needed for the deployment of advanced air mobility involving electrified vertical take-off and landing technologies. The report covers four research areas: (1) Identifying charging infrastructure requirements for existing facilities based on flight operational parameters, potential use cases, charging strategy, and other constraints. (2) Assessing sites on power availability to meet charging demand, the impact on grid infrastructure, potential hazards, and cybersecurity needs, and using technoeconomic analysis to identify opportunities for onsite distributed energy resources, primarily solar photovoltaics and battery energy storage systems. (3) Calculating greenhouse gas emission based on total energy consumption attributable to each site. (4) Analyzing the job and economic development impact for sites adopting new infrastructure.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Powernet in Farms Project

Coordinating behind-the-meter (BTM) distributed energy resources (DERs) is critical to ensuring efficiency and reliability for consumers facing an increasingly variable grid supply. Outside of very controlled environments, however, such coordination of heterogeneous resources at scale has remained a challenge due to harsh field conditions, the lack of adequate communication infrastructure, and the difficulty of modeling the system. The intent of this research was to refine the Powernet system deployed in a California dairy farm to achieve the following objectives: a) validate the results of the previous deployment and b) validate new hypothesis about system performance based on the simulation of the new system. The new system design would reduce the overall system cost, and achieve a payback period of less than 3 years, demonstrating the feasibility of such system and its relevance for a segment not well known for technology advancements in power systems. The new proposed system was significantly cheaper than the original design, which would enable the solution to be cost effective and likely economically viable. However, due to significant delays in project start date which affected funding availability, overlap with prior scheduled mandatory military leave from key members of the project team, and customer drop-out, due to the significant delays, which could not be replaced in time, caused the project to be ended prior to completion.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Crew-Centered Operations: What HAL 9000 Should Have Been

To date, manned space flight has maintained the locus of control for the mission on the ground. Mission control performs tasks such as activity planning, system health management, resource allocation, and astronaut health monitoring. Future exploration missions require the locus of control to shift to on-board due light speed constraints and potential loss of communication. The lunar campaign must begin to utilize a shared control approach to validate and understand the limitations of the technology allowing astronauts to oversee and direct aspects of operation that require timely decision making. Crew-centered Operations require a system-level approach that integrates multiple technologies together to allow a crew-prime concept of operations. This paper will provide an overview of the driving mission requirements, highlighting the limitations of existing approaches to mission operations and identifying the critical technologies necessary to enable a crew-centered mode of operations. The paper will focus on the requirements, trade spaces, and concepts for fulfillment of this capability. The paper will provide a broad overview of relevant technologies including: Activity Planning and Scheduling; System Monitoring; Repair and Recovery; Crew Work Practices.

Korsmeyer, David J.↗

Cognitive Functioning in Space Exploration Missions: A Human Requirement

Solving cognitive issues in the exploration missions will require implementing results from both Human Behavior and Performance, and Space Human Factors Engineering. Operational and research cognitive requirements need to reflect a coordinated management approach with appropriate oversight and guidance from NASA headquarters. First, this paper will discuss one proposed management method that would combine the resources of Space Medicine and Space Human Factors Engineering at JSC, other NASA agencies, the National Space Biomedical Research Institute, Wyle Labs, and other academic or industrial partners. The proposed management is based on a Human Centered Design that advocates full acceptance of the human as a system equal to other systems. Like other systems, the human is a system with many subsystems, each of which has strengths and limitations. Second, this paper will suggest ways to inform exploration policy about what is needed for optimal cognitive functioning of the astronaut crew, as well as requirements to ensure necessary assessment and intervention strategies for the human system if human limitations are reached. Assessment strategies will include clinical evaluation and fitness-to-perform evaluations. Clinical intervention tools and procedures will be available to the astronaut and space flight physician. Cognitive performance will be supported through systematic function allocation, task design, training, and scheduling. Human factors requirements and guidelines will lead to well-designed information displays and retrieval systems that reduce crew time and errors. Means of capturing process, design, and operational requirements to ensure crew performance will be discussed. Third, this paper will describe the current plan of action, and future challenges to be resolved before a lunar or Mars expedition. The presentation will include a proposed management plan for research, involvement of various organizations, and a timetable of deliverables.

Fiedler, Edan↗

TTEthernet for Integrated Spacecraft Networks

Aerospace projects have traditionally employed federated avionics architectures, in which each computer system is designed to perform one specific function (e.g. navigation). There are obvious downsides to this approach, including excessive weight (from so much computing hardware), and inefficient processor utilization (since modern processors are capable of performing multiple tasks). There has therefore been a push for integrated modular avionics (IMA), in which common computing platforms can be leveraged for different purposes. This consolidation of multiple vehicle functions to shared computing platforms can significantly reduce spacecraft cost, weight, and design complexity. However, the application of IMA principles introduces significant challenges, as the data network must accommodate traffic of mixed criticality and performance levels - potentially all related to the same shared computer hardware. Because individual network technologies are rarely so competent, the development of truly integrated network architectures often proves unreasonable. Several different types of networks are utilized - each suited to support a specific vehicle function. Critical functions are typically driven by precise timing loops, requiring networks with strict guarantees regarding message latency (i.e. determinism) and fault-tolerance. Alternatively, non-critical systems generally employ data networks prioritizing flexibility and high performance over reliable operation. Switched Ethernet has seen widespread success filling this role in terrestrial applications. Its high speed, flexibility, and the availability of inexpensive commercial off-the-shelf (COTS) components make it desirable for inclusion in spacecraft platforms. Basic Ethernet configurations have been incorporated into several preexisting aerospace projects, including both the Space Shuttle and International Space Station (ISS). However, classical switched Ethernet cannot provide the high level of network determinism required by real-time spacecraft applications. Even with modern advancements, the uncoordinated (i.e. event-driven) nature of Ethernet communication unavoidably leads to message contention within network switches. The arbitration process used to resolve such conflicts introduces variation in the time it takes for messages to be forwarded. TTEthernet1 introduces decentralized clock synchronization to switched Ethernet, enabling message transmission according to a time-triggered (TT) paradigm. A network planning tool is used to allocate each device a finite amount of time in which it may transmit a frame. Each time slot is repeated sequentially to form a periodic communication schedule that is then loaded onto each TTEthernet device (e.g. switches and end systems). Each network participant references the synchronized time in order to dispatch messages at predetermined instances. This schedule guarantees that no contention exists between time-triggered Ethernet frames in the network switches, therefore eliminating the need for arbitration (and the timing variation it causes). Besides time-triggered messaging, TTEthernet networks may provide two additional traffic classes to support communication of different criticality levels. In the rate-constrained (RC) traffic class, the frame payload size and rate of transmission along each communication channel are limited to predetermined maximums. The network switches can therefore be configured to accommodate the known worst-case traffic pattern, and buffer overflows can be eliminated. The best-effort (BE) traffic class behaves akin to classical Ethernet. No guarantees are provided regarding transmission latency or successful message delivery. TTEthernet coordinates transmission of all three traffic classes over the same physical connections, therefore accommodating the full spectrum of traffic criticality levels required in IMA architectures. Common computing platforms (e.g. LRUs) can share networking resources in such a way that failures in non-critical systems (using BE or RC communication modes) cannot impact flight-critical functions (using TT communication). Furthermore, TTEthernet hardware (e.g. switches, cabling) can be shared by both TTEthernet and classical Ethernet traffic.

Loveless, Andrew↗

NASA-evolving to Ada: Five-year plan. A plan for implementing recommendations made by the Ada and software management assessment working group

At their March 1988 meeting, members of the National Aeronautics and Space Administration (NASA) Information Resources Management (IRM) Council expressed concern that NASA may not have the infrastructure necessary to support the use of Ada for major NASA software projects. Members also observed that the agency has no coordinated strategy for applying its experiences with Ada to subsequent projects (Hinners, 27 June 1988). To deal with these problems, the IRM Council chair appointed an intercenter Ada and Software Management Assessment Working Group (ASMAWG). They prepared a report (McGarry et al., March 1989) entitled, 'Ada and Software Management in NASA: Findings and Recommendations'. That report presented a series of recommendations intended to enable NASA to develop better software at lower cost through the use of Ada and other state-of-the-art software engineering technologies. The purpose here is to describe the steps (called objectives) by which this goal may be achieved, to identify the NASA officials or organizations responsible for carrying out the steps, and to define a schedule for doing so. This document sets forth four goals: adopt agency-wide software standards and policies; use Ada as the programming language for all mission software; establish an infrastructure to support software engineering, including the use of Ada, and to leverage the agency's software experience; and build the agency's knowledge base in Ada and software engineering. A schedule for achieving the objectives and goals is given.

Source record↗

Robotic and Human-Tended Collaborative Drilling Automation for Subsurface Exploration

Future in-situ lunar/martian resource utilization and characterization, as well as the scientific search for life on Mars, will require access to the subsurface and hence drilling. Drilling on Earth is hard - an art form more than an engineering discipline. Human operators listen and feel drill string vibrations coming from kilometers underground. Abundant mass and energy make it possible for terrestrial drilling to employ brute-force approaches to failure recovery and system performance issues. Space drilling will require intelligent and autonomous systems for robotic exploration and to support human exploration. Eventual in-situ resource utilization will require deep drilling with probable human-tended operation of large-bore drills, but initial lunar subsurface exploration and near-term ISRU will be accomplished with lightweight, rover-deployable or standalone drills capable of penetrating a few tens of meters in depth. These lightweight exploration drills have a direct counterpart in terrestrial prospecting and ore-body location, and will be designed to operate either human-tended or automated. NASA and industry now are acquiring experience in developing and building low-mass automated planetary prototype drills to design and build a pre-flight lunar prototype targeted for 2011-12 flight opportunities. A successful system will include development of drilling hardware, and automated control software to operate it safely and effectively. This includes control of the drilling hardware, state estimation of both the hardware and the lithography being drilled and state of the hole, and potentially planning and scheduling software suitable for uncertain situations such as drilling. Given that Humans on the Moon or Mars are unlikely to be able to spend protracted EVA periods at a drill site, both human-tended and robotic access to planetary subsurfaces will require some degree of standalone, autonomous drilling capability. Human-robotic coordination will be important, either between a robotic drill and humans on Earth, or a human-tended drill and its visiting crew. The Mars Analog Rio Tinto Experiment (MARTE) is a current project that studies and simulates the remote science operations between an automated drill in Spain and a distant, distributed human science team. The Drilling Automation for Mars Exploration (DAME) project, by contrast: is developing and testing standalone automation at a lunar/martian impact crater analog site in Arctic Canada. The drill hardware in both projects is a hardened, evolved version of the Advanced Deep Drill (ADD) developed by Honeybee Robotics for the Mars Subsurface Program. The current ADD is capable of 20m, and the DAME project is developing diagnostic and executive software for hands-off surface operations of the evolved version of this drill. The current drill automation architecture being developed by NASA and tested in 2004-06 at analog sites in the Arctic and Spain will add downhole diagnosis of different strata, bit wear detection, and dynamic replanning capabilities when unexpected failures or drilling conditions are discovered in conjunction with simulated mission operations and remote science planning. The most important determinant of future 1unar and martian drilling automation and staffing requirements will be the actual performance of automated prototype drilling hardware systems in field trials in simulated mission operations. It is difficult to accurately predict the level of automation and human interaction that will be needed for a lunar-deployed drill without first having extensive experience with the robotic control of prototype drill systems under realistic analog field conditions. Drill-specific failure modes and software design flaws will become most apparent at this stage. DAME will develop and test drill automation software and hardware under stressful operating conditions during several planned field campaigns. Initial results from summer 2004 tests show seven identifi distinct failure modes of the drill: cuttings-removal issues with low-power drilling into permafrost, and successful steps at executive control and initial automation.

Glass, Brian↗

VIPER – Volatiles Investigating Polar Exploration Rover: Mission Overview

VIPER is a low cost, lunar volatiles detection and measurement mission that will be delivered to the lunar south pole by one of NASA’s Commercial Lunar Payload Services partners and will characterize the nature of the volatiles in the area and extrapolate this data to create global lunar water resource maps. It will be the first mining expedition on another world while simultaneously addressing fundamental planetary science questions. Prospecting for lunar water at the poles is the next step in understanding the resource potential and addressing key theories about water emplacement and retention. It now appears that potentially economically significant amounts of water ice exists at the poles of the Moon, however, the distribution of this water is still not understood at a level sufficient to fully evaluate economic models. The water ice (and other potential volatiles), the “ore body”, needs to be understood at the scales of 10s to 100s of meters to evaluate localization, extraction and processing techniques. To accomplish this, VIPER will survey permanently-shadowed regions, semi-permanent shadowed regions, and even semi and full sunlit areas in order to have a comprehensive survey of polar region volatiles, to best inform future mission architectures. In order to characterize the volatiles, a payload suite consisting of a neutron spectrometer, mass spectrometer, near infrared spectrometer and a 1-meter drill will be hosted on the VIPER mobile lunar rover platform. Since VIPER is a relatively low cost, schedule-constrained, risk-tolerant mission, there are architectural limitations that require unique mission planning constraints to enable exploration of the lunar south pole region. These regions offer unique challenges such as uncertain terrain conditions, rock and crater hazards, lunar dust, multipath communications effects, extreme thermal environments and multiple overlapping planning constraints. Mission design/traverse planning, system design capabilities and mission operations are all highly linked through initial development phases. We will describe the current mission overview and the unique approaches taken by the VIPER project based on our programmatic framework and unique mission environment.

VIPER↗

Explaining Soft-Goal Conflicts through Constraint Relaxations

Recent work suggests to explain trade-offs between soft goals in terms of their conflicts, i. e., minimal unsolvable soft-goal subsets. But this does not explain the conflicts themselves: Why can a given set of soft-goals not be jointly achieved? Here we approach that question in terms of the underlying constraints on plans in the task at hand, namely resource availability and time windows. In this context, a natural form of explanation for a soft-goal conflict is a minimal constraint relaxation under which the conflict disappears (“if the deadline was 1 hour later, it would work”). We explore algorithms for computing such explanations. A baseline is to simply loop over all relaxed tasks and compute the conflicts for each separately. We improve over this by two algorithms that leverage information – conflicts, reachable states – across relaxed tasks. We show that these algorithms can exponentially outperform the baseline in theory, and we run experiments confirming that advantage in practice.

Planning↗

Radiological Contingency Planning for the Mars Science Laboratory Launch

This paper describes the contingency planning for the launch of the Mars Science Laboratory scheduled for the 21-day window beginning on September 15, 2009. National Security Technologies, LLC (NSTec), based in Las Vegas, Nevada, will support the U.S. Department of Energy (DOE) in its role for managing the overall radiological contingency planning support effort. This paper will focus on new technologies that NSTec’s Remote Sensing Laboratory (RSL) is developing to enhance the overall response capability that would be required for a highly unlikely anomaly. This paper presents recent advances in collecting and collating data transmitted from deployed teams and sensors. RSL is responsible to prepare the contingency planning for a range of areas from monitoring and assessment, sample collection and control, contaminated material release criteria, data management, reporting, recording, and even communications. The tools RSL has available to support these efforts will be reported. The data platform RSL will provide shall also be compatible with integration of assets and field data acquired with other DOE, National Aeronautics and Space Administration, state, and local resources, personnel, and equipment. This paper also outlines the organizational structure for response elements in radiological contingency planning.

79 ASTRONOMY AND ASTROPHYSICS↗

Orbital Express Mission Operations Planning and Resource Management using ASPEN

The Orbital Express satellite servicing demonstrator program is a DARPA program aimed at developing "a safe and cost-effective approach to autonomously service satellites in orbit". The system consists of: a) the Autonomous Space Transport Robotic Operations (ASTRO) vehicle, under development by Boeing Integrated Defense Systems, and b) a prototype modular next-generation serviceable satellite, NEXTSat, being developed by Ball Aerospace. Flexibility of ASPEN: a) Accommodate changes to procedures; b) Accommodate changes to daily losses and gains; c) Responsive re-planning; and d) Critical to success of mission planning Auto-Generation of activity models: a) Created plans quickly; b) Repetition/Re-use of models each day; and c) Guarantees the AML syntax. One SRP per day vs. Tactical team

automated planning scheduling↗

Techno-Economic Analysis of Greenfield Geothermal Hybrid Power Plants using a Solar or Natural Gas Steam Topping Cycle

The relatively low generation costs associated with wind, solar photovoltaic (PV), and natural-gas power plants make it challenging for geothermal power plants to produce and sell the power that has the reliability and sustainability characteristics that are greatly needed in U.S. power markets. This is especially true for geothermal resources with low-to-medium temperatures, which results in relatively low-thermal efficiency and generation costs that are higher than those for wind, solar PV, and natural gas. This analysis evaluates solar thermal- and natural-gas combustion waste heat recovery-based topping cycle hybridization of geothermal binary power plants. This approach provides several benefits that may allow geothermal power plants to generate power at more competitive costs. First, the addition of solar thermal energy or natural-gas combustion waste heat input to a geothermal power plant provides additional heat input that can be converted to electrical power. Second, the temperature level of the heat obtained from concentrating solar collectors or natural-gas combustion exhaust is higher than that of geothermal heat, which provides opportunities for improving the efficiency of the conversion of thermal energy to electrical power. Third, the ease with which solar thermal systems integrate with energy storage and the flexibility of natural gas means power generation can occur during peak demand periods. The hybrid cycles are compared to equivalently sized, co-located, independent geothermal, concentrating solar, and/or natural-gas power plants. The hybrid cycle tends to produce slightly more power than the standalone plants combined. However, the hybrid plant Levelized Cost of Energy (LCOE) is slightly higher than the LCOE of the combined standalone power plants for each of the case study locations investigated. Using the steam-topping cycle, organic Rankine cycle (ORC)-bottoming cycle hybrid plant design to combine a solar thermal resource and low- temperature geothermal resource (<120 degrees C) leads to a hybrid plant with a lower LCOE than a standalone geothermal-only system. Thus, hybrid plants may enable the economic development of geothermal resources in locations with low geothermal resource temperatures. However, in areas with higher geothermal resource temperatures (>120 degrees C), the geothermal-only plant has a lower LCOE than the hybrid cycle and thus could be developed without the need for solar heat addition. iv A geothermal-natural-gas reciprocating engine hybrid plant was evaluated for an Elk Hills, California case study location. The Elk Hills case study analysis indicates that when the natural-gas engine operates for more than 12 hours per day the hybrid plant can produce power at an LCOE lower than a standalone geothermal plant, and comparable to that of the standalone natural-gas reciprocating engine, while also reducing the carbon intensity of the power generated relative to the standalone natural-gas engine. This may represent a scenario in which the hybrid plant provides an opportunity for the deployment of a low-temperature geothermal resource that otherwise may have an LCOE too high to develop and operate as a standalone resource, while also reducing the carbon intensity of natural-gas generation sources. A "triple-hybrid" plant that combines natural gas, solar thermal, thermal energy storage, and geothermal was also investigated. A natural-gas combustion turbine (NGCT) is added to the geothermal-solar hybrid such that the hot exhaust gas from the gas turbine provides an alternative source of heat to the steam turbine of the hybrid cycle. Analysis results suggest that the triple-hybrid plant has a significantly higher energy generation and revenue than a standalone NGCT or the original geothermal-solar hybrid. The triple-hybrid design benefits most from using a smaller solar field so that the solar energy can be dispatched at the most valuable times available. The triple-hybrid plant also has a lower LCOE than the standalone NGCT. The triple-hybrid plant was evaluated making simple assumptions about the dispatch profile of the gas cycle, and more nuanced and realistic dispatching schedules should be analyzed in future work.

15 GEOTHERMAL ENERGY↗