Search NASA⌕ Search

SEARCH · Search NASA

Results for “integrated testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,639 records · Page 91

UAS Integration in the NAS Project: Flight Test 3 Data Analysis of JADEM-Autoresolver Detect and Avoid System

The Unmanned Aircraft Systems Integration in the National Airspace System project, or UAS Integration in the NAS, aims to reduce technical barriers related to safety and operational challenges associated with enabling routine UAS access to the NAS. The UAS Integration in the NAS Project conducted a flight test activity, referred to as Flight Test 3 (FT3), involving several Detect-and-Avoid (DAA) research prototype systems between June 15, 2015 and August 12, 2015 at the Armstrong Flight Research Center (AFRC). This report documents the flight testing and analysis results for the NASA Ames-developed JADEM-Autoresolver DAA system, referred to as 'Autoresolver' herein. Four flight test days (June 17, 18, 22, and July 22) were dedicated to Autoresolver testing. The objectives of this test were as follows: 1. Validate CPA prediction accuracy and detect-and-avoid (DAA, formerly known as self-separation) alerting logic in realistic flight conditions. 2. Validate DAA trajectory model including maneuvers. 3. Evaluate TCAS/DAA interoperability. 4. Inform final Minimum Operating Performance Standards (MOPS). Flight test scenarios were designed to collect data to directly address the objectives 1-3. Objective 4, inform final MOPS, was a general objective applicable to the UAS in the NAS project as a whole, of which flight test is a subset. This report presents analysis results completed in support of the UAS in the NAS project FT3 data review conducted on October 20, 2015. Due to time constraints and, to a lesser extent, TCAS data collection issues, objective 3 was not evaluated in this analysis.

flight test↗

Critical Current Stability of 2G REBCO Tape for Space-Flight HTS Leads

High reliability is an essential requirement for all spaceflight hardware. XRISM, a follow-on mission to the Hitomi x-ray observatory, also uses 2G REBCO tapes as current leads for the superconducting magnets that are a key component of the Adiabatic Demagnetization Refrigerator (ADR) that cools the detector array. While the Hitomi Soft X-ray Spectrometer (SXS) worked flawlessly in orbit, during its development there were indications that the critical current of its specialized REBCO tapes could degrade over time when exposed to normal-humidity air. To demonstrate that the updates to the XRISM HTS lead assemblies had mitigated this risk, a series of tests were carried out to measure the stability of Ic of dozens of samples over a period greater than the flight assemblies were exposed to air during integration and test. The test rig allowed not only the measurement of the sample Ic, but also the localization of the voltage rise as the current approached Ic. We will discuss the trends in the critical current of the samples, as well as localization of lower Ic regions.

Edgar R. Canavan↗

Operationally efficient propulsion system study (OEPSS) data book: Preliminary Development Plan for an Integrated Booster Propulsion Module (BPM) - Volume 9

A preliminary development plan for an integrated propulsion module (IPM) is described. The IPM, similar to the Space Transportation Main engine (STME) engine, is applicable to the Advanced Launch System (ALS) baseline vehicle. The same STME development program ground rules and time schedule were assumed for the IPM. However, the unique advantages of testing an integrated engine element, in terms of reduced number of hardware and number of system and reliability tests, compared to single standalone engine and MPTA, are highlighted. The potential ability of the IPM to meet the ALS program goals for robustness, operability and reliability is emphasized.

DiBlasi, Angelo G.↗

Development and Bench-Scale Testing of a Novel Biphasic Solvent-Enabled Absorption Process for Post-Combustion Carbon Capture (Final Technical Report)

A new class of biphasic solvents was developed, and the concept of the enabled carbon dioxide (CO 2 ) absorption process was tested for post-combustion carbon capture in our previous lab-scale research. The primary goals of this project were to advance the development of the novel biphasic CO 2 absorption process (BiCAP) and validate its technical advantages by testing the integrated technology at a 40 kWe bench-scale with actual coal-derived flue gas in a power plant environment. The project was led by the University of Illinois at Urban-Champaign (UIUC), and Trimeric Corporation served as a sub-awardee providing support in basic design and techno-economic studies. To achieve the project goals and objectives, solvent management studies, process modeling and optimization, bench-scale equipment design, construction and testing, and technical, economic and environmental assessments have been conducted. The two top-performing biphasic solvents developed in our previous research were used in this project. Biphasic solvent emissions and control were investigated in the laboratory. The emissions of the biphasic solvents from the absorber were comparable to or lower than the reference 30 wt% monoethanolamine (MEA) solution, while they could be more effectively removed in the water wash column. Lab-scale testing of solvent degradation reclamation has revealed that vacuum distillation was feasible for biphasic solvent reclamation. Aspen Plus models were used to optimize the BiCAP, and a CO 2 stripping configuration introducing a secondary cold solvent feed to the stripper was identified to be the most energy efficient. A 40 kWe bench-scale, integrated BiCAP system was successfully designed, fabricated, and installed at the UIUC’s Abbott Power Plant. Parametric testing with synthetic flue gas has demonstrated that the two biphasic solvents required a more than 40% lower heat duty for CO 2 desorption as compared to the reference MEA tested on the same bench-scale skid. Slipstream testing with actual coal flue gas for a total of 31 days in two test campaigns has further demonstrated stable operation of the bench-scale skid. During the first campaign targeting 90% CO 2 removal, the heat duty averaged at 2,183 MJ/tonne of CO 2 captured and during the second campaign targeting 95% removal, the heat duty averaged at 2,450 MJ/tonne of CO 2 captured. A techno-economic analysis has revealed that for integration of the BiCAP into a 650-MWe pulverized coal-fired power plant, the parasitic power loss was reduced by ~20%, and the cost of CO 2 capture was reduced by ~21% ($36.3/tonne on a December 2018 dollar basis) compared to the U.S. Department of Energy (DOE)’s baseline Case B12B. As progression from this bench-scale development effort, a new project “Engineering-Scale Testing of the Biphasic Solvent Based CO 2 Absorption Capture Technology at a Covanta Waste-to-Energy Facility” was awarded by the DOE, launched in February 2023, to allow the team to further test the technology and demonstrate its technical and economic advantages at a pilot scale.

20 FOSSIL-FUELED POWER PLANTS↗

Grasping objects autonomously in simulated KC-135 zero-g

The KC-135 aircraft was chosen for simulated zero gravity testing of the Extravehicular Activity Helper/retriever (EVAHR). A software simulation of the EVAHR hardware, KC-135 flight dynamics, collision detection and grasp inpact dynamics has been developed to integrate and test the EVAHR software prior to flight testing on the KC-135. The EVAHR software will perform target pose estimation, tracking, and motion estimation for rigid, freely rotating, polyhedral objects. Manipulator grasp planning and trajectory control software has also been developed to grasp targets while avoiding collisions.

Norsworthy, Robert S.↗

Light Microscopy Module Imaging Tested and Demonstrated

The Fluids Integrated Rack (FIR), a facility-class payload, and the Light Microscopy Module (LMM), a subrack payload, are integrated research facilities that will fly in the U.S. Laboratory module, Destiny, aboard the International Space Station. Both facilities are being engineered, designed, and developed at the NASA Glenn Research Center by Northrop Grumman Information Technology. The FIR is a modular, multiuser scientific research facility that is one of two racks that make up the Fluids and Combustion Facility (the other being the Combustion Integrated Rack). The FIR has a large volume dedicated for experimental hardware; easily reconfigurable diagnostics, power, and data systems that allow for unique experiment configurations; and customizable software. The FIR will also provide imagers, light sources, power management and control, command and data handling for facility and experiment hardware, and data processing and storage. The first payload in the FIR will be the LMM. The LMM integrated with the FIR is a remotely controllable, automated, on-orbit microscope subrack facility, with key diagnostic capabilities for meeting science requirements--including video microscopy to observe microscopic phenonema and dynamic interactions, interferometry to make thin-film measurements with nanometer resolution, laser tweezers to manipulate micrometer-sized particles, confocal microscopy to provide enhanced three-dimensional visualization of structures, and spectrophotometry to measure the photonic properties of materials. Vibration disturbances were identified early in the LMM development phase as a high risk for contaminating the science microgravity environment. An integrated FIR-LMM test was conducted in Glenn's Acoustics Test Laboratory to assess mechanical sources of vibration and their impact to microscopic imaging. The primary purpose of the test was to characterize the LMM response at the sample location, the x-y stage within the microscope, to vibration emissions from the FIR and LMM support structures.

Gati, Frank↗

Habitability Assessments And Lessons-learned From 3-day And 11-day Enriched Oxygen Hypobaric Chamber Tests At NASA Johnson Space Center

INTRODUCTION: Decompression sickness (DCS) is a risk to the health and performance of astronauts and high-altitude aircrew. Tolerance to flammability, hypoxia, prebreathe duration, and DCS risk varies across different organizations, vehicles, suits, and destinations, necessitating a variety of DCS risk mitigation approaches. Existing models of altitude DCS risk are often insufficient to enable accurate risk-informed decisions during hardware development, mission planning, and flight operations. METHODS: NASA completed outfitting of a dedicated facility at Johnson Space Center to support testing of up to eight human subjects for multiple days in hypobaric and enriched oxygen atmospheres. The primary purpose of the testing capability is validation of DCS risk mitigation protocols for Artemis missions to the Moon; however, it will also support development and validation of a generalizable altitude DCS risk estimation tool. A 3-day and an 11-day prebreathe validation test were completed in 2022, each with 8 human subjects living at 56.5 kPa (8.2 psia), 34% O2, 66% N2, with 5 simulated EVAs performed on masks at 29.6 kPa (4.3 psi), 85% O2, 15% N2. Facility and organizational lessons-learned and process improvements were recorded during and following the tests, and subjective habitability ratings were recorded daily during the 11-day test. Hypoxia and DCS-related physiological and cognitive outcome measures were recorded during both tests and are reported in companion presentations. RESULTS & DISCUSSION: All subjects completed each of the tests. Primary habitability issues related to mask discomfort during simulated EVAs and poor sleep quality due to thin mattresses. Polybenzimidazole (PBI) clothing was worn by all subjects due to the increased fire risk and may be required for Artemis missions; clothing was found to be acceptable overall with the worst ratings being due to poor fit and inelasticity. Chamber O2 and CO2 sensor inconsistency was observed that did not result in test termination but required post-test follow-up. Forward plans include additional hypobaric testing and integration of existing and future physiological outcome data into an open-source Aerospace Estimation Tool for Hypobaric Exposure Risk (AETHER). NASA is also working to make the testing capability available to commercial companies.

Andrew F J Abercromby↗

Habitability Assessments And Lessons-learned From 3-day And 11-day Enriched Oxygen Hypobaric Chamber Tests At NASA Johnson Space Center

INTRODUCTION: Decompression sickness (DCS) is a risk to the health and performance of astronauts and high-altitude aircrew. Tolerance to flammability, hypoxia, prebreathe duration, and DCS risk varies across different organizations, vehicles, suits, and destinations, necessitating a variety of DCS risk mitigation approaches. Existing models of altitude DCS risk are often insufficient to enable accurate risk-informed decisions during hardware development, mission planning, and flight operations. METHODS: NASA completed outfitting of a dedicated facility at Johnson Space Center to support testing of up to eight human subjects for multiple days in hypobaric and enriched oxygen atmospheres. The primary purpose of the testing capability is validation of DCS risk mitigation protocols for Artemis missions to the Moon; however, it will also support development and validation of a generalizable altitude DCS risk estimation tool. A 3-day and an 11-day prebreathe validation test were completed in 2022, each with 8 human subjects living at 56.5 kPa (8.2 psia), 34% O2, 66% N2, with 5 simulated EVAs performed on masks at 29.6 kPa (4.3 psi), 85% O2, 15% N2. Facility and organizational lessons-learned and process improvements were recorded during and following the tests, and subjective habitability ratings were recorded daily during the 11-day test. Hypoxia and DCS-related physiological and cognitive outcome measures were recorded during both tests and are reported in companion presentations. RESULTS & DISCUSSION: All subjects completed each of the tests. Primary habitability issues related to mask discomfort during simulated EVAs and poor sleep quality due to thin mattresses. Polybenzimidazole (PBI) clothing was worn by all subjects due to the increased fire risk and may be required for Artemis missions; clothing was found to be acceptable overall with the worst ratings being due to poor fit and inelasticity. Chamber O2 and CO2 sensor inconsistency was observed that did not result in test termination but required post-test follow-up. Forward plans include additional hypobaric testing and integration of existing and future physiological outcome data into an open-source Aerospace Estimation Tool for Hypobaric Exposure Risk (AETHER). NASA is also working to make the testing capability available to commercial companies.

Andrew Abercromby↗

Software Considerations for Subscale Flight Testing of Experimental Control Laws

The NASA AirSTAR system has been designed to address the challenges associated with safe and efficient subscale flight testing of research control laws in adverse flight conditions. In this paper, software elements of this system are described, with an emphasis on components which allow for rapid prototyping and deployment of aircraft control laws. Through model-based design and automatic coding a common code-base is used for desktop analysis, piloted simulation and real-time flight control. The flight control system provides the ability to rapidly integrate and test multiple research control laws and to emulate component or sensor failures. Integrated integrity monitoring systems provide aircraft structural load protection, isolate the system from control algorithm failures, and monitor the health of telemetry streams. Finally, issues associated with software configuration management and code modularity are briefly discussed.

Murch, Austin M.↗

Modernization of NASA Johnson Space Center's Chamber A to Support Cryogenic Vacuum Optical Testing of the James Webb Space Telescope (JWST)

Final document is attached. NASA is the mission lead for the James Webb Space Telescope (JWST), the next of the "Great Observatories", scheduled for launch in 2021. NASA is directly responsible for the integration and test (I&T) program that culminated in an end-to-end cryo vacuum optical test of the flight telescope and instrument module in Chamber A at NASA Johnson Space Center. Historic Chamber A is the largest thermal vacuum chamber at Johnson Space Center and one of the largest space simulation chambers in the world. Chamber A has undergone a major modernization effort to support the deep cryogenic, vacuum and cleanliness requirements for testing the JWST. This paper describes the upgrades to the Chamber A facility: Thermal Shrouds, Helium Refrigeration, Liquid Nitrogen System, High Vacuum System, Clean Airflow System, and Utilities.

Thermal vacuum testing↗

IOTA Run 2 Beam Dynamics Studies in Nonlinear Integrable Systems

Nonlinear integrable optics is a promising design approach for suppressing fast collective instabilities. To study it experimentally, a new storage ring, the Integrable Optics Test Accelerator (IOTA), was built at Fermilab. IOTA has recently completed its second scientific run, incorporating many hardware and instrumentation improvements. This report presents the results of the two integrable optics experiments - the quasi-integrable Henon-Heiles octupole system and the fully integrable Danilov-Nagaitsev system. We demonstrate tune spread and dynamic aperture in agreement with tracking simulations, and a stable crossing of the integer resonance. Based on recovered single-particle phase space dynamics, we show improved invariant jitter consistent with intended effective Hamiltonian. We conclude by outlining future plans and efforts towards proton studies and larger designs.

43 PARTICLE ACCELERATORS↗

Feasibility of Adding Twitter Data to Aid Drought Depiction: Case Study in Colorado

The use of social media, such as Twitter, has changed the information landscape for citizens’ participation in crisis response and recovery activities. Given that drought progression is slow and also spatially extensive, an interesting set of questions arise, such as how the usage of Twitter by a large population may change during the development of a major drought alongside how the changing usage facilitates drought detection. For this reason, contemporary analysis of how social media data, in conjunction with meteorological records, was conducted towards improvement in the detection of drought and its progression. The research utilized machine learning techniques applied over satellite-derived drought conditions in Colorado. Three different machine learning techniques were examined: the generalized linear model, support vector machines and deep learning, each applied to test the integration of Twitter data with meteorological records as a predictor of drought development. It is found that the integration of data resources is viable given that the Twitter-based model outperformed the control run which did not include social media input. Eight of the ten models tested showed quantifiable improvements in the performance over the control run model, suggesting that the Twitter-based model was superior in predicting drought severity. Future work lies in expanding this method to depict drought in the western U.S.

54 ENVIRONMENTAL SCIENCES↗

Flow Quality Measurements in the NASA Ames Upgraded 11-by 11-Foot Transonic Wind Tunnel

Among the many upgrades designed and implemented in the NASA Ames 11-by 11-Foot Transonic Wind Tunnel over the past few years, several directly affect flow quality in the test section: a turbulence reduction system with a honeycomb and two screens, a flow smoothing system in the back leg diffusers, an improved drive motor control system, and a full replacement set of composite blades for the compressor. Prior to the shut-down of the tunnel for construction activities, an 8-foot span rake populated with flow instrumentation was traversed in the test section to fully document the flow quality and establish a baseline against which the upgrades could be characterized. A similar set of measurements was performed during the recent integrated system test trials, but the scope was somewhat limited in accordance with the primary objective of such tests, namely to return the tunnel to a fully operational status. These measurements clearly revealed substantial improvements in flow angularity and significant reductions in turbulence level for both full-span and semi-span testing configurations, thus making the flow quality of the tunnel one of the best among existing transonic facilities.

Amaya, Max A.↗

E-4 Test Facility Design Status

Combined-cycle propulsion technology is a strong candidate for meeting NASA space transportation goals. Extensive ground testing of integrated air-breathing/rocket system (e.g., components, subsystems and engine systems) across all propulsion operational modes (e.g., ramjet, scramjet) will be needed to demonstrate this propulsion technology. Ground testing will occur at various test centers based on each center's expertise. Testing at the NASA John C. Stennis Space Center will be primarily concentrated on combined-cycle power pack and engine systems at sea level conditions at a dedicated test facility, E-4. This paper highlights the status of the SSC E-4 test Facility design.

Ryan, Harry↗

Developing Ultra Reliable Life Support for the Moon and Mars

Recycling life support systems can achieve ultra reliability by using spares to replace failed components. The added mass for spares is approximately equal to the original system mass, provided the original system reliability is not very low. Acceptable reliability can be achieved for the space shuttle and space station by preventive maintenance and by replacing failed units, However, this maintenance and repair depends on a logistics supply chain that provides the needed spares. The Mars mission must take all the needed spares at launch. The Mars mission also must achieve ultra reliability, a very low failure rate per hour, since it requires years rather than weeks and cannot be cut short if a failure occurs. Also, the Mars mission has a much higher mass launch cost per kilogram than shuttle or station. Achieving ultra reliable space life support with acceptable mass will require a well-planned and extensive development effort. Analysis must define the reliability requirement and allocate it to subsystems and components. Technologies, components, and materials must be designed and selected for high reliability. Extensive testing is needed to ascertain very low failure rates. Systems design should segregate the failure causes in the smallest, most easily replaceable parts. The systems must be designed, produced, integrated, and tested without impairing system reliability. Maintenance and failed unit replacement should not introduce any additional probability of failure. The overall system must be tested sufficiently to identify any design errors. A program to develop ultra reliable space life support systems with acceptable mass must start soon if it is to produce timely results for the moon and Mars.

Jones, Harry W.↗

Ultra Reliable Closed Loop Life Support for Long Space Missions

Spacecraft human life support systems can achieve ultra reliability by providing sufficient spares to replace all failed components. The additional mass of spares for ultra reliability is approximately equal to the original system mass, provided that the original system reliability is not too low. Acceptable reliability can be achieved for the Space Shuttle and Space Station by preventive maintenance and by replacing failed units. However, on-demand maintenance and repair requires a logistics supply chain in place to provide the needed spares. In contrast, a Mars or other long space mission must take along all the needed spares, since resupply is not possible. Long missions must achieve ultra reliability, a very low failure rate per hour, since they will take years rather than weeks and cannot be cut short if a failure occurs. Also, distant missions have a much higher mass launch cost per kilogram than near-Earth missions. Achieving ultra reliable spacecraft life support systems with acceptable mass will require a well-planned and extensive development effort. Analysis must determine the reliability requirement and allocate it to subsystems and components. Ultra reliability requires reducing the intrinsic failure causes, providing spares to replace failed components and having "graceful" failure modes. Technologies, components, and materials must be selected and designed for high reliability. Long duration testing is needed to confirm very low failure rates. Systems design should segregate the failure causes in the smallest, most easily replaceable parts. The system must be designed, developed, integrated, and tested with system reliability in mind. Maintenance and reparability of failed units must not add to the probability of failure. The overall system must be tested sufficiently to identify any design errors. A program to develop ultra reliable space life support systems with acceptable mass should start soon since it must be a long term effort.

Jones, Harry W.↗

Integrated Optical Design Analysis (IODA): New Test Data and Modeling Features

A general overview of the capabilities of the IODA ("Integrated Optical Design Analysis") exchange of data and modeling results between thermal, structures, optical design, and testing engineering disciplines. This presentation focuses on new features added to the software that allow measured test data to be imported into the IODA environment for post processing or comparisons with pretest model predictions. software is presented. IODA promotes efficient

Moore, Jim↗