NASA NTRS1985
The construction of the National Transonic Facility was completed in September 1982, and checkout operations started the following month with the maximum Reynolds number being obtained in May 1983. Afterwards, effort was primarily devoted to installing the model access housings and adjusting or altering various tunnel hardware systems. In May 1984, the aerodynamic calibration started and was performed in parallel with checkout of the tunnel systems. In August 1984, the final operation readiness review was conducted and the facility declared operational for research testing. The facility has been operated in both air and nitrogen modes covering a Mach number range of 0.2 to 1.22 at pressures up to 8.5 atm and at temperatures doen to 100K. A limited amount of tunnel circuit performance information has been obtained and is presented in this paper. An aerodynamic calibration plan has been outlined, and the first part of the steady-state calibration has been completed, of which some results are presented in this paper. The first aerodynamic vehicle, Pathfinder I, was installed in December 1984 for checkout of instrumentation systems, and a status report and some results are presented.