Search NASA⌕ Search

SEARCH · Search NASA

Results for “program areas”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,639 records · Page 91

FINAL REPORT: SUNSHINE STATE SOLAR GRID INITIATIVE (SUNGRIN) PHASE 1 (Critical Milestone Review Version)

This report provides details on the activities and accomplishments of Phase 1 of the Sunshine State Solar Grid Initiative (SUNGRIN) Project for the period beginning 4/28/2010 and ending 12/31/2011. SUNGRIN is a five-phase high-penetration solar PV project within the Systems Integration (SI) area of the Solar Energy Technologies (SETP) Program, under the SunShot Initiative. SUNGRIN is focused on understanding and enabling high-penetration grid-connected solar PV through simulation assisted studies of actual Florida utility high-penetration distribution circuits as well as substations and, to a limited extent, the bulk power system. Each phase builds and expands upon the efforts of the previous phase, leading to a comprehensive examination and understanding of high-penetration solar PV issues, from the solar resource to the conversion and integration technologies to the electric power system, with Florida and it’s utility partners providing the broad range of conditions and system integration scenarios necessary to develop useful insight and solutions. This phase, Phase 1, was funded with American Recovery and Reinvestment Act (ARRA) funds. This version of the final report is organized to align with statement of project objectives (SOPO) critical milestones.

14 SOLAR ENERGY↗

The River Corridor Closure Contract How Washington Closure Hanford is Closing A Unique Department of Energy Project - 12425

Cleanup of the Hanford River Corridor has been one of Hanford Site's top priorities since the early 1990's. This urgency is due to the proximity of hundreds of waste sites to the Columbia River and the groundwater that continues to threaten the Columbia River. In April 2005, the U.S. Department of Energy, Richland Operations Office (DOE-RL) awarded the Hanford River Corridor Closure Contract (RCCC), a cost-plus incentive-fee closure contract with a 2015 end date and first of its kind at Hanford Site, to Washington Closure Hanford (WCH), a limited-liability company owned by URS, Bechtel National, and CH2M HILL. WCH is a single-purpose company whose goal is to safely, compliantly, and efficiently accelerate cleanup in the Hanford River Corridor and reduce or eliminate future obligations to DOE-RL for maintaining long-term stewardship over the site. Accelerated performance of the work-scope while keeping a perspective on contract completion presents challenges that require proactive strategies to support the remaining work-scope through the end of the RCCC. This paper outlines the processes to address the challenges of completing work-scope while planning for contract termination. WCH is responsible for cleanup of the River Corridor 569.8 km{sup 2} (220 mi{sup 2}) of the 1,517.7 km{sup 2} (586 mi{sup 2}) Hanford Site's footprint reduction. At the end of calendar year 2011, WCH's closure implementation is well underway. Fieldwork is complete in three of the largest areas within the RCCC scope (Segments 1, 2, and 3), approximately 44.5% of the River Corridor (Figure 3). Working together, DOE-RL and WCH are in the process of completing the 'paper work' that will document the completion of the work-scope and allow DOE-RL to relieve WCH of contractual responsibilities and transition the completed areas to the Long-Term Stewardship Program, pending final action RODs. Within the next 4 years, WCH will continue to complete cleanup of the River Corridor following the completion goals. As field work-scope is completed, progressive reductions of business processes, physical facilities, and staff will occur. Organizations will collapse and flatten commensurate with workload. WCH employees will move on to new endeavors, proud of their accomplishments and the legacy they are leaving behind as being the first and largest environmental cleanup closure contract at Hanford. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transition of Site Programs and Implementation of Decommissioning Agent Oversight - 18653

San Onofre Nuclear Generating Station (SONGS), acting as the Decommissioning Agent (DA), retained its NRC License and contracted a Decommissioning General Contractor (DGC) to manage plant programs and execute the Demolition and Dismantlement (D and D) of the site. To support this effort, over twenty-one programs transitioned to the DGC, including Occupational Health and Safety, Radiation Protection, Maintenance, and Engineering. In addition, SONGS effected a cultural shift from an operating station performing work to one of overseeing it. The framework and road map for this kind of D and D model is new to the industry. This presentation shares the SONGS' experience and lessons learned associated with this transition. SONGS and the DGC entered an Agreement that established the contractual requirements and responsibilities of the parties, the Scope of Work, and the mechanisms to ensure effective transition of DA programs. As a part of defining the Scope of Work, the contract established functional areas and divisions of responsibilities divided into the roles of Governance, Oversight, Support, and Performance (GOSP). SONGS, as the site licensee, retained the Oversight Role, with exception of those areas that, as the licensee, would be considered 'non-transferrable'. Examples of those programs were Quality Assurance, Regulatory Affairs and the Employee Concerns Program. While the Company retained responsibility for those programs the DGC developed their own 'parallel' programs that the Company provided Oversight for. In 2017, SONGS completed program transition within one-year following the notice-to-proceed. The overall strategy was driven by three high-level principles: - Allow the DGC the most unfettered execution of the Scope of Work with limited interference and maximum self-governance. With the overriding principle that transitioned programs have a direct link to a basis in regulation or law. - Identify safety and compliance risks, and then bridge the transition of programs from the SONGS to the DGC such that identified risks are minimized and/or mitigated. - Allow the SONGS organization to transition from a Performance role to a primarily Oversight role as the DA. Working collaboratively with the DGC, programs were strategically grouped and sequenced for turnover. Central to the success of transition was fostering a collaborative environment with the DGC, facilitating knowledge transfer, applying schedule rigor, and keeping the team horizontally and vertically aligned to management expectations. SONGS achieved this alignment by embedding the formal process with management expectations for review and acceptance of proposed programs. SONGS' transitioned core programs to a general contractor and transition from a 'perform' organization to an 'oversight' organization. Lessons learned from this experience may benefit other nuclear generating station owners currently evaluating options for site D and D. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NASA Headquarters training catalog

The NASA Headquarters training catalog is a comprehensive listing of all educational and employee development programs. This course catalog contains descriptions of course content, objectives, target audience, prerequisites, length of course, approximate number of times the course is offered per year, and cost of the course. Curriculum areas include graduate and undergraduate academic study; professional development program; and executive management, senior management, and supervisory development programs. Secretarial/clerical and general computer skills programs are also included.

Source record↗

Carbon Storage (Sample Annual Report for SCC)

This project consists of a diverse set of research activities performed by the U.S. Department of Energy (DOE), National Energy Technology Laboratory (NETL), Office of Research and Development (ORD), along with its Regional University Alliance (RUA) partners to fill multiple research needs within the Carbon Storage Core Research Program. Activities include laboratory experimentation, field work, and numerical modeling. Research tasks are organized into five theme areas. The tasks span three major focus areas in the Core R&D Element as defined in the Technology Program Plan. These are “Geologic Storage;” “Monitoring, Verification, and Accounting (MVA);” and “Simulation and Risk Assessment.”

20 FOSSIL-FUELED POWER PLANTS↗

A review of helicopter control-display requirements for decelarating instrument approach

This paper reviews research and operational test programs that have dealt with control and display requirements for helicopters performing decelerating approaches in the terminal area under instrument flight conditions. A survey of literature concentrating on flight programs resulted in approximately 50 applicable references which were summarized and classified according to the type of stability/control augmentation that was emphasized. On this basis, display information requirements for each control system type were hypothesized consistent with documented results of these programs. Nine control-display combinations that appear to warrant further ground simulation and flight testing are defined and discussed.

Lebacqz, J. V.↗

Open solutions to distributed control in ground tracking stations

The advent of high speed local area networks has made it possible to interconnect small, powerful computers to function together as a single large computer. Today, distributed computer systems are the new paradigm for large scale computing systems. However, the communications provided by the local area network is only one part of the solution. The services and protocols used by the application programs to communicate across the network are as indispensable as the local area network. And the selection of services and protocols that do not match the system requirements will limit the capabilities, performance, and expansion of the system. Proprietary solutions are available but are usually limited to a select set of equipment. However, there are two solutions based on 'open' standards. The question that must be answered is 'which one is the best one for my job?' This paper examines a model for tracking stations and their requirements for interprocessor communications in the next century. The model and requirements are matched with the model and services provided by the five different software architectures and supporting protocol solutions. Several key services are examined in detail to determine which services and protocols most closely match the requirements for the tracking station environment. The study reveals that the protocols are tailored to the problem domains for which they were originally designed. Further, the study reveals that the process control model is the closest match to the tracking station model.

Heuser, William Randy↗

Application of ERTS-1 Results to US Department of Interior Programs

The activities of the U.S. Department of Interior which have benefited from ERTS-1 data are described. It is stated that the primary interest is in the area of land use. Legislative actions regarding land use are reported. Programs involving renewable resources are stressed.

John M DeNoyer↗

ERTS-1 data in support of the national program of inspection of dams

A computer-aided procedure, for use in the detection and location of areas of surface water, has been developed. The procedure was developed in support of the National Program of Inspection of Dams established by Public Law 92-367. The procedure utilizes data acquired by the unmanned Earth Resources Technology Satellite in conjunction with ancillary data in the form of topographic and highway maps, and meteorological data summaries. The procedure is divided into several distinct phases. A five-volume manual has been prepared to instruct potential users of the procedure.

Graybeal, G. E.↗

NASTRAN structural model for the large 64-meter antenna pedestal. Part 2: Improved model

Static analysis and a computer structural model for the large 64-m antenna pedestal are developed using the MSC version of the NASTRAN program. This improved pedestal model includes the launch areas and the actual pressure pattern of the oil under the hydrostatic bearing pad. The results obtained from the new improved model have indicated that the deflections due to pad loads are in good agreement with field measurements. The top surface deflection of the pedestal obtained from the NASTRAN model is used as an input to the oil film computer program to determine the minimum oil film thickness under the pad.

Chian, C. T.↗

Automated Global-Scale Detection and Characterization of Anthropogenic Activity using Multi-Source Satellite-Based Remote Sensing Imagery

Satellite-based remote sensing imagery is an effective means for detecting objects and structures in support of many applications. However, detecting the spatial and temporal bounds of a specific activity in satellite imagery is inherently more complex and research in this area is nascent. One reason for this is that describing an activity implies defining both spatial and temporal bounds and while activity is inherently continuous in nature, the geospatial (imagery) time series for any particular swath of ground provided by satellite imagery is relatively sparse and discrete in comparison. The IARPA Space-Based Machine Automated Recognition Technique (SMART)1 program is the first large-scale research program to target advancing the state of the art for automatically detecting, characterizing, and monitoring large-scale anthropogenic activity in global, multispectral satellite imagery. The program has two primary research objectives: 1) the “harmonization” of multiple imagery sources and 2) automated reasoning at scale to detect, characterize, and monitor activities of interest. This paper provides details on the goals, dataset, metrics, and lessons learned of the IARPA SMART program. By releasing the annotated dataset, the program aims to foster additional research in this area by the community at large.

Hirsh R Goldberg↗

Enhanced Damage-Resistant Optics for Spaceflight Laser Systems: Workshop findings and recommendations

NASA has defined a program to address critical laser-induced damage issues peculiar to its remote sensing systems. The Langley Research Center (LaRC), with input from the Goddard Space Flight Center (GSFC), has developed a program plan focusing on the certification of optical materials for spaceflight applications and the development of techniques to determine the reliability of such materials under extended laser exposures. This plan involves cooperative efforts between NASA and optics manufacturers to quantify the performance of optical materials for NASA systems and to ensure NASA's continued application of the highest quality optics possible for enhanced system reliability. A review panel was organized to assess NASA's optical damage concerns and to evaluate the effectiveness of the LaRC proposed program plan. This panel consisted of experts in the areas of laser-induced damage, optical coating manufacture, and the design and development of laser systems for space. The panel was presented information on NASA's current and planned laser remote sensing programs, laser-induced damage problems already encountered in NASA systems, and the proposed program plan to address these issues. Additionally, technical presentations were made on the state of the art in damage mechanisms, optical materials testing, and issues of coating manufacture germane to laser damage.

Schulze, Norman↗

The Eco-Bio-Social Factors That Modulate Aedes aegypti Abundance in South Texas Border Communities

Aedes aegypti control requires dedicated resources that are usually scarce, limiting the reach and sustainability of vector control programs. This generates a need to focus on areas at risk of disease transmission and also understand the factors that might modulate local mosquito abundance. We evaluated the eco-bio-social factors that modulate indoor and outdoor relative abundance of female Ae. aegypti in communities of South Texas. We conducted housing quality and Knowledge Attitudes and Practices surveys in households that were part of a weekly mosquito surveillance program in November of 2017 and 2018. Our results showed widespread knowledge of mosquitoes and Zika virus by our participants. However, less than 35% considered them as serious problems in this region. The presence of window-mounted air conditioning units increased the risk of female mosquito relative abundance indoors. An increase in outdoor relative abundance was associated with larger properties and a higher number of children between 6 to 17 years of age. Interestingly, we observed that an increasing number of children <5 years of age modulated both indoor and outdoor relative abundance, with a 52% increase indoors and 30% decrease outdoors. The low perception of mosquito and disease risk highlights engagement needs for vector-borne disease prevention in this region. The identified risk factors can help guide public health officials in their efforts to reduce human and vector contact.

54 ENVIRONMENTAL SCIENCES↗

HEDS Goals

In November of 1996, NASA made the decision to fully integrate several areas of robotic and human Mars exploration study and planning. As a result of this decision, requirements for unmanned robotic missions to support human Mars exploration were identified and a plan to meet these requirements was developed. Concrete progress in the implementation of this plan has been made. Three experiments have been selected and are in development for the Mars Surveyor Program 2001 Orbiter and Lander missions which will provide critical data for the planning of human missions to Mars. An Announcement of Opportunity for the Mars Surveyor Program 2003 Lander mission has recently been released which solicited proposals related to planning for a human mission. In order to define HEDS objectives for Mars robotic missions, it is important to understand what information is required as a foundation for mounting a program of exploration of this magnitude. We identify areas of research on robotic missions that will enable future human missions. These areas include Site Selection for Human Missions, Hazards to Human Explorers, Living off the Land, and Testing Critical Technologies in the Mars Environment.

Pline, A.↗

Atmospheric numerical modeling resource enhancement and model convective parameterization/scale interaction studies

Research will be undertaken in this contract in the area of Modeling Resource and Facilities Enhancement to include computer, technical and educational support to NASA investigators to facilitate model implementation, execution and analysis of output; to provide facilities linking USRA and the NASA/EADS Computer System as well as resident work stations in ESAD; and to provide a centralized location for documentation, archival and dissemination of modeling information pertaining to NASA's program. Additional research will be undertaken in the area of Numerical Model Scale Interaction/Convective Parameterization Studies to include implementation of the comparison of cloud and rain systems and convective-scale processes between the model simulations and what was observed; and to incorporate the findings of these and related research findings in at least two refereed journal articles.

Cushman, Paula P.↗

Environmental Restoration of Diesel-Range Organics from Project Chariot, Cape Thompson, Alaska - 16147

Cape Thompson, Alaska, is located approximately 120 miles north of Kotzebue, Alaska, within the Ogotoruk Creek valley. The remote Alaskan location is also home to the US Atomic Energy Commission (AEC) Project Chariot study area. Project Chariot was part of the Plowshare Program, created in 1957 by the AEC to study peaceful uses for atomic energy. Project Chariot began in 1958 when a scientific field team chose Cape Thompson as a potential site to excavate a harbor using a series of nuclear explosions. Between 1959 and 1962, AEC was responsible for over 40 pretest bio-environmental and geotechnical studies of the Cape Thompson area. Strong public opposition to the tests developed, which caused the project to be cancelled with no nuclear explosions ever conducted at the site. In the early 1960's, several deep boreholes were drilled to obtain subsurface, temperature, and high-explosive testing data. Refrigerated diesel was used as a drilling fluid to keep the boreholes open so that thermistors could measure subsurface temperatures. The test boreholes were named Able, Baker, Charlie, Dog, and X-1. In the summer of 2014, the US Department of Energy, Office of Legacy Management (LM) completed the remediation of remnant diesel at these sites. Prior to the 2014 remediation activities, LM conducted two separate characterization field studies to determine the nature and extent of the contamination from the 1960's drilling activities. In 2013, LM developed a remediation plan that was submitted and approved by the Alaska Department of Environmental Conservation (ADEC). The 2014 Project Chariot remediation had some unique logistical challenges and historic issues with stakeholders to overcome. Many of the historic issues centered on previous AEC scientific actions and a general mistrust of the government by the local stakeholders. Prior to and during the 2014 remediation work, an outreach campaign was implemented to discuss prior activities at the site and include stakeholders from Point Hope, Alaska, in the remediation-planning process. The remoteness of the region also provided unique logistical challenges. Because of the short field season, LM initiated several subcontracts over a year in advance. The field camp, heavy equipment, and soil storage containers were shipped by barge to the site. Personnel, food, and small materials were flown in by bush plane from Kotzebue, Alaska. Previous site characterization had identified diesel-range organics (DROs) as the primary contaminant. The cleanup levels for the site were provided by the Alaska Administrative Code (AAC) for the Arctic Zone region. The AAC cleanup level for DROs on gravel pads is 500 mg/kg and 12,500 mg/kg tundra in the arctic-zone region. To help determine the extent and direct soil excavation in the field, photoionization detectors (PIDs) were used for field screening. While the PID results provided rough limits for excavation, laboratory confirmation sampling was required to provide actual excavation guidance. All excavation locations remained open until laboratory results met AAC criteria and ADEC approved closure. The laboratory sample protocol required the bush plane to pick up samples almost daily and transfer them to Anchorage for analysis. In order to meet holding time requirements, all laboratory samples were analyzed on an expedited basis. Analytical results and ADEC approval notifications were e-mailed back to the site via satellite connection. A total of 202 laboratory analyses were needed to complete the remediation effort. At each location (Able, Baker, Charlie, Dog, and X-1), the boreholes were plugged and abandoned in accordance with ADEC regulations. Contaminated soil was excavated, and the material was placed in super-sacks and hauled to connex boxes located near the sea shore. Approximately 786 tons of material was removed and shipped by barge to the Columbia Ridge Landfill in Arlington, Oregon, for disposal. The well casings were cut and sealed below ground surface. Each location was graded to its original contours and reclaimed with native vegetation, and a geodetic survey was conducted. Tours with leaders of the Village of Point Hope and the land owner (Arctic Slope Regional Corporation) were conducted prior to the final demobilization. All remediation equipment and camp facilities were removed at the completion of the project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2D Dam-Break Analysis of L Lake and PAR Pond Dams Using HEC-RAS

In 1991 a dam-break study was conducted for the high hazard dams located at L Lake and PAR Pond on the Savannah River Site. Two scenarios were considered, over topping from a Probable Maximum Flood (PMF), and a fair weather dam-break for either or both dams. Unfortunately, no inundation map was developed from the study. The purpose of this project was to redo the original dam-break study with improved data and methodology to generate Inundation maps to assist with emergency response and evacuation plans. The Hydrologic Engineering Center's River Analysis System (HEC-RAS) is a free to download river analysis modeling program developed by the US Army Corps of Engineers capable of 1D and 2D hydraulic calculations. Version 5.0.7 (released March 2019) was used for this project. Digital elevation models for the area were retrieved from the US Geological Survey database and converted to a .hdf file within the program. Then the 2D flood area was identified from the contours. Both L Lake and PAR Pond were inputted as 1D storage areas because DEM data does not contain elevation values under water bodies. An elevation vs volume curve was available for both storage areas. Initial elevations were set for both scenarios. Both dams are earthen dams. The Steel Creek dam at L Lake has 6 ft diameter conduit with an upper and lower sluice gate. PAR pond dam consist of a weir and sluice gate connected to an 8 x 8 ft channel. Both outlets were modeled with a pool elevation vs discharge curve. The steel creek dam sluice gates were assumed to be fully open in all cases. As in the previous study, the dams were set to breach when they were overtopped by 1.5 ft during PMF conditions (Figure 1). A fair weather breach was set to be due to a piping failure (Figure 1). In the dual dam break during fair weather conditions the PAR pond dam fails 3 hours after Steel Creek to achieve maximum flooding in the down stream reaches. Simulation was run 3 days for each case and with a 1 minute computational interval. Maximum flooding occurs under PMF conditions with the failure of both dams. PAR pond dam fails first 16 hours and 32 minutes after the start of the simulation with the Steel creek dam failing 6 minutes later. In all cases, the bridges and roads spanning Steel Creek and Lower Three Runs will be inundated and potentially washed away. The Burtons Ferry Highway south of the storage areas will be partially flooded during PMF failure, dual fair weather failure, and PAR pond failure under fair weather conditions.

54 ENVIRONMENTAL SCIENCES↗

Computer programs for spherical satellites

This paper describes briefly two rather specialized computer programs which solve for steady-state temperatures over a sphere. The first program deals with opaque surfaces and allows for skin conduction and black body internal radiation. This program differs from the conventional 3-D heat transfer programs in that it automatically subdivides the sphere into a specified number of nodes and computes for each node, surface area, conductances, radiation shape factors and incident solar flux. The second program allows for transmission through partially or fully transparent external surfaces and accounts for multiple diffuse reflections at the inner surfaces, but does not include conduction.

THERMAL ENVIRONMENT↗