Particle Scale Melt Modeling of Selective Laser Melting with Uncertainty Quantification.
Abstract not provided.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Explore the source record for details and available documents.
Abstract not provided.
Explore the source record for details and available documents.
AREVA NP has developed a process, based upon standard licensing methods and specialized applications, for the assessment of the risk of crud induced corrosion and crud induced axial off-set. This streamlined process allows for the evaluation of the crud risk for full core subchannel by subchannel models, by applying local conditions on each fuel rod/subchannel, with axial nodes spanning several centimeters. AREVA NP has applied these tools successfully to units from various NSSS vendors. To date, there have been no plant performance issues that have been outside the performance as predicted by the AREVA NP risk assessment tools. The study presented in this paper utilized the core simulator and thermal-hydraulic packages of this tool set to evaluate the effects of changing various fuel cycle design (e.g. radial zoning patterns) and fuel assembly design parameters (e.g. fuel rod diameter, spacer grid placement) on thermal-hydraulic key decision variables (KDVs) of interest. The study may be valuable as a first step towards optimizing the fuel cycle design, optimizing the fuel lattice design, or evaluating potential operating changes such as a power up-rate or modification of the cycle length for a given PWR plant. The various geometric inputs to the AREVA NP risk assessment process were tested by individually adjusting a single parameter and observing the effect. Multi-parameter studies are also included to assess the impact of optimized fuel cycle designs. The sensitivity of the model, in terms of thermal-hydraulic results, is presented. Provided a relationship between the thermal-hydraulic results to both crud deposition thickness and lithium uptake in the zirconium cladding oxide layer, approximate impacts to the risk of crud induced corrosion and crud induced axial off-set can be estimated. (authors)
Cameco Corporation's (Cameco) Port Hope Conversion Facility (PHCF) was previously owned by the federal Crown Corporation, Eldorado Nuclear, which held a significant inventory of legacy waste material at the time Cameco was formed in 1988. Over time, Cameco's ongoing operations contributed to an increase in the volume of low-level radioactive waste managed onsite. Since 2011, Cameco has completed annual waste management campaigns with the goal of accelerating the recycle/disposal of accumulated legacy radioactive wastes stored at its Ontario operations. With disposal options for low-level radioactively contaminated wastes in Canada limited due to cost considerations and no commercially accessible landfills licensed for radioactive material. In recent years, Cameco has started to ship marginally contaminated wastes (<500 ppm uranium) to the United States for disposal in an appropriate landfill owned by US Ecology in Idaho. Numerous successful campaigns totaling over 1,000 successful shipments, have been completed to transport drummed and/or bagged material by rail in gondola cars to the disposal facility in Idaho since 2011. All shipments have been completed in compliance with all environmental regulations, with a perfect compliance record maintained to date. To achieve this excellent compliance record, the campaigns require careful planning by both organizations, as well as deployment of personnel from the Idaho facility during the campaign for project management, characterization and/or radiation monitoring support. As the accumulated waste inventory has been reduced through these projects, the scope and duration of each campaign has also decreased. In the last few years, road transport directly to the Idaho facility has also been utilized. This option allows for the deployment of small projects that may be completed for a smaller inventory of a specific waste type and to manage newly-generated low-level radioactive wastes on an ongoing basis. These projects have ranged from a single standard van shipment to multiple trucks running continuous loops between the Ontario and Idaho or Ontario and an intermediary site and have been utilized for marginally contaminated wastes (<500 ppm uranium) as well as marginally contaminated wastes with additional hazard classification. Cameco and US Ecology personnel have collaborated to develop characterization and shipment procedures that enable these projects to be executed in full compliance with all Canadian and US regulations, without deployment of personnel from the Idaho facility, while maintaining adequate oversight by both organizations to ensure that the waste is safely and compliantly managed. These protocols have been implemented and optimized for the Port Hope Conversion Facility and will be rolled out to other Cameco facilities in Ontario through 2019. Cameco expects to utilize the small project model for the long term to ensure that eligible marginally contaminated wastes (<500 ppm uranium) are managed appropriately to ensure that once the legacy material is eliminated, it remains so. (authors)
N/A