Search NASA⌕ Search

SEARCH · Search NASA

Results for “Validating”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,657 records · Page 92

Independent Verification and Validation Of SAPHIRE 8 Software Configuration Management Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE configuration management is to assess the activities that results in the process of identifying and defining the baselines associated with the SAPHIRE software product; controlling the changes to baselines and release of baselines throughout the life cycle; recording and reporting the status of baselines and the proposed and actual changes to the baselines; and verifying the correctness and completeness of baselines.. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

99 GENERAL AND MISCELLANEOUS↗

Independent Verification and Validation Of SAPHIRE 8 Software Quality Assurance Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

This report provides an evaluation of the Software Quality Assurance Plan. The Software Quality Assurance Plan is intended to ensure all actions necessary for the software life cycle; verification and validation activities; documentation and deliverables; project management; configuration management, nonconformance reporting and corrective action; and quality assessment and improvement have been planned and a systematic pattern of all actions necessary to provide adequate confidence that a software product conforms to established technical requirements; and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

99 GENERAL AND MISCELLANEOUS↗

Independent Verification and Validation Of SAPHIRE 8 Software Configuration Management Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE configuration management is to assess the activities that results in the process of identifying and defining the baselines associated with the SAPHIRE software product; controlling the changes to baselines and release of baselines throughout the life cycle; recording and reporting the status of baselines and the proposed and actual changes to the baselines; and verifying the correctness and completeness of baselines.. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

99 GENERAL AND MISCELLANEOUS↗

Independent Verification and Validation Of SAPHIRE 8 Volume 3 Users' Guide Project Number: N6423 U.S. Nuclear Regulatory Commission

The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE 8 Volume 3 Users’ Guide is to assess the user documentation for its completeness, correctness, and consistency with respect to requirements for user interface and for any functionality that can be invoked by the user. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

99 GENERAL AND MISCELLANEOUS↗

Independent Verification and Validation Of SAPHIRE 8 Software Acceptance Test Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE 8 Software Acceptance Test Plan is to assess the approach to be taken for intended testing activities. The plan typically identifies the items to be tested, the requirements being tested, the testing to be performed, test schedules, personnel requirements, reporting requirements, evaluation criteria, and any risks requiring contingency planning. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

99 GENERAL AND MISCELLANEOUS↗

Independent Verification and Validation Of SAPHIRE 8 System Test Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE System Test Plan is to assess the approach to be taken for intended testing activities associated with the SAPHIRE software product. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

99 GENERAL AND MISCELLANEOUS↗

J-Integral modeling and validation for GTS reservoirs.

Non-destructive detection methods can reliably certify that gas transfer system (GTS) reservoirs do not have cracks larger than 5%-10% of the wall thickness. To determine the acceptability of a reservoir design, analysis must show that short cracks will not adversely affect the reservoir behavior. This is commonly done via calculation of the J-Integral, which represents the energetic driving force acting to propagate an existing crack in a continuous medium. J is then compared against a material's fracture toughness (J{sub c}) to determine whether crack propagation will occur. While the quantification of the J-Integral is well established for long cracks, its validity for short cracks is uncertain. This report presents the results from a Sandia National Laboratories project to evaluate a methodology for performing J-Integral evaluations in conjunction with its finite element analysis capabilities. Simulations were performed to verify the operation of a post-processing code (J3D) and to assess the accuracy of this code and our analysis tools against companion fracture experiments for 2- and 3-dimensional geometry specimens. Evaluation is done for specimens composed of 21-6-9 stainless steel, some of which were exposed to a hydrogen environment, for both long and short cracks.

08 HYDROGEN↗

STORMVEX: The Storm Peak Lab Cloud Property Validation Experiment Science and Operations Plan

During the Storm Peak Lab Cloud Property Validation Experiment (STORMVEX), a substantial correlative data set of remote sensing observations and direct in situ measurements from fixed and airborne platforms will be created in a winter season, mountainous environment. This will be accomplished by combining mountaintop observations at Storm Peak Laboratory and the airborne National Science Foundation-supported Colorado Airborne Multi-Phase Cloud Study campaign with collocated measurements from the second ARM Mobile Facility (AMF2). We describe in this document the operational plans and motivating science for this experiment, which includes deployment of AMF2 to Steamboat Springs, Colorado. The intensive STORMVEX field phase will begin nominally on 1 November 2010 and extend to approximately early April 2011.

54 ENVIRONMENTAL SCIENCES↗

VALIDATION FOR THE PERMANGANATE DIGESTION OF REILLEX HPQ ANION RESIN

The flowsheet for the digestion of Reillex{trademark} HPQ was validated both under the traditional alkaline conditions and under strongly acidic conditions. Due to difficulty in performing a pH adjustment in the large tank where this flowsheet must be performed, the recommended digestion conditions were changed from pH 8-10 to 8 M HNO{sub 3}. Thus, no pH adjustment of the solution is required prior to performing the permanganate addition and digestion and the need to sample the digestion tank to confirm appropriate pH range for digestion may be avoided. Neutralization of the acidic digestion solution will be performed after completion of the resin digestion cycle. The amount of permanganate required for this type of resin (Reillex{trademark} HPQ) was increased from 1 kg/L resin to 4 kg/L resin to reduce the amount of residual resin solids to a minimal amount (<5%). The length of digestion time at 70 C remains unchanged at 15 hours. These parameters are not optimized but are expected to be adequate for the conditions. The flowsheet generates a significant amount of fine manganese dioxide (MnO{sub 2}) solids (1.71 kg/L resin) and involves the generation of a significant liquid volume due to the low solubility of permanganate. However, since only two batches of resin (40 L each) are expected to be digested, the total waste generated is limited.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Validating the BHR RANS model for variable density turbulence

The BHR RANS model is a turbulence model for multi-fluid flows in which density variation plays a strong role in the turbulence processes. In this paper they demonstrate the usefulness of BHR over a wide range of flows which include the effects of shear, buoyancy, and shocks. The results are in good agreement with experimental and DNS data across the entire set of validation cases, with no need to retune model coefficients between cases. The model has potential application to a number of aerospace related flow problems.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

1D Heat Loss Models Validation Experiment

Contains data from the model validation in the 1D Heat Loss Models to Predict the Aquifer Temperature Profile during Hot/Cold Water Injection Project. The data include two COMSOL models (2D axisymmetric benchmark model and 2D Vinsome model), one python code (1D Vinsome based FEM numerical simulation), one matlab main code (1D Newton analytical solution and all results comparison visualization), and output files generated from the above models.

1D↗

Demonstration of Pronghorn’s Subchannel Code Modeling of Liquid-Metal Reactors and Validation in Normal Operation Conditions and Blockage Scenarios

Pronghorn-SC is a subchannel code within the Multiphysics Object-Oriented Simulation Environment (MOOSE). Initially designed to simulate flows in water-cooled, square lattice, subchannel assemblies, Pronghorn-SC has been expanded to simulate liquid-metal-cooled flows in triangular lattices, hexagonal subchannel assemblies. For this purpose, the algorithm of Pronghorn-SC was adapted to solve the subchannel equations as they are applicable to a hexagonal wire-wrapped sodium-cooled fast reactor. Cheng–Todreas models for pressure drop and cross-flow models were adopted and a coolant heat conduction term was added. To solve these equations, an improved implicit algorithm was developed robust enough to deal with the numerical issues, associated with low flow and recirculation phenomena. To confirm the prediction capability of Pronghorn-SC, calculations and comparisons with available experimental data of 19- and 37-pin assemblies were performed, as well as other subchannel codes. Finally, a flow blockage modeling feature was added. This capability was validated for both water-cooled square sub-assemblies and sodium-cooled hexagonal sub-assemblies, using experimental data of partially and fully blocked cases.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Wave Energy Power Take-off Validation with a Hydraulicly Actuated Rotary Dynamometer and a Bi-Directional High-Power DC Supply

There are many organizations working towards the commercialization of wave energy converter technologies and are advancing their designs through the technology readiness levels (TRLs). A critical step before the field deployment of prototype wave energy converters is the validation of the subsystems and components that are contained in the wave energy converter through laboratory testing and performance characterization. In 2021, the National Renewable Energy Laboratory (NREL) developed and demonstrated a system for testing power takeoffs (PTO) with a low-speed, high-torque dynamometer and a grid-tied high-power DC power source and sink before field deployment. The hydraulic dynamometer allows for the simulation of PTO actuation from wave motion and is capable of a wide range of wave periods and heights which are represented as various speeds and torques from the dynamometer. The high-power bidirectional power supply allows for hardware in the loop and controller in the loop testing to be conducted on WEC power electronics. This presentation was made to describe the methods used by NREL research staff to test all components and sub-systems in the PTO of a novel wave energy converter before field deployment.

dynamometer↗

Validation of the EDGES Low-band Antenna Beam Model

The response of the antenna is a source of uncertainty in measurements with the Experiment to Detect the Global Epoch of Reionization Signature (EDGES). We aim to validate the electromagnetic beam model of the low-band (50–100 MHz) dipole antenna with comparisons between models and against data. We find that simulations of a simplified model of the antenna over an infinite perfectly conducting ground plane are, with one exception, robust to changes in the numerical electromagnetic solver code or algorithm. For simulations of the antenna with the actual finite ground plane and realistic soil properties, we find that two out of three numerical solvers agree well. Applying our analysis pipeline to a simulated drift-scan observation from an early EDGES low-band instrument that had a 10 m × 10 m ground plane, we find residual levels after fitting and removing a five-term foreground model from the simulated data binned in local sidereal time (LST) average about 250 mK with ±40 mK variation between numerical solvers. A similar analysis of the primary 30 m × 30 m sawtooth ground plane reduced the LST-averaged residuals to about 90 mK with ±10 mK between the two viable solvers. More broadly we show that larger ground planes generally perform better than smaller ground planes. Simulated data have a power that is within 4% of real observations, a limitation of net accuracy of the sky and beam models. We observe that residual spectral structures after foreground model fits match qualitatively between simulated data and observations, suggesting that the frequency dependence of the beam is reasonably represented by the models. We find that a soil conductivity of 0.02 S m{sup -1} and relative permittivity of 3.5 yield good agreement between simulated spectra and observations. This is consistent with the soil properties reported by Sutinjo et al. for the Murchison Radio-astronomy Observatory, where EDGES is located.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗