Search NASA⌕ Search

SEARCH · Search NASA

Results for “additional protocol”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,657 records · Page 92

Costs to Automate Demand Response - Taxonomy and Results from Field Studies and Programs

During the past decade, the technology to automate demand response (DR) in buildings and industrial facilities has advanced significantly. Automation allows rapid, repeatable, reliable operation. This study focuses on costs for DR automation in commercial buildings with some discussion on residential buildings and industrial facilities. DR automation technology relies on numerous components, including communication systems, hardware and software gateways, standards-based messaging protocols, controls and integration platforms, and measurement and telemetry systems. This report compares cost data from several DR automation programs and pilot projects, evaluates trends in the cost per unit of DR and kilowatts (kW) available from automated systems, and applies a standard naming convention and classification or taxonomy for system elements. Median costs for the 56 installed automated DR systems studied here are about $200/kW. The deviation around this median is large with costs in some cases being an order of magnitude great or less than the median. This wide range is a result of variations in system age, size of load reduction, sophistication, and type of equipment included in cost analysis. The costs to automate fast DR systems for ancillary services are not fully analyzed in this report because additional research is needed to determine the total cost to install, operate, and maintain these systems. However, recent research suggests that they could be developed at costs similar to those of existing hot-summer DR automation systems. This report considers installation and configuration costs and does include the costs of owning and operating DR automation systems. Future analysis of the latter costs should include the costs to the building or facility manager costs as well as utility or third party program manager cost.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Performance of Windows in Walls With Continuous Insulation

Window openings in walls are a significant contributor to poor thermal performance because of thermal bridging through the framing members (e.g., studs, joists, plates, bracing) and because windows lack the thermal properties of insulation. Window installation guidance for walls with continuous insulation (CI) is critical for continued market growth of this energy efficiency technology. This research project offers window manufacturers a starting point and a potential path toward developing installation instructions for windows over CI. The objectives of the research include evaluating the common method for installing windows in walls with CI, as well as establishing acceptance criteria for evaluating the performance of windows installed in walls with and without CI. The research measures: 1. The performance characteristics (e.g., water management, structural integrity) of windows in walls without CI. 2. The performance of different thicknesses and types of CI used in walls. 3. The performance of different types of window assemblies (e.g., double-hung windows, mulled double-hung windows, mulled casement windows, and slider windows) installed over CI. 4. The performance of window flange types (e.g., rigid mounting and less robust flanges) installed over CI. 5. Installing windows over CI using baseline installation instructions versus window manufacturer installation instructions. The project’s sequential testing protocol consists of the following: • A water penetration resistance testing adapted from two ASTM standards: E331 (uniform static air pressure in four steps) and E547 (cyclic static air pressure) • A temperature cycling adapted from ASTM E2264 Method B (convective hot air) • A service condition wind loading test adapted from ASTM E330 • A six-month vertical displacement observation phase prior to the structural performance testing • A final water penetration resistance test after vertical displacement observation • A structural performance test adapted from ASTM E330. Key research findings include: • The criterion for passing a water penetration resistance test is that there is no water overflowing at the interior face of the studs. If there is any bubbling or slight pooling of water at the sill, then it must recede after the pressure is removed. Excessive leakage and/or water leaking to the interior face of the framing around the window constitutes a failure. • All single double-hung windows installed directly to lumber or over oriented strand board passed all test protocols. • For most wall specimens, the test results showed that the use of foam sheathing did not affect the performance of the window for water leakage. • All wall specimens underwent temperature cycling. The results indicated that temperature cycling had little to no effect on windows installed over foam sheathing. • For wall specimens that underwent six-month vertical displacement monitoring, the results showed that windows installed over foam sheathing do not sag over time. • The single-hung and double-hung windows installed using window manufacturer installation instructions passed the structural performance test, compared to failures observed in windows that were installed using generic installation instructions. The generic and manufacturer installation methods differed on the following construction details: type of fasteners, fastening patterns on the flanges, and window shimming details. • Additional testing is required to determine methods to improve structural pressure performance of slider windows. Potential solutions that would require additional testing may include fastener spacing, different types of fasteners, masonry window clips, construction adhesive, foam sealant, stronger window flange material, and/or straps.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Merged Observatory Data Files (MODFs): an integrated observational data product supporting process-oriented investigations and diagnostics

A large and ever-growing body of geophysical information is measured in campaigns and at specialized observatories as a part of scientific expeditions and experiments. These collections of observed data include many essential climate variables (as defined by the Global Climate Observing System) but are often distinguished by a wide range of additional non-routine measurements that are designed to not only document the state of the environment but also the drivers that contribute to that state. These field data are used not only to further understand environmental processes through observation-based studies but also to provide baseline data to test model performance and to codify understanding to improve predictive capabilities. To address the considerable barriers and difficulty in utilizing these diverse and complex data for observation–model research, the Merged Observatory Data File (MODF) concept has been developed. A MODF combines measurements from multiple instruments into a single file that complies with well-established data format and metadata practices and has been designed to parallel the development of corresponding Merged Model Data Files (MMDFs). Using the MODF and MMDF protocols will facilitate the evolution of model intercomparison projects into model intercomparison and improvement projects by putting observation and model data “on the same page” in a timely manner. The MODF concept was developed especially for weather forecast model studies in the Arctic. The surprisingly complex process of implementing MODFs in that context refined the concept itself. Thus, this article explains the concept of MODFs by providing details on the issues that were revealed and resolved during that first specific implementation. Detailed instructions are provided on how to make MODFs, and this article can be considered a MODF creation manual.

54 ENVIRONMENTAL SCIENCES↗

Space Shuttle Hot Cabin Emergency Responses

Methods: Human thermal tolerance, countermeasures, and thermal model data were reviewed and compared to existing shuttle ECS failure temperature and humidity profiles for each failure mode. Increases in core temperature associated with cognitive impairment was identified, as was metabolic heat generation of crewmembers, temperature monitoring, and communication capabilities after partial power-down and other limiting factors. Orbiter landing strategies and a hydration and salt replacement protocol were developed to put wheels on deck in each failure mode prior to development of significant cognitive impairment or collapse of crewmembers. Thermal tradeoffs for use of the Advanced Crew Escape Suit (ACES), Liquid Cooling Garment, integrated G-suit and Quick Don Mask were examined. candidate solutions involved trade-offs or conflicts with cabin oxygen partial pressure limits, system power-downs to limit heat generation, risks of alternate and emergency landing sites or compromise of Mode V-VIII scenarios. Results: Rehydration and minimized cabin workloads are required in all failure modes. Temperature/humidity profiles increase rapidly in two failure modes, and deorbit is recommended without the ACES, ICU and g-suit. This latter configuration limits several shuttle approach and landing escape modes and requires communication modifications. Additional data requirements were identified and engineering simulations were recommended to develop more current shuttle temperature and humidity profiles. Discussion: After failure of the shuttle ECS, there is insufficient cooling capacity of the ACES to protect crewmembers from rising cabin temperature and humidity. The LCG is inadequate for cabin temperatures above 76 F. Current shuttle future life policy makes it unlikely that major engineering upgrades necessary to address this problem will occur.

Stepaniak, P.↗

Improving UDP/IP Transmission Without Increasing Congestion

Datagram Retransmission (DGR) is a computer program that, within certain limits, ensures the reception of each datagram transmitted under the User Datagram Protocol/Internet Protocol. [User Datagram Protocol (UDP) is considered unreliable because it does not involve a reliability-ensuring connection-initiation dialogue between sender and receiver. UDP is well suited to issuing of many small messages to many different receivers.] Unlike prior software for ensuring reception of UDP datagrams, DGR does not contribute to network congestion by retransmitting data more frequently as an ever-increasing number of messages and acknowledgements is lost. Instead, DGR does just the opposite: DGR includes an adaptive timeout-interval- computing component that provides maximum opportunity for reception of acknowledgements, minimizing retransmission. By monitoring changes in the rate at which message-transmission transactions are completed, DGR detects changes in the level of congestion and responds by imposing varying degrees of delay on the transmission of new messages. In addition, DGR maximizes throughput by not waiting for acknowledgement of a message before sending the next message. All DGR communication is asynchronous, to maximize efficient utilization of network connections. DGR manages multiple concurrent datagram transmission and acknowledgement conversations.

Burleigh, Scott↗

Delamination-Assisted Ultrafast Wrinkle Formation in a Freestanding Film

Freestanding films provide a versatile platform for materials engineering thanks to additional structural motifs not found in films with a substrate. A ubiquitous example is wrinkles, yet little is known about how they can develop over as fast as a few picoseconds due to a lack of experimental probes to visualize their dynamics in real time on the nanoscopic scale. Here, we use time-resolved electron diffraction to directly observe light-activated wrinkling formation in freestanding La 2/3 Ca 1/3 MnO 3 films. Via a “lock-in” analysis of oscillations in the diffraction peak position, intensity, and width, we quantitatively reconstructed how wrinkles develop on the time scale of lattice vibration. Contrary to the common assumption of fixed boundary conditions, we found that wrinkle development is associated with ultrafast delamination at the film boundaries. Finally, our work provides a generic protocol to quantify wrinkling dynamics in freestanding films and highlights the importance of the film–substrate interaction in determining the properties of freestanding structures.

36 MATERIALS SCIENCE↗

Save Energy Now Assessments Results 2008 Summary Report

In October 2005, U.S. Department of Energy Secretary Bodman launched his Easy Ways to Save Energy campaign with a promise to provide energy assessments to 200 of the largest U.S. manufacturing plants. DOE's Industrial Technologies Program (ITP) responded to the Secretary's campaign with its Save Energy Now initiative, featuring a new and highly cost-effective form of energy savings assessment. The approach for these assessments drew heavily on the existing resources of ITP's technology delivery component. Over the years, ITP Technology Delivery has worked with industry partners to assemble a suite of respected software tools, proven assessment protocols, training curricula, certified energy experts, and strong partnerships for deployment. The Save Energy Now assessments conducted in calendar year 2006 focused on natural gas savings and targeted many of the nation's largest manufacturing plants - those that consume at least 1 TBtu of energy annually. The 2006 Save Energy Now assessments focused primarily on assessments of steam and process heating systems, which account for an estimated 74% of all natural gas use by U.S. manufacturing plants. Because of the success of the Save Energy Now assessments conducted in 2006 and 2007, the program was expanded and enhanced in two major ways in 2008: (1) a new goal was set to perform at least 260 assessments; and (2) the assessment focus was expanded to include pumping, compressed air, and fan systems in addition to steam and process heating. DOE ITP also has developed software tools to assess energy efficiency improvement opportunities in pumping, compressed air, and fan systems. The Save Energy Now assessments integrate a strong training component designed to teach industrial plant personnel how to use DOE's opportunity assessment software tools. This approach has the advantages of promoting strong buy-in of plant personnel for the assessment and its outcomes and preparing them better to independently replicate the assessment process at the company's other facilities. Another important element of the Save Energy Now assessment process is the follow-up process used to identify how many of the recommended savings opportunities from individual assessments have been implemented in the industrial plants. Plant personnel involved with the Save Energy Now assessments are contacted 6 months, 12 months, and 24 months after individual assessments are completed to determine implementation results. A total of 260 Save Energy Now assessments were successfully completed in calendar year 2008. This means that a total of 718 assessments were completed in 2006, 2007, and 2008. As of July 2009, we have received a total of 239 summary reports from the ESAs that were conducted in year 2008. Hence, at the time that this report was prepared, 680 final assessment reports were completed (200 from year 2006, 241 from year 2007, and 239 from year 2008). The total identified potential cost savings from these 680 assessments is $1.1 billion per year, including natural gas savings of about 98 TBtu per year. These results, if fully implemented, could reduce CO{sub 2} emissions by about 8.9 million metric tons annually. When this report was prepared, data on implementation of recommended energy and cost savings measures from 488 Save Energy Now assessments were available. For these 488 plants, measures saving a total of $147 million per year have been implemented, measures that will save $169 million per year are in the process of being implemented, and plants are planning implementation of measures that will save another $239 million per year. The implemented recommendations are already achieving total CO{sub 2} reductions of about 1.8 million metric tons per year. This report provides a summary of the key results for the Save Energy Now assessments completed in 2008; details of the 6-month, 12-month, and 24-month implementation results obtained to date; and an evaluation of these implementation results. This report also summarizes key accomplishments, findings, and lessons learned from all the Save Energy Now assessments completed to date. A separate report (Wright et al. 2010) provides more detailed information on key results for all of the 2008 assessments of steam, process heating, pumping, compressed air, and fan systems. Two prior reports (Wright et al. 2007 and Wright et al. 2009) detail the results from the 2006 and 2007 assessments and discuss the major components of the assessment process and improvements in the process made in 2007.

03 NATURAL GAS↗

Save Energy Now Assessments Results 2008 Detailed Report

In October 2005, U.S. Department of Energy Secretary Bodman launched his Easy Ways to Save Energy campaign with a promise to provide energy assessments to 200 of the largest U.S. manufacturing plants. DOE's Industrial Technologies Program (ITP) responded to the Secretary's campaign with its Save Energy Now initiative, featuring a new and highly cost-effective form of energy savings assessment. The approach for these assessments drew heavily on the existing resources of ITP's technology delivery component. Over the years, ITP Technology Delivery has worked with industry partners to assemble a suite of respected software tools, proven assessment protocols, training curricula, certified energy experts, and strong partnerships for deployment. The Save Energy Now assessments conducted in calendar year 2006 focused on natural gas savings and targeted many of the nation's largest manufacturing plants - those that consume at least 1 TBtu of energy annually. The 2006 Save Energy Now assessments focused primarily on assessments of steam and process heating systems, which account for an estimated 74% of all natural gas use by U.S. manufacturing plants. Because of the success of the Save Energy Now assessments conducted in 2006 and 2007, the program was expanded and enhanced in two major ways in 2008: (1) a new goal was set to perform at least 260 assessments; and (2) the assessment focus was expanded to include pumping, compressed air, and fan systems in addition to steam and process heating. DOE ITP also has developed software tools to assess energy efficiency improvement opportunities in pumping, compressed air, and fan systems. The Save Energy Now assessments integrate a strong training component designed to teach industrial plant personnel how to use DOE's opportunity assessment software tools. This approach has the advantages of promoting strong buy-in of plant personnel for the assessment and its outcomes and preparing them better to independently replicate the assessment process at the company's other facilities. Another important element of the Save Energy Now assessment process is the follow-up process used to identify how many of the recommended savings opportunities from individual assessments have been implemented in the industrial plants. Plant personnel involved with the Save Energy Now assessments are contacted 6 months, 12 months, and 24 months after individual assessments are completed to determine implementation results. A total of 260 Save Energy Now assessments were successfully completed in calendar year 2008. This means that a total of 718 assessments were completed in 2006, 2007, and 2008. As of July 2009, we have received a total of 239 summary reports from the ESAs that were conducted in year 2008. Hence, at the time that this report was prepared, 680 final assessment reports were completed (200 from year 2006, 241 from year 2007, and 239 from year 2008). The total identified potential cost savings from these 680 assessments is $1.1 billion per year, including natural gas savings of about 98 TBtu per year. These results, if fully implemented, could reduce CO{sub 2} emissions by about 8.9 million metric tons annually. When this report was prepared, data on implementation of recommended energy and cost savings measures from 488 Save Energy Now assessments were available. For these 488 plants, measures saving a total of $147 million per year have been implemented, measures that will save $169 million per year are in the process of being implemented, and plants are planning implementation of measures that will save another $239 million per year. The implemented recommendations are already achieving total CO{sub 2} reductions of about 1.8 million metric tons per year. This report provides a summary of the key results for the Save Energy Now assessments completed in 2008; details of the 6-month, 12-month, and 24-month implementation results obtained to date; and an evaluation of these implementation results. This report also summarizes key accomplishments, findings, and lessons learned from all the Save Energy Now assessments completed to date. A separate report (Wright et al. 2010) provides more detailed information on key results for all of the 2008 assessments of steam, process heating, pumping, compressed air, and fan systems. Two prior reports (Wright et al. 2007 and Wright et al. 2009) detail the results from the 2006 and 2007 assessments and discuss the major components of the assessment process and improvements in the process made in 2007.

03 NATURAL GAS↗

Clouds and Earth Radiant Energy System (CERES), a Review: Past, Present and Future

The Clouds and Earth Radiant Energy System (CERES) project s objectives are to measure the reflected solar radiance (shortwave) and Earth-emitted (longwave) radiances and from these measurements to compute the shortwave and longwave radiation fluxes at the top of the atmosphere (TOA) and the surface and radiation divergence within the atmosphere. The fluxes at TOA are to be retrieved to an accuracy of 2%. Improved bidirectional reflectance distribution functions (BRDFs) have been developed to compute the fluxes at TOA from the measured radiances with errors reduced from ERBE by a factor of two or more. Instruments aboard the Terra and Aqua spacecraft provide sampling at four local times. In order to further reduce temporal sampling errors, data are used from the geostationary meteorological satellites to account for changes of scenes between observations by the CERES radiometers. A validation protocol including in-flight calibrations and comparisons of measurements has reduced the instrument errors to less than 1%. The data are processed through three editions. The first edition provides a timely flow of data to investigators and the third edition provides data products as accurate as possible with resources available. A suite of cloud properties retrieved from the MODerate-resolution Imaging Spectroradiometer (MODIS) by the CERES team is used to identify the cloud properties for each pixel in order to select the BRDF for each pixel so as to compute radiation fluxes from radiances. Also, the cloud information is used to compute radiation at the surface and through the atmosphere and to facilitate study of the relationship between clouds and the radiation budget. The data products from CERES include, in addition to the reflected solar radiation and Earth emitted radiation fluxes at TOA, the upward and downward shortwave and longwave radiation fluxes at the surface and at various levels in the atmosphere. Also at the surface the photosynthetically active radiation and ultraviolet radiation (total, UVA and UVB) are computed. The CERES instruments aboard the Terra and Aqua spacecraft have served well past their design life times. A CERES instrument has been integrated onto the NPP platform and is ready for launch in 2011. Another CERES instrument is being built for launch in 2014, and plans are being made for a series of follow-on missions.

Smith, G. L.↗

Update - Body of Knowledge (BOK) for Copper Wire Bonds

Copper wire bond technology developments continue to be a subject of technical interest to the NASA (National Aeronautics and Space Administration) NEPP (NASA Electronic Parts and Packaging Program) which funded this update. Based on this new research, additional copper bond wire vulnerabilities were found in the literature - Crevice corrosion, intrinsic degradation of palladium coated copper wire, congregation of palladium near ball bond interface leading to failure, residual aluminum pad metallization impact on device lifetimes, stitch cracking phenomena, package delamination's that have resulted in wire bond failures and device failure due to elemental sulfur. A search of the U.S.A. patent web site found 3 noteworthy patents on the following developments: claim of a certain IMC (Intermetallic Compound) thickness as a mitigation solution to chlorine corrosion; claim of using materials with different pHs to neutralize contaminants in a package containing copper wire bonds; and a discussion on ball shear test threshold values for different applications. In addition, an aerospace contractor of military hardware had a presentation on copper bond wires where it was reported that there was a parametric shift and noise susceptibility of devices with copper bond wires which affected legacy design performance. A review of silver bond wire (another emerging technology) technical papers found that an electromigration failure mechanism was evident in device applications that operate under high current conditions. More studies may need to be performed on a comprehensive basis. Research areas for consideration are suggested, however, these research and or qualification/standard test areas are not all inclusive and should not be construed as the element (s) that delivers any potential copper wire bond solution. A false sense of security may occur, whenever there is a reliance on passing any particular qualification, standard, or test protocol.

Rutkowski, E.↗

Validation of Fitness for Duty Standards Using Pre- and Post-Flight Capsule Egress and Suited Functional Performance Tasks in Simulated Reduced Gravity

The transition between gravity environments will involve one of the most complex, high-risk phases of exploration missions. The reduced functional capacity caused by physiological deconditioning adaptations in microgravity coupled with the stressors of re-entry into partial gravity environments will increase risks to crew, even with rigorous adherence to inflight countermeasures. Specifically, two high-risk scenarios may be required to be performed soon after gravity transitions: 1) nominal and/or emergency unassisted capsule egress task after return to Earth, and 2) planetary extravehicular activity (EVA) soon after landing on Mars or the Moon. Quantification of crewmember’s functional performance after long-duration spaceflight is necessary to inform concepts of operations for future exploration missions. The overarching aim of this study is to quantify post-landing functional performance with deconditioning after long-duration ISS missions. This study is broken down into two phases. Phase 1 includes a pilot study to assess the overall feasibility and demonstrate the capability to perform mission-like tasks shortly after landing. Phase 2, the Egress Fitness study, which is part of the Complement of Integrated Protocols for Human Exploration Research (CIPHER), uses a task-based approach to characterize functional performance in long-duration ISS crewmembers before flight and shortly after return to Earth. The pilot and full Egress Fitness study includes pre-flight and post-flight testing of simulated emergency egress out of a functional capsule mockup and a Mars gravity EVA simulation at the Active Response Gravity Offload System (ARGOS) facility. The EVA simulation tasks include suit donning, hatch egress, ladder descent, task board cable operations, baggage transfer over sand/rocky regolith, alignment with a rear entry port, and suit egress. The post-flight simulated capsule egress test occurs 1–4 h after landing and the planetary EVA simulation occurs 18–36 h after landing. The full CIPHER Egress Fitness study has additional pre-flight sessions, longer EVA tasks that include traverse and geology sampling, and post-flight sessions on R+1, 4, and 8 to characterize the timeframe of recovery. The Pilot Egress Fitness study has completed baseline and post-flight testing on four crewmembers. All subjects were able to complete the post-flight simulated planetary EVA; three subjects were able to complete the postflight capsule egress simulation. CIPHER study data collection is ongoing. This study will quantify post-landing functional performance in operationally relevant simulations to help inform future planetary concepts of operations shortly after landing.

egress↗

CIPHER: Egress Fitness

The transition between gravity environments will involve one of the most complex, high-risk phases of exploration missions. The reduced functional capacity caused by physiological deconditioning adaptations in microgravity coupled with the stressors of re-entry into partial gravity environments will increase risks to crew, even with rigorous adherence to inflight countermeasures. Specifically, two high-risk scenarios may be required to be performed soon after gravity transitions: 1) nominal and/or emergency unassisted capsule egress task after return to Earth, and 2) planetary extravehicular activity (EVA) soon after landing on Mars or the Moon. Quantification of crewmember’s functional performance after long-duration spaceflight is necessary to inform concepts of operations for future exploration missions. The overarching aim of this study is to quantify post-landing functional performance with deconditioning after long-duration ISS missions. This study is broken down into two phases. Phase 1 includes a pilot study to assess the overall feasibility and demonstrate the capability to perform mission-like tasks shortly after landing. Phase 2, the Egress Fitness study, which is part of the Complement of Integrated Protocols for Human Exploration Research (CIPHER), uses a task-based approach to characterize functional performance in long-duration ISS crewmembers before flight and shortly after return to Earth. The pilot and full Egress Fitness study includes pre-flight and post-flight testing of simulated emergency egress out of a functional capsule mockup and a Mars gravity EVA simulation at the Active Response Gravity Offload System (ARGOS) facility. The EVA simulation tasks include suit donning, hatch egress, ladder descent, task board cable operations, baggage transfer over sand/rocky regolith, alignment with a rear entry port, and suit egress. The post-flight simulated capsule egress test occurs 1–4 h after landing and the planetary EVA simulation occurs 18–36 h after landing. The full CIPHER Egress Fitness study has additional pre-flight sessions, longer EVA tasks that include traverse and geology sampling, and post-flight sessions on R+1, 4, and 8 to characterize the timeframe of recovery. Pilot Egress Fitness has completed baseline and post-flight testing on four crewmembers. That study remains open. Originally this was to cover the Boeing CFT mission, but now also includes private astronauts on commercial spaceflights. CIPHER study data collection is ongoing with 2 subjects completed and 4 additional subjects consented. This study will quantify post-landing functional performance in operationally relevant simulations to help inform fitness for duty standards and future planetary concepts of operations shortly after landing.

Jason Norcross↗

Direct analysis of cotton swipes for uranium and plutonium isotopic determination by microextraction-ICP-MS

The determination of uranium and plutonium isotopic abundance on environmental samples collected by International Atomic Energy Agency (IAEA) inspectors is vital for the detection of undeclared nuclear activities and material under the international nuclear safeguards regime. Current analytical protocols require time-consuming sample preparation steps prior to subsequent measurement by inorganic mass spectrometry (MS). Recent efforts from this laboratory have focused on developing sample preparation methods for faster analysis, potentially allowing higher sample throughput[1]. Alternative methods including microextraction sampling in conjunction with inductively coupled plasma-mass spectrometry (ICP-MS) have been recently explored. This methodology, microextraction-ICP-MS, was developed such that uranium and plutonium could be extracted from the swipe surface and directed into the ICP-MS for an in-situ measurement, eliminating the need for swipe ashing and digestion. A commercial off-the-shelf microextraction system was customized with an automated movable XY stage that can be programmed to save sampling locations, allowing for automated rapid sampling of swipe surfaces. Additional efforts have focused on the utilization of collision cell technology to the microextraction ICP-MS method. This would eliminate the need for lengthy column chemistry procedures to purify separated uranium and plutonium fractions before analysis. Here, the extracted U/Pu analyte is measured by reacting the uranium ions with CO2 in the collision cell of an ICP-MS, shifting the uranium to UO+, which will not interfere with the plutonium isotopic determination. The developed method utilizing collision cell – ICP-MS technology has demonstrated the ability to measure plutonium isotope ratios in the presence of high uranium concentration on the transient signal from the microextraction system utilizing certified reference materials from JRC-Geel and the New Brunswick Laboratory Program Office.

Bradley, Veronica↗

Supersonically Spray-Coated Colloidal Quantum Dot Ink Solar Cells

Controlling the thickness of quantum dot (QD) films is difficult using existing film formation techniques, which employ pre-ligand-exchanged PbS QD inks, because of several issues: 1) poor colloidal stability, 2) use of high-boiling-point solvents for QD dispersion, and 3) limitations associated with one-step deposition. Here in this paper, we suggest a new protocol for QD film deposition using electrical double-layered PbS QD inks, prepared by solution-phase ligand exchange using methyl ammonium lead iodide (MAPbI 3 ). The films are deposited by the supersonic spraying technique, which facilitates the rapid evaporation of the solvent and the subsequent deposition of the PbS QD ink without requiring a post-deposition annealing treatment for solvent removal. The film thickness could be readily controlled by varying the number of spraying sweeps made across the substrate. This spray deposition process yields high-quality n-type QD films quickly (within 1 min) while minimizing the amount of the PbS QD ink used to less than 5 mg for one device (300-nm-thick absorbing layer, 2.5 x 2.5 cm 2 ). Further, the formation of an additional p-layer by treatment with mercaptopropionic acid allows for facile hole extraction from the QD films, resulting in a power conversion efficiency of 3.7% under 1.5 AM illumination.

14 SOLAR ENERGY↗

TH-A-BRC-00: New Task Groups for External Beam QA: An Overview

AAPM TG-135U1 QA for Robotic Radiosurgery - Sonja Dieterich Since the publication of AAPM TG-135 in 2011, the technology of robotic radiosurgery has rapidly developed. AAPM TG-135U1 will provide recommendations on the clinical practice for using the IRIS collimator, fiducial-less real-time motion tracking, and Monte Carlo based treatment planning. In addition, it will summarize currently available literature about uncertainties. Learning Objectives: Understand the progression of technology since the first TG publication Learn which new QA procedures should be implemented for new technologies Be familiar with updates to clinical practice guidelines AAPM TG-178 Gamma Stereotactic Radiosurgery Dosimetry and Quality Assurance - Steven Goetsch Purpose: AAPM Task Group 178 Gamma Stereotactic Radiosurgery Dosimetry and Quality Assurance was formed in August, 2008. The Task Group has 12 medical physicists, two physicians and two consultants. Methods: A round robin dosimetry intercomparison of proposed ionization chambers, electrometer and dosimetry phantoms was conducted over a 15 month period in 2011 and 2012 (Med Phys 42, 11, Nov, 2015). The data obtained at 9 institutions (with ten different Elekta Gamma Knife units) was analyzed by the lead author using several protocols. Results: The most consistent results were obtained using the Elekta ABS 16cm diameter phantom, with the TG-51 protocol modified as recommended by Alfonso et al (Med Phys 35, 11, Nov 2008). A key white paper (Med Phys, in press) sponsored by Elekta Corporation, was used to obtain correction factors for the ionization chambers and phantoms used in this intercomparison. Consistent results were obtained for both Elekta Gamma Knife Model 4C and Gamma Knife Perfexion units as measured with each of two miniature ionization chambers. Conclusion: The full report gives clinical history and background of gamma stereotactic radiosurgery, clinical examples and history, quality assurance recommendations and outline of possible dosimetry protocols. The report will be reviewed by the AAPM Working Group on Recommendations for Radiotherapy External Beam Quality Assurance and then by the AAPM Science Council before publication in Medical Physics Survey of possible calibration protocols for calibration of Gamma Stereotactic Radiosurgery (GSR) devices Overview of modern Quality Assurance techniques for GSR AAPM TG-218 Tolerance Levels and Methodologies for IMRT Verification QA - Moyed Miften Patient-specific IMRT QA measurement is a process designed to identify discrepancies between calculated and delivered doses. Error tolerance limits are not well-defined or consistently applied across centers. The AAPM TG-218 report has been prepared to improve the understanding and consistency of this process by providing recommendations for methodologies and tolerance limits in patient-specific IMRT QA. Learning Objectives: Review measurement methods and methodologies for absolute dose verification Provide recommendations on delivery methods, data interpretation, the use of analysis routines and choice of tolerance limits for IMRT QA Sonja Dieterich has a research agreement with Sun Nuclear Inc. Steven Goetsch is a part-time consultant for Elekta.

60 APPLIED LIFE SCIENCES↗

TH-A-BRC-01: AAPM TG-135U1 QA for Robotic Radiosurgery

AAPM TG-135U1 QA for Robotic Radiosurgery - Sonja Dieterich Since the publication of AAPM TG-135 in 2011, the technology of robotic radiosurgery has rapidly developed. AAPM TG-135U1 will provide recommendations on the clinical practice for using the IRIS collimator, fiducial-less real-time motion tracking, and Monte Carlo based treatment planning. In addition, it will summarize currently available literature about uncertainties. Learning Objectives: Understand the progression of technology since the first TG publication Learn which new QA procedures should be implemented for new technologies Be familiar with updates to clinical practice guidelines AAPM TG-178 Gamma Stereotactic Radiosurgery Dosimetry and Quality Assurance - Steven Goetsch Purpose: AAPM Task Group 178 Gamma Stereotactic Radiosurgery Dosimetry and Quality Assurance was formed in August, 2008. The Task Group has 12 medical physicists, two physicians and two consultants. Methods: A round robin dosimetry intercomparison of proposed ionization chambers, electrometer and dosimetry phantoms was conducted over a 15 month period in 2011 and 2012 (Med Phys 42, 11, Nov, 2015). The data obtained at 9 institutions (with ten different Elekta Gamma Knife units) was analyzed by the lead author using several protocols. Results: The most consistent results were obtained using the Elekta ABS 16cm diameter phantom, with the TG-51 protocol modified as recommended by Alfonso et al (Med Phys 35, 11, Nov 2008). A key white paper (Med Phys, in press) sponsored by Elekta Corporation, was used to obtain correction factors for the ionization chambers and phantoms used in this intercomparison. Consistent results were obtained for both Elekta Gamma Knife Model 4C and Gamma Knife Perfexion units as measured with each of two miniature ionization chambers. Conclusion: The full report gives clinical history and background of gamma stereotactic radiosurgery, clinical examples and history, quality assurance recommendations and outline of possible dosimetry protocols. The report will be reviewed by the AAPM Working Group on Recommendations for Radiotherapy External Beam Quality Assurance and then by the AAPM Science Council before publication in Medical Physics Survey of possible calibration protocols for calibration of Gamma Stereotactic Radiosurgery (GSR) devices Overview of modern Quality Assurance techniques for GSR AAPM TG-218 Tolerance Levels and Methodologies for IMRT Verification QA - Moyed Miften Patient-specific IMRT QA measurement is a process designed to identify discrepancies between calculated and delivered doses. Error tolerance limits are not well-defined or consistently applied across centers. The AAPM TG-218 report has been prepared to improve the understanding and consistency of this process by providing recommendations for methodologies and tolerance limits in patient-specific IMRT QA. Learning Objectives: Review measurement methods and methodologies for absolute dose verification Provide recommendations on delivery methods, data interpretation, the use of analysis routines and choice of tolerance limits for IMRT QA Sonja Dieterich has a research agreement with Sun Nuclear Inc. Steven Goetsch is a part-time consultant for Elekta.

60 APPLIED LIFE SCIENCES↗

TH-A-BRC-02: AAPM TG-178 Gamma Stereotactic Radiosurgery Dosimetry and Quality Assurance

AAPM TG-135U1 QA for Robotic Radiosurgery - Sonja Dieterich Since the publication of AAPM TG-135 in 2011, the technology of robotic radiosurgery has rapidly developed. AAPM TG-135U1 will provide recommendations on the clinical practice for using the IRIS collimator, fiducial-less real-time motion tracking, and Monte Carlo based treatment planning. In addition, it will summarize currently available literature about uncertainties. Learning Objectives: Understand the progression of technology since the first TG publication Learn which new QA procedures should be implemented for new technologies Be familiar with updates to clinical practice guidelines AAPM TG-178 Gamma Stereotactic Radiosurgery Dosimetry and Quality Assurance - Steven Goetsch Purpose: AAPM Task Group 178 Gamma Stereotactic Radiosurgery Dosimetry and Quality Assurance was formed in August, 2008. The Task Group has 12 medical physicists, two physicians and two consultants. Methods: A round robin dosimetry intercomparison of proposed ionization chambers, electrometer and dosimetry phantoms was conducted over a 15 month period in 2011 and 2012 (Med Phys 42, 11, Nov, 2015). The data obtained at 9 institutions (with ten different Elekta Gamma Knife units) was analyzed by the lead author using several protocols. Results: The most consistent results were obtained using the Elekta ABS 16cm diameter phantom, with the TG-51 protocol modified as recommended by Alfonso et al (Med Phys 35, 11, Nov 2008). A key white paper (Med Phys, in press) sponsored by Elekta Corporation, was used to obtain correction factors for the ionization chambers and phantoms used in this intercomparison. Consistent results were obtained for both Elekta Gamma Knife Model 4C and Gamma Knife Perfexion units as measured with each of two miniature ionization chambers. Conclusion: The full report gives clinical history and background of gamma stereotactic radiosurgery, clinical examples and history, quality assurance recommendations and outline of possible dosimetry protocols. The report will be reviewed by the AAPM Working Group on Recommendations for Radiotherapy External Beam Quality Assurance and then by the AAPM Science Council before publication in Medical Physics Survey of possible calibration protocols for calibration of Gamma Stereotactic Radiosurgery (GSR) devices Overview of modern Quality Assurance techniques for GSR AAPM TG-218 Tolerance Levels and Methodologies for IMRT Verification QA - Moyed Miften Patient-specific IMRT QA measurement is a process designed to identify discrepancies between calculated and delivered doses. Error tolerance limits are not well-defined or consistently applied across centers. The AAPM TG-218 report has been prepared to improve the understanding and consistency of this process by providing recommendations for methodologies and tolerance limits in patient-specific IMRT QA. Learning Objectives: Review measurement methods and methodologies for absolute dose verification Provide recommendations on delivery methods, data interpretation, the use of analysis routines and choice of tolerance limits for IMRT QA Sonja Dieterich has a research agreement with Sun Nuclear Inc. Steven Goetsch is a part-time consultant for Elekta.

60 APPLIED LIFE SCIENCES↗

TH-A-BRC-03: AAPM TG218: Measurement Methods and Tolerance Levels for Patient-Specific IMRT Verification QA

AAPM TG-135U1 QA for Robotic Radiosurgery - Sonja Dieterich Since the publication of AAPM TG-135 in 2011, the technology of robotic radiosurgery has rapidly developed. AAPM TG-135U1 will provide recommendations on the clinical practice for using the IRIS collimator, fiducial-less real-time motion tracking, and Monte Carlo based treatment planning. In addition, it will summarize currently available literature about uncertainties. Learning Objectives: Understand the progression of technology since the first TG publication Learn which new QA procedures should be implemented for new technologies Be familiar with updates to clinical practice guidelines AAPM TG-178 Gamma Stereotactic Radiosurgery Dosimetry and Quality Assurance - Steven Goetsch Purpose: AAPM Task Group 178 Gamma Stereotactic Radiosurgery Dosimetry and Quality Assurance was formed in August, 2008. The Task Group has 12 medical physicists, two physicians and two consultants. Methods: A round robin dosimetry intercomparison of proposed ionization chambers, electrometer and dosimetry phantoms was conducted over a 15 month period in 2011 and 2012 (Med Phys 42, 11, Nov, 2015). The data obtained at 9 institutions (with ten different Elekta Gamma Knife units) was analyzed by the lead author using several protocols. Results: The most consistent results were obtained using the Elekta ABS 16cm diameter phantom, with the TG-51 protocol modified as recommended by Alfonso et al (Med Phys 35, 11, Nov 2008). A key white paper (Med Phys, in press) sponsored by Elekta Corporation, was used to obtain correction factors for the ionization chambers and phantoms used in this intercomparison. Consistent results were obtained for both Elekta Gamma Knife Model 4C and Gamma Knife Perfexion units as measured with each of two miniature ionization chambers. Conclusion: The full report gives clinical history and background of gamma stereotactic radiosurgery, clinical examples and history, quality assurance recommendations and outline of possible dosimetry protocols. The report will be reviewed by the AAPM Working Group on Recommendations for Radiotherapy External Beam Quality Assurance and then by the AAPM Science Council before publication in Medical Physics Survey of possible calibration protocols for calibration of Gamma Stereotactic Radiosurgery (GSR) devices Overview of modern Quality Assurance techniques for GSR AAPM TG-218 Tolerance Levels and Methodologies for IMRT Verification QA - Moyed Miften Patient-specific IMRT QA measurement is a process designed to identify discrepancies between calculated and delivered doses. Error tolerance limits are not well-defined or consistently applied across centers. The AAPM TG-218 report has been prepared to improve the understanding and consistency of this process by providing recommendations for methodologies and tolerance limits in patient-specific IMRT QA. Learning Objectives: Review measurement methods and methodologies for absolute dose verification Provide recommendations on delivery methods, data interpretation, the use of analysis routines and choice of tolerance limits for IMRT QA Sonja Dieterich has a research agreement with Sun Nuclear Inc. Steven Goetsch is a part-time consultant for Elekta.

60 APPLIED LIFE SCIENCES↗