Search NASA⌕ Search

SEARCH · Search NASA

Results for “certification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,657 records · Page 92

Industrial Hygiene Asbestos Negative Exposure Assessment Class III Wallboard penetration and removal up to 10 square feet of wallboard with asbestos containing joint compound

This negative exposure assessment (NEA) for asbestos is a certification stating that a specific type of work involving one or more hazardous materials has been evaluated and found not to result in exposure in excess of applicable standards. This assessment included the collection of personal exposure air samples and a review of the operation by an Industrial Hygienist. Work which deviates from the provisions below falls outside of the scope of this NEA and may result in exposure of personnel to hazardous materials in excess of applicable standards. Such operations must be independently evaluated.

54 ENVIRONMENTAL SCIENCES↗

Industrial Hygiene Asbestos Negative Exposure Assessment Flooring Material Penetration and Sampling

This negative exposure assessment (NEA) for asbestos is a certification stating that a specific type of work involving one or more hazardous materials has been evaluated and found not to result in exposure in excess of applicable standards. This assessment included the collection of personal exposure air samples and a review of the operation by an Industrial Hygienist. Work which deviates from the provisions below falls outside of the scope of this NEA and may result in exposure of personnel to hazardous materials in excess of applicable standards. Such operations must be independently evaluated.

54 ENVIRONMENTAL SCIENCES↗

Shaker Table Test

This report describes the Shaker Table Test conducted on September 12, 2018, at the Dynamic Certification Laboratories (DCL) in Sparks, Nevada. This report satisfies Milestone M3SF-19SN010202021 Shaker Table Test, Sandia National Laboratories (SNL) Work Package (Parent WBS # 1.08.01.02.02; Work Package #SF-19SN01020202). The Shaker Table Test is related to the Multi-Modal Transportation Test (MMTT) conducted in 2017. During the MMTT, accelerations and strains were measured on the transportation platform, ENsa UNiversal (ENUN) 32P dual-purpose rail cask, cradle, basket, and three surrogate 17x17 pressurized water reactor (PWR) assemblies (one from SNL, one from Spain and one from Korea).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites

A preliminary evaluation of removing spent nuclear fuel (SNF) from 14 shutdown nuclear power plant sites was performed. At these shutdown sites the nuclear power reactors have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The shutdown sites were Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, San Onofre, Vermont Yankee, and Fort Calhoun. The evaluation was divided into four components: (1) characterization of the SNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory, (2) a description of the on-site infrastructure at the shutdown sites, (3) an evaluation of the near-site transportation infrastructure and transportation experience at the shutdown sites, and (4) an evaluation of the actions necessary to prepare for and remove SNF and GTCC waste. The primary sources for the inventory of SNF and GTCC waste were the U.S. Department of Energy (DOE) spent nuclear fuel inventory database, industry publications such as StoreFUEL, and government sources such as the U.S. Nuclear Regulatory Commission. The primary sources for information on the conditions of on-site infrastructure and near-site transportation infrastructure and experience included information collected during site visits, information provided by managers at the shutdown sites, Facility Interface Data Sheets compiled for DOE in 2005, Services Planning Documents prepared for DOE in 1993 and 1994, industry publications such as Radwaste Solutions, and Google Earth. State representatives, State Regional Group representatives, Tribal representatives, and a Federal Railroad Administration representatives have participated in eleven of the shutdown site visits. Every shutdown site was found to have at least one off-site transportation mode option for removing its SNF and GTCC waste; some have multiple options. Experience removing large components during reactor decommissioning provided an important source of information used to identify the transportation mode options for the sites. Especially important in conducting the evaluation were site visits, through which information was obtained that would not have been available otherwise. Extensive photographs taken during the site visits proved to be particularly useful in documenting the current conditions at or near the sites. Additional conclusions from this evaluation include: The 14 shutdown sites use designs from 4 different suppliers involving 11 different (horizontal and vertical) dry storage systems that would require the use of 9 different transportation cask designs to remove the SNF and GTCC waste from the shutdown sites. Although some changes to transportation certificates of compliance will be required, the SNF at the initial 9 shutdown sites (Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, and Zion) is in dual purpose dry storage canisters that can be transported, including a small amount of high-burnup fuel. Most sites indicated that 2-3 years of advance time would be required for its preparations before shipments could begin. Some sites could be ready in less time. As additional sites such as Palisades, Pilgrim, Three Mile Island, Oyster Creek, Indian Point, and Diablo Canyon shut down, these sites will be included in updates to the evaluation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Report from the Inaugural Meeting on the Opportunities at the SEEMS Facility

An Inaugural Meeting on the Opportunities at the SEEMS Facility was held at the Spallation Neutron Source (SNS) on June 11 - 12, 2019. It focused on the second of the user communities - industrial and academic researchers. Indeed, the SEEMS design concept started with a Spallation Neutron Source (SNS) study conducted for the Federal Aviation Administration (FAA) that examines test facility options for providing neutron radiation simulating that in the atmosphere originating from cosmic rays and solar particles. The study was stimulated by earlier work calling for neutron radiation facilities with increased capacity and capabilities to meet current and future needs. Regulators, aircraft producers and avionics equipment suppliers recognize the growing urgent need for SEE testing in prototypical radiation fields. Industry standards formalizing procedures to assure that critical systems are robust against SEE phenomena have been issued. Regulatory bodies including the Federal Aviation Administration (FAA) and the European Union Aviation Safety Agency (EASA) now requiring that updated standards are met for aircraft certification.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

LANSCE 21st Century Deterrence

The LANSCE accelerator is an important tool in the assessment and certification of the nation’s nuclear stockpile. LANSCE provides critical materials and nuclear data needed to develop a predictive capability for the performance of nuclear weapons. As the stockpile ages, materials are replaced, and manufacturing processes change, it is critical that we understand how these changes impact device performance. Dynamic proton radiography and neutron diffraction are ideally suited to contribute to this need. These capabilities are essential to enabling the NNSA labs to become more responsive and agile in advancing the deterrent of the future.

43 PARTICLE ACCELERATORS↗

Fissionable Materials Handlers Operators-Initial Training

These courses were designed for all Initial Fissionable Material Handlers Operators and Supervisors whose job activities will require the performance of Fissile Material Operations located within the Plutonium Facility (PF-4). The course requirements are based on DOE order 426.2, Personnel Section, Qualification, and Training Requirements for Fissionable Material Handlers. These courses are required training for all initial Fissionable Material Handlers and is specific to TA-55 FMH Certification. It covers the core areas and topics in Criticality Safety, Material-at-Risk, Nuclear Material Control and Accountability, Radiological Protection, TA-55 Material Handling and Movement.

61 RADIATION PROTECTION AND DOSIMETRY↗

An Authentication Vulnerability Assessment of Connected Lighting Systems

Emerging connected lighting systems (CLS) that incorporate distributed intelligence, network interfaces, and sensors can become data-collection platforms that enable a wide range of valuable new capabilities as well as greater energy savings in buildings and cities. However, CLS technology is currently at an early stage of development, and its increased connectivity introduces cybersecurity risks that are new to the lighting industry and that must be addressed for successful integration with other systems. While a number of existing frameworks, guidelines, and tests for evaluating cybersecurity vulnerability may apply to CLS in whole or in part, there is currently no mandatory requirement for cybersecurity testing or certification. The lighting industry, including technology developers and specification organizations, is currently evaluating the suitability of existing frameworks and guidelines for CLS. To support these efforts, Pacific Northwest National Laboratory (PNNL) is conducting a series of studies intended to educate lighting industry stakeholders on specific cybersecurity practices and characterize their implementation in commercially available CLS with varying system architectures, network-communication technologies, and degrees of maturity. This study demonstrates that tests for authentication vulnerabilities can be developed with objective pass/fail criteria, therby facilitating comparisons between CLS. Based on the limited results of this study, it appears that the CLS that are being brought to market have varying levels of authentication vulnerability. It is hoped that these evaluations will support and perhaps accelerate industry discussions on the risks of specific security vulnerabilities, what vulnerabilities should be addressed by in-development of future lighting-specific best practices, and whether any such practices should be included in voluntary lighting standards.

42 ENGINEERING↗

BigData Express: Toward Predictable, Schedulable, and High-Performance Data Transfer [Slides]

BigData Express: a schedulable, predictable, and high-performance data transfer service. A peer-to-peer, scalable, and extensible data transfer model; A visually appealing, easy-to-use web portal; A high-performance data transfer engine; On-demand provisioning of end-to-end network paths with guaranteed QoS; Robust and flexible error handling; CILogon-based security (certificate version); A rich set of REST APIs to support scientific workflows

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Data Compilation for AGR-2 UCO Variant Compact Lot LEU09-OP2-Z

This document is a compilation of characterization data for the candidate AGR-2 UCO Variant fuel compact lot LEU09-OP2-Z. The compacts were produced by ORNL for the Advanced Gas Reactor Fuel Development and Qualification (AGR) program for the second AGR irradiation test (AGR-2). This compact lot was fabricated using particle composite LEU09. LEU09 came from Babcock and Wilcox (B&W) coated particle lot G73J-14-93073A, which was an upgraded batch of TRISO-coated 425 μm diameter, 14% low enriched uranium oxide/uranium carbide kernels (LEUCO). The AGR-2 TRISO-coated particles consist of a spherical kernel coated with an ~50% dense carbon buffer layer (100 μm nominal thickness), followed by a dense inner pyrocarbon layer (40 μm nominal thickness), followed by a SiC layer (35 μm nominal thickness), followed by another dense outer pyrocarbon layer (40 μm nominal thickness). The kernels were also manufactured by B&W and identified as kernel lot G73I-14-69307. Two data packages were submitted by B&W containing the acceptance testing results for the kernels and coated particles, these are identified by their lot numbers. A discussion on the coating of the B&W TRISO particles can also be found in INL report INL/EXT-09-16545. A data compilation of ORNL analysis of G73J-14-93073A can be found in ORNL/TM-2008/134. The AGR-2 Fuel Specification (INL SPC-923) provides the requirements necessary for acceptance of the fuel manufactured for the AGR-2 irradiation test. Section 3.3 of SPC-923 provides the property requirements for the heat treated compacts. The Statistical Sampling Plan for AGR-2 Fuel Materials (INL PLN-2691) provides additional guidance regarding statistical methods for product acceptance and recommended sample sizes. The procedures for characterizing and qualifying the compacts are outlined in ORNL product inspection plan AGRCHAR- PIP-12. The inspection report forms generated by this product inspection plan document the product acceptance for the property requirements listed in section 3.3 of SPC-923. Prior to compacting, the overcoated particles are characterized per ORNL product inspection plan AGRCHAR- PIP-11 to obtain data needed for calculation of compacting charge weight and matrix density. Riffling of compact charges is also covered by this procedure. Prior to overcoating, the TRISO particles are characterized per ORNL product inspection plan AGR-CHAR-PIP-10 to determine uranium content, obtain data needed for overcoating and compact fabrication, and obtain further data needed for calculation of matrix density. Riffling of overcoater charges is also covered by this procedure. This document contains all the inspection report forms and data report forms generated by these inspection plans. In addition to the characterization data, this report also contains other records relevant to the fuel product acceptance. A history of the material flow and sample naming is included. The overcoating and compacting process is summarized, and a record of the materials used to make the matrix is included. A Certificate of Conformance and any applicable Nonconformance Reports are attached as Appendices.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Exploration of PG&E Auto DR Incentive Options (Final Project Report)

Demand Response programs offer incentives to customers to modify energy use during times of peak demand. There is a growing trend toward automating demand response. The market benefits from the use of common communication standards to facilitate automation because it allows communication and control companies to build technology using common protocols that reduces the cost of integrating ADR technologies into buildings. Common communication standards also allow electricity providers to build common platforms to communicate with customer or aggregator end-use equipment. This report considers strategies for increasing the use of automated DR technology for residential and small and medium business (SMB) customers within the Pacific Gas and Electric (PG&E) service territory. PG&E is interested in designing new incentive structures for automated DR equipment. In developing these new structures, it is important to understand the incremental cost of the automated demand response (ADR) communication technology. This technology is usually imbedded in end-use controls to communicate with an end-use device. Standards based ADR technologies require that the control system have the ability to communicate using an open standard communication protocol, usually either Open Automated Demand Response (OpenADR, certification for which is available through the OpenADR Alliance) or Smart Energy Profile.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Data Compilation for AGR-2 UCO Baseline Compact Lot LEU07-OP1-Z

This document is a compilation of characterization data for the candidate AGR-2 UCO Baseline fuel compact lot LEU07-OPI-Z. The compacts were produced by ORNL for the Advanced Gas Reactor Fuel Development and Qualification (AGR) program for the second AGR irradiation test (AGR-2). This compact lot was fabricated using particle composite LEU07. LEU07 came from Babcock and Wilcox (B&W) coated particle lot G73J-14-92072A, which was an upgraded batch of TRISO-coated 425 μm diameter, 14% low enrichment uranium oxide/uranium carbide kernels (LEUCO). The AGR-2 TRISO-coated particles consist of a spherical kernel coated with an ~50% dense carbon buffer layer (100 μm nominal thickness), followed by a SiC layer (35 μm nominal thickness), followed by another dense outer pyrocarbon layer (40 μm nominal thickness). The kernels were also manufactured by B&W and identified as kernel lot G73I-14-69307. Two data packages were submitted by B&W containing the acceptance testing results for the kernels and coated particles, these are identified by their lot numbers. A discussion on the coating of the B&W TRISO particles can also be found in INL report INL/EXT-09-16545. A data compilation of ORNL analysis of G73J-14-93072A can be found in ORNL/TM-2008/133. The AGR-2 Fuel Specification (INL SPC-923) provides the requirements necessary for acceptance of the fuel manufactured for the AGR-2 irradiation test. Section 3.3 of SPC-923 provides the property requirements for the heat treated compacts. The Statistical Sampling Plan for AGR-2 Fuel Materials (INL PLN-2691) provides additional guidance regarding statistical methods for product acceptance and recommended sample sizes. The procedures for characterizing and qualifying the compacts are outlined in ORNL product inspection plan AGR-CHAR-PIP-11 to obtain data needed for calculation of compacting charge weight and matrix density. Riffling of compact charges is also covered by this procedure. Prior to overcoating, the TRISO particles are characterized per ORNL product inspection plan AGR-CHAR-PIP-10 to determine uranium content, obtain data need for overcoating and compact fabrication, and obtain further data needed for calculation of matrix density. Riffling of overcoater charges is also covered by this procedure. This document contains all the inspection report forms and data report forms generated by these inspection plans. In addition to the characterization data, this report also contains other records relevant to the fuel product acceptance. A history of the material flow and sample naming is included. The overcoating and compacting process is summarized. A record of the materials use to make the matrix is also included. A Certificate of Conformance and any applicable Nonconformance Reports are attached as Appendices.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Data Compilation for AGR-2 UCO Variant Compact Lot LEU06-OP1-Z

This document is a compilation of characterization data for the candidate AGR-2 UCO Baseline fuel compact lot LEU07-OPI-Z. The compacts were produced by ORNL for the Advanced Gas Reactor Fuel Development and Qualification (AGR) program for the second AGR irradiation test (AGR-2). This compact lot was fabricated using particle composite LEU07. LEU07 came from Babcock and Wilcox (B&W) coated particle lot G73J-14-92072A, which was an upgraded batch of TRISO-coated 425 μm diameter, 14% low enrichment uranium oxide/uranium carbide kernels (LEUCO). The AGR-2 TRISO-coated particles consist of a spherical kernel coated with an ~50% dense carbon buffer layer (100 μm nominal thickness), followed by a SiC layer (35 μm nominal thickness), followed by another dense outer pyrocarbon layer (40 μm nominal thickness). The kernels were also manufactured by B&W and identified as kernel lot G73I-14-69307. Two data packages were submitted by B&W containing the acceptance testing results for the kernels and coated particles, these are identified by their lot numbers. A discussion on the coating of the B&W TRISO particles can also be found in INL report INL/EXT-09-16545. A data compilation of ORNL analysis of G73J-14-93072A can be found in ORNL/TM-2008/133. The AGR-2 Fuel Specification (INL SPC-923) provides the requirements necessary for acceptance of the fuel manufactured for the AGR-2 irradiation test. Section 3.3 of SPC-923 provides the property requirements for the heat treated compacts. The Statistical Sampling Plan for AGR-2 Fuel Materials (INL PLN-2691) provides additional guidance regarding statistical methods for product acceptance and recommended sample sizes. The procedures for characterizing and qualifying the compacts are outlined in ORNL product inspection plan AGR-CHAR-PIP-11 to obtain data needed for calculation of compacting charge weight and matrix density. Riffling of compact charges is also covered by this procedure. Prior to overcoating, the TRISO particles are characterized per ORNL product inspection plan AGR-CHAR-PIP-10 to determine uranium content, obtain data need for overcoating and compact fabrication, and obtain further data needed for calculation of matrix density. Riffling of overcoater charges is also covered by this procedure. This document contains all the inspection report forms and data report forms generated by these inspection plans. In addition to the characterization data, this report also contains other records relevant to the fuel product acceptance. A history of the material flow and sample naming is included. The overcoating and compacting process is summarized. A record of the materials use to make the matrix is also included. A Certificate of Conformance and any applicable Nonconformance Reports are attached as Appendices.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Next Generation Three-Way Catalysts for Future, Highly Efficient Gasoline Engines (Final Report)

Ford Motor Company, Oak Ridge National Laboratory, and the University of Michigan completed a 3.25 year project on exhaust catalysts for gasoline vehicles that exhibit higher activity at lower temperatures down to 150°C. Ford has successfully used catalysts on cars and trucks to control emissions for over forty years. Changes in gasoline engine technology have allowed the use of “high tech” three-way catalysts (TWCs) to simultaneously control HC (hydrocarbons), CO (carbon monoxide), and NOx (nitrogen oxides) at nearly 100% efficiency. Excess fueling is used upon engine start to heat the catalyst up to its full operating temperature of greater than 350°C, lowering fuel economy and creating particulate matter. It was desirable to develop new catalysts for lower operating temperatures that may occur with future, more efficient gasoline powered vehicles, while still being durable to 150,000 mi with peak temperatures of 960°C. The work included laboratory preparation, aging, and poisoning of catalyst materials, activity tests, and chemical analyses. The objective of this project was to demonstrate progress toward the USDRIVE goal of achieving durable 90% conversion (T90) of hydrocarbons (HC), carbon monoxide (CO), and oxides of nitrogen (NOx) at 150°C. The project partners focused on several supported metal catalyst structures to promote lower light-off temperatures, enhance metal-support interaction, and improve durability. The raw materials (oxides of aluminum, cerium, silicon, titanium, and zirconium) were not new, but were used in novel ways. Palladium (Pd) or rhodium (Rh) were supported either on layered metal oxide supports, on nanoparticles, or used in various core@shell configurations. Catalyst materials were aged hydrothermally to a simulated high mileage. The catalyst formulation with the lowest durable light-off was 0.5 wt% Rh supported on alumina with an overlayer of either Ti or Zr. The temperatures for 90% conversion were up to 128°C lower than those of a commercial Pd three-way catalyst that had > 3x metal loading of the new Rh catalyst. An additional material made of Pd supported on nanoparticles of ceria-zirconia (CZO) was also considered; the aged T90s were up to 40°C lower than the commercial catalyst, at similar metal loading. Further understanding of the catalyst architecture provided additional confidence to move forward with scale-up of 0.5 wt% Rh/Ti/Al 2 O 3 to coated monolith laboratory cores for further evaluation. The team worked with Johnson Matthey to accomplish this, in addition to exploring manufacturability and potential costs. The overall benefit was estimated to be 10-15% lower NMOG and NOx tailpipe emissions on a cold start certification cycle.

02 PETROLEUM↗

Data Compilation for AGR-2 B&W UO₂ Compact Lot LEU11-OP2-Z (Revision 1)

This document is a compilation of characterization data for the candidate AGR-2 B&W UO 2 fuel compact lot LEU11-OP2-Z. The compacts were produced by ORNL for the Advanced Gas Reactor Fuel Development and Qualification (AGR) program for the second AGR irradiation test (AGR-2). This compact lot was fabricated using particle composite LEU11. LEU11 came from Babcock and Wilcox (B&W) coated particle lot G73H-10-93085B, which was an upgraded batch of TRISO-coated 500 μm nominal diameter, 9.6% low enriched uranium oxide kernels (LEU). The AGR-2 TRISO-coated particles consist of a spherical kernel coated with an ~50% dense carbon buffer layer (100 μm nominal thickness), followed by a dense inner pyrocarbon layer (40 μm nominal thickness), followed by a SiC layer (35 μm nominal thickness), followed by another dense outer pyrocarbon layer (40 μm nominal thickness). The kernels were also manufactured by B&W and identified as kernel lot G73AA-10-69308. Two data packages were submitted by B&W containing the acceptance testing results for the kernels and coated particles, these are identified by their lot numbers. A discussion on the coating of the B&W TRISO particles can also be found in INL report INL/EXT-09-16545. A data compilation of ORNL analysis of G73H-10-93085B can be found in ORNL/TM-2009/255. The AGR-2 Fuel Specification (INL SPC-923) provides the requirements necessary for acceptance of the fuel manufactured for the AGR-2 irradiation test. Section 4.3 of SPC-923 provides the property requirements for the heat treated UO 2 compacts. The Statistical Sampling Plan for AGR-2 Fuel Materials (INL PLN-2691) provides additional guidance regarding statistical methods for product acceptance and recommended sample sizes. The procedures for characterizing and qualifying the compacts are outlined in ORNL product inspection plan AGRCHAR- PIP-14. The inspection report forms generated by this product inspection plan document the product acceptance for the property requirements listed in section 4.3 of SPC-923. Prior to compacting, the overcoated particles are characterized per ORNL product inspection plan AGRCHAR- PIP-11 to obtain data needed for calculation of compacting charge weight and matrix density. Riffling of compact charges is also covered by this procedure. Prior to overcoating, the TRISO particles are characterized per ORNL product inspection plan AGR-CHAR-PIP-10 to determine uranium content, obtain data needed for overcoating and compact fabrication, and obtain further data needed for calculation of matrix density. Riffling of overcoater charges is also covered by this procedure. This document contains all the inspection report forms and data report forms generated by these inspection plans. In addition to the characterization data, this report also contains other records relevant to the fuel product acceptance. A history of the material flow and sample naming is included. The overcoating and compacting process is summarized, and a record of the materials used to make the matrix is included. A Certificate of Conformance and any applicable Nonconformance Reports are attached as Appendices.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Operational Planning Strategy for a Sequim Bay Underwater UXO Test Site (SBU2)

The Department of Defense (DoD) has identified more than 400 underwater sites that are potentially contaminated with munitions. Most areas are in shallow water (0-35 m) where the munitions pose a threat to human health and the environment. The Strategic Environmental Research and Development Program (SERDP) and Environmental Security Technology Certification Program (ESTCP) held a workshop in 2018 to establish the requirements, framework, protocols, responsibilities, and time lines for development of a series of underwater UXO Standardized Demonstration sites (“test beds”) for the purpose of testing the efficacy of sensors, equipment, and technologies to detect UXO. The workshop recommended a phased approach to building test beds to capitalize on: 1) incorporation of lessons learned from existing DoD funded projects, 2) leveraging existing underwater test bed environments funded by other programs, and 3) supporting recursive learning from early phases of the test bed development (i.e. efficiently optimizing through a scaling-up approach). This strategy document provides the framework to establish a working operational plan for the Sequim Bay Underwater UXO (SBU2) Test Bed (Phase II). Details of the plan are dependent on earlier phases of the effort as shown in Figure 1. Results from Phase I are being evaluated, and when complete, will inform the next iteration of this plan. As such, it should be considered a living document that will be informed by the lessons learned and updated as new information becomes known and requirements are refined. This approach will allow SBU2 to evolve to meet the needs of the remediation community.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

LLNL Semiannual Wastewater Point Source Monitoring Report (July 2020)

In accordance with the Code of Federal Regulations, Title 40, Part 403.12(e), Lawrence Livermore National Laboratory (LLNL) submits a semiannual monitoring report regarding federally regulated wastewater generating processes (categorical processes) that discharge wastewater to the sanitary sewer system. Attachments A-2 and A-3 of the 2019-2020 Wastewater Discharge Permit #1250 granted to LLNL by the City of Livermore Water Resources Division (WRD) also mandate submission of this report. The LLNL Livermore Site is required to monitor identified electrical and electronic components processes (40 CFR Part 469) and metal finishing processes (40 CFR Part 433) semiannually and to submit monitoring reports in January and July of each year. Under authority delegated to enforce compliance with these regulations, the WRD reviews this report. This report provides information on the significant metal-finishing operations and electrical and electronic component operations located at the Livermore Site during the period from December 1, 2019 through May 31, 2020 and includes descriptions of the LLNL regulated (categorical) processes that discharge to the sanitary sewer. Attachments A-2 and A-3 of the 2019-2020 Wastewater Discharge Permit #1250 provide the list of categorical processes and the required self-monitoring program for point-source discharges at LLNL. The monitoring data collected for this report documents compliance with all federal and local pretreatment limits. Compliance certification accompanies this report, as required by federal regulations.

54 ENVIRONMENTAL SCIENCES↗

Data Compilation for AGC-2 Matrix-only Compact Lot A3-H08

This document is a compilation of fabrication and characterization data for the compact lot A3-H08, which was produced for possible insertion into the second ATR Graphite Creep irradiation test capsule (AGC-2). The compacts were produced by Oak Ridge National Laboratory (ORNL) for the Advanced Gas Reactor Fuel Development and Qualification (AGR) program. This compact lot was fabricated using a graphite/resin blend formulated by INL as a candidate matrix precursor for scale-up of overcoating and compacting processes. The matrix precursor powder for compact lot A3-H08 was a jet milled blend of 64 wt% natural graphite (Asbury 3482), 16 wt% synthetic graphite (Graftech GTI-D), and 20 wt% high purity novolac resin (Hexion D_SD-1708 with 7.5% hexamethylenetetramine added). The “Matrix Compacts for AGC-2 Irradiation” Specification (INL SPC-1285, Rev. 1) provides the requirements necessary for acceptance of the compacts. Sections 2.03 and 2.04 of SPC-1285 provide the property requirements for the heat-treated compacts. There are requirements on the length, diameter, and matrix density. Section 2.02.01.01 further requests impurity analysis on representative samples from the final compact lot, but there are no specified acceptance criteria. The impurity information will be evaluated by INL as part of a final decision on whether to insert the compacts into the AGC-2 experiment. The procedures for characterizing and qualifying the compacts are outlined in ORNL product inspection plan AGR-CHAR-PIP-16. The measurement of compact length, diameter, and matrix density was performed according to data acquisition method AGR-CHAR-DAM-39. The data report forms generated by this procedure document the product acceptance for the property requirements listed in sections 2.03 and 2.04 of SPC-1285. All compacts selected for irradiation conformed to the specified requirements for length, diameter, and density. In addition to the characterization data, this report also contains other records relevant to the product acceptance. A history of the material flow and sample naming is included and the compacting process is summarized. In addition to results of the impurity analysis on representative samples from the final compact lot, impurity analysis results are also provided for samples of the graphite, resin, and the graphite/resin blend. A Certificate of Conformance to SPC-1285, Rev. 1 is attached in Appendix B.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗