Search NASA⌕ Search

SEARCH · Search NASA

Results for “Communication Protocol”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,675 records · Page 93

A critical review of cyber-physical security for building automation systems

Modern Building Automation Systems (BASs), as the brain that enable the smartness of a smart building, often require increased connectivity both among system components as well as with outside entities, such as the cloud, to enable low-cost remote management, optimized automation via outsourced cloud analytics, and increased building-grid integrations. As smart buildings move towards open communication technologies, providing access to BASs through the building's intranet, or even remotely through the Internet, has become a common practice. However, increased connectivity and accessibility come with increased cyber security threats. BASs were historically developed as closed environments with limited cyber-security considerations. As a result, BASs in many buildings are vulnerable to cyber-attacks that may cause adverse consequences, such as occupant discomfort, excessive energy usage, and unexpected equipment downtime. Therefore, there is a strong need to advance the state-of-the-art in cyber-physical security for BASs and provide practical solutions for attack mitigation in buildings. However, an inclusive and systematic review of BAS vulnerabilities, potential cyber-attacks with impact assessment, detection & defense approaches, and cyber resilient control strategies is currently lacking in the literature. This review paper fills the gap by providing a comprehensive up-to-date review of cyber-physical security for BASs at three levels in commercial buildings: management level, automation level, and field level. The general BASs vulnerabilities and protocol-specific vulnerabilities for the four dominant BAS protocols (i.e., BACnet, KNX, LonWorks, and Modbus) are reviewed, followed by a discussion on four attack targets and seven potential attack scenarios. Furthermore, the impact of cyber-attacks on BASs is summarized as signal corruption, signal delaying, and signal blocking. The typical cyber-attack detection and defense approaches are identified at the three levels. Cyber resilient control strategies for BASs under attack are categorized into passive and active resilient control schemes. Open challenges and future opportunities are finally discussed.

97 MATHEMATICS AND COMPUTING↗

Analysis of 2016 Occurrence Reports Involving Electrical Energy

The 04100 Center Director requested an analysis of 2016 occurrence reports (ORs) involving electrical energy be performed to facilitate learning through use of performance assurance methodologies. Preliminarily, 11 reportable events were identified for review; however, this population was updated to 12 during the review. Appendix 1 includes the analysis protocol and a listing of the ORs reviewed. The Team completed its review at the end of October 2016. At that time, causal analysis and associated corrective action information was available for eight events. Elements of this analysis included determining the following: common weaknesses that contributed to electrical events; the quality of causal analysis products with the goal of providing sustainable long-term corrective actions; and how learning from issues, causes, and corrective actions from prior similar events is incorporated into causal analyses for today’s events. As used in this report, the term “trends” was used as a catalyst to determine categories of events for deeper analysis. The content of ORs is important. The information in an OR for a past event can be useful in addressing today’s issues because it provides information on systemic issues that were found and past actions addressing those issues. The effectiveness of those actions as viewed from today’s vantage point is useful input to the determination of corrective actions for current problems. Additionally, as a means of communication to DOE and NNSA, ORs provide a measure of Sandia’s maturity in understanding problems and their solutions.

42 ENGINEERING↗

A guide to NASA's Pilot Land Data System (PLDS)

NASA's Pilot Land Data System (PLDS) is a distributed information management system designed to support NASA's land science community. The PLDS provides a wide range of services including management of information about scientific data, access to a library of scientific data, a data ordering capability, communications, connection to data analysis facilities, and electronic mail. The PLDS provides these services by offering the scientist the capability to search for and order data, and to communicate electronically with other scientists and computers. Three functions enable scientists to find what data are available and where they reside. The first two, Find data summaries and Read detailed descriptions give summary and detailed descriptions about data sets or groups of related data sets, science, projects, and institutions which archive land data. The third, gives information about specific pieces of data. This last function has two components, Search systemwide inventory and Search local inventory. The first component enables the user to find data elements (images, geological samples, transects, maps, etc.) that exist anywhere in the PLDS while the second has only information about data at the local site. The first enables the user to find pieces of data from several different data sets with the same temporal and spatial coverage and other elements common to most data sets, while the second allows the user to select a data set based on these descriptors and on those that are unique to a data set. The PLDS provides capabilities that enable electronic file transfers, intercomputer connection, and electronic mail. Both TCP/IP and DECnet protocols are supported via the NASA Science Internet (NIS). Access is also available through Telenet.

Source record↗

Experimental Evaluation of an Integrated Datalink and Automation-Based Strategic Trajectory Concept

This paper presents research on the interoperability of trajectory-based automation concepts and technologies with modern Flight Management Systems and datalink communication available on many of today s commercial aircraft. A tight integration of trajectory-based ground automation systems with the aircraft Flight Management System through datalink will enable mid-term and far-term benefits from trajectory-based automation methods. A two-way datalink connection between the trajectory-based automation resident in the Center/TRACON Automation System and the Future Air Navigation System-1 integrated FMS/datalink in NASA Ames B747-400 Level D simulator has been established and extensive simulation of the use of datalink messages to generate strategic trajectories completed. A strategic trajectory is defined as an aircraft deviation needed to solve a conflict or honor a route request and then merge the aircraft back to its nominal preferred trajectory using a single continuous trajectory clearance. Engineers on the ground side of the datalink generated lateral and vertical trajectory clearances and transmitted them to the Flight Management System of the 747; the airborne automation then flew the new trajectory without human intervention, requiring the flight crew only to review and to accept the trajectory. This simulation established the protocols needed for a significant majority of the trajectory change types required to solve a traffic conflict or deviate around weather. This demonstration provides a basis for understanding the requirements for integration of trajectory-based automation with current Flight Management Systems and datalink to support future National Airspace System operations.

Mueller, Eric↗

Applications of telemedicine in the United States space program

Since the beginning of human space flight, NASA has been placing humans in extreme and remote environments. There are many challenges in maintaining humans in outer space, including the provision of life-support systems, radiation shielding, and countermeasures for minimizing the effect of microgravity. Because astronauts are selected for their health, among other factors, disease and illness are minimized. However, it is still of great importance to have appropriate medical care systems in place to address illness and injury should they occur. With the exception of the Apollo program, exploration of space has been limited to missions that are within several hundred miles of the surface of the Earth. At the drawn of the 21st century and the new millennium, human exploration will be focused on operation of the International Space Station (ISS) and preparation for human missions to Mars. These missions will present inherent risks to human health, and, therefore, appropriate plans must be established to address these challenges and risks. Crews of long-duration missions must become more independent from ground controllers. New systems, protocols, and procedures are currently being perfected. Application of emerging technologies in information systems and telecommunications will be critical to inflight medical care. Application of these technologies through telemedicine will provide crew members access to information, noninvasive procedures for assessing health status, and guidance through the integration of sensors, holography, decision-support systems, and virtual environments. These technologies will also serve as a basis to enhance training and medical education. The design of medical care for space flight should lead to a redesign of the practice of medicine on Earth.

Review, Tutorial↗

Description of the NASA Hypobaric Decompression Sickness Database (1982-1998)

The availability of high-speed computers, data analysis software, and internet communication are compelling reasons to describe and make available computer databases from many disciplines. Methods: Human research using hypobaric chambers to understand and then prevent decompression sickness (DCS) during space walks has been conducted at the Johnson Space Center (JSC) from 1982 to 1998. The data are archived in the NASA Hypobaric Decompression Sickness Database, within an Access 2003 Relational Database. Results: There are 548 records from 237 individuals that participated in 31 unique tests. Each record includes physical characteristics, the denitrogenation procedure that was tested, and the outcome of the test, such as the report of a DCS symptom and the intensity of venous gas emboli (VGE) detected with an ultrasound Doppler bubble detector as they travel in the venous blood along the pulmonary artery on the way to the lungs. We documented 84 cases of DCS and 226 cases where VGE were detected. The test altitudes were 10.2, 10.1, 6.5, 6.0, and 4.3 pounds per square inch absolute (psia). 346 records are from tests conducted at 4.3 psia, the operating pressure of the current U.S. space suit. 169 records evaluate the Staged 10.2 psia Decompression Protocol used by the Space Shuttle Program. The mean exposure time at altitude was 242.3 minutes (SD = 80.6), with a range from 120 to 360 minutes. Among our test subjects, 96 records of exposures are females. The mean age of all test subjects was 31.8 years (SD = 7.17), with a range from 20 to 54 years. Discussion: These data combined with other published databases and evaluated with metaanalysis techniques would extend our understanding about DCS. A better understanding about the cause and prevention of DCS would benefit astronauts, aviators, and divers.

Wessel, J. H., III↗

Data Communications Performance of AOCDL and AUTOMET Over a VDL Mode 2 Link

Airline Operational Control Data Link (AOCDL) is a service that allows for downlink of in-flight data to help an airline operate efficiently. Automated Meteorological Transmission (AUTOMET) is a weather reporting system that provides forecasts and atmospheric conditions to pilots during flight. These are two examples of new or extended services that will be enabled by implementation of the ATN and its digital air/ground communications data links. One of the possible data links identified for these services is VDL Mode 2. This research focuses on the data link performance of AOCDL and AUTOMET services in a 2015 scenario using VDL Mode 2 as the data link. In the near term, it is expected that the Controller-Pilot Data Link Communication (CPDLC) and Decision Support System Data Link (DSSDL) services will also use the VDL Mode 2 link. CPDLC and DSSDL are high-priority services that communicate aircraft control information and require low end-to-end delays for safety. VDL Mode 3, which is the preferred link for these services because it provides priority-based link access, will not be deployed in time for earlier implementations of these services to use. As such, the research also investigates the impact of CPDLC and DSSDL services on the same VDL link as AOCDL and AUTOMET. Performance of these services over the data link will be separately examined for the airport, terminal, and en route domains. OPNET simulations are performed for each domain. The number of aircraft for each domain is representative of the expected peak aircraft in 2015. Results are collected during a steady-state condition, with aircraft neither entering nor exiting the domain. The study explores the services in terms of the traffic load they present to the VDL Mode 2 radio. The amount of load each service contributes to the data link will be shown for each domain. The end-to-end delays for each service will be discussed. Data link metrics such as subnetwork and queuing delays, channel utilization, and protocol overhead will be used to show the impact of these services on VDL Mode 2. All results will be presented both with and without the inclusion of CPDLC and DSSDL services.

Bretmersky, Steven↗

Nanochanneled Device and Related Methods

A nanochannel delivery device and method of manufacturing and use. The nanochannel delivery device comprises an inlet, an outlet, and a nanochannel. The nanochannel may be oriented parallel to the primary plane of the nanochannel delivery device. The inlet and outlet may be in direct fluid communication with the nanochannel. Considerable advances have been made in the field oftherapeutic agent (e.g. drug) delivery technology over thelast three decades, resulting in many breakthroughs in clinicalmedicine. The creation of therapeutic agent deliverydevices that are capable of delivering therapeutic agents incontrolled ways is still a challenge. One of the majorrequirements for an implantable drug delivery device iscontrolled release of therapeutic agents, ranging from smalldrug molecules to larger biological molecules. It is particularlydesirable to achieve a continuous passive drug releaseprofile consistent with zero order kinetics whereby theconcentration of drug in the bloodstream remains constantthroughout an extended delivery period.These devices have the potential to improve therapeuticefficacy, diminish potentially life-threatening side effects,improve patient compliance, minimize the intervention ofhealthcare personnel, reduce the duration of hospital stays,and decrease the diversion of regulated drugs to abusiveuses.Nanochannel delivery devices may be used in drug deliveryproducts for the effective administration of drugs. Inaddition, nanochannel delivery devices can be used in otherapplications where controlled release of a substance overtime is needed. Embodiments of this invention comprise a nanochanneldelivery device having nanochannels within a structureconfigured to yield high mechanical strength and high flowrates. Various fabrication protocols may be used to form thenanochannel delivery device. Embodiments of the fabricateddevices feature horizontal nanochannel lay-out (e.g., thenanochannel is parallel to the primary plane of the device),high molecule transport rate, high mechanical strength,optional multilayered lay-out, amenability to select channellining materials, and possible transparent top cover. Basedon silicon microfabrication technology, the dimensions ofthe nanochannel area as well as concomitant microchannelareas can be precisely controlled, thus providing a predictable,reliable, constant release rate of drug (or other) moleculesover an extended time period. In certain embodiments,the nanochannel delivery device can be used to builda multilayered nanochannel structure.

Ferrari, Mauro↗

Multiqubit noise deconvolution and characterization

We present a noise deconvolution technique for obtaining noiseless expectation values of noisy observables at the output of multiqubit quantum channels. For any number of qubits or in the presence of correlations, our protocol applies to any mathematically invertible noise model, even when its inverse map is not physically implementable, i.e., when it is neither completely positive nor trace preserving. For a generic observable affected by Pauli noise it provides a quadratic speedup, always producing a rescaling of its Pauli basis components. We show that it is still possible to achieve the deconvolution while experimentally estimating the noise parameters, whenever these are unknown (bypassing resource-heavy techniques such as quantum process tomography). We provide a simulation, with examples for both Pauli and non-Pauli channels.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Gigabit Satellite Network for NASA's Advanced Communication Technology Satellite (ACTS)

The advanced communication technology satellite (ACTS) gigabit satellite network provides long-haul point-to-point and point-to-multipoint full-duplex SONET services over NASA's ACTS. at rates up to 622 Mbit/s (SONET OC-12), with signal quality comparable to that obtained with terrestrial fiber networks. Data multiplexing over the satellite is accomplished using time-division multiple access (TDMA) techniques coordinated with the switching and beam hopping facilities provided by ACTS. Transmissions through the satellite are protected with Reed-Solomon encoding. providing virtually error-free transmission under most weather conditions. Unique to the system are a TDMA frame structure and satellite synchronization mechanism that allow: (a) very efficient utilization of the satellite capacity: (b) over-the-satellite dosed-loop synchronization of the network in configurations with up to 64 ground stations: and (c) ground station initial acquisition without collisions with existing signalling or data traffic. The user interfaces are compatible with SONET standards, performing the function of conventional SONET multiplexers and. as such. can be: readily integrated with standard SONET fiber-based terrestrial networks. Management of the network is based upon the simple network management protocol (SNMP). and includes an over-the-satellite signalling network and backup terrestrial internet (IP-based) connectivity. A description of the ground stations is also included.

Hoder, Douglas↗

Load Disaggregation Technologies: Real World and Laboratory Performance

Low cost interval metering and communication technology improvements over the past ten years have enabled the maturity of load disaggregation (or non-intrusive load monitoring) technologies to better estimate and report energy consumption of individual end-use loads. With the appropriate performance characteristics, these technologies have the potential to enable many utility and customer facing applications such as billing transparency, itemized demand and energy consumption, appliance diagnostics, commissioning, energy efficiency savings verification, load shape research, and demand response measurement. However, there has been much skepticism concerning the ability of load disaggregation products to accurately identify and estimate energy consumption of end-uses; which has hindered wide-spread market adoption. A contributing factor is that common test methods and metrics are not available to evaluate performance without having to perform large scale field demonstrations and pilots, which can be costly when developing such products. Without common and cost-effective methods of evaluation, more developed disaggregation technologies will continue to be slow to market and potential users will remain uncertain about their capabilities. This paper reviews recent field studies and laboratory tests of disaggregation technologies. Several factors are identified that are important to consider in test protocols, so that the results reflect real world performance. Potential metrics are examined to highlight their effectiveness in quantifying disaggregation performance. This analysis is then used to suggest performance metrics that are meaningful and of value to potential users and that will enable researchers/developers to identify beneficial ways to improve their technologies.

Mayhorn, Ebony T.↗

Remediation Guidance for Major Airports after a Bioterrorist Attack

This document provides general guidelines for airport managers, local officials, and other stakeholders for developing a response and recovery plan for a major airport following the release of a biological warfare agent, with specific guidance for remediation. San Francisco International Airport was selected as the example airport during development of the guidance to illustrate specific details. The spore-forming bacterium Bacillus anthracis was selected as the biological agent of primary concern because it is the most difficult of known bioterrorism agents to inactivate and is considered to be one of the agents most likely to be used as a biological weapon. The focus of the guidance is on cleanup and disposal activities associated with the Characterization, Decontamination, and Clearance Phases that are defined herein. Activities associated with the Notification and First-Response Phases are brieÀy discussed in Appendixes A and B, respectively. In addition to the main text of this Remediation Guidance document and associated appendixes, a data supplement was developed specifically for San Francisco International Airport. Requests for the data supplement must be made directly to the Emergency Planning Operations Division of San Francisco International Airport. This document does not describe public health responses to release of a biological warfare agent. If laboratory analytical results confirm the presence of a biological agent, the responsible public health agency involved in the response will commence appropriate public health actions, such as treatment (CDC 2004) and decontamination of potentially contaminated individuals, distribution of prophylaxis, and medical examinations. See the Centers for Disease Control and Prevention web site for more information on emergency public health responses (http://www.bt.cdc.gov/). Effective communication with the media and the public is an essential component of airport remediation and recovery. Whereas such communication is beyond the scope of this document, many helpful resources are available. (See Section 1.1 for more information.) The concept of operations described in this document for cleanup of a Bacillus anthracis release at a major airport conforms to the National Response Framework (NRF) (DHS 2008) and implementation of the National Incident Management System (NIMS 2004). In most cases, a Unified Command would be formed to direct the cleanup process jointly and to take ultimate responsibility for all cleanup decisions. The Unified Command would likely include the Airport Manager or Airport Emergency Operations Manager, representatives from state and local public health and emergency management agencies, and Federal agencies, such as the U.S. Environmental Protection Agency. The Unified Command and Incident Command Staff would ideally be co-located in an Incident Command Post in an uncontaminated area of the airport. If a release is large or complex, co-location of all key players may not be possible. If a major incident is declared, a Principal Federal Official may be appointed by the Department of Homeland Security to facilitate Federal support to the Unified Command. In some facilities and jurisdictions, additional response plans or procedures (such as BioWatch or other emergency response plans, procedures, or protocols) may govern notification and first response. Facility personnel, responders, and emergency management coordinators should be aware of all applicable plans and procedures and how to implement them. Cleanups following the anthrax attacks of 2001 in the U.S. pre-dated the NRF and NIMS and did not make use of a NIMS Incident Command System as we know it today. Most Incident Commanders for the larger of those cleanups chose to convene a Technical Working Group (TWG) of multi-agency, multi-disciplinary, outside experts to advise in developing sampling and decontamination plans. Most of the Incident Commanders also convened a separate Environmental Clearance Committee (ECC) to independently review pre- and post decontamination sampling data as well as data on decontamination parameters, to evaluate whether the decontamination was effective, and to add credibility regarding a decision that decontaminated areas may be reoccupied. Use of such specialized technical expertise is strongly recommended, although it would now operate within the construct of the NIMS Incident Command System. The TWG, if convened, would act in an advisory capacity to the Environmental Unit within the Planning Section. Likewise, the ECC, if convened, would provide independent peer review of products and recommendations by the Environmental Unit. For maximum impartiality, the ECC could also provide recommendations directly to the Unified Command. Cleanup activities commence with site characterization. The principal goal of characterization is to define the extent of contamination and to gather information needed to design the decontamination approach. Initial sampling data collected by first responders are assessed to approximate the location(s) of contamination. Confirmation of the agent type and viability is obtained from a Laboratory Response Network laboratory. Additional characterization data are collected to determine the extent of contamination and where decontamination actions are needed. Areas suspected of being contaminated are contained and isolated to the degree possible to prevent further movement of an agent to uncontaminated areas or the environment, and to reduce the potential for future exposure from the agent or fumigant, if fumigation is needed. Agent air monitoring in areas adjacent to the contained contamination zones is done to ensure the protection of remediation personnel and to monitor any release from the contained zones. Various sampling approaches are considered. For example, wipe samples can be used to sample hard, nonporous surfaces. Swab samples can be used to sample nooks, crannies, joints, and seams. Appendix I is a template for preparing an incident-specific, operational characterization plan. Upon completion of the characterization plan, an internal review is initiated. Upon approval of the plan by the Unified Command, characterization commences. The Site Safety Officer develops a Health and Safety Plan to ensure that coordinated health and safety measures are in place for all responding personnel. This plan describes physical, chemical, and biological hazards at the site, personal protective equipment, personal decontamination procedures, and emergency procedures to be used by sampling and remediation personnel. An incident-specific Remediation Action Plan is developed, which describes the decontamination methods to be used and other details, including waste disposal. Under NIMS, this overall plan, as well as other plans described below, are implemented through a series of standardized, shorter-term Incident Action Plans, which describe specific activities that will take place during a shift or a day. The template in Appendix J is designed to facilitate preparation of the Remediation Action Plan. If fumigation will be done, a Sampling and Analysis Plan will be needed, as well as an Ambient Air Monitoring Plan, which can be a component of the Remediation Action Plan. These three plans are needed to obtain a crisis exemption from the U.S. Environmental Protection Agency for authorized use of an unregistered sterilant or pesticide during cleanup. If pesticide products become registered for inactivation of B. anthracis in the future, the three plans will likely be required by the product’s labeling, but the plans would no longer be submitted to the U.S. Environmental Protection Agency for approval; rather, the Incident Commander would approve them. If fumigation is used, an Emergency Response Plan is also recommended, although such a plan is not required for a crisis exemption. For some nonpersistent biological warfare agents, natural attenuation may be an adequate decontamination option. In cases where contamination is not extensive or an agent is not persistent, application of surface decontaminants or other methods of medical infection control may be effective. For extensive contamination by persistent agents, such as Bacillus anthracis, fumigation may be necessary. In those cases, the Decontamination Phase commences with source reduction, such as pre-cleaning surfaces to reduce the contaminant load. To expedite cleanup and prevent costs from escalating unnecessarily, a cost–benefit analysis should be incorporated in the decision process related to retention versus disposal of facility items and materials. Certain materials and structural components can be decontaminated for reuse, but it may not be feasible or cost-effective to decontaminate other items. Those items must be pre-treated, packaged (with the package decontaminated externally), and removed for disposal as waste. Site preparation includes sealing openings to prevent leaks and setting up equipment. Decontamination reagents and delivery systems are selected, and pre-testing all systems is done before carrying out chemical treatment(s). The important choice of decontamination technologies depends on characteristics of the agent, the nature and extent of contamination, and other site parameters identified during characterization. Decontamination-related decisions can have a major impact on waste-disposal costs, and it is necessary to develop a disposal plan that identifies a means of disposal, necessary approvals, transportation, and other details. A clearance strategy is developed to ensure that after decontamination, the risk of exposure to residual contamination is negligible. A clearance sampling plan is developed, which sets clearance criteria, specifies how to determine whether the criteria have been met, and describes how and where to collect clearance samples after decontamination. In most cases, clearance sampling includes both surface and aggressive air samples. Appendix K is a clearance plan template that identifies the types of required information. To determine whether the decontaminated area may be reoccupied, the Environmental Unit (and the ECC separately, if one is convened) evaluates the results of clearance samples. For the anthrax incidents to date, and given methods that have been used, cleanup was considered successful only when there was no growth of B. anthracis cultured from any environmental samples taken after decontamination. Other factors that will be considered include the decontamination process parameters (e.g., temperature, relative humidity, decontaminant concentration, and contact time) and the results from post-decontamination culture of biological indicators that may have been used during fumigation or sterilization processes. From such an evaluation the Environmental Unit or ECC, or both, recommend whether the area may be reoccupied, or whether further decontamination is necessary. The UC makes the final decision that a facility is appropriately decontaminated for reoccupancy. The facility owner or responsible public health agency makes the final decision to reopen a decontaminated facility. A theme that is emphasized throughout this document is that many activities can greatly reduce the time required to restore airport operations if those activities are conducted prior to an actual release of biological warfare agent. A summary of specific resources (such as Federal, state, and local agency contacts; contractors; prospective team members; subject-matter experts; laboratory facilities; and other entities) that should be identified in advance by airport officials is provided in each pertinent section of this document, and summary contact lists of such resources are provided in Appendix L. A summary of overall pre-planning actions that should be completed by airport officials is presented at the end of this document.

59 BASIC BIOLOGICAL SCIENCES↗

The Nuclear Energy Knowledge and Validation Center – Summary of Activities Conducted in FY15

The Nuclear Energy Knowledge and Validation Center (NEKVaC) is a new initiative by the Department of Energy and the Idaho National Laboratory to coordinate and focus the resources and expertise that exist with the DOE Complex toward solving issues in modern nuclear code validation. In time, code owners, users, and developers will view the Center as a partner and essential resource for acquiring the best practices and latest techniques for validating codes, for guidance in planning and executing experiments, for facilitating access to, and maximizing the usefulness of, existing data, and for preserving knowledge for continual use by nuclear professionals and organizations for their own validation needs. The scope of the center covers many inter-related activities which will need to be cultivated carefully in the near-term and managed properly once the Center is fully functional. Three areas comprise the principal mission: 1) identification and prioritization of projects that extend the field of validation science and its application to modern codes, 2) adapt or develop best practices and guidelines for high fidelity multiphysics/multiscale analysis code development and associated experiment design, and 3) define protocols for data acquisition and knowledge preservation and provide a portal for access to databases currently scattered among numerous organizations. These mission areas, while each having a unique focus, are inter-dependent and complementary. Likewise, all activities supported by the NEKVaC, both near-term and long-term), must possess elements supporting all three. This cross-cutting nature is essential to ensuring that activities and supporting personnel do not become ‘stove-piped’, i.e. focused so much on a specific function that the activity itself becomes the objective rather than the achieving the larger vision. Achieving the broader vision will require a healthy and accountable level of activity in each of the areas. This will take time and significant DOE support. Growing too fast (budget-wise) will not allow ideas to mature, lessons to be learned, and taxpayer money to be spent responsibly. The process should be initiated with a small set of tasks, executed over a short but reasonable term, that will exercise most if not all aspects of the Center’s potential operation. The initial activities described in this report have a high potential for near-term success in demonstrating Center objectives but also to work out some of the issues in task execution, communication between functional elements, and the ability to raise awareness of the Center and cement stakeholder buy-in. This report begins with a description of the Mission areas; specifically the role played by each and the types of activities for which they are responsible. It then lists and describes the proposed near-term tasks upon which future efforts can build.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Facilitating Data Collection of Maintenance Events to Populate the Hydrogen Component Reliability Database (HyCReD)

The Hydrogen Component Reliability Database (HyCReD) is a collaborative project between the National Renewable Energy Laboratory, the University of Maryland, and hydrogen stakeholders to improve safety and reliability for hydrogen facilities by implementing component reliability data taxonomies that support hydrogen infrastructure failure rate analysis. The project aims to quantify failure rates of hydrogen components through high-quality data collection and analysis on root causes and maintenance needed. HyCReD provides a common database for cataloging hydrogen component failures which exists for reliability research in many other mature industries [2]. The database fills a gap for the hydrogen community by providing a scientifically rigorous approach to quantitative risk assessment (QRA), prognostic health management (PHM), and reliability-centered maintenance (RCM) analysis. High level results will be aggregated and anonymized to protect company sensitive information; detailed results will be used to help address issues of hydrogen components. These advanced analytics will support accelerated deployment of hydrogen infrastructure by enabling better: design and safety of projects (safety codes and standards development), infrastructure reliability and cost (component failure rates, maintenance protocols), and component R&D needs (robust supply chain). A key to a successful HyCReD implementation is facilitating the ease of reporting and data quality in the database that can be used for analysis. Maintenance data was a previously identified gap in initial efforts to populate and validate the database taxonomies [3]. Collection of maintenance data will be instrumental in identifying failure modes and rates, identifying incipient component failures or reduced performance, cataloging best practices for maintenance routines and methods for prognostic health management, and quantifying the risk and effect of different failure modes. Several key priorities are identified for streamlined data collection to achieve quality and detailed failure data: Applicability, Ease of Use, Accessibility, and Information Security. The HyCReD team has now begun deployment of the database to several companies and groups that have signed non-disclosure agreements to facilitate the data collection of failures in industry hydrogen refueling station infrastructure. This paper will provide an update into the process of HyCReD deployment including the development of a coding guide for facility personnel to reference and ensure data quality and consistency from one station to another as well as implementation of contextually dependent data fields of system taxonomy and formatted entries to provide ease of use. The goal is to communicate the lessons learned from the roll-out to technicians and engineers in the field, and the addition of need for high level of security to protect all stakeholders.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Virtual machine-based simulation platform for mobile ad-hoc network-based cyber infrastructure

In modeling and simulating complex systems such as mobile ad-hoc networks (MANETs) in de-fense communications, it is a major challenge to reconcile multiple important considerations: the rapidity of unavoidable changes to the software (network layers and applications), the difficulty of modeling the critical, implementation-dependent behavioral effects, the need to sustain larger scale scenarios, and the desire for faster simulations. Here we present our approach in success-fully reconciling them using a virtual time-synchronized virtual machine(VM)-based parallel ex-ecution framework that accurately lifts both the devices as well as the network communications to a virtual time plane while retaining full fidelity. At the core of our framework is a scheduling engine that operates at the level of a hypervisor scheduler, offering a unique ability to execute multi-core guest nodes over multi-core host nodes in an accurate, virtual time-synchronized manner. In contrast to other related approaches that suffer from either speed or accuracy issues, our framework provides MANET node-wise scalability, high fidelity of software behaviors, and time-ordering accuracy. The design and development of this framework is presented, and an ac-tual implementation based on the widely used Xen hypervisor system is described. Benchmarks with synthetic and actual applications are used to identify the benefits of our approach. The time inaccuracy of traditional emulation methods is demonstrated, in comparison with the accurate execution of our framework verified by theoretically correct results expected from analytical models of the same scenarios. In the largest high fidelity tests, we are able to perform virtual time-synchronized simulation of 64-node VM-based full-stack, actual software behaviors of MANETs containing a mix of static and mobile (unmanned airborne vehicle) nodes, hosted on a 32-core host, with full fidelity of unmodified ad-hoc routing protocols, unmodified application executables, and user-controllable physical layer effects including inter-device wireless signal strength, reachability, and connectivity.

97 MATHEMATICS AND COMPUTING↗

Essential SpaceWire Hardware Capabilities for a Robust Network

The Geostationary Operational Environmental Satellite R-Series Program (GOES-R) mission is a joint program between National Oceanic & Atmospheric Administration (NOAA) and National Aeronautics & Space Administration (NASA) Goddard Space Flight Center (GSFC). GOES-R project selected SpaceWire as the best solution to satisfy the desire for simple and flexible instrument to spacecraft command and telemetry communications. GOES-R development and integration is complete and the observatory is scheduled for launch October 2016. The spacecraft design was required to support redundant SpaceWire links for each instrument side, as well as to route the fewest number of connections through a Slip Ring Assembly necessary to support Solar pointing instruments. The final design utilized two different router designs. The SpaceWire standard alone does not ensure the most practical or reliable network. On GOES-R a few key hardware capabilities were identified that merit serious consideration for future designs. Primarily these capabilities address persistent port stalls and the prevention of receive buffer overflows. Workarounds were necessary to overcome shortcomings that could be avoided in future designs if they utilize the capabilities, discussed in this paper, above and beyond the requirements of the SpaceWire standard.

SpaceWire↗

Space Mobile Network (SMN) User Demonstration Satellite (SUDS) for a Practical On-Orbit Demonstration of User Initiated Services (UIS)

This paper will discuss the various aspects of implementation of the Space Mobile Network (SMN) architecture framework within the context of operations of various nodes equipped with the User Initiated Services (UIS) protocol. These aspects include development of a Client-Server architecture in which space based Clients can create links with ground based Servers to negotiate passes with ground stations or contacts with the Tracking and Data Relay Satellite (TDRS) fleet. A key feature of this concept is that Users may require a mix of low data rate continuous contacts with one or more of the TDRS fleet and sporadic contacts with ground stations as passes become available. SUDS (SMN User Demonstration Satellite) will have the availability of TDRS contacts, the U.S. Naval Academy's ground station, NASA Near Earth Network ground sites and others. This mode of operations must be integrated within the traditional mode of scheduling contacts and passes. Thus, SUDS fits into a heterogeneous network operations concept of operations.

CubeSat and Autonomy↗

Weather-Corrected Performance Ratio

Photovoltaic (PV) system performance depends on both the quality of the system and the weather. One simple way to communicate the system performance is to use the performance ratio (PR): the ratio of the electricity generated to the electricity that would have been generated if the plant consistently converted sunlight to electricity at the level expected from the DC nameplate rating. The annual system yield for flat-plate PV systems is estimated by the product of the annual insolation in the plane of the array, the nameplate rating of the system, and the PR, which provides an attractive way to estimate expected annual system yield. Unfortunately, the PR is, again, a function of both the PV system efficiency and the weather. If the PR is measured during the winter or during the summer, substantially different values may be obtained, making this metric insufficient to use as the basis for a performance guarantee when precise confidence intervals are required. This technical report defines a way to modify the PR calculation to neutralize biases that may be introduced by variations in the weather, while still reporting a PR that reflects the annual PR at that site given the project design and the project weather file. This resulting weather-corrected PR gives more consistent results throughout the year, enabling its use as a metric for performance guarantees while still retaining the familiarity this metric brings to the industry and the value of its use in predicting actual annual system yield. A testing protocol is also presented to illustrate the use of this new metric with the intent of providing a reference starting point for contractual content.

14 SOLAR ENERGY↗