At least 1,675 records · Page 93

Grid Strength Analysis for Integrating 30 GW of Offshore Wind Generation by 2030 in the U.S. Eastern Interconnection: Preprint

Offshore wind is a key player in the transition to a decarbonized electric gird, and the United States has set ambitious goals of integrating 30 GW of offshore wind capacity by 2030 and 110 GW by 2050. To facilitate this integration, the National Renewable Energy Laboratory and the Pacific Northwest National Laboratory are conducting the Atlantic Offshore Wind Transmission Study to assess transmission solutions. To achieve the 110-GW target by 2050, meticulous planning for network expansion and resource allocation is essential; however, meeting the 2030 goals requires integrating offshore wind power with minimal system upgrades, thus necessitating a careful study of grid strength and stability. The study team developed the Grid Strength Analysis Tool (GSAT) to assess system strength under various operating conditions and contingencies, focusing on the proposed integration of 30 GW of offshore wind power by 2030. In this paper, we provide a summary of key features of the GSAT software and results of the grid strength analysis for integrating 30 GW of offshore wind generation by 2030 in the U.S. Eastern Interconnection.

Automated System-wide Strength Evaluation Tool (AS↗

Waste Feed Delivery Planning at Hanford - 13232

The Integrated Waste Feed Delivery Plan (IWFDP) describes how waste feed will be delivered to the Waste Treatment and Immobilization Plant (WTP) to safely and efficiently accomplish the River Protection Project (RPP) mission. The IWFDP, which is integrated with the Baseline Case operating scenario, is comprised of three volumes. Volume 1 - Process Strategy provides an overview of waste feed delivery (WFD) and describes how the WFD system will be used to prepare and deliver feed to the WTP based on the equipment configuration and functional capabilities of the WFD system. Volume 2 - Campaign Plan describes the plans for the first eight campaigns for delivery to the WTP, evaluates projected feed for systematic issues, projects 242-A Evaporator campaigns, and evaluates double-shell tank (DST) space and availability of contingency feed. Volume 3 - Project Plan identifies the scope and timing of the DST and infrastructure upgrade projects necessary to feed the WTP, and coordinates over 30 projectized projects and operational activities that comprise the needed WFD upgrades. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Quantifying Contaminant Mass for the Feasibility Study of the DuPont Chambers Works FUSRAP Site - 13510

The U.S. Army Corps of Engineers (USACE) - Philadelphia District is conducting an environmental restoration at the DuPont Chambers Works in Deepwater, New Jersey under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Discrete locations are contaminated with natural uranium, thorium-230 and radium-226. The USACE is proposing a preferred remedial alternative consisting of excavation and offsite disposal to address soil contamination followed by monitored natural attenuation to address residual groundwater contamination. Methods were developed to quantify the error associated with contaminant volume estimates and use mass balance calculations of the uranium plume to estimate the removal efficiency of the proposed alternative. During the remedial investigation, the USACE collected approximately 500 soil samples at various depths. As the first step of contaminant mass estimation, soil analytical data was segmented into several depth intervals. Second, using contouring software, analytical data for each depth interval was contoured to determine lateral extent of contamination. Six different contouring algorithms were used to generate alternative interpretations of the lateral extent of the soil contamination. Finally, geographical information system software was used to produce a three dimensional model in order to present both lateral and vertical extent of the soil contamination and to estimate the volume of impacted soil for each depth interval. The average soil volume from all six contouring methods was used to determine the estimated volume of impacted soil. This method also allowed an estimate of a standard deviation of the waste volume estimate. It was determined that the margin of error for the method was plus or minus 17% of the waste volume, which is within the acceptable construction contingency for cost estimation. USACE collected approximately 190 groundwater samples from 40 monitor wells. It is expected that excavation and disposal of contaminated soil will remove the contaminant source zone and significantly reduce contaminant concentrations in groundwater. To test this assumption, a mass balance evaluation was performed to estimate the amount of dissolved uranium that would remain in the groundwater after completion of soil excavation. As part of this evaluation, average groundwater concentrations for the pre-excavation and post-excavation aquifer plume area were calculated to determine the percentage of plume removed during excavation activities. In addition, the volume of the plume removed during excavation dewatering was estimated. The results of the evaluation show that approximately 98% of the aqueous uranium would be removed during the excavation phase. The USACE expects that residual levels of contamination will remain in groundwater after excavation of soil but at levels well suited for the selection of excavation combined with monitored natural attenuation as a preferred alternative. (authors)

54 ENVIRONMENTAL SCIENCES↗

Uncertainty in decommissioning, the benefits of 3D simulation - 15124

Any industrial plant whatever the industry is will face its end of life. In the nuclear field decommissioning is inevitable for returning to green. Because of the specificity of each plant, decommissioning projects are never the same. The choice of a specific strategy for each operation during a scenario has cascade consequences on the generated waste, extension of due date, costs and risks. Decommissioning in nuclear industry is a new domain where countries have a limited experience. When starting a decommissioning project engineers have to gather some data needed for planning and realizing the best scenario strategy. Scenario which should consider the costs, waste management, received dose and the planning. The quality of the input data has a strong influence on the risks and should be analyzed with care to reduce all doubts for the study. Nuclear plants running decommissioning programs concerns old plants with poorly documented history resulting in missing or uncertain data. The ambient dose rate is not always well-known as dose measurement or samples have not been taken or updated for many years. This kind of data may vary quite a lot when radiological events happen. An efficient way to reduce contingencies is to go through simulations. It allows determining the best scenario strategy for each set of data while evaluating the influence of all uncertainties. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning costs - some international perspectives and initiatives. Presentation for Panel discussion. Session No. 024: 'Getting a Handle on Decommissioning Costs - a Global Perspective'

Financing for decommissioning: Are the cost estimates valid? Are the financing arrangements suitable? Are the fund management systems appropriate? Cost estimates are estimated, analysed and updated on a regular basis, but cost comparisons are not straight-forward. There is an incomplete understanding of variability between estimates. Multiple internal and external factors impact estimates: Institutional, legal and policy, purpose, Strategies and plans, overall context, Facility characteristics and history Contingencies and risk, Limited actual cost data. The financing arrangements: there exists a range of systems in place for the implementation of Funding Policy and Strategy, but there are Considerable variations in: Calculating funding requirements, contributions/provisions, Allocating risks and requirements for securities Managing funds and accounting, adjusting the system, Managing disbursements, Reporting and supervision. All cost estimates for future decommissioning activities include considerable uncertainties. These uncertainties will gradually diminish with growing experience from current and planned projects. Different costing methods have different data requirements. Their reliability depends on the extent to which various data are available and applicable to the specific case being considered. Independent of the assessment method, some uncertainty is inevitable in all estimates of future costs. Analysis of the costing method may be useful in order to locate the key uncertainties in each specific estimate. NEA's Decommissioning Cost Estimation Group (DCEG) was Created in 2008 to foster the exchange of information and experience. It Aims to enhance the credibility, reliability, and auditability of the cost estimation process. It Helps define international good practices in decommissioning cost estimation. However, some major challenges remain. Weaknesses in: Understanding relations between estimates and actual costs, Lack of relevant cost data, sharing data. How might be addressed: Improved sharing of cost data, Systematic analyses of estimates and actual costs, Developing benchmarking approaches.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Global Solutions Through Simulation For Better Decommissioning - 16457

Each nuclear facility is different due to their history and there is no rule for choosing a decommissioning strategy. There are three major decommissioning strategies. First, 'immediate dismantling', which means the decommissioning begins immediately after the transfer of waste and nuclear material. Second, 'deferred dismantling strategy', meaning the facility is maintained into a containment zone from thirty to one hundred years before being decommissioned. Finally, 'entombment', referring to the placement of the facility into a reinforced containment until the radionuclides decay and reach a level allowing the site release. When a strategy is decided many factors have to be taken into account. Into a major project such as a reactor decommissioning, there are many smaller projects and the decommissioning strategy can be different among these smaller projects. Very often, some entry data are not perfectly known, for example, the dosimetric activity has not been updated through time or after specific events. Because of uncertainties and/or hypothesis existing around projects and their high level of interdependency, global solutions are a good way to choose the best decommissioning strategy. Especially since each entry data has consequences on output results whether it is on costs, cumulated dose, waste or delays. Also the dose, delays or waste management, all have impact on costs. To obtain an optimal scenario into a special environment, it is necessary to deal with all these items together. This global solution can be implemented thanks to simulation in dedicated software which helps define the global strategy, optimize the scenario, and prevent contingencies. For a specific environment, when many scenarios have been developed and simulated, sensitivity studies are really important to choose the optimal decommissioning strategy. Sensitivity studies can be done with simulation tools by comparing results of scenarios directly into the software. This comparison helps to choose the optimal scenario according to which output data is considered as key determinant. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning Cost Estimate Uncertainty: What is It, How Do You Deal with It? - 16527

The issue of decommissioning cost estimate uncertainty has returned to plague the industry. As we gain more hands-on experience, the expectations are that the cost estimates for future projects should be more accurate and the uncertainties reduced. To some extent this is true, but there remains the issue of how to deal with the major elements of uncertainty of allowances, contingency and risk. The OECD/NEA and the IAEA have joined forces through its member states and outside consultants to bring definition and insight into how to deal with uncertainty. The author has been a participant in this joint organization effort since the outset two years ago. This paper will present the current state-of-the-art in the definitions, approaches, and limitations in the topic of uncertainty. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessing Cumulative Impacts from Source Units within Hanford's Inner Area - 16546

The Central Plateau area at the Hanford Site has a complex mix of waste sites in several operable units, with many co-mingled source contamination and groundwater plumes. A key component of the evaluation process involves a planned assessment of the potential cumulative impacts resulting from co-mingled plumes and potential contribution from waste sites sources throughout the Inner Area, about 26 million square meters (10 square miles) area located in the middle of the Central Plateau. This assessment will evaluate the fate and transport of contamination at each waste site and remedial actions at those waste sites, providing an integrated vadose zone and groundwater fate and transport assessment. Although DOE's goal is to remediate the entire Inner Area to meet standard requirements in the National Contingency Plan (NCP), the complexity of the contamination including continuing contaminant sources in the Inner Area may not allow restoration of groundwater in a reasonable timeframe. DOE and regulatory agencies may need to evaluate the technical practicability of remedial actions and the potential for establishment of one or more waste management areas where drinking water standards can be obtained and maintained. The cumulative impacts evaluation is the tool to evaluate remedial action effects across source and groundwater operable units, contribute to technical impracticability evaluations, support remedial design and remedial process optimization efforts, identify additional monitoring requirements, and evaluate standard and conditional points of compliance for use considering all contaminant sources and groundwater plumes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pathways towards Valid Data: Assessment of Optimized Packaging Strategies for Core Components - 18158

Every company that runs nuclear power plants needs a strategy for disposal of the radioactive waste and for decommissioning and dismantling of its nuclear reactors. The dismantling progress of several German NPPs is already in an advanced stage. Hence, particularly highly activated core components have to be disposed of as radioactive waste. Nevertheless, this is also an issue during the operating phase due to necessary replacements of highly activated core components such as PWR control elements or RPV heads. The conditioning of waste packages for final disposal in the German repository Konrad requires the core components to be dismantled, packaged and dried. Therefore, a qualified packaging strategy is needed to ensure a reliable compliance with the protection objectives of the repository and an optimized utilization of prescribed contingents. Exemplified by PWR control elements a pathway is drawn how to perform an optimized packaging strategy in compliance with the protection objectives of the repository based on only few relevant radionuclides derived from activation calculations. For these calculations, particularly the influence of trace impurities in the materials has to be considered and their amounts have to be verified or analyzed by sampling. Furthermore, low nuclide activities from contamination cannot simply be neglected because some of them are obliged to be declared or their radiological relevance has not been sufficiently determined. Due to various influence factors, qualified sampling strategies need carefully considered concepts. Therefore, detailed planning facilitates the qualification and approval process and reduces the costs for analyses and the number of containers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation Residential Properties Contaminated with LLRW as Part of the Port Hope Area Initiative - The Importance of Effective Community Consultation - 18591

The Port Hope Area Initiative (PHAI) is a community-based solution for the long-term management of historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the urban setting of Port Hope, Ontario. The Eldorado refinery, on the shores of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium ore. Process residues were deposited at the Welcome Waste Management Facility in the Municipality of Port Hope until the mid-1950's switching to the Port Granby Waste Management Facility (PGWMF), which continued to accept waste until the late 1980's. Within the community of Port Hope, surveys are being conducted at approximately 4800 individual properties to identify the presence of LLRW resulting from fugitive emissions from the refinery and/or the use of refinery residue as construction backfill within the community. Identification of the presence of LLRW is based on multiple lines of evidence including reviews of historical information, gamma radiation surveys and physical sampling of soil for the presence of four signature contaminants. Of the 4800 properties being surveyed, it is expected that approximately 10% will contain some degree of LLRW requiring physical remediation. Many of the residences requiring remediation will require extensive soil removal, removal and restoration of outbuildings, fences and other structures, and the removal of mature trees, hedges and decorative gardens. For the property owners involved this phase represents the final and most intrusive aspect of the program. As such, the remedial designs must be sensitive to the needs of the community and individual property owners taking into consideration factors such as the need to minimize the disturbance to the neighborhood; maintaining geotechnical and structural stability of homes during excavations; removal and restoration of outbuildings affected by LLRW; removal and replacement of landscaping features (decks, fences, pools etc) and mature trees; radiation protection during earthworks; control of dust and noise; and maintaining safe access by residents. As Community satisfaction is a key metric for the success of the project, constant and effective communication at all stages of the project is necessary to ensure the residents understand the nature and extent of work to be undertaken; any and all inconveniences they can expect during the work; contingencies to deal with those inconveniences (e.g. parking, garbage collection etc); measures to protect their health and safety; scheduling; and what their property will look like at the completion of works. This paper provides an overview of the residential remediation program in Port Hope and describes the consultation efforts with property owners that are integral to the development of final designs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Theoretical Calculation and Simulation Studies of Axisymmetric Plasma and Halo Current Analysis in EAST

A new technology for developing fusion energy is to use hydrogen isotopes i.e., deuterium (D) and tritium (T) which is a combine effort for building up of International Thermonuclear Reactor (ITER) named as Tokamak, which will come into operation in 2020. Handsome amount of work has already been done by many researchers contingent with plasma shape, halo current and plasma equilibrium properties by numerical techniques. Halo current calculation is the most important work in fusion reactors. In this paper, we have calculated halo current and plasma cross-section energy. The research covers calculation of plasma energy and determines the force on the vessel by magnetic field transformation method, which is the essential part of calculating halo current. Further, we have developed VDE up/down halo current models. These models give total magnetic field, asymmetric forces, conducting points and poloidal halo current. Confined plasma by magnetic field is considered to be an abundant and durable source of energy for future aspects. In this paper, plasma magnetic field of each cross section was calculated by using energy integral. Transformation method has been successfully applied which provides the connection between major sideways forces acting on the plasma. Theoretical investigation and analyses of halo current have successfully been done. Two observations were analyzed, large ratio of halo current during VDE down and cancellation of specific forces at conducting point. The results obtained will be useful for equalizing the simulation and experimental results. The research will be extended to developed new models for future fusion research. (authors)

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Certifying the Performance of Fixative Technologies under Open Air Demolition Activities for D and D - 20096

Department of Energy (DOE) facilities undergoing deactivation and decommissioning (D and D) activities struggle with safety concerns of residual radioactive contamination leftover after gross decontamination efforts have concluded. The positive effects of implementing fixative technologies for decommissioning and maintenance is known across the DOE complex. However, there is no standardized metric in place that quantifies the performance of these technologies such as incombustible fixative platforms that immobilize the contamination in a solid polymer material under normal operating conditions or when exposed to stressors. The primary focus of this research is to provide the empirical data necessary to properly characterize the effects of implementing fixative technologies on mitigating the release of contamination. In addition, this effort has been used to identify and establish uniform testing protocols to quantify operational parameters of fixating platforms and properly credit such systems under a variety of operational conditions and stressors that can arise during open air demolition efforts (e.g. impact, water, thermal, etc.). The established protocols will be provided to the ASTM International E10.03 Subcommittee on Radiological Protection for Decontamination and Decommissioning of Nuclear Facilities and Components for the potential of formal standardization. Attributes to be addressed during testing are material compromise from impact stress, thermal stress for incombustible fixative materials, and immobilization factors (how well an immobilizing platform is capable of retaining fixated material during thermal and impact stressors). In developing these test methods, a greater understanding of the material's behavior under anticipated and unanticipated events, such as decommissioning activities and contingency events as outlined in the Basis of Interim Operations (BIO), can be successfully characterized. There are several key components of the experimental methodology that is essential in empirically certifying fixative technologies. A surrogate contaminant with a unique signature has been utilized with the implementation of a uniform contamination process of test coupons that is quantifiable and replicable for direct fixative comparisons. A modular test chamber has also been used to apply the various stressors of interest. Collection of released contamination that includes airborne and resettled contaminant particles and analyzed using mass spectrometry. This research directly supports DOE complex-wide concerns in terms of final disposition of nuclear facilities and the considerations made during their time between ceasing facility operation and final disposition. The results of this effort aims to provide a standardized road map and logical decision flow to better facilitate fixative technologies into D and D activities required to achieve the desired facility end state. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Excavation Volume Growth Factors at Environmental Remediation Sites - 20318

The U.S. Army Corps of Engineers (USACE) manages numerous environmental remediation projects in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, otherwise known as CERCLA. These include projects for the Formerly Utilized Sites Remedial Action Program (FUSRAP). Utilizing the CERCLA framework to address these projects requires detailed cost estimates and a significant portion of costs are associated with the volume of material to be excavated and that material's final disposition. Accordingly, understanding the expected volumes and uncertainty associated with those volumes is vital to project cost estimating. These estimates are completed at various stages of the CERCLA process, thus the project team has varying degrees of information available from which to develop these estimates depending on how far along the project is. Understanding the factors contributing to volume growth (increase in volume of material from that originally estimated) is a crucial element to determining volume and cost uncertainty. This paper presents a case study of a FUSRAP site which involves excavation and offsite disposal of contaminated soils from complex commercial, industrial, and residential properties. Original volume estimates were compared to post excavation volumes on a property by property basis. Reasons for differences are determined along with magnitude of impacts to cost estimating. For both residential and commercial property types, volume estimating factors, uncertainty considerations, and methods to account for each are discussed with emphasis on volume growth considerations. Cost estimating model input considerations are discussed with specific emphasis on accounting for volume uncertainty at the Feasibility Study (FS) phase of CERCLA. Underestimating or overestimating costs at the FS phase has repercussions under CERCLA that may impact project close out or completion schedule. Discussions presented will be helpful to both reviewers and preparers of cost estimates involving excavations. Additionally, project planners may be able to use the information to plan for volume growth contingencies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

GIS-Based Modeling of Contaminated Soil Volumes at Multiple Sites in the Formerly Utilized Sites Remedial Action Program - 20149

The remediation of hazardous, toxic, and radioactive waste (HTRW) sites produces cost-related risks associated with the estimation of contaminated soil or debris volumes. Historical risk-management techniques include cost contingencies to cover volume uncertainties that affect project budgeting and decision-making. The Buffalo District teamed with project partners to lessen volume uncertainty and reduce project risks at multiple HTRW sites managed under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Historical remedial investigations under FUSRAP commonly identified the presence of radiological material in site media, the associated human health risk, and then areas of remediation. To manage remedial execution and reduce risk, pre-design or remediation-phase sampling essentially 'chased' contamination, which was not conducive to efficient predictive budgeting derived from Feasibility Study (FS) cost analyses. The Buffalo District first optimized their approach to better understand volume uncertainty by utilizing the Argonne National Laboratory's Bayesian Approaches for Adaptive Spatial Sampling (BAASS) software [1]. BAASS processed soft data (e.g., gamma walk-over data) and spatial sampling data to estimate the lateral extent of contaminated soil irrespective of depth (i.e., gross contamination extent) and define areas of contaminant uncertainty. The software performed a binary transformation of contaminant concentrations at all sampling points based upon remedial action goals or a sum of ratios approach (i.e., clean, impacted, or range of impacts in soil). The model produced two-dimensional (horizontal) contaminant probability contours and statistical uncertainty in the sampling coverage and resulting contaminant extents. This method was translated vertically by partitioning the sampling data into depth brackets that produced a stacked representation of contaminant extents and uncertainty in the subsurface (i.e., similar to construction lifts). The results commonly led to a better understanding of project uncertainty and the need for sampling strategies that produce high-confidence soil volumes, which control costs. The BAASS-based delineations were eventually replaced by Empirical Bayesian Kriging (EBK) methods available in ArcGIS Spatial or 3D Analysts [2]. The EBK method calculates contaminant probability zones derived from user-controlled semivariograms of the spatial datasets. The resulting probability zones (e.g., 50% or 80% of contaminant probability) represent the two-dimensional surface delineation of the overall horizontal remedial area, similarly to BAASS. However, unlike BAASS, the vertical sampling data within these probability zones became vertical control points to contour a subterranean surface that connects subsurface points to the land-surface delineations of contamination. The resulting representation of horizontal and vertical impacts within an enclosed envelop (volume) of soil included uncertainty distributions that are used to plan uncertainty-reduction sampling. These data-driven and math-based models of three-dimensional sampling results produced well-bounded remedial volumes for project planning and better uncertainty predictions during project budgeting. The EBK method was applied to several FUSRAP sites managed by the Buffalo District and compared to less rigorously modeled sites previously remediated by the District. The comparison of modeled to actual remediated volumes provide a basis for validating the volume-estimation method. This comparison is important to ensure modeled volumes match physical boundaries of site remediation. FUSRAP sites with denser investigative sampling and lesser volume uncertainty proved useful in remedial planning and contracting. The Buffalo District noted that historical sites with sparser sampling arrays had greater disparity between estimated volumes and final remedial volumes. The benefit achieved over the cost of detailed soil sampling appears positive for FUSRAP projects, especially where impacts vary widely and appear unbounded by investigation-phase sampling. The subsequent Empirical Bayesian Kriging of contamination coupled with vertical contouring for soil estimations reduces uncertainty in soil volumes or indicates where sampling is required to reduce uncertainty, which together optimize remedial planning and budgeting. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of the Corrosion Risks to a Double Shell Tank During the Selective Removal of a Cesium-rich Supernate Layer - 20227

The Direct Feed Low Activity Waste (DF-LAW) activity will provide the initial feed to the Waste Treatment and Immobilization Plant at the Hanford Tank Farm facility. Feed preparation for DF-LAW will be carried out in multiple double shell waste tanks (DST) utilizing the Tank Side Cesium Removal (TSCR) process. Tank AP-106 will be an integral part of the TSCR process and hence key to the DFLAW activity. Prior to being utilized for this purpose, the Cs-137 concentration levels in the AP-106 supernate must be reduced significantly. The AP-106 re-purposing process manages normal waste tank addition procedures such that waste acceptance criteria objectives for Cs-137 removal are achieved. As this process was being developed, several concerns regarding tank integrity during and after repurposing of Tank AP-106, and the associated tanks (i.e., AP-102, AN-101, and AP-108), were addressed. The potential corrosion degradation mechanisms identified based on process knowledge included: general and pitting corrosion, caustic stress corrosion cracking, concentration cell corrosion, and microbiologically induced corrosion (MIC). A systematic approach was undertaken to assess the risk of corrosion during the AP-106 re-purposing process. The assessment considered the initial and present condition of the tank, the service history of the tank, the environmental conditions created in each tank during each stage of the process, process timing, and corrosion testing and modeling that approximated tank conditions. Based on this information, recommendations were provided to minimize the exposure of the tank to corrosive conditions. These recommendations included time limits for each stage of the process, staging of corrosion inhibitor solutions should process delays occur, and waste sampling with potential chemistry adjustments at defined steps in the process. Additionally, recommendations for post-process supernate chemistry adjustments and tank inspections were put forth. The greatest risk for this process occurs during the manipulation of large quantities of Columbia River water (i.e., greater than 450,000 gallons) within AP-106, the associated tanks and the supporting infrastructure (i.e., transfer line piping). This risk becomes more pronounced if there is a process upset and the tank walls remain exposed to a corrosive condition longer than intended. As long as the river water is blended into the supernate in a timely fashion, and the waste is adjusted appropriately with corrosion inhibitors, corrosion may be minimized and the final condition of the supernate in AP-106 and the associated tanks is expected to be in compliance with corrosion chemistry requirements. Contingency plans will be made to minimize the impact of a process upset. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Challenge of Achieving Site Closure of a Complex Groundwater Plume - 20531

Over the last three decades, DOE has made substantial progress in nearly every area of nuclear waste cleanup and has closed and transitioned 91 of the 107 sites in the EM complex. Several of the remaining groundwater plumes at Hanford, Los Alamos, Paducah, Oak Ridge, and Savannah River are complex and tend to have unique site or contaminant characteristics which provide an almost impossible challenge to remediate to regulatory levels. As a result, these complex sites will require a large investment to remediate. In order for DOE to achieve regulatory closure, a technically sound case must be developed and presented to regulators and stakeholders that clearly demonstrates that remedial goals have been or will be irreversibly achieved or that there is an alternate acceptable end-state. Five lines of evidence are required: - A conceptual site model that is as complete as possible, with the knowledge that it may continue to evolve with time; - Demonstration that trends in contaminant concentrations, or flux, versus time indicate that remedial goals will be achieved on schedule or within a reasonable time thereafter and that trends that deviate from this path are explainable by the conceptual model; - Demonstration that remobilization of attenuated contaminants is unlikely to occur in the future; - Explicit consideration of remedial contingencies, should deviations in the path toward remedial goals occur; - Development of an effective long-term monitoring plan to detect any conditions that might alter the path toward remedial goals. SRS has made significant progress in the remediation of contamination associated with the F-area and H-Area Seepage Basins, and it is currently developing a strategic closure path that addresses each of these lines of evidence and identifies both basic and applied scientific issues that will need to be addressed in order to obtain regulatory closure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Best-Estimate-Plus-Uncertainty-Informed Deterministic Safety Evaluation

Nuclear power plant (NPP) utilities operate contingent on receiving a favorable safety assessment from their national regulatory and safety authority. Among the many facets of NPP safety addressed is verification of integral design-basis performance - a demonstration of a plant's response to a suite of challenging transient and accident scenarios. Thermal-hydraulic system computer codes like RELAP5, TRAC, CATHARE, and ATHLET are used as the simulation engine as part of a broader evaluation model that accounts for a variety of uncertainties. It is common for these evaluation models to apply either a super-bounding/ deterministic or best-estimate plus uncertainty (BEPU) approach. The trend over the past two decades has been away from the classical deterministic methods towards methods explicitly incorporating parametric uncertainty models. These methods center upon the evaluation of parametric and system response uncertainties, where these uncertainties are derived from the convolution of one or more parametric uncertainty models. Acceptance of BEPU methods has provided the nuclear industry benefits regarding operational flexibility and, in some cases, power output. The advantage of BEPU for new NPPs is less obvious. Generally, these new designs include engineered safety features that practically eliminate fuel damage resulting from design-basis events. To substantiate such claims, applying super-bounding assumptions on uncertainties may be a more expedient demonstration of a plant's safety case than those based on BEPU. In addition, the requirements on design inputs for a deterministic evaluation model are substantially less than that for a BEPU evaluation model. As such, applying a deterministic evaluation model is expected to have the advantage of reducing the duration of the licensing review process. For the current operating fleet of light-water reactors (LWRs), the nuclear safety authorities in most countries have followed the U.S. Nuclear Regulatory Commission's rules for the preparation of safety analysis. These rules are specified in the U.S. Code of Federal Regulations, most notably in, Part 10, Section 50.46, entitled 'acceptance criteria for emergency core cooling systems for light-water nuclear power reactors' and its Appendix K. Notably, Appendix K specifies deterministic requirements for analysis of the loss-of-coolant accident (LOCA), which is generally regarded as the maximum credible accident for LWRs. Projecting 10 CFR 50, Appendix K, to new plants is not obviously applicable as it addresses light water fluid flow and heat transfer phenomena associated with core uncovery. Preventing core uncovery is a requirement for several designs in the class of small modular reactors (SMR). In doing so, the majority of phenomenological uncertainties prescribed in Appendix K are eliminated. Similarly, the impact of other phenomena to effect a change in various safety measures, i.e., figures-of-merit, is expected to be different. The implication is that development of a deterministic evaluation model must be derived with an original technical basis rather than solely rely on Appendix K. While a logical conclusion, the expectation of original bases, regardless of the treatment of uncertainties, is embodied in the U.S. NRC's Regulatory Guide (RG) 1.203, Transient and Accident Analysis. Within the evaluation model development and application process framework of RG 1.203, this paper describes a BEPU-informed deterministic evaluation model for NPPs with large inherent safety margins. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Theoretical Calculation and Simulation Studies of Balancing Forces and Axisymmetric Poloidal Halo Current in EAST

A new technology for developing fusion energy is to use hydrogen isotopes i.e., deuterium (D) and tritium (T) which is a combine effort for building up of International Thermonuclear Reactor (ITER) named as Tokamak, which will come into operation in 2020. Handsome amount of work has already been performed by many scientists contingent with plasma shape, halo current and plasma equilibrium properties by numerical techniques. Halo current calculation is the most important work in fusion reactors. In this paper, halo current and plasma cross-section energy have been calculated. The research covers calculation of plasma energy and determines the force on the vessel by magnetic field transformation method, which is the essential part of calculating halo current. Further, vertical displacement event (VDE) up/down halo current models have been calculated. These models give total magnetic field, asymmetric forces, conducting points and poloidal halo current.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗