Search NASA⌕ Search

SEARCH · Search NASA

Results for “Ground Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,675 records · Page 93

Design of a Multi-mode Flight Deck Decision Support System for Airborne Conflict Management

NASA Langley has developed a multi-mode decision support system for pilots operating in a Distributed Air-Ground Traffic Management (DAG-TM) environment. An Autonomous Operations Planner (AOP) assists pilots in performing separation assurance functions, including conflict detection, prevention, and resolution. Ongoing AOP design has been based on a comprehensive human factors analysis and evaluation results from previous human-in-the-loop experiments with airline pilot test subjects. AOP considers complex flight mode interactions and provides flight guidance to pilots consistent with the current aircraft control state. Pilots communicate goals to AOP by setting system preferences and actively probing potential trajectories for conflicts. To minimize training requirements and improve operational use, AOP design leverages existing alerting philosophies, displays, and crew interfaces common on commercial aircraft. Future work will consider trajectory prediction uncertainties, integration with the TCAS collision avoidance system, and will incorporate enhancements based on an upcoming air-ground coordination experiment.

Barhydt, Richard↗

Autonomous Command Operations of the WIRE Spacecraft

This paper presents operational innovations which will be introduced on NASA's Wide Field Infrared Explorer (WIRE) mission. These innovations include an end-to-end design architecture for an autonomous commanding capability for the uplink of command loads during unattended station contacts. The WIRE mission is the fifth and final mission of NASA's Goddard Space Flight Center Small Explorer (SMEX) series to be launched in March of 1999. Its primary mission is the targeting of deep space fields using an ultra-cooled infrared telescope. Due to its mission design WIRE command loads are large (approximately 40 Kbytes per 24 hours) and must be performed daily. To reduce the cost of mission operations support that would be required in order to uplink command loads, the WIRE Flight Operations Team has implemented all autonomous command loading capability. This capability allows completely unattended operations over a typical two-day weekend period. The key factors driving design and implementation of this capability were: 1) integration with already existing ground system autonomous capabilities and systems, 2) the desire to evolve autonomous operations capabilities based upon previous SMEX operations experience - specifically the TRACE mission, 3) integration with ground station operations - both autonomous and man-tended, 4) low cost and quick implementation, and 5) end-to-end system robustness. A trade-off study was performed to examine these factors in light of the low-cost, higher-risk SMEX mission philosophy. The study concluded that a STOL (Spacecraft Test and Operations Language) based script, highly integrated with other scripts used to perform autonomous operations, was best suited given the budget and goals of the mission. Each of these factors is discussed in addition to use of the TRACE mission as a testbed for autonomous commanding prior to implementation on WIRE. The capabilities implemented on the WIRE mission are an example of a low-cost, robust, and efficient method for autonomous command loading when implemented with other autonomous features of the ground system. They call be used as a design and implementation template by other missions interested in evolving toward autonomous and lower cost operations. Additionally, the WIRE spacecraft will be used as an operational testbed upon completion of its nominal mission later in 1999. One idea being studied is advanced on-board modeling. Advanced on-board modeling techniques will be used to more efficiently display the spacecraft state. This health and safety information could be used by engineers on the ground or could be used by tile spacecraft for its own assessments. Additionally, this same state information could also be input into the event-driven scheduling system, as the scheduling system will need to assess the spacecraft state before undertaking a new activity. Advanced modeling techniques are being evaluated for a number of NASA missions including The Next Generation Space Telescope (NGST), which is scheduled to launch in 2007.

Walyus, Keith↗

An Analysis of the Pressures, Forces and Moments Induced by the Ground Vortex Generated by a Single Impinging Jet

When a jet STOVL aircraft is in STOL operation the jets impinge on the ground and generate wall jets flowing radially outward from the points at which the jets impinge. When the forward flowing part of a wall jet meets the free stream flow it is rolled back on itself forming a parabolic shaped ground vortex. Positive pressures are induced on the lower surface of the configuration ahead of the ground vortex and suction pressures are induced over the ground vortex itself. In addition, the suction pressures induced aft of the jet out of ground effect are reduced and lifting pressures are induced on the upper surface. This study analyzes available pressure and force data and develops a method for estimating the forces and moments induced in ground effect. The method includes the effects of configuration variables, height and operating conditions, as well as the effects of the location, deflection and shape of the jet. However, it is limited to single jets at subcritical nozzle pressure ratios. An analysis of the effects of moving over the ground vs. tests over a fixed ground plane is included.

Kuhn, Richard E.↗

Research needs in aircraft noise prediction

Progress needed in understanding the mechanisms of aircraft noise generation and propagation is outlined using the focus provided by the need to predict accurately the noise produced and received at the ground by an aircraft operating in the vicinity of an airport. The components of internal engine noise generation, jet exhaust, airframe noise and shielding and configuration effects, and the roles of atmospheric propagation and ground noise attenuation are presented and related to the prediction problem. The role of NASA in providing the focus and direction for needed advances is discussed, and possible contributions of the academic community in helping to fulfill the needs for accurate aircraft noise prediction methods are suggested.

Raney, J. P.↗

Communications support for lunar missions using the TDRS II system

For several years NASA has been performing systems engineering analysis for lunar exploration scenarios with studies focused mainly on lunar communications, data systems and operations. Two basic earth-region communications architectures have been seriously considered, ground terminal architectures such as the deep space network (DSN) and geosynchronous relay satellites such as the tracking and data relay satellite II (TDRS II). An overview of TDRS II is given and lunar coverage, data rate capability, impacts to ground based elements, availability and operational scenarios are discussed. Development of the system is scheduled to begin soon and TDRS II can provide substantial support to early lunar missions without modification. Coverage and data rates are adequate and FLO missions can be supported. With enhancement nearly continuous coverage can be provided. TDRS II is a viable architecture and low cost option and should be considered as an alternative to the currently baselined DSN for precursor and possibly FLO missions.

Todd, Jacqueline↗

NASA's Ground Test Unit (GTU) Lunar Terrain Vehicle (LTV) Conceptual Hand Controllers Studies

Over that past year, the National Aeronautics and Space Administration (NASA) has been preparing and developing a set of standardized testing protocols for the commercial LTV vendor selection. Two studies have been conducted on two possible hand controller concepts specifically designed for the operation of NASA’s Ground Test Unit (GTU) Lunar Terrain Vehicle (LTV) that can be applied to the heretofore unknown designs developed by future LTV vendors. The objective for the two studies were to determine which hand controller enable acceptable operation of the LTV in a simulated lunar traverse. In the first evaluation a total of nine subjects in shirtsleeves with ungloved hands performed two simulated lunar driving courses in an engineering simulator with each hand controller. Controller concept one was the T-handle fashioned after the Apollo Lunar Roving Vehicle’s (LRV) T-Handle controller. The rational for using this design is it’s a proven design while in a pressurized suit. However, the LTV does have a driving mode the LRV did not consider. The mode of crabbing or strafing the vehicle at different angles; thus, the idea of a dual T-Handle controllers to accommodate this function without using a switch or display was introduced. The second concept controller is a new innovative controller call the Tri-Rotor [NASA patent review MSC-27385-1]. Inspired by Formula One race steering, the Tri-Rotor was designed to take advantage of the restricted movement and dexterity of a pressurized space suit. During testing, all subjects were able to successfully navigate through two test courses of varying lengths and complexity. Results indicated the dual Thandle had minimal recommendations for improvement while the Tri-Rotor had more extensive ones. It must be noted, the Tri-Rotor is a first-generation prototype and has some known mechanical concerns; thus, recommendations from this study will be incorporated into the second generation.

Human Factors↗

The Mars 2020 Ground Data System Architecture

The Mars 2020 Mission’s primary objective is to collect 20 geographically unique samples during its prime mission of one and a quarter Martian years, or just over 2 Earth years. Mission planners determined the project needed to develop a system that would enable the operations team to analyze engineering and science data, make science decisions, select viable rover targets at a millimeter resolution and validate an uplink bundle for a car sized rover with more complex science instruments than any previous Mars surface mission. All this had to be done within a five hour time frame. Doing this with a small team would be a challenge, but this had to be accomplished by a large team of engineers and scientists located across North America and Europe. Achieving this level of operational efficiency was unheard of in the prime mission. In addition, the mission had another set of requirements that had nothing to do with surface operations; the Mars 2020 Ground Data System (GDS) was also expected to comply with a new set of security requirements to keep up with the ever changing cybersecurity landscape. The Mars 2020 Ground Data System (GDS) is a re-architected version of the Mars Science Laboratory GDS. The primary goal was to integrate the lessons learned from previous Mars surface missions, accommodate a set of new requirements and capabilities required to ensure mission success, and comply with a new set of cybersecurity controls. The new architecture includes several unique qualities including a data lake, language-agnostic system-wide event-based operations, containerization, automated deployment, network segmentation, infrastructure-as-code, API-driven interfaces, and the first Mars surface GDS to operate primarily in the cloud. The new architecture enabled greater access to the system’s data, tighter integration with the operations team, and a higher level of traceability. The availability of the data also enabled a new set of capabilities previously not possible on surface missions. These new capabilities include an autonomous data to information, pipeline for downlink analysis, horizontal scaling of science data processing capabilities, autonomous round trip data tracking of science and engineering data, integration of flight system state into the tactical planning cycle, high fidelity targeting utilizing kinematic data, and hierarchical image and 3d meshes data representations. This paper will introduce the requirements for the Mars 2020 Mission, the heritage architecture, and the rationale for the changes to achieve the new architecture. The paper will continue to describe the fundamental changes made to the GDS architecture, how these changes enabled a more tightly integrated GDS, and the new capabilities that were enabled by the new architecture. The paper will conclude with the lessons learned from the process of rearchitecting a heritage GDS system and from the first 200 days of operations supporting over 800 users from around the world.

Lopez-Roig, Reynaldo↗

ESTL tracking and data relay satellite /TDRSS/ simulation system

The Tracking Data Relay Satellite System (TDRSS) provides single access forward and return communication links with the Shuttle/Orbiter via S-band and Ku-band frequency bands. The ESTL (Electronic Systems Test Laboratory) at Lyndon B. Johnson Space Center (JSC) utilizes a TDRS satellite simulator and critical TDRS ground hardware for test operations. To accomplish Orbiter/TDRSS relay communications performance testing in the ESTL, a satellite simulator was developed which met the specification requirements of the TDRSS channels utilized by the Orbiter. Actual TDRSS ground hardware unique to the Orbiter communication interfaces was procured from individual vendors, integrated in the ESTL, and interfaced via a data bus for control and status monitoring. This paper discusses the satellite simulation hardware in terms of early development and subsequent modifications. The TDRS ground hardware configuration and the complex computer interface requirements are reviewed. Also, special test hardware such as a radio frequency interference test generator is discussed.

Kapell, M. H.↗

A cyclic ground test of an ion auxiliary propulsion system: Description and operational considerations

The Ion Auxiliary Propulsion System (IAPS) experiment is designed for launch on an Air Force Space Test Program satellite (NASA-TM-78859; AIAA Paper No. 78-647). The primary objective of the experiment is to flight qualify the 8 cm mercury ion thruster system for stationkeeping applications. Secondary objectives are measuring the interactions between operating ion thruster systems and host spacecraft, and confirming the design performance of the thruster systems. Two complete 8 cm mercury ion thruster subsystems will be flown. One of these will be operated for 2557 on and off cycles and 7057 hours at full thrust. Tests are currently under way in support of the IAPS flight experiment. In this test an IAPS thruster is being operated through a series of startup/run/shut-down cycles which simulate thruster operation during the planned flight experiment. A test facility description and operational considerations of this testing using an engineering model 8 cm thruster (S/N 905) is the subject of this paper. Final results will be published at a later date when the ground test has been concluded.

Ling, Jerri S.↗

Commonality of flight control systems for support of European telecommunications missions

This paper is concerned with the presentation of mission-independent software systems that provide a common software platform to ground data systems for mission operations. The objectives of such common software platforms are to reduce the cost of the development of mission-dedicated software systems and to increase the level of reliability of the ground data systems for mission operations. In accordance with this objective, the Multi-Satellite Support System (MSSS) was developed at the European Space Operations Center (ESOC). Between 1975 and 1992, the MSSS provided support to 16 European Space Agency (ESA) missions, among them very demanding science missions such as GEOS, EXOSAT, and Giotto. The successful support of these missions proved the validity of the MSSS concept with its extended mission-independent platform. This paper describes the MSSS concept and focuses on the wide use of MSSS as a flight control system for geosynchronous telecommunications satellites. Reference is made to more than 15 telecommunications missions that are operated from Western Europe using flight control systems with an underlying MSSS concept, demonstrating the benefits of a commonly used software platform. Finally, the paper outlines the design of the new generation of flight control systems, which is being developed at ESOC for this decade, following a period of more than 15 years of MSSS support.

Debatin, Kurt↗

Juno Mission Simulation

The Juno spacecraft is planned to launch in August of 2012 and would arrive at Jupiter four years later. The spacecraft would spend more than one year orbiting the planet and investigating the existence of an ice-rock core; determining the amount of global water and ammonia present in the atmosphere, studying convection and deep- wind profiles in the atmosphere; investigating the origin of the Jovian magnetic field, and exploring the polar magnetosphere. Juno mission management is responsible for mission and navigation design, mission operation planning, and ground-data-system development. In order to ensure successful mission management from initial checkout to final de-orbit, it is critical to share a common vision of the entire mission operation phases with the rest of the project teams. Two major challenges are 1) how to develop a shared vision that can be appreciated by all of the project teams of diverse disciplines and expertise, and 2) how to continuously evolve a shared vision as the project lifecycle progresses from formulation phase to operation phase. The Juno mission simulation team addresses these challenges by developing agile and progressive mission models, operation simulations, and real-time visualization products. This paper presents mission simulation visualization network (MSVN) technology that has enabled a comprehensive mission simulation suite (MSVN-Juno) for the Juno project.

space vehicles↗

Overview of Crew Operations for Transit to Mars

Crewed Mars missions are estimated to be 700-1,200 days in length which is two to three times longer than any continuous human spaceflight mission to date. When architecting a Mars mission there are numerous resources that must be considered, evaluated, and planned for, including—but not limited to—mass, cost, performance, and risk. Crew time is a limited resource that will need to be appropriately allocated during future Mars missions. NASA’s “Moon to Mars Objectives” specifically recognizes as Recurring Tenets the need to return crews safely to Earth while mitigating adverse impacts to crew health and maximizing crew time available for science and engineering activities within planned mission durations. Crew operations and the crew time allocation for a Mars missions will likely be different than current operational planning aboard the ISS due to communication delays, crew health and performance needs, transportation system needs, potential vehicle dormancy, and mass ejection. Crew will need to operate much more Earth independently and potentially be responsible for more operations since traditional Earth ground support will be delayed. Incidents requiring immediate crew action will therefore either be the responsibility of the crew or an automated feature of the transit vehicle. This paper discusses the operational challenges of a Mars transit mission and the associated activities that will need to take place during each operational phase of transit to and from Mars.

Crew Time↗

Overview of Crew Operations for Transit to Mars

Crewed Mars missions are estimated to be 700-1,200 days in length which is two to three times longer than any continuous human spaceflight mission to date. When architecting a Mars mission there are numerous resources that must be considered, evaluated, and planned for, including—but not limited to—mass, cost, performance, and risk. Crew time is a limited resource that will need to be appropriately allocated during future Mars missions. NASA’s “Moon to Mars Objectives” specifically recognizes as Recurring Tenets the need to return crews safely to Earth while mitigating adverse impacts to crew health and maximizing crew time available for science and engineering activities within planned mission durations. Crew operations and the crew time allocation for a Mars missions will likely be different than current operational planning aboard the ISS due to communication delays, crew health and performance needs, transportation system needs, potential vehicle dormancy, and mass ejection. Crew will need to operate much more Earth independently and potentially be responsible for more operations since traditional Earth ground support will be delayed. Incidents requiring immediate crew action will therefore either be the responsibility of the crew or an automated feature of the transit vehicle. This paper discusses the operational challenges of a Mars transit mission and the associated activities that will need to take place during each operational phase of transit to and from Mars.

Crew Time↗

Comparison of Ground-Based and Airborne Function Allocation Concepts for NextGen Using Human-In-The-Loop Simulations

Investigation of function allocation for the Next Generation Air Transportation System is being conducted by the National Aeronautics and Space Administration (NASA). To provide insight on comparability of different function allocations for separation assurance, two human-in-the-loop simulation experiments were conducted on homogeneous airborne and ground-based approaches to four-dimensional trajectory-based operations, one referred to as ground-based automated separation assurance (groundbased) and the other as airborne trajectory management with self-separation (airborne). In the coordinated simulations at NASA s Ames and Langley Research Centers, controllers for the ground-based concept at Ames and pilots for the airborne concept at Langley managed the same traffic scenarios using the two different concepts. The common scenarios represented a significant increase in airspace demand over current operations. Using common independent variables, the simulations varied traffic density, scheduling constraints, and the timing of trajectory change events. Common metrics were collected to enable a comparison of relevant results. Where comparisons were possible, no substantial differences in performance or operator acceptability were observed. Mean schedule conformance and flight path deviation were considered adequate for both approaches. Conflict detection warning times and resolution times were mostly adequate, but certain conflict situations were detected too late to be resolved in a timely manner. This led to some situations in which safety was compromised and/or workload was rated as being unacceptable in both experiments. Operators acknowledged these issues in their responses and ratings but gave generally positive assessments of the respective concept and operations they experienced. Future studies will evaluate technical improvements and procedural enhancements to achieve the required level of safety and acceptability and will investigate the integration of airborne and ground-based capabilities within the same airspace to leverage the benefits of each concept.

Wing, David J.↗

Probabilistic Survivability Versus Time Modeling

This presentation documents Kennedy Space Center's Independent Assessment work completed on three assessments for the Ground Systems Development and Operations (GSDO) Program to assist the Chief Safety and Mission Assurance Officer during key programmatic reviews and provided the GSDO Program with analyses of how egress time affects the likelihood of astronaut and ground worker survival during an emergency. For each assessment, a team developed probability distributions for hazard scenarios to address statistical uncertainty, resulting in survivability plots over time. The first assessment developed a mathematical model of probabilistic survivability versus time to reach a safe location using an ideal Emergency Egress System at Launch Complex 39B (LC-39B); the second used the first model to evaluate and compare various egress systems under consideration at LC-39B. The third used a modified LC-39B model to determine if a specific hazard decreased survivability more rapidly than other events during flight hardware processing in Kennedy's Vehicle Assembly Building.

Operational Hazards↗

A section 110 evaluation of the 10,500-foot blast line civil effects structures and military trenches associated with the apple-2 test, area 1, nevada national security site, nye county, nevada

The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) has tasked Desert Research Institute (DRI) with identifying and evaluating additional resources that contribute to the significance of the Apple-2 Historic District as part of a Section 110 effort. Apple-2 was a 1955 atmospheric test in which the Federal Civil Defense Administration (FCDA) conducted an extensive civil effects program named Operation Cue. The objective of Operation Cue was to understand the blast and thermal effects of the test by using a simulated community of residential buildings, industrial structures, utilities, and commercial equipment arranged at various distances from ground zero (GZ). Military operations conducted by the Department of Defense (DoD) as part of the Desert Rock VI exercise were also associated with the Apple-2 test. The Apple-2 Historic District was originally defined in 2000 by Johnson and Edwards as 15 highly visible contributing elements dispersed across the landscape. Since its original recording, DRI has conducted additional archival research and this report details the identification and evaluation results of testing-related material remains at a distance of 10,500 ft from the Apple-2 GZ. Between 2017 and 2020, DRI conducted fieldwork at 10,500 ft from the Apple-2 GZ, revisited previously recorded contributing elements, and identified and evaluated newly recorded resources associated with Operation Cue as well as DoD operations. In total, DRI revisited or newly identified 15 principal resources. Of these, 13 are located within the historic district and contribute to the district’s significance. A set of military trenches and the associated material remains are discontiguous from the district, but also contribute to the district’s significance.

54 ENVIRONMENTAL SCIENCES↗

Performance Test Results of the NASA-457M v2 Hall Thruster

Performance testing of a second generation, 50 kW-class Hall thruster labeled NASA-457M v2 was conducted at the NASA Glenn Research Center. This NASA-designed thruster is an excellent candidate for a solar electric propulsion system that supports human exploration missions. Thruster discharge power was varied from 5 to 50 kW over discharge voltage and current ranges of 200 to 500 V and 15 to 100 A, respectively. Anode efficiencies varied from 0.56 to 0.71. The peak efficiency was similar to that of other state-of-the-art high power Hall thrusters, but outperformed these thrusters at lower discharge voltages. The 0.05 to 0.18 higher anode efficiencies of this thruster compared to its predecessor were primarily due to which of two stable discharge modes the thruster was operated. One stable mode was at low magnetic field strengths, which produced high anode efficiencies, and the other at high magnetic fields where its predecessor was operated. Cathode keeper voltages were always within 2.1 to 6.2 V and cathode voltages were within 13 V of tank ground during high anode efficiency operation. However, during operation at high magnetic fields, cathode-to-ground voltage magnitudes increased dramatically, exceeding 30 V, due to the high axial magnetic field strengths in the immediate vicinity of the centrally-mounted cathode. The peak thrust was 2.3 N and this occurred at a total thruster input power of 50.0 kW at a 500 V discharge voltage. The thruster demonstrated a thrust-to-power range of 76.4 mN/kW at low power to 46.1 mN/kW at full power, and a specific impulse range of 1420 to 2740 s. For a discharge voltage of 300 V, where specific impulses would be about 2000 s, thrust efficiencies varied from 0.57 to 0.63.

Soulas, George C.↗

Community-wide Validation of Geospace Model Ground Magnetic Field Perturbation Predictions to Support Model Transition to Operations

In this paper we continue the community-wide rigorous modern space weather model validation efforts carried out within GEM, CEDAR and SHINE programs. In this particular effort, in coordination among the Community Coordinated Modeling Center (CCMC), NOAA Space Weather Prediction Center (SWPC), modelers, and science community, we focus on studying the models' capability to reproduce observed ground magnetic field fluctuations, which are closely related to geomagnetically induced current phenomenon. One of the primary motivations of the work is to support NOAA SWPC in their selection of the next numerical model that will be transitioned into operations. Six geomagnetic events and 12 geomagnetic observatories were selected for validation.While modeled and observed magnetic field time series are available for all 12 stations, the primary metrics analysis is based on six stations that were selected to represent the high-latitude and mid-latitude locations. Events-based analysis and the corresponding contingency tables were built for each event and each station. The elements in the contingency table were then used to calculate Probability of Detection (POD), Probability of False Detection (POFD) and Heidke Skill Score (HSS) for rigorous quantification of the models' performance. In this paper the summary results of the metrics analyses are reported in terms of POD, POFD and HSS. More detailed analyses can be carried out using the event by event contingency tables provided as an online appendix. An online interface built at CCMC and described in the supporting information is also available for more detailed time series analyses.

MAGNETIC↗