Search NASA⌕ Search

SEARCH · Search NASA

Results for “Launch Processing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,675 records · Page 93

Shuttle Rocket Motor Program: NASA should delay awarding some construction contracts. Report to the Chair, Subcommittee on Government Activities and Transportation, Committee on Government Operations, House of Representatives

Even though the executive branch has proposed terminating the Advanced Solid Rocket Motor (ASRM) program, NASA is proceeding with all construction activity planned for FY 1992 to avoid schedule slippage if the program is reinstated by Congress. However, NASA could delay some construction activities for at least a few months without affecting the current launch data schedule. For example, NASA could delay Yellow Creek's motor storage and dock projects, Stennis' dock project, and Kennedy's rotation processing and surge facility and dock projects. Starting all construction activities as originally planned could result in unnecessarily incurring additional costs and termination liability if the funding for FY 1993 is not provided. If Congress decides to continue the program, construction could still be completed in time to avoid schedule slippage.

Source record↗

Neighboring extremal guidance for systems with a piecewise linear control

The neighboring extremal feedback control law is developed for systems with a piecewise linear control for the case where the optimal control is obtained by nonlinear programming techniques. To develop the control perturbation for a given deviation from the nominal path, the second variation is minimized subject to the constraint that the final conditions be satisfied. This process leads to a feedback relationship between the control perturbation and the measured deviation from the nominal state. A simple example, the lunar launch problem, is used to demonstrate the validity of the guidance law. For model errors on the order of 5 percent, the results indicate that 5 percent errors occur in the final conditions.

Hull, David G.↗

Follow-the-leader algorithm for the payload inspection and processing system

This report summarizes the author's summer 1995 work at NASA Kennedy Space Center in the Advanced System Division. The assignment was path planning for the Payload Inspection and Processing System (PIPS). PIPS is an automated system, programmed off-line for inspection of Space Shuttle payloads after integration and prior to launch. PIPS features a hyper-redundant 18-dof serpentine truss manipulator capable of snake-like motions to avoid obstacles. The path planning problem was divided into two segments: (1) determining an obstacle-free trajectory for the inspection camera at the manipulator tip to follow; and (2) development of a follow-the-leader (FTL) algorithm which ensures whole-arm collision avoidance by forcing ensuing links to follow the same tip trajectory. The summer 1995 work focused on the FTL algorithm. This report summarizes development, implementation, testing, and graphical demonstration of the FTL algorithm for prototype PIPS hardware. The method and code was developed in a modular manner so the final PIPS hardware may use them with minimal changes. The FTL algorithm was implemented using MATLAB software and demonstrated with a high-fidelity IGRIP model. The author also supported implementation of the algorithm in C++ for hardware control. The FTL algorithm proved to be successful and robust in graphical simulation. The author intends to return to the project in summer 1996 to implement path planning for PIPS.

Williams, Robert L., II↗

STS-97 Prelaunch Press Conference

Bruce Buckingham, NASA Public Affairs, introduces Ron Dittemore, NASA Shuttle Program Manager, Bob Cabana, International Space Station (ISS) Manager, International Operations, NASA, Michael Vachon, Canadian Space Agency, David King, NASA Director of Shuttle Processing, and Lieutenant Ken Ferland, 45th Weather Squadron, US Air Force. They each give a brief statement on the STS-97 Endeavour mission, launch, and weather status and answer questions from the press.

Source record↗

Second Generation RLV Space Vehicle Concept

NASA has a long history of conducting development programs and projects in a consistent fashion. Systems Engineering within those programs and projects has also followed a given method outlined by such documents as the NASA Systems Engineering Handbook. The relatively new NASA Space Launch Initiative (SLI) is taking a new approach to developing a space vehicle, with innovative management methods as well as new Systems Engineering processes. With the program less than a year into its life cycle, the efficacy of these new processes has yet to be proven or disproven. At $776M for phase 1, SLI represents a major portion of the NASA focus; however, the new processes being incorporated are not reflected in the training provided by NASA to its engineers. The NASA Academy of Program and Project Leadership (APPL) offers core classes in program and project management and systems engineering to NASA employees with the purpose of creating a "knowledge community where ideas, skills, and experiences are exchanged to increase each other's capacity for strong leadership". The SLI program is, in one sense, a combination of a conceptual design program and a technology program. The program as a whole doesn't map into the generic systems engineering project cycle as currently, and for some time, taught. For example, the NASA APPL Systems Engineering training course teaches that the "first step in developing an architecture is to define the external boundaries of the system", which will require definition of the interfaces with other systems and the next step will be to "define all the components that make up the next lower level of the system hierarchy" where fundamental requirements are allocated to each component. Whereas, the SLI technology risk reduction approach develops architecture subsystem technologies prior to developing architectures. The higher level architecture requirements are not allowed to fully develop and undergo decomposition and allocation down to the subsystems before the subsystems must develop allocated requirements based on the highest level of requirements. In the vernacular of the project cycles prior to the mid 1990's, the architecture definition portion of the program appears to be at a generic Phase A stage, while the subsystems are operating at Phase B. Even the management structure of the SLI program is innovative in its approach to Systems Engineering and is not reflected in the APPL training modules. The SLI program has established a Systems Engineering office as an office separate from the architecture development or the subsystem technology development, while that office does have representatives within these other offices. The distributed resources of the Systems Engineering Office are co-located with the respective Project Offices. This template is intended to provide systems engineering as an integrated function at the Program Level. the program management of SLI and the MAT agree that "program/project managers and the systems engineering team must work closely together towards the single objective of delivering quality products that meet the customer needs". This paper will explore the differences between the methods being taught by NASA, which represent decades of ideas, and those currently in practice in SLI. Time will tell if the innovation employed by SLI will prove to be the model of the future. For now, it is suggested that the training of the present exercise the flexibility of recognizing the new processes employed by a major new NASA program.

Bailey, Michelle↗

Solar System Studies with the Space Infrared Telescope Facility (SIRTF)

SIRTF (Space Infrared Telescope Facility) is the final element in NASA's 'Great Observatories' program. It consists of an 85-cm cryogenically-cooled observatory for infrared astronomy from space. SIRTF is scheduled for launch in late 2001 or early 2002 on a Delta rocket into a heliocentric orbit trailing the Earth. Data from SIRTF will be processed and disseminated to the community through the SIRTF Science Center (SSC) located at the Infrared Processing and Analysis Center (IPAC) at Caltech. Some 80/% of the total observing time (estimated at a minimum of 7500 hours of integration time per year for the mission lifetime of about 4 years) will be available to the scientific community at large through a system of refereed proposals. Three basic instruments are located in the SIRTF focal plane. The Multiband Imaging Photometer (MIPS), the Infrared Array Camera (IRAC), and the Infrared Spectrometer (IRS), taken together, provide imaging and spectroscopy from 3.5 to 160 microns. Among the solar system studies suited to SIRTF are the following: 1) spectroscopy and radiometry of small bodies from the asteroid main belt, through the Trojan clouds, to the Kuiper Disk; 2) dust distribution in the zodiacal cloud and the Earth's heliocentric dust ring; 3) spectroscopy and radiometry of comets; and 4) spectroscopy and radiometry of planets and their satellites. Searches for, and studies of dust disks around other stars, brown dwarfs, and superplanets will also be conducted with SIRTF. The SORTIE web site (http://ssc.ipac.caltech.edu/sirtf) contains important details and documentation on the project, the spacecraft, the telescope, instruments, and observing procedures. A community-wide workshop for solar system studies with SIRTF is in the planning stages by the author and Martha S. Hanner for the summer of 1999.

Cruikshank, Dale P.↗

Space Ops 2002: Bringing Space Operations into the 21st Century. Track 3: Operations, Mission Planning and Control. 2nd Generation Reusable Launch Vehicle-Concepts for Flight Operations

With the successful implementation of the International Space Station (ISS), the National Aeronautics and Space Administration (NASA) enters a new era of opportunity for scientific research. The ISS provides a working laboratory in space, with tremendous capabilities for scientific research. Utilization of these capabilities requires a launch system capable of routinely transporting crew and logistics to/from the ISS, as well as supporting ISS assembly and maintenance tasks. The Space Shuttle serves as NASA's launch system for performing these functions. The Space Shuttle also serves as NASA's launch system for supporting other science and servicing missions that require a human presence in space. The Space Shuttle provides proof that reusable launch vehicles are technically and physically implementable. However, a couple of problems faced by NASA are the prohibitive cost of operating and maintaining the Space Shuttle and its relative inability to support high launch rates. The 2nd Generation Reusable Launch Vehicle (2nd Gen RLV) is NASA's solution to this problem. The 2nd Gen RLV will provide a robust launch system with increased safety, improved reliability and performance, and less cost. The improved performance and reduced costs of the 2nd Gen RLV will free up resources currently spent on launch services. These resource savings can then be applied to scientific research, which in turn can be supported by the higher launch rate capability of the 2nd Gen RLV. The result is a win - win situation for science and NASA. While meeting NASA's needs, the 2nd Gen RLV also provides the United States aerospace industry with a commercially viable launch capability. One of the keys to achieving the goals of the 2nd Gen RLV is to develop and implement new technologies and processes in the area of flight operations. NASA's experience in operating the Space Shuttle and the ISS has brought to light several areas where automation can be used to augment or eliminate functions performed by crew and ground controllers. This experience has also identified the need for new approaches to staffing and training for both crew and ground controllers. This paper provides a brief overview of the mission capabilities provided by the 2nd Gen RLV, a description of NASA's approach to developing the 2nd Gen RLV, a discussion of operations concepts, and a list of challenges to implementing those concepts.

Hagopian, Jeff↗

Fluids and Combustion Facility: Combustion Integrated Rack Modal Model Correlation

The Fluids and Combustion Facility (FCF) is a modular, multi-user, two-rack facility dedicated to combustion and fluids science in the US Laboratory Destiny on the International Space Station. FCF is a permanent facility that is capable of accommodating up to ten combustion and fluid science investigations per year. FCF research in combustion and fluid science supports NASA's Exploration of Space Initiative for on-orbit fire suppression, fire safety, and space system fluids management. The Combustion Integrated Rack (CIR) is one of two racks in the FCF. The CIR major structural elements include the International Standard Payload Rack (ISPR), Experiment Assembly (optics bench and combustion chamber), Air Thermal Control Unit (ATCU), Rack Door, and Lower Structure Assembly (Input/Output Processor and Electrical Power Control Unit). The load path through the rack structure is outlined. The CIR modal survey was conducted to validate the load path predicted by the CIR finite element model (FEM). The modal survey is done by experimentally measuring the CIR frequencies and mode shapes. The CIR model was test correlated by updating the model to represent the test mode shapes. The correlated CIR model delivery is required by NASA JSC at Launch-10.5 months. The test correlated CIR flight FEM is analytically integrated into the Shuttle for a coupled loads analysis of the launch configuration. The analysis frequency range of interest is 0-50 Hz. A coupled loads analysis is the analytical integration of the Shuttle with its cargo element, the Mini Payload Logistics Module (MPLM), in the Shuttle cargo bay. For each Shuttle launch configuration, a verification coupled loads analysis is performed to determine the loads in the cargo bay as part of the structural certification process.

McNelis, Mark E.↗

The Optimization of Trained and Untrained Image Classification Algorithms for Use on Large Spatial Datasets

The HARVIST project seeks to automatically provide an accurate, interactive interface to predict crop yield over the entire United States. In order to accomplish this goal, large images must be quickly and automatically classified by crop type. Current trained and untrained classification algorithms, while accurate, are highly inefficient when operating on large datasets. This project sought to develop new variants of two standard trained and untrained classification algorithms that are optimized to take advantage of the spatial nature of image data. The first algorithm, harvist-cluster, utilizes divide-and-conquer techniques to precluster an image in the hopes of increasing overall clustering speed. The second algorithm, harvistSVM, utilizes support vector machines (SVMs), a type of trained classifier. It seeks to increase classification speed by applying a "meta-SVM" to a quick (but inaccurate) SVM to approximate a slower, yet more accurate, SVM. Speedups were achieved by tuning the algorithm to quickly identify when the quick SVM was incorrect, and then reclassifying low-confidence pixels as necessary. Comparing the classification speeds of both algorithms to known baselines showed a slight speedup for large values of k (the number of clusters) for harvist-cluster, and a significant speedup for harvistSVM. Future work aims to automate the parameter tuning process required for harvistSVM, and further improve classification accuracy and speed. Additionally, this research will move documents created in Canvas into ArcGIS. The launch of the Mars Reconnaissance Orbiter (MRO) will provide a wealth of image data such as global maps of Martian weather and high resolution global images of Mars. The ability to store this new data in a georeferenced format will support future Mars missions by providing data for landing site selection and the search for water on Mars.

Kocurek, Michael J.↗

Layered Metals Fabrication Technology Development for Support of Lunar Exploration at NASA/MSFC

NASA's human exploration initiative poses great opportunity and risk for missions to the Moon and beyond. In support of these missions, engineers and scientists at the Marshall Space Flight Center are developing technologies for ground-based and in-situ fabrication capabilities utilizing provisioned and locally-refined materials. Development efforts are pushing state-of-the art fabrication technologies to support habitat structure development, tools and mechanical part fabrication, as well as repair and replacement of ground support and space mission hardware such as life support items, launch vehicle components and crew exercise equipment. This paper addresses current fabrication technologies relative to meeting targeted capabilities, near term advancement goals, and process certification of fabrication methods.

Cooper, Kenneth G.↗

The Global Precipitation Measurement (GPM) Project

The GIobd Precipitation hleasurement (GPM) mission is an international cooperati~ee ffort to advance weather, climate, and hydrological predictions through space-based precipitation measurements. The Core Observatory will be a reference standard to uniform11 calibrate data from a constellatism of spacecraft with passive microuave sensors. GP3l mission data will be used for scientific research as well as societal applications. GPM is being developed under a partnership between the United States (US) National .Aeronautics and Space Administration (XASA) and the Japanese Aerospace and Exploration Agency (JAYA). NASA is developing the Core Observatory, a Low-Inclination Constellation Observatory, two GPM Rlicrowave Imager (GXII) instruments. Ground Validation System and Precipitation Processing System for the GPRl mission. JAXA will provide a Dual-frequency Precipitation Radar (DPR) for installation on the Core satellite and launch services for the Core Observatory. Other US agencies and international partners contribute to the GPkf mission by providing precipitation measurements obtained from their own spacecraft and,'or providing ground-based precipitation measurements to support ground validation activities. The GPM Core Observatory will be placed in a low earth orbit (-400 krn) with 65-degree inclination, in order to calibrate partner instruments in a variety of orbits. The Core Observatory accommodates 3 instruments. The GkfI instrument provides measurements of precipitation intensity and distribution. The DPR consists of Ka and Ku band instruments, and provides threedimensional measurements of cloud structure, precipitation particle size distribution and precipitation intensitj and distribution. The instruments are key drivers for GPM Core Observatory overall size (1 1.6m x 6.5m x 5.0m) and mass (3500kg), as well as the significant (-1 950U.3 power requirement. The Core Spacecraft is being built in-house at Goddard Space Flight Center. The spacecraft structure consists of an aluminum lower bus structure. composite upper bus structure, '-axis steerable High Gain Antenna System on a dual-hinged boom, and two deploy able solar arraq s. The propulsion system features twelve thrusters and a single Composite Overlv~apP ressure Vessel tank. The GPhl Core spacecraft is one of the first large spacecraft developed to be demiseable (i.e. burn up upon atmospheric reentry j. The spacecraft dernissable components-- structure. propulsion tank, lithium-ion battery, sotar array md reaction wheels. are a unique fcature.

Azarbarazin, Ardeshir Art↗

Design for Safety - The Ares Launch Vehicles Paradigm Change

The lessons learned from the S&MA early involvement in the Ares I launch vehicle design phases proved that performing an in-line function jointly with engineering is critical for S&MA to have an effective role in supporting the system, element, and component design. These lessons learned were used to effectively support the Ares V conceptual design phase and planning for post conceptual design phases. The Top level Conceptual LOM assessment for Ares V performed by the S&MA community jointly with the engineering Advanced Concept Office (ACO) was influential in the final selection of the Ares V system configuration. Post conceptual phase, extensive reliability effort should be planned to support future Heavy Lift Launch Vehicles (HLLV) design. In-depth reliability analysis involving the design, manufacturing, and system engineering communities is critical to understand design and process uncertainties and system integrated failures.

Safie, Fayssal M.↗

Exploiting the Free Landsat Archive for Operational Monitoring of Ecosystem Condition and Change Across the Chesapeake Bay Watershed

For the first time, all imagery acquired by the Landsat series of satellites is being made available by the USGS to users at no cost. This represents a key opportunity to use Landsat in a truly operational monitoring framework: large regions of the U.S. such as the Chesapeake Bay Watershed can now be analyzed using "wall-to-wall" imagery at timescales from approximately 1 month to several years. With the future launch of the Landsat Data Continuity Mission (LDCM) and Decadal Survey missions such as the hyperspectral HyspIRI, it is imperative to develop robust processing systems to perform annual ecosystem assessments over large regions such as the Chesapeake Bay. We have been working at NASA's Goddard Space Flight Center (GSFC) to develop an integrative framework for inserting 30m, annual, Landsat based data and derived products into the existing decision support system for the Bay, with a particular focus on ecosystem condition and changes over the entire watershed. The basic goal is to use a 'stack' of Landsat imagery with 40% or less cloud cover to produce multi-date (2005-2009 period), cloud/shadow/gap-free composited surface reflectance products that will support the creation of watershed scale land cover/ use products and the monitoring of ecosystem change across the Bay. Our scientific focus extends beyond the conventional definition of land cover (i.e. a classification of vegetation type) as we propose to monitor both changes in surface type (e.g. forest to urban), vegetation structure (e.g. forest disturbance due to logging or insect damage), as well as winter crop cover. These processes represent a continuum from large, interannual changes in land cover type, to subtler, intra-annual changes associated with short-term disturbance. The free Landsat data are being processed to surface reflectance and composited using the existing Landsat Ecosystem Disturbance Adaptive Processing System here at NASA/ GSFC, and land cover products (type, tree cover, impervious cover, winter cover) are being produced using well-established decision tree and regression tree algorithms. The goal of this session is to present the data products that we have been developing to the Bay science community and to discuss potential avenues for improvements and usage of the products for decision support.

BrowndeColstoun, Eric↗

Space Shuttle Payload Information Source

The Space Shuttle Payload Information Source Compact Disk (CD) is a joint NASA and USA project to introduce Space Shuttle capabilities, payload services and accommodations, and the payload integration process. The CD will be given to new payload customers or to organizations outside of NASA considering using the Space Shuttle as a launch vehicle. The information is high-level in a visually attractive format with a voice over. The format is in a presentation style plus 360 degree views, videos, and animation. Hyperlinks are provided to connect to the Internet for updates and more detailed information on how payloads are integrated into the Space Shuttle.

Griswold, Tom↗

Ares I-X Flight Data Evaluation: Executive Overview

NASA's Constellation Program (CxP) successfully launched the Ares I-X flight test vehicle on October 28, 2009. The Ares I-X flight was a developmental flight test to demonstrate that this very large, long, and slender vehicle could be controlled successfully. The flight offered a unique opportunity for early engineering data to influence the design and development of the Ares I crew launch vehicle. As the primary customer for flight data from the Ares I-X mission, the Ares Projects Office (APO) established a set of 33 flight evaluation tasks to correlate flight results with prospective design assumptions and models. The flight evaluation tasks used Ares I-X data to partially validate tools and methodologies in technical disciplines that will ultimately influence the design and development of Ares I and future launch vehicles. Included within these tasks were direct comparisons of flight data with preflight predictions and post-flight assessments utilizing models and processes being applied to design and develop Ares I. The benefits of early development flight testing were made evident by results from these flight evaluation tasks. This overview provides summary information from assessment of the Ares I-X flight test data and represents a small subset of the detailed technical results. The Ares Projects Office published a 1,600-plus-page detailed technical report that documents the full set of results. This detailed report is subject to the International Traffic in Arms Regulations (ITAR) and is available in the Ares Projects Office archives files.

Huebner, Lawrence D.↗

New Diagnostic, Launch and Model Control Techniques in the NASA Ames HFFAF Ballistic Range

This report presents new diagnostic, launch and model control techniques used in the NASA Ames HFFAF ballistic range. High speed movies were used to view the sabot separation process and the passage of the model through the model splap paper. Cavities in the rear of the sabot, to catch the muzzle blast of the gun, were used to control sabot finger separation angles and distances. Inserts were installed in the powder chamber to greatly reduce the ullage volume (empty space) in the chamber. This resulted in much more complete and repeatable combustion of the powder and hence, in much more repeatable muzzle velocities. Sheets of paper or cardstock, impacting one half of the model, were used to control the amplitudes of the model pitch oscillations.

Bogdanoff, David W.↗

Citric Acid Alternative to Nitric Acid Passivation

The Ground Systems Development and Operations GSDO) Program at NASA John F. Kennedy Space Center (KSC) has the primary objective of modernizing and transforming the launch and range complex at KSC to benefit current and future NASA programs along with other emerging users. Described as the launch support and infrastructure modernization program in the NASA Authorization Act of 2010, the GSDO Program will develop and implement shared infrastructure and process improvements to provide more flexible, affordable, and responsive capabilities to a multi-user community. In support of the GSDO Program, the purpose of this project is to demonstratevalidate citric acid as a passivation agent for stainless steel. Successful completion of this project will result in citric acid being qualified for use as an environmentally preferable alternative to nitric acid for passivation of stainless steel alloys in NASA and DoD applications.

Technology↗

Alternative to Nitric Acid Passivation

The Ground Systems Development and Operations (GSDO) Program at NASA John F. Kennedy Space Center (KSC), Florida, has the primary objective of modernizing and transforming the launch and range complex at KSC to benefit current and future NASA programs along with other emerging users. Described as the launch support and infrastructure modernization program in the NASA Authorization Act of 2010, the GSDO Program will develop and implement shared infrastructure and process improvements to provide more flexible, affordable, and responsive capabilities to a multi-user community. In support of NASA and the GSDO Program, the objective of this project is to qualify citric acid as an environmentally-preferable alternative to nitric acid for passivation of stainless steel alloys. This project is a direct follow-on to United Space Alliance (USA) work at KSC to optimize the parameters for the use of citric acid and verify effectiveness. This project will build off of the USA study to further evaluate citric acids effectiveness and suitability for corrosion protection of a number of stainless steels alloys used by NASA, the Department of Defense (DoD), and the European Space Agency (ESA).

stainless steel↗