Search NASA⌕ Search

SEARCH · Search NASA

Results for “Power Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,675 records · Page 93

Loss of Coolant High Burnup (LOC-HBu) Program

LOC-HBu is a joint experimental program (JEEP) operating within the Nuclear Energy Agency’s (NEA’s) framework for irradiation experiments II (FIDES-II). LOC-HBu is dedicated to the understanding of light water reactor (LWR) fuel performance at high burnup under loss of coolant accident (LOCA) conditions. LOC-HBu aims to support burnup extension needs by addressing identified R&D priorities to achieve an improved understanding of fuel fragmentation, relocation, and dispersal (FFRD) of HBu fuel during LOCA events. The need for such experiments was identified in the United States by the Fuel Performance Testing Technical Expert Group (FPTTEG) under the Electric Power Research Institute (EPRI)’s Collaborative Research on Advanced Fuel Technologies (CRAFT) framework. A combined in-pile and furnace testing program plan was developed by researchers at Idaho National Laboratory (INL) and Oak Ridge National Laboratory (ORNL) which was reviewed and approved by the FPTTEG Combined TREAT-LOC and SATS LOCA Experiment Plan. The first 4 tests identified in this plan are being put forward by the U.S. Department of Energy (U.S. DOE) and INL for inclusion in the FIDES-II second triannual work period. The data produced under this plan will be used to further validate and confirm existing models and inform future R&D and model development. The experimental program was specifically developed to address data gaps and opportunities identified via detailed review of the existing public knowledge base on LOCA FFRD, as well as reviewing specific experimental development activities regarding prototypic LOCA conditions for light-water reactor (LWR) systems. The program will systematically investigate the impacts of prototypic HBu fuel/cladding thermomechanical behaviors under postulated LWR LOCA conditions not yet fully investigated. These conditions correspond with prototypic decay-energy heatup (DEH) and stored-energy heatup (SEH) conditions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Hybrid feature selection approach for power transformer fault diagnosis based on support vector machine and genetic algorithm

To further improve fault diagnosis accuracy, a new hybrid feature selection approach combined with a genetic algorithm (GA) and support vector machine (SVM) is presented in this study. Adaptive synthetic technique and arctangent transformation method are adopted to improve the statistical property of the training set (IEC TC10 dataset). Five filter methods based on different evaluation metrics are employed to rank 48 input features derived from dissolved gas analysis (DGA). Then, feature combination methods are applied to aggregate feature ranks and form a lower-dimension candidate feature subset. The GA-SVM model is implemented to optimise parameters and select optimal feature subsets. 5-fold cross-validation accuracy of the GA-SVM is used to evaluate fault diagnosis capability of feature subsets and finally, a novel subset is determined as the optimal feature subset. Accuracy comparison manifests the superiority of the optimal feature subsets over that of conventional approaches. Besides, generalisation and robustness of the optimal subset are validated by testing DGA samples from the local power utility. Results indicate that the optimal feature subset obtained by the proposed method can significantly improve the accuracies of power transformer fault diagnosis.

Kari, Tusongjiang↗

SU-E-CAMPUS-T-03: Development and Implementation of An Anthropomorphic Pediatric Spine Phantom for the Assessment of Craniospinal Irradiation Procedures in Proton Therapy

Purpose: To design an anthropomorphic pediatric spine phantom for use in the evaluation of proton therapy facilities for clinical trial participation by the Imaging and Radiation Oncology Core (IROC) Houston QA Center (formerly RPC). Methods: This phantom was designed to perform an end-to-end audit of the proton spine treatment process, including simulation, dose calculation by the treatment planning system (TPS), and proton treatment delivery. The design incorporated materials simulating the thoracic spinal column of a pediatric patient, along with two thermoluminescent dosimeter (TLD)-100 capsules and radiochromic film embedded in the phantom for dose evaluation. Fourteen potential materials were tested to determine relative proton stopping power (RSP) and Hounsfield unit (HU) values. Each material was CT scanned at 120kVp, and the RSP was obtained from depth ionization scans using the Zebra multilayer ion chamber (MLIC) at two energies: 160 MeV and 250 MeV. To determine tissue equivalency, the measured RSP for each material was compared to the RSP calculated by the Eclipse TPS for a given HU. Results: The materials selected as bone, tissue, and cartilage substitutes were Techron HPV Bearing Grade (Boedeker Plastics, Inc.), solid water, and blue water, respectively. The RSP values did not differ by more than 1.8% between the two energies. The measured RSP for each selected material agreed with the RSP calculated by the Eclipse TPS within 1.2%. Conclusion: An anthropomorphic pediatric proton spine phantom was designed to evaluate proton therapy delivery. The inclusion of multiple tissue substitutes increases heterogeneity and the level of difficulty for institutions to successfully treat the phantom. The following attributes will be evaluated: absolute dose agreement, distal range, field width, junction match and right/left dose profile alignment. The phantom will be tested at several institutions using a 5% dose agreement criterion, and a 5%/3mm gamma analysis criterion for the film planes. Work supported by grants CA10953, CA059267, and CA81647 (NCI, DHHS)

07 ISOTOPE AND RADIATION SOURCES↗

Performance Evaluation of Distributed Energy Resources Management System via Advanced Hardware-in-the-Loop Simulation: Preprint

This paper presents an advanced hardware-in-the-loop (HIL) platform to evaluate the performance of voltage regulation coordinated across advanced distribution management systems (ADMS), distributed energy management system (DERMS), and DERs. The HIL platform provides realistic laboratory testing, including accurate modeling of the real-world distribution system from a utility partner, real controller (ADMS and DERMs) and power (DERs) hardware, and standard communications protocols. The test results show proper functionalities of the integrated platform and performance of the peak load management of coordinated control systems. Based on the laboratory testing, the utility can set up the same grid automation system to manage DERs to achieve system-level control and operation objectives (e.g., peak load management), thus derisking potential issues (e.g., instability) for field deployment.

24 POWER TRANSMISSION AND DISTRIBUTION↗

WISP: Watching grid Infrastructure Stealthily through Proxies (Final Technical Report)

The complex interdependencies of cyber systems (sensors and communications), physical grids and associated electricity market operations make protecting electric power grids a significant challenge. The energy sector is constantly under new, targeted, advanced and dangerous cyber-attacks that have the potential to result in the loss of human life. These threats are further exacerbated by our need to modernize the grid. One focus of cyber security research in smart grids is the securing of the SCADA system through advanced intrusion detection systems (IDS) and bad data detection algorithms in state estimation. These methods either require full knowledge of the system topology and parameters or fail to understand the physical behaviors under attack. WISP (Watching grid Infrastructure Stealthily through Proxies) is designed to provide additional protection to the power grid using only publicly available data. In particular, WISP exploits the spatio-temporal nature of the real time locational marginal prices (LMPs), in conjunction with other information such as bids, weather, outages and load data to analyze anomalous power pricing behaviors and then correlate those observations to localize regions of interest and identify potential cyber events. WISP is non-intrusive as the tool is deployed as a service in the Cloud or on premise and provides reliable information to system operators for enhanced situational awareness, without impeding energy delivery functions. The WISP technology comprises three modules: the data-driven anomaly detection core, the vulnerability and risk analysis and the root cause analysis. The data-driven anomaly detection core performs the tasks of feature selection, anomaly detection and attack region localization. The vulnerability and risk analysis module provides system level information of the vulnerable variables and times, assisting the operators in selecting monitoring and protection nodes. The root cause analysis module takes the detection results and identifies potential operational conditions that contribute to the detected anomalies. In Phase I, we have demonstrated the feasibility and effectiveness of WISP. We developed a realistic electricity market simulator capable of generating normal and attack market data under various operational conditions. We developed a series of cyber-attack detection and analysis algorithms and evaluated them under multiple data sources. Finally, we integrated all modules into an end-to-end software, providing functions for data management, data analytics and visualization. Specifically, we have achieved: (i) real-time data acceptance from external utility interfaces with >99% acceptance rate; (ii) high performance anomaly detection algorithms with >98% detection accuracy and <0.1% false alarm rate; and (iii) ultra-low computing delay <50 milliseconds. Additionally, our team developed algorithms to identify the vulnerable variables in electricity market operations and root cause analysis functions to identify major contributors to the price spikes. These ancillary modules are necessary when deploying WISP in real world industry environment. In Phase II, we have demonstrated the effectiveness of WISP software on realistic largescale power systems. We performed red team testing for the Phase I WISP software and identified software vulnerabilities and implemented corresponding mitigation solutions. We adapted the electricity market simulator for the Texas synthetic 2000-bus system and generated datasets for the false data injection attacks. We created database and visualization interfaces for the Texas system and the ISO New England system. We performed software optimization in terms of operation efficiency, computing speed and detection accuracy. Finally, we tested the software on the Texas system and the ISO New England system and evaluated the detection performance. Overall, we achieved above 89% detection rate, below 3% false alarm rate and below 37 seconds of end-to-end detection delay.

24 POWER TRANSMISSION AND DISTRIBUTION↗

In-flight performance of the XRISM/Resolve detector system

The Resolve instrument was launched on board the XRISM observatory in early September 2023. The Resolve spectrometer is based on a high-sensitivity X-ray calorimeter detector system (DS) that has been successfully deployed in many ground and sub-orbital spectrometers. However, the Resolve instrument is the first long-term implementation in space. The instrument will provide essential diagnostics for nearly every class of X-ray emitting objects, from galactic supernova remnants to the outskirts of galaxy clusters, without degradation for spatially extended objects. The Resolve DS consists of a 36-pixel microcalorimeter array operated at a heat sink temperature of 50 mK. In pre-flight testing, the DS demonstrated a resolving power of better than 1300 at 6 keV with a simultaneous bandpass from below 0.3 keV to above 12 keV and a timing precision better than 100μs. An anti-coincidence detector placed directly behind the microcalorimeter array effectively suppresses background. The detector energy-resolution budget included terms for interference from the Resolve cooling system and the spacecraft. Additional terms for energy-scale stability, on-orbit effects, and use of mid-grade events were also included, predicting an end-of-life, on-orbit performance for high- and mid-resolution grade events that meet the requirement of 7 eV FWHM at 6 keV. Here, we discuss the actual on-orbit performance of the Resolve DS and compare this with the performance in pre-flight testing, on-orbit predictions, and the almost identical Hitomi/SXS instrument. We will also discuss the on-orbit gain stability, an assessment of on-orbit interference, and measurements of the on-orbit background.

Astronomy and AstroPhysics↗

Probing primordial power spectrum and non-Gaussianities with fast radio bursts

We use the precision measurements of the arrivaltime differences of the same fast radio burst (FRB) source along multiple sightlines to measure the primordial power spectrum and Non-Gaussianities. The anticipated experiment requires a sightline separation of 100 AU, achieved by sending three or more radio telescopes to the outer solar system.The Shapiro time delays, measured relatively between different telescopes, are sensitive to the gradient field of the gravitational potential between different sightlines. Since the arrival time difference is independent of when the transient signal is emitted from the source, every measurement of the detected FRB source can be correlated. With enough FRB sources discovered, we can map the gravitational potential across the sky. We further calculate the two-point and three-point correlation function of the arrival time difference between telescopes for different FRB sources in the sky. If 10$^{4}$ FRBs were to be detected, our results suggest that this technique can test the inflationary scale-invariant power spectrum down to ∼ 10$^{3}$ Mpc$^{-1}$ and primordial Non-Gaussianities at a level of f$_{NL}$ ∼ 1.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

TREAT Neutronics Analysis and Design Support, Part I: Multi-SERTTA

Experiment vehicle design is necessary in preparation for Transient Reactor Test (TREAT) facility restart and the resumption of transient testing to support Accident Tolerant Fuel (ATF) characterization and other future fuels testing requirements. Currently the most mature vehicle design is the Multi-SERTTA (Static Environments Rodlet Transient Test Apparatuses), which can accommodate up to four concurrent rodlet-sized specimens under separate environmental conditions. Robust test vehicle design requires neutronics analyses to support design development, optimization of the power coupling factor (PCF) to efficiently maximize energy generation in the test fuel rodlets, and experiment safety analyses. Calculations were performed to support analysis of a near-final design of the Multi-SERTTA vehicle, the design process for future TREAT test vehicles, and establish analytical practices for upcoming transient test experiments. Models of the Multi-SERTTA vehicle containing typical PWR-fuel rodlets were prepared and neutronics calculations were performed using MCNP6.1 with ENDF/B-VII.1 nuclear data libraries. Calculation of the PCF for reference conditions of a PWR fuel rodlet in clean water at operational temperature and pressure provided results between 1.10 and 1.74 W/g-MW depending on the location of the four Multi-SERTTA units with the stack. Basic changes to the Multi-SERTTA secondary vessel containment and support have minimal impact on PCF; using materials with less neutron absorption can improve expected PCF values, especially in the primary containment. An optimized balance is needed between structural integrity, experiment safety, and energy deposition in the experiment. Type of medium and environmental conditions within the primary vessel surrounding the fuel rodlet can also have a significant impact on resultant PCF values. The estimated reactivity insertion worth into the TREAT core is impacted more by the primary and secondary Multi-SERTTA vehicle structure with the experiment content and contained environment having a near negligible impact on overall system reactivity. Additional calculations were performed to evaluate the peak-to-average assembly powers throughout the TREAT core, as well as the nuclear heat generation for the various structural components of the Multi-SERTTA assembly. Future efforts include the evaluation of flux collars to shape the PCF for individual Multi-SERTTA units during an experiment such as to achieve uniformity in test unit environmental conditions impacted by the non-uniform axial flux/power profile of TREAT. Upon resumption of transient testing, experimental results from both the Multi-SERTTA and Multi-SERTTA-CAL will be compared against calculational results and methods for further optimization and design strategies.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

TREAT neutronics analysis and design support, Part I: Multi-SERTTA

Experiment vehicle design is necessary in preparation for Transient Reactor Test (TREAT) facility restart and the resumption of transient testing to support Accident Tolerant Fuel (ATF) characterization and other future fuels testing requirements. Currently the most mature vehicle design is the Multi-SERTTA (Static Environments Rodlet Transient Test Apparatuses), which can accommodate up to four concurrent rodlet-sized specimens under separate environmental conditions. Robust test vehicle design requires neutronics analyses to support design development, optimization of the power coupling factor (PCF) to efficiently maximize energy generation in the test fuel rodlets, and experiment safety analyses. Calculations were performed to support analysis of a near-final design of the Multi-SERTTA vehicle, the design process for future TREAT test vehicles, and establish analytical practices for upcoming transient test experiments. Models of the Multi-SERTTA vehicle containing typical PWR-fuel rodlets were prepared and neutronics calculations were performed using MCNP6.1 with ENDF/B-VII.1 nuclear data libraries. Calculation of the PCF for reference conditions of a PWR fuel rodlet in clean water at operational temperature and pressure provided results between 1.10 and 1.73 W/g-MW depending on the location of the four Multi-SERTTA units with the stack. Basic changes to the Multi-SERTTA secondary vessel containment and support have minimal impact on PCF; using materials with less neutron absorption can improve expected PCF values, especially in the primary containment. An optimized balance is needed between structural integrity, experiment safety, and energy deposition in the experiment. Type of medium and environmental conditions within the primary vessel surrounding the fuel rodlet can also have a significant impact on resultant PCF values. The estimated reactivity insertion worth into the TREAT core is impacted more by the primary and secondary Multi-SERTTA vehicle structure with the experiment content and contained environment having a near negligible impact on overall system reactivity. Additional calculations were performed to evaluate the peak-to-average assembly powers throughout the TREAT core, as well as the nuclear heat generation for the various structural components of the Multi-SERTTA assembly. Future efforts include the evaluation of flux collars to shape the PCF for individual Multi-SERTTA units during an experiment such as to achieve uniformity in test unit environmental conditions impacted by the non-uniform axial flux/power profile of TREAT. Upon resumption of transient testing, experimental results from both the Multi-SERTTA and Multi-SERTTA-CAL will be compared against calculational results and methods for further optimization and design strategies. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Inference of the linear matter power spectrum at z = 0 using DESI DR1 Full-Shape data

Measurements of galaxy distributions at large cosmic distances capture clustering from the past. In this study, we use a cosmological model to translate these observations into the present-day galaxy distribution. Specifically, we reconstruct the 3D linear matter power spectrum at redshift z = 0 using Dark Energy Spectroscopic Instrument (DESI) Year 1 (DR1) galaxy clustering data and Cosmic Microwave Background (CMB) observations, assuming the ΛCDM model, and compare it to the result assuming the w 0 w a CDM model. Building on previous state-of-the-art methods, we apply Effective Field Theory (EFT) modelling of the galaxy power spectrum to account for small-scale effects in the 2-point statistics of galaxy data. Implementation of the EFT approach improves the modelling of the galaxy power spectrum, providing a more robust consistency test of the assumed cosmological model. By casting both CMB and galaxy clustering observations, spanning distinct redshift regimes, into k-space, we can identify discrepancies between the datasets of different redshifts, which would indicate potential inaccuracies in the assumed expansion history. While previous studies have shown consistency with ΛCDM, this work extends the analysis with higher-quality data to further test the expansion histories of both ΛCDM and w 0 w a CDM. Our findings show that both ΛCDM and w 0 w a CDM provide consistent fits to the linear matter power spectrum recovered from DESI DR1 data.

cosmological parameters from LSS↗

Light Water Reactor Sustainability Program: Advanced Instrumentation, Information, and Control Systems Technologies Technical Program Plan for 2013

Reliable instrumentation, information, and control (II&C) systems technologies are essential to ensuring safe and efficient operation of the U.S. light water reactor (LWR) fleet. These technologies affect every aspect of nuclear power plant (NPP) and balance-of-plant operations. In 1997, the National Research Council conducted a study concerning the challenges involved in modernizing existing analog-based instrumentation and controls with digital instrumentation and control systems in NPPs. Their findings identified the need for new II&C technology integration. The objective of these efforts is to develop, demonstrate, and support deployment of new digital II&C technologies for nuclear process control, enhance worker performance, and provide enhanced monitoring capabilities to ensure the continued safe, reliable, and economic operation of the nation’s NPPs. Digital II&C technologies are deployed in a number of power generation settings worldwide. Current instrumentation and human-machine interfaces in the nuclear power sector employ analog technologies. In other power generation sectors, analog technologies have largely been replaced with digital technologies. This is in part due to the manufacturing and product support base transitioning to these newer technologies. It also accompanies the transition of education curricula for I&C engineers to digital technologies. Consequently, product manufacturers refer to analog I&C as having reached the end of its useful service life. Although considered obsolete by other industries, analog I&C continues to function reliably, though spare and replacement parts are becoming increasingly scarce as is the workforce that is familiar with and able to maintain it. Analog I&C was also the predominant means used for process control in an era when human labor was more affordable, and maintaining an I&C technology base through a larger workforce conducting frequent rounds for surveillances, inspections, and tests was accepted in the nuclear power generation business model. Today’s power generation business climate is much different and II&C technologies are needed in the long run that are more highly automated and require less cost to operate and maintain, are as highly reliable as those used today, and will be familiar to a future work force. They should also enable performance gains for the utility so that they are not merely a sunken cost, as this would weigh heavily on the balance sheet at a time of particularly high cost competitiveness in electricity markets.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Comprehensive Comparison of Methods for Evaluating Dispatch of Long-Duration Energy Storage in Power Systems Models

Long-duration energy storage (LDES) could play a pivotal role in the transformation of electricity grids with high shares of variable renewable energy (VRE) such as solar and wind. However, the weather-dependent nature of VRE introduces challenges for grid balancing and stability, which LDES - along with short-duration energy storage (SDES) - can help address. However, modeling LDES in production cost models (PCMs) is particularly challenging due to the need for high temporal resolution over extended optimization windows while preserving chronology, which ensures the alignment of energy storage operations with VRE generation over multi-day periods. This report compares traditional dispatch methods with advanced LDES dispatch strategies, such as the extended horizon approach, across different PCM platforms and examines tradeoffs and scalability. The comparison reveals that the traditional 1-day optimization horizon within the PCM leads to inefficient utilization of LDES. In contrast, extending the optimization horizon as much as possible significantly reduces curtailment and improves storage dispatch, especially in renewable-dense systems. There is also promise in using state-of-charge or end volume targets set by an external model, however this requires an additional modeling set and generally increases computational burden. This paper presents a comparison of these various methods in a number of power systems, showing algorithms initially in small test systems and scaling up to large, country-wide simulations. Overall, the research presents the trade-offs of various computational methods and illustrates how LDES may play an essential role in power systems of the future.

14 SOLAR ENERGY↗

Experience in the Implementation of an Automatic System for Stabilizing the Mode of a Power District in Terms of Voltage and Reactive Power

Questions regarding the creation of a power district two-level control system for voltage and reactive power overflows are examined. Objectives and tasks are designated for the control system, and resolution of this makes it possible to increase the power efficiency of the power grid company. A methodology for controlling equipment at the substation (SS) level is briefly described, as well as expansion and test results on a dynamic model of the power grid.

42 ENGINEERING↗

Joint analysis of 6dFGS and SDSS peculiar velocities for the growth rate of cosmic structure and tests of gravity

ABSTRACT Measurement of peculiar velocities by combining redshifts and distance indicators is a powerful way to measure the growth rate of a cosmic structure and test theories of gravity at low redshift. Here we constrain the growth rate of the structure by comparing observed Fundamental Plane peculiar velocities for 15 894 galaxies from the 6dF Galaxy Survey (6dFGS) and Sloan Digital Sky Survey (SDSS) with predicted velocities and densities from the 2M++ redshift survey. We measure the velocity scale parameter $\beta \equiv {\Omega _{\rm m}^\gamma }/b = 0.372^{+0.034}_{-0.050}$ and $0.314^{+0.031}_{-0.047}$ for 6dFGS and SDSS, respectively, where Ωm is the mass density parameter, γ is the growth index, and b is the bias parameter normalized to the characteristic luminosity of galaxies, L*. Combining 6dFGS and SDSS, we obtain β = 0.341 ± 0.024, implying that the amplitude of the product of the growth rate and the mass fluctuation amplitude is fσ8 = 0.338 ± 0.027 at an effective redshift z = 0.035. Adopting Ωm = 0.315 ± 0.007, as favoured by Planck and using γ = 6/11 for General Relativity and γ = 11/16 for DGP gravity, we get $S_8(z=0) = \sigma _8 \sqrt{\Omega _{\rm m}/0.3} =0.637 \pm 0.054$ and 0.741 ± 0.062 for GR and DGP, respectively. This measurement agrees with other low-redshift probes of large-scale structure but deviates by more than 3σ from the latest Planck CMB measurement. Our results favour values of the growth index γ > 6/11 or a Hubble constant H0 > 70 km s−1 Mpc−1 or a fluctuation amplitude σ8 < 0.8 or some combination of these. Imminent redshift surveys such as Taipan, DESI, WALLABY, and SKA1-MID will help to resolve this tension by measuring the growth rate of cosmic structure to 1 per cent in the redshift range 0 < z < 1.

Said, Khaled↗

Design and Simulation of a Novel Mechanical Power Take-Off for a Two-Body Wave Energy Point Absorber

In this paper, a two-body self-react wave energy converter with a novel mechanical Power Take-off (PTO) is introduced. The PTO rectifies the mechanical motion and regulates the flow with a mechanism called Mechanical Motion Rectifier (MMR), which converts the reciprocating motion of the ocean wave into unidirectional rotation of the generator. The overall system is analyzed in both time and frequency domain. In time domain, the piecewise non-linear dynamic model of the MMR PTO is derived, and parameters that could significantly influence the MMR property is extracted. By building the model into WEC-Sim, a time domain wave energy converter (WEC) simulation tool, to simulate and evaluate the performance of the PTO. In addition, the system is modelled as a two-body vibration system for frequency domain analysis in order to further investigate and optimize the proposed wave energy converter. The tunable parameters within the system, including the equivalent mass, the equivalent damping coefficient, and the PTO stiffness, are discussed based on the criteria of maximization of the total output power. To verify the theoretical analysis, a bench test prototype is developed and tested on a hydraulic test machine. The experimental results in line with the derived model and can be used for reasonable estimation on the output power of the proposed system in real ocean conditions.

16 TIDAL AND WAVE POWER↗

Convex Relaxations of the Network Flow Problem Under Cycle Constraints

In this paper, we consider the problem of optimizing the flows in a lossless flow network with additional nonconvex cycle constraints on nodal variables; such constraints appear in several applications, including electric power, water distribution, and natural gas networks. This problem is a nonconvex version of the minimum-cost network flow problem (NFP), and to solve it, we propose three different approaches. One approach is based on solving a convex approximation of the problem, obtained by augmenting the cost function with an entropy-like term to relax the nonconvex constraints. We show that the approximation error, for which we give an upper bound, can be made small enough for practical use. An alternative approach is to solve the classical NFP, that is, without the cycle constraints, and solve a separate optimization problem afterwards in order to recover the actual flows satisfying the cycle constraints; the solution of this separate problem maximizes the individual entropies of the cycles. The third approach is based on replacing the nonconvex constraint set with a convex inner approximation, which yields a suboptimal solution for the cyclic networks with each edge belonging to at most two cycles. We validate the practical usefulness of the theoretical results through numerical examples, in which we study the standard test systems for water and electric power distribution networks.

42 ENGINEERING↗

Microgrid Testing

With the publication of IEEE 1574.4 Guide for Design, Operation, and Integration of Distributed Resource Island Systems with Electric Power Systems, there is an increasing amount of attention on not only the design and operations of microgrids, but also on the proper operation and testing of these systems. This standard provides alternative approaches and good practices for the design, operation, and integration of microgrids. This includes the ability to separate from and reconnect to part of the utility grid while providing power to the islanded power system. This presentation addresses the industry need to develop standardized testing and evaluation procedures for microgrids in order to assure quality operation in the grid connected and islanded modes of operation.

24 POWER TRANSMISSION AND DISTRIBUTION↗