Search NASA⌕ Search

SEARCH · Search NASA

Results for “Technology and Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,675 records · Page 93

Turnaround operations analysis for OTV. Volume 2: Detailed technical report

The objectives and accomplishments were to adapt and apply the newly created database of Shuttle/Centaur ground operations. Previously defined turnaround operations analyses were to be updated for ground-based OTVs (GBOTVs) and space-based OTVs (SBOTVs), design requirements identified for both OTV and Space Station accommodations hardware, turnaround operations costs estimated, and a technology development plan generated to develop the required capabilities. Technical and programmatic data were provided for NASA pertinent to OTV round and space operations requirements, turnaround operations, task descriptions, timelines and manpower requirements, OTV modular design and booster and Space Station interface requirements. SBOTV accommodations development schedule, cost and turnaround operations requirements, and a technology development plan for ground and space operations and space-based accommodations facilities and support equipment. Significant conclusion are discussed.

Source record↗

Environmentally improved CdTe photovoltaic recycling through novel technologies and facility location strategies

Abstract Photovoltaic waste is projected to reach up to 78 million tons across globally dispersed locations through 2050. Current recycling infrastructure is inadequate to process these waste volumes responsibly. This necessitates commercializing novel, environmentally advantageous photovoltaic recycling technologies that improve upon incumbent industrial operations. CdTe photovoltaic recycling is a promising candidate for improvements as 25,000 tons of spent modules are recycled worldwide annually. This paper evaluates the operational performance and compares six novel technologies, the incumbent technology used in industry and one technology which extends the incumbent process across ten environmental impact categories. The tradeoff between incurring a transportation burden (ship or road) to recycle in a large‐scale centralized facility with a higher operational efficiency and avoiding transportation by recycling in a small‐scale decentralized facility with a lower operational efficiency is evaluated. Thermal delamination to eliminate the ethylene vinyl acetate and separate the photovoltaic glass panels is preferable to the incumbent mechanical process across nine environmental impact categories and decreases the climate‐change impact of CdTe photovoltaic recycling by 23%. Bath and probe sonication are ineffective for delamination, and the use of organic solvents is more environmentally burdensome than the incumbent mechanical process. Centralized recycling with shipping is environmentally preferable than with road‐based transportation. For every 100‐km increase in road transportation from the decentralized to the centralized facility, the inventory requirement in the centralized facility should be 6% lower than the decentralized facility for centralized recycling to have a lower climate‐change impact than decentralized recycling. The corresponding value for shipping is 0.4%.

Ravikumar, Dwarakanath↗

The Maintainable Fusion Pilot Plant

The US fusion community has coalesced around the goal of building an FPP as described by the National Academies of Science, Engineering, and Medicine (NASEM). In addition to demonstrating the viability of the technologies necessary to operate such a plant, including demonstration of net energy and electricity production, NASEM found that a “fusion pilot plant will need to demonstrate the ability to efficiently perform remote maintenance and replacement in support of the design of a power plant, taking into account details of the consequences of the fusion environment, such as material activation and tritium retention in components.” Current designs of fusion demonstration reactors do usually foresee a regular exchange of their first wall modules, including the tritium breeding blankets. In the European Power Plant Conceptual Studies, it is assumed that a fusion reactor will need to change its divertor every 2 years and its first wall blanket module every 5 to 6 years to reach acceptable availability. Underlying this capability are remote-handling technologies to keep the outage for the exchange of these components short. There are many uncertainties in the remote-handling schemes, and most schemes are at a preconceptual level at best. In addition, the exchange of these components would either produce an enormous rad-waste stream or would require an enormous refurbishment activity with huge cost-prohibitive hot-cells. Past Fusion Nuclear Science Facility (FNSF) preconceptual studies have led to hot cell dimensions of an unbelievable size, likely costing tens of billions of dollars. Already at The Way (previously International Thermonuclear Experimental Reactor, ITER), hot-cells have become cost-prohibitive, demanding redesigns of the ITER first wall to reduce the toxic rad-waste/inventory. In this in-situ PFC repair project, a concept for a long-life, maintainable first wall module concept is developed and tested. This first wall concept relies on innovative remote handling to repair the first wall modules in-situ, avoiding costly refurbishments outside of the tokamak vessel. This approach was highlighted in the Fusion Energy Sciences Advisory Committee (FESAC) report on Transformative Enabling Capabilities for Efficient Advance Toward Fusion Energy. In general, the damage of the first wall armor is due to particle and radiation exposures. Load conditions vary from one fusion reactor design to another. In tokamaks, first wall Plasma Facing Components (PFCs) are exposed to far-Scrape-Off-Layer plasma fluxes, electromagnetic radiation, energetic CX neutrals, and potentially runaway electron beams. Protecting the first wall to the worst-case load conditions would require the design of a very thick first wall armor. Transient heat and particle fluxes due to disruptions or edge localized modes can lead to excessive heat loads resulting potentially in melting PFCs down to the cooling channel. Catastrophic events like these need to be avoided by appropriate disruption mitigation systems. However, failure of these systems will still put a first wall at an unacceptable risk. Hence, a first wall design needs to accommodate the occasional transient heat loads by introducing sacrificial limiters, which will absorb these transients.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

ConocoPhillips Sweeny IGCC/CCS Project

Under its Industrial Carbon Capture and Sequestration (ICCS) Program, the United States (U.S.) Department of Energy (DOE) selected ConocoPhillips Company (ConocoPhillips) to receive funding through the American Recovery and Reinvestment Act (ARRA) of 2009 for the proposed Sweeny Integrated Gasification Combined Cycle (IGCC)/Carbon Capture and Storage (CCS) Project (Project) to be located in Brazoria County, Texas. Under the program, the DOE is partnering with industry to demonstrate the commercial viability and operational readiness of technologies that would capture carbon dioxide (CO{sub 2}) emissions from industrial sources and either sequester those emissions, or beneficially reuse them. The primary objective of the proposed Project was to demonstrate the efficacy of advanced technologies that capture CO{sub 2} from a large industrial source and store the CO{sub 2} in underground formations, while achieving a successful business venture for the entity (entities) involved. The Project would capture 85% of the CO{sub 2} produced from a petroleum coke (petcoke) fed, 703 MWnet (1,000 MWgross) IGCC power plant, using the ConocoPhillips (COP) proprietary and commercially proven E-Gas{trademark} gasification technology, at the existing 247,000 barrel per day COP Sweeny Refinery. In addition, a number of other commercially available technologies would be integrated into a conventional IGCC Plant in a unique, efficient, and reliable design that would capture CO{sub 2}. The primary destination for the CO{sub 2} would be a depleted natural gas field suitable for CO{sub 2} storage ('Storage Facility'). COP would also develop commercial options to sell a portion of the IGCC Plant's CO{sub 2} output to the growing Gulf Coast enhanced oil recovery (EOR) market. The IGCC Plant would produce electric power for sale in the Electric Reliability Council of Texas Houston Zone. The existing refinery effluent water would be treated and reused to fulfill all process water needs. The DOE ICCS program adopts a two-phase approach. During the 7-month Phase 1 period, ConocoPhillips further defined the Project by advancing the preliminary design, permits, and contracts. In addition, ConocoPhillips was developing a Phase 2 renewal application to seek continued DOE funding for the Project's design, construction, and early operations. The DOE and ConocoPhillips entered into a Phase1 Cooperative Agreement (DOE Award Number DE-FE0001859) on November 16, 2009, agreeing to share cost on a 50/50 basis during the Phase 1 period, with a DOE budget of $2,989,174. On April 7, 2010, ConocoPhillips informed the DOE that it would not participate in Phase 2 of the DOE ICCS program. The company believes that enabling legislation and regulations at both the federal and state levels will not be approved and implemented in time to make a final investment decision such that the Project would be substantially constructed by September 30, 2015, the end of the AARA funding period. Considering current price assumptions, the Project would not generate investment level returns. ConocoPhillips elected not to submit a Phase 2 renewal application, which was due on April 16, 2010. This Final Scientific/Technical Report provides an overview of the Project, including highlights and benefits of the proposed carbon capture and storage project scope, sites, and technologies. It also summarizes the work accomplishments during the Phase 1 period from November 16, 2009 to June 16, 2010. Due to ConocoPhillips decision not to submit the Phase 2 renewal application and not to enter into related agreements, certain information regarding the proposed CO{sub 2} storage facility cannot be publicly reported due to confidentiality agreements.

01 COAL, LIGNITE, AND PEAT↗

Laramie County Community College: Utility-Scale Wind Energy Technology (Final Technical Report)

The Utility-Scale Wind Energy Technology U.S. Department of Energy (DOE) grant EE0000538, provided a way ahead for Laramie County Community College (LCCC) to increase educational and training opportunities for students seeking an Associate of Applied Science (AAS) or Associate of Science (AS) degree in Wind Energy Technology. The DOE grant enabled LCCC to program, schedule, and successfully operate multiple wind energy technology cohorts of up to 20-14 students per cohort simultaneously. As of this report, LCCC currently runs four cohorts. In addition, the DOE grant allowed LCCC to procure specialized LABVOLT electronic equipment that directly supports is wind energy technology curriculum.

17 WIND ENERGY↗

Cost-effective implementation of intelligent systems

Significant advances have occurred during the last decade in knowledge-based engineering research and knowledge-based system (KBS) demonstrations and evaluations using integrated intelligent system technologies. Performance and simulation data obtained to date in real-time operational environments suggest that cost-effective utilization of intelligent system technologies can be realized. In this paper the rationale and potential benefits for typical examples of application projects that demonstrate an increase in productivity through the use of intelligent system technologies are discussed. These demonstration projects have provided an insight into additional technology needs and cultural barriers which are currently impeding the transition of the technology into operational environments. Proposed methods which addresses technology evolution and implementation are also discussed.

Lum, Henry, Jr.↗

Demonstration of Two Extended Visual Line of Sight Methods for Urban UAV Operations

This report describes two extended visual line of sight (EVLOS) methods developed and utilized during two flight campaigns over the campus of NASA Langley Research Center (LaRC): a chase vehicle method and a radio controlled (RC) pilot handoff method. These campaigns were performed to (a) evaluate small unmanned aerial system (sUAS) flight beyond the visual line of sight (BVLOS) of the ground control station operator and (b) test technologies under development to enable a transition from EVLOS to BVLOS operations. While an autonomous waypoint-based operational approach enabled minimal pilot intervention in both methods, range containment was enforced (a) manually via continual pilot visual monitoring and (b) autonomously via on-board contingency landing autonomy triggerable at the boundary of stay-in geofences. In the thirty-nine flights which utilized the chase vehicle, the pilot followed the sUAS flying a 1.2 km path at 40m altitude over urban streets. In the fifteen flights which utilized pilot handoff, a pilot at one end of a 1.5 km path initiated the flight at 120m altitude over buildings and trees, and at the midway point of the path transferred radio control to a pilot at the other end. In comparison, the chase vehicle method requires less ground crew and simpler avionics, while the pilot handoff method avoids schedule risk arising from street traffic congestion but better replicates actual direct routing for BVLOS flights. Collision risk with another aircraft was introduced in both campaigns and mitigated with the same manual and autonomous methods. Results from these campaigns serve as a basis for planned BVLOS operations at NASA LaRC.

Nicholas Rymer↗

Environmental and Operational Performance of CO2-EOR as a CCUS Technology: A Cranfield Example with Dynamic LCA Considerations

This study evaluates the potential of carbon dioxide-enhanced oil recovery (CO2-EOR) to reduce greenhouse gas emissions without compromising oil production goals. A novel, dynamic carbon lifecycle analysis (d-LCA) was developed and used to understand the evolution of the environmental impact (CO2 emissions) and mitigation (geologic CO2 storage) associated with an expanded carbon capture, utilization and storage (CCUS) system, from start to closure of operations. EOR operational performance was assessed through CO2 utilization rates, which relate usage of CO2 to oil production. Because field operational strategies have a significant impact on reservoir engineering parameters that affect both CO2 storage and oil production (e.g., sweep efficiency, flood conformance, fluid saturation distribution), we conducted a scenario analysis that assessed the operational and environmental performance of four common and novel CO2-EOR field development strategies. Each scenario was evaluated with and without stacked saline carbon storage, an EOR/storage combination strategy where excess CO2 from the recycling facility is injected into an underlying saline aquifer for long-term carbon storage. The dynamic interplay between operational and environmental performance formed the basis of our CCUS technology analysis. The results showed that all CO2-EOR evaluated scenarios start operating with a negative carbon footprint and, years into the project, transitioned into operating with a positive carbon footprint. The transition points were significantly different in each scenario. Water-alternating-gas (WAG) was identified as the CO2 injection strategy with the highest potential to co-optimize EOR and carbon storage goals. The results provide an understanding of the evolution of the system’s net carbon balance in all four field development strategies studied. The environmental performance can be significantly improved with stacked storage, where a negative carbon footprint can be maintained throughout the life of the operation in most of the injection scenarios modelled. This information will be useful to CO2-EOR operators seeking value in storing more CO2 through a carbon credit program (e.g., the 45Q carbon credit program in the USA). Most importantly, this study serves as confirmation that CO2-EOR can be operationally designed to both enhance oil production and reduce greenhouse gas emissions into the atmosphere.

58 GEOSCIENCES↗

Raising Nuclear Thermal Propulsion (NTP) Technology Readiness Above 3

NTP development is currently supported by the NASA program office "Advanced Exploration Systems". The concept is a main propulsion option being considered for human missions to Mars in the 2030's. Major NTP development took place in the 1960's and 1970's under the Rover/NERVA program. The technology had matured to TRL 6 and was preparing to go to TRL 7 with a prototype flight engine before the program was cancelled. Over the last 40 years, a variety of continuations started, but only lasted a few years each. The Rover/NERVA infrastructure is almost all gone. The only remains are a few pieces of hardware, final reports and a few who worked the Rover/NERVA. Two types of nuclear fuel are being investigated to meet the current engine design specific impulse of 900 seconds compared to approximately 850 seconds demonstrated during Rover/NERVA. One is a continuation of composite fuel with new coatings to better control mid-band corrosion. The other type is a CERMET fuel made of Tungsten and UO2. Both fuels are being made from Rover/NERVA lessons learned, but with slightly different recipes to increase fuel endurance at higher operating temperatures. The technology readiness level (TRL) of these current modified reactor fuels is approximately TRL 3. To keep the development cost low and help mature the TRL level past 4 quickly, a few special non-nuclear test facilities have been made to test surrogate fuel, with depleted uranium, as coupons and full length elements. Both facilities utilize inductive heating and are licensed to handle depleted uranium. TRL 5 requires exposing the fuel to a nuclear environment and TRL 6 requires a prototype ground or flight engine system test. Currently, three different NTP ground test facility options are being investigated: exhaust scrubber, bore hole, and total exhaust containment. In parallel, a prototype flight demonstration test is also being studied. The first human mission to Mars in the 2030's is currently 2033. For an advanced propulsion concept to be seriously considered for use, the engine development plans need to show it is feasible and affordable to reach TRL 8 by 2027 and can be qualified for human mission use.

Gerrish, Harold P., Jr.↗

Object-oriented technologies in a multi-mission data system

The Operations Engineering Laboratory (OEL) at JPL is developing new technologies that can provide more efficient and productive ways of doing business in flight operations. Over the past three years, we have worked closely with the Multi-Mission Control Team to develop automation tools, providing technology transfer into operations and resulting in substantial cost savings and error reduction. The OEL development philosophy is characterized by object-oriented design, extensive reusability of code, and an iterative development model with active participation of the end users. Through our work, the benefits of object-oriented design became apparent for use in mission control data systems. Object-oriented technologies and how they can be used in a mission control center to improve efficiency and productivity are explained. The current research and development efforts in the JPL Operations Engineering Laboratory are also discussed to architect and prototype a new paradigm for mission control operations based on object-oriented concepts.

Murphy, Susan C.↗

Microwave Radiometry at Frequencies from 500 to 1400 MHz: An Emerging Technology for Earth Observations

Microwave radiometry has provided valuable spaceborne observations of Earth's geophysical properties for decades. The recent SMOS, Aquarius, and SMAP satellites have demonstrated the value of measurements at 1400 MHz for observing surface soil moisture, sea surface salinity, sea ice thickness, soil freeze/thaw state, and other geophysical variables. However, the information obtained is limited by penetration through the subsurface at 1400 MHz and by a reduced sensitivity to surface salinity in cold or wind-roughened waters. Recent airborne experiments have shown the potential of brightness temperature measurements from 500–1400 MHz to address these limitations by enabling sensing of soil moisture and sea ice thickness to greater depths, sensing of temperature deep within ice sheets, improved sensing of sea salinity in cold waters, and enhanced sensitivity to soil moisture under vegetation canopies. However, the absence of significant spectrum reserved for passive microwave measurements in the 500–1400 MHz band requires both an opportunistic sensing strategy and systems for reducing the impact of radio-frequency interference. Here, we summarize the potential advantages and applications of 500–1400 MHz microwave radiometry for Earth observation and review recent experiments and demonstrations of these concepts. We also describe the remaining questions and challenges to be addressed in advancing to future spaceborne operation of this technology along with recommendations for future research activities.

Microwave radiometry↗

Microwave Radiometry at Frequencies From 500 to 1400 MHz: An Emerging Technology for Earth Observations

Microwave radiometry has provided valuable spaceborne observations of Earth's geophysical properties for decades. The recent SMOS, Aquarius, and SMAP satellites have demonstrated the value of measurements at 1400 MHz for observing surface soil moisture, sea surface salinity, sea ice thickness, soil freeze/thaw state, and other geophysical variables. However, the information obtained is limited by penetration through the subsurface at 1400 MHz and by a reduced sensitivity to surface salinity in cold or wind-roughened waters. Recent airborne experiments have shown the potential of brightness temperature measurements from 500–1400 MHz to address these limitations by enabling sensing of soil moisture and sea ice thickness to greater depths, sensing of temperature deep within ice sheets, improved sensing of sea salinity in cold waters, and enhanced sensitivity to soil moisture under vegetation canopies. However, the absence of significant spectrum reserved for passive microwave measurements in the 500–1400 MHz band requires both an opportunistic sensing strategy and systems for reducing the impact of radio-frequency interference. Here, we summarize the potential advantages and applications of 500–1400 MHz microwave radiometry for Earth observation and review recent experiments and demonstrations of these concepts. We also describe the remaining questions and challenges to be addressed in advancing to future spaceborne operation of this technology along with recommendations for future research activities.

microwave radiometry↗

Broad specification fuels technology program, phase 1

An experimental evaluation was conducted to assess the impact of the use of broadened properties fuels on combustor design concepts. Emphasis was placed on establishing the viability of design modifications to current combustor concepts and the use of advanced technology concepts to facilitate operation on Experimental Referee Broad Specification (ERBS) fuel while meeting exhaust emissions and performance specifications and maintaining acceptable durability. Three different combustor concepts, representative of progressively more aggressive technology levels, were evaluated. When operated on ERBS rather than Jet A fuel, a single stage combustor typical of that in the most recent versions of the JT9D-7 engine was found to produce excess carbon monoxide emissions at idle and elevated liner temperatures at high power levels that were projected to reduced liner life by 13 percent. The introduction of improved component technology, such as refined fuel injectors and advanced liner cooling concepts were shown to have the potential of enhancing the fuel flexibility of the single stage combustor.

Lohmann, R. P.↗

Development of an Alternative Approach to Demonstrating Environmental Performance in the UK - 19354

European basic safety standards require that exposure of humans to the potentially harmful effects of ionising radiation are optimised so that they are as low as reasonably achievable, taking account of economic and societal factors. In the United Kingdom the responsibility for ensuring that exposures to humans are optimised is split between two regulatory functions. The Office of Nuclear Regulation regulates exposures to workers in all scenarios and to members of the public in the event of an accident. Environmental regulators in each of the four nations comprising the United Kingdom regulate exposures to members of the public from normal operations. Since the early 1990's, all permissions granted to nuclear sites in the UK for the discharge/disposal of radioactive waste to the environment have contained conditions requiring holders to demonstrate that they minimise the generation of radioactive waste, apply appropriate abatement and discharge/dispose of it in a way that minimises impacts on members of the public and the environment. For many years, the industry standard for providing this demonstration, which was heavily influenced by regulatory expectations and feedback, was to undertake one or a series of multi-attribute decision assessments (MADA). Wood's team of environmental specialists has been involved in undertaking such MADA studies for many years. Since the mid-2000's, our team has become increasingly aware of some of the limitations of undertaking MADA to demonstrate environmental performance for large scale new nuclear build projects and, in particular, the next generation of new nuclear power stations that are being planned and implemented in the UK. We have collaborated with the vendors of reactor technologies, the prospective/owner operators of new nuclear power stations and the developers of new facilities on existing sites to develop an alternative approach to demonstrating environmental performance. Our alternative approach comprises three main pillars which are summarised as: - Evolution - benefit from progressive improvements, operational experience and recent permitting activities. Our alternative approach uses the claim, argument, evidence approach which is commonly used for nuclear safety cases and which allows us to 'tell the story' of how environmental performance has been achieved. We have successfully deployed this approach for all new nuclear power stations proposed in the UK. - Integration - ensure that optimisation is integrated into the project programme and forms part of the 'big picture'. Our alternative approach allows environmental performance to be managed better throughout the life cycle of the project and ensures that our outputs are 'living' documents and do not 'sit on the shelf'. We have successfully demonstrated how this can be applied during rationalisation of major schemes and significant design changes on nuclear new build projects. - Opportunity - identify the best time to deliver elements of the programme. Our alternative approach aims to minimise the overall time, trouble and costs associated with demonstrating environmental performance by ensuring that decisions are made at the time when they offer greatest benefit and by minimising unnecessary rework. Our advice has helped to reduce the project costs and minimise delays associated with regulatory queries and interventions. This paper describes the journey that we have taken with our clients in developing our alternative approach to demonstrating environmental performance. We explain the UK regulatory context and explore the need for change. We present a number of case studies related to new nuclear power stations and other new facilities on existing nuclear sites that demonstrate the successful application of our alternative approach. We provide examples of how we have successfully implemented the outputs of our alternative approach into project and corporate management arrangements. Finally, we examine feedback from clients, regulators and other interested parties to propose future refinements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of an Advanced Integrated Operations Concept for Hybrid Control Rooms

The U.S. Nuclear Industry has an urgent need to reduce the operations and maintenance costs to remain economically competitive in today’s energy market. Measures to improve efficiency in operations will need to leverage technology in a way that safely transforms how plants are operated. This work describes the development of an integrated operations concept that integrates data from existing Instrumentation and Control (I&C) infrastructure, upgraded I&C systems, new sensors, and field technologies such as computer-based procedures to provide operators with centralized, streamlined instructions. The concept was developed to allow for an operator to remotely supervise many plant activities and to dramatically streamline plant operations and maintenance. This report describes the design philosophy, the analysis used to inform design, the implementation in the Human Systems Simulation Laboratory, and illustrates the design concept.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Aging Infrastructure: Application of System Health Monitoring at the Defense Waste Processing Facility - 16069

The disposition of high level waste (HLW) into borosilicate glass canistered waste forms began at SRS in 1996. Since that time, the Defense Waste Processing Facility (DWPF) has produced nearly four thousand HLW canisters. The DWPF is now approaching 20 years of radioactive service and 25 years of operation since the commencement of nonradioactive testing in 1990. Many facility systems are challenged by equipment or component obsolescence, which places a premium on proper work planning, engineering, and maintenance resource allocation to ensure facility reliability. To this end, Savannah River Remediation (SRR) implements programs and procedures for performance monitoring of structures, systems, and components (SSCs) within all of its processing facilities. As these programs have matured, they have helped to identify vulnerabilities within facility systems and provided a framework for ranking system assets to ensure correct priority is established and maintained. This paper provides an overview of how SRR structures and implements system performance monitoring with specific focus on the recent replacement of the DWPF Safety Grade Purge Flowmeters. This case study will discuss: 1) How the performance monitoring process identified an availability risk due to the minimal vendor support for the in-use flow transmitters, 2) The design changes developed as part of the project to transition to a different measurement technology, which includes operational lessons learned from the original installation, 3) The execution of the replacement effort, which was complicated by the fact that the purge system is a Vital Safety System (VSS) and not easily taken out of service for extended maintenance, and 4) The need to consider future maintainability, particularly given that continued acceleration in technical innovation will likely increase the frequency of equipment obsolescence. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Crisis action planning and replanning using SIPE-2

Rome Laboratory and DARPA are jointly sponsoring an initiative to develop the next generation of AI planning and scheduling technology focused on military operations planning, especially for crisis situations. SRI International has demonstrated their knowledge-based planning technology in this domain with a system called SOCAP, System for Operations Crisis Action Planning. SOCAP's underlying power comes from SIPE-2, a hierarchical, domain-independent, nonlinear AI planner also developed at SRI. This paper discusses the features of SIPE-2 that made it an ideal choice for military operations planning and which contributed greatly to SOCAP's success.

Skidmore, Jennifer D.↗

Demonstration and Evaluation of an Advanced Integrated Operations Concept for Hybrid Control Rooms

The U.S. nuclear industry has an urgent need to reduce operations and maintenance costs to remain economically competitive in today’s energy market. Measures to improve efficiency in operations will need to leverage technology in a way that safely transforms how plants are operated. This work describes the Evaluation of an integrated operations concept that draws together data from existing Instrumentation and Control (I&C) infrastructure, upgraded I&C systems, new sensors, and field technologies such as computer-based procedures to provide operators with centralized, streamlined instructions. The concept was developed to allow for an operator to remotely supervise many plant activities and to dramatically streamline plant operations and maintenance. This describes the methods, results, and design recommendations for the concept based on an operator workshop to evaluate the concept.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗