Search NASA⌕ Search

SEARCH · Search NASA

Results for “Unit testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,675 records · Page 93

Overview of Past and Future EVA Suit Testing and Training in Chamber B at NASA JSC

The Crew and Thermal System Division’s Chamber B has received an increase in demand for next generation suit testing. Chamber B is the National Aeronautics and Space Administration (NASA) Johnson Space Center’s only human-rated thermal vacuum (TVAC) chamber. Historically it was used in Gemini, Apollo, Skylab, Shuttle, and the International Space Station (ISS) suit tests. Recently, the chamber has been returned to service with new capabilities for suit testing. In 2023, The Exploration Extravehicular Mobility Unit (xEMU) underwent a 5-day, extensive thermal vacuum test that included both a full-bodied Exploration Pressure Garment Suit (xPGS) as well as a high fidelity Short xEMU. SpaceX has also used the chamber for human-in-the-loop (HITL) qualification and acceptance testing on their flight Polaris Dawn suits for the first-ever commercial extravehicular activity (EVA). Current chamber Manlock B2 upgrades include the support of two test subjects at the same time with updated chamber interface and support systems for the next generation of suits. This paper will discuss the history of spacesuit testing in the chamber, the recent testing for commercial and NASA suits, and upgrades to accommodate new test requirements.

Human-in-the-loop↗

Personnel Certifications for the Design, Installation and Maintenance of Photovoltaic Systems. Final Technical Report

The North American Board of Certified Energy Practitioners (NABCEP) is the most respected, well-established, and widely recognized national certification organization for professionals in the field of renewable energy. NABCEP’s certifications were created to facilitate consumer protection, improve quality assurance, and help employers judge the skills of existing or potential employees. The certifications also allow individuals to differentiate themselves from others in their field and advance their careers while fostering increased recognition of the profession. Since NABCEP’s founding in 2002, all of its certification exams have been administered in paper-and-pencil format twice per year at 30 exam sites around the United States. The biannual test administration and relatively low number of exam sites make it challenging for many qualified renewable energy professionals to take NABCEP’s certification exams. The rigorous nature of the exam, which leads to many candidates failing the exam on their first and sometimes second attempts, combined with the low number of annual test administrations means that anyone who fails will need to wait another six months for the chance to retake the exam. These factors limited the potential growth of NABCEP’s certification programs and the resultant quality assurance within the renewable energy industry. Thanks to a generous grant by the Department of Energy’s Solar Training and Education for Professional (STEP) program, NABCEP recently began updating its Photovoltaic (PV) Installation Professional Exam and developing three new specialty certifications in PV design, PV installation, and PV commissioning & maintenance. One of the primary objectives of this STEP-funded project was to develop the exams using a computer-based testing (CBT) model to increase the number of exam administrations and available exam sites for NABCEP’s certification exams. To successfully complete this project, NABCEP partnered with Castle Worldwide, Inc. With more than 25 years of experience in test development, test administration, analysis of examinations, and has a staff of 70 experienced personnel, NABCEP was confident that Castle’s team was more than qualified to help NABCEP make the transition to CBT examinations. NABCEP and Castle Worldwide jointly developed a project management plan that included key deliverables, scope management, a work breakdown structure, roles and responsibilities, and a project schedule with milestones. The project schedule was carefully monitored to ensure that activities along the critical path were not delayed and, when deemed necessary, the project was crashed to add resources so that activities could occur in parallel. NABCEP and Castle Worldwide staff met weekly to discuss any potential schedule variances and activities which might delay the closing of the project. NABCEP also recruited 46 subject matter experts (SMEs) to work with Castle’s staff on this project. NABCEP staff, SME’s, and Castle staff worked together to develop the Job Task Analyses that form the basis for the certification exams, create new examination forms, conduct passing score studies, and complete a psychometrical analysis of potential exam items. NABCEP’s SMEs utilized Castle’s item development platform during face-to-face meetings, webinars, and remote item authoring to write, review, and approve exam items. Castle also used their software to psychometrically analyze existing exam items to confirm the reliability and validity of the NABCEP’s certification exams. On January 3rd, 2018, NABCEP’s began offering its PV Installation Professional certification exam via CBT. The exam was available at Castle’s nearly 600 exam sites in the United States. A large number of sites will help to ensure better access for solar professionals in rural and remote areas, which drives down the implicit costs of taking the certification exams. Thanks to the STEP grant and the robust partnership between NABCEP and Castle Worldwide, Inc., personnel certifications will be much more accessible and affordable for renewable energy professionals.

14 SOLAR ENERGY↗

Development and application of a standardized flow measurement uncertainty analysis framework to various low-head short-converging intake types across the United States federal hydropower fleet

Turbine discharges at low-head short converging intakes are difficult to measure accurately. The proximity of the measurement section to the intake entrance admits large uncertainties related to asymmetry of the velocity profile, swirl, and turbulence. Existing turbine performance codes [10, 24] do not address this special case and published literature is largely silent on rigorous evaluation of uncertainties associated with this measurement context. The American Society of Mechanical Engineers (ASME) Committee investigated the use of Acoustic transit time (ATT), Acoustic scintillation (AS), and Current meter (CM) in a short converging intake at the Kootenay Canal Generating Station in 2009. Based on their findings, a standardized uncertainty analysis (UA) framework for velocity-area method (specifically for CM measurements) is presented in this paper given the fact that CM is still the most fundamental and common type of measurement system. Typical sources of systematic and random errors associated with CM measurements are investigated, and the major sources of uncertainties associated with turbulence and velocity fluctuations, numerical velocity integration technique (bi-cubic spline), and the number and placement of current meters are being considered for an evaluation. Since the velocity measurements in a short converging intake are associated with complex nonlinear and time varying uncertainties (e.g., Reynolds stress in fluid dynamics), simply applying the law of propagation of uncertainty is known to overestimate the measurement variance while the Monte Carlo method does not. Therefore, a pseudo-Monte Carlo simulation method (random flow generation technique [8]) which was initially developed for the purpose of establishing upstream or initial conditions in the Large-Eddy Simulation (LES) and the Direct Numerical Simulation (DNS) is used to statistically determine uncertainties associated with turbulence and velocity fluctuations. This technique is then combined with a bi-cubic spline interpolation method which converts point velocities into a continuous velocity distribution over the measurement domain. Subsequently the number and placement of current meters are simulated to investigate the accuracy of the estimated flow rates using the numerical velocity-area integration method outlined in ISO 3354 [12]. The authors herein consider that statistics on generated flow rates processed with bi-cubic interpolation and sensor simulations are the combined uncertainties which already accounted for the effects of all those three uncertainty sources. A preliminary analysis based on the current meter data obtained through an upgrade acceptance test of a single unit located in a mainstem plant has been presented.

Smith, Brennan T↗

Advanced Manufacturing of the SLS Block 1B Payload Adapter: Engineering Development Unit

The Payload Adapter (PLA) for the Space Launch System Block 1B configuration (SLS B1B) is a structural frustum that interfaces with the Exploration Upper Stage (EUS) and the Universal Stage Adapter (USA) or the cargo fairing at the aft end and interfaces with the primary or co-manifested payload at the forward end. The primary structure is composed of a single piece aluminum forward ring, a segmented aluminum aft ring, eight carbon composite sandwich panels, and composite bonded longitudinal joints. The PLA is designed and fabricated in-house at MSFC. Development and flight article builds are joint efforts between the Materials & Processes Laboratory (EM), the Spacecraft & Vehicle Systems Department (EV), the Space Systems Department (ES), and the Test Laboratory (ET). The large-scale manufacturing efforts associated with this task include the fabrication of pathfinder panels; the fabrication and assembly of a full-scale Manufacturing Demonstration Article (MDA); the fabrication, assembly, and test of an Engineering Demonstration Unit (EDU); the fabrication, assembly, and test of a qualification Article; and the fabrication, assembly, and proof test of subsequent flight articles. The PLA team recently completed assembly of the EDU. The final assembly included the instillation of the co-manifested secondary payload, NEST, and the instillation and tensioning of the Payload Separation System (PSS). This poster will detail the assembly process which includes: (1) composite panel to ring assembly, (2) adhesive bonding for the longitudinal joints, and (3) instillation of the NEST and PSS. The PLA EDU is prepared to undergo modal and static load testing.

Monique Wallace↗

Hollow cathode heater development for the Space Station plasma contactor

A hollow cathode-based plasma contactor has been selected for use on the Space Station. During the operation of the plasma contactor, the hollow cathode heater will endure approximately 12000 thermal cycles. Since a hollow cathode heater failure would result in a plasma contactor failure, a hollow cathode heater development program was established to produce a reliable heater design. The development program includes the heater design, process documents for both heater fabrication and assembly, and heater testing. The heater design was a modification of a sheathed ion thruster cathode heater. Three heaters have been tested to date using direct current power supplies. Performance testing was conducted to determine input current and power requirements for achieving activation and ignition temperatures, single unit operational repeatability, and unit-to-unit operational repeatability. Comparisons of performance testing data at the ignition input current level for the three heaters show the unit-to-unit repeatability of input power and tube temperature near the cathode tip to be within 3.5 W and 44 degrees C, respectively. Cyclic testing was then conducted to evaluate reliability under thermal cycling. The first heater, although damaged during assembly, completed 5985 ignition cycles before failing. Two additional heaters were subsequently fabricated and have completed 3178 cycles to date in an on-going test.

Soulas, George C.↗

A report on laboratory performance of the spectroscopic detector arrays for SPIRE/HSO

We report the performance of the flight bolometer arrays for the Spectral and Photometric Imaging REceiver (SPIRE) instrument to be on board of the Herschel Space Observatory (HSO). We describe the test setup for the flight Bolometric Detector Assembly (BDA) that allows the characterization of its performance, both dark and optical, in one instrument’s cool down. We summarize the laboratory procedure to measure the basic bolometer parameters, optical response time, optical efficiency of bolometer and feedhorn, dark and optical noise, and the overall thermal conductance of the BDA unit. Finally, we present the test results obtained from the two flight units, Spectroscopic Long Wavelength (SLW) and Spectroscopic Short Wavelength (SSW).

Hargrave, P. C.↗

Reactor Simulator Integration and Testing

As part of the Nuclear Systems Office Fission Surface Power Technology Demonstration Unit (TDU) project, a reactor simulator (RxSim) test loop was designed and built to perform integrated testing of the TDU components. In particular, the objectives of RxSim testing were to verify the operation of the core simulator, the instrumentation and control system, and the ground support gas and vacuum test equipment. In addition, it was decided to include a thermal test of a cold trap purification design and a pump performance test at pump voltages up to 150 V because the targeted mass flow rate of 1.75 kg/s was not obtained in the RxSim at the originally constrained voltage of 120 V. This Technical Memorandum summarizes RxSim testing. The gas and vacuum ground support test equipment performed effectively in NaK fill, loop pressurization, and NaK drain operations. The instrumentation and control system effectively controlled loop temperature and flow rates or pump voltage to targeted settings. The cold trap design was able to obtain the targeted cold temperature of 480 K. An outlet temperature of 636 K was obtained, which was lower than the predicted 750 K but 156 K higher than the cold temperature, indicating the design provided some heat regeneration. The annular linear induction pump tested was able to produce a maximum flow rate of 1.53 kg/s at 800 K when operated at 150 V and 53 Hz.

Schoenfield, M. P.↗

Progress and investigation on lattice Boltzmann modeling of multiple immiscible fluids or components with variable density and viscosity ratios

Lattice Boltzmann models for simulating multiphase flows are relatively new, and much work remains to be done to demonstrate their ability to solve fundamental test cases before they are considered for engineering problems. From this perspective, a hydrodynamic lattice Boltzmann model for simulating immiscible multiphase flows with high density and high viscosity ratios, up to O(1000) and O(100) respectively, is presented and validated against analytical solutions. The method is based on a two phase flow model with operators extended to handle N immiscible fluids. The current approach is O(N) in computational complexity for the number of different gradient approximations. This is a major improvement, considering the O(N{sup 2}) complexity found in most works. A sequence of systematic and essential tests have been conducted to establish milestones that need to be met by the proposed approach (as well as by other methods). First, the method is validated qualitatively by demonstrating its ability to address the spinodal decomposition of immiscible fluids. Second, the model is quantitatively verified for the case of multilayered planar interfaces. Third, the multiphase Laplace law is studied for the case of three fluids. Fourth, a quality index is developed for the three-phase Laplace–Young’s law, which concerns the position of the interfaces between the fluids resulting from the different surface tensions. The current model is compatible with the analytical solution, and is shown to be first order accurate in terms of this quality index. Finally, the multilayered Couette’s flow is studied. In this study, numerical results can recover the analytical solutions for all the selected test cases, as long as unit density ratios are considered. For high density and high viscosity ratios, the analytical solution is recovered for all tests, except that of the multilayered Couette’s flow. Numerical results and a discussion are presented for this unsuccessful test case. It is believed that other LB models may have the same problem in addressing the simulation of multiphase flows with variable density ratios.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Passive Optical Sample Assembly (POSA)

A Passive Optical Sample Assembly (POSA) unit was mounted and flown in the cargo bay of the space shuttle Columbia during the first Orbital Flight Test (OFT-1). A similar unit was mounted in a different location in the cargo bay during the postflight operations. The samples in both POSA arrays were subjected to a series of optical and analytical measurements prior to delivery for installation in the cargo bay and after retrieval of the flight hardware. The final results of a comparison of the two series of measurements are presented. These STS-1 results are based on data obtained from only a portion of one of the ten Induced Environment Contamination Monitor instruments to be flown on several shuttle flights beginning with STS-2. These limited results do not indicate shuttle contamination levels in excess of those anticipated.

Linton, R. C.↗

Liquid Engine Test Facilities Assessment

The John C. Stennis Space Center (SSC) requested The Aerospace Corporation to examine the current testing capability of all existing large liquid engine test facilities located in the United States. That information along with projected liquid rocket engine development was used to examine future liquid rocket engine testing facilities needs in the coming decade. Current domestic liquid engine test facilities capabilities, when examined against engine concepts for the coming decade, indicate there are ample facilities offering altitude simulation during test. In addition, it was observed that many contractor facilities have limited ambient test capability of larger thrust engines under current consideration. Finally, it was concluded that diminished contractor participation engine development testing will drive this activity to the government sector. Only three facilities are seen as key contributors to engine testing in the coming decade, namely John C. Stennis Space Center (SSC), Marshall Space Flight Center (MSFC), and Air Force Research Laboratory (AFRL). Past rocket engine test experience was evaluated as a possible resource for projecting future engine test needs. A database comprised of various engine models and the level of testing performed to flight qualify those systems for their first flight was constructed. For comparison purposes in this study, development and qualification efforts were totaled and treated as one test program. Based on experience with past Air Force programs, the time on the test stand accounts for typically 50% or more of the total program time. Historical data show that the time to design and develop new engines has increased over the last 40 years, most likely due to scarcer resources in today's funding environment.

Adams, Michael J.↗

Non-Nuclear Testing of Compact Reactor Technologies at NASA MSFC

Safe, reliable, compact, autonomous, long-life fission systems have numerous potential applications, both terrestrially and in space. Technologies and facilities developed in support of these systems could be useful to a variety of concepts. At moderate power levels, fission systems can be designed to operate for decades without the need for refueling. In addition, fast neutron damage to cladding and structural materials can be maintained at an acceptable level. Nuclear design codes have advanced to the stage where high confidence in the behavior and performance of a system can be achieved prior to initial testing. To help ensure reactor affordability, an optimal strategy must be devised for development and qualification. That strategy typically involves a combination of non-nuclear and nuclear testing. Non-nuclear testing is particularly useful for concepts in which nuclear operating characteristics are well understood and nuclear effects such as burnup and radiation damage are not likely to be significant. To be mass efficient, a SFPS must operate at higher coolant temperatures and use different types of power conversion than typical terrestrial reactors. The primary reason is the difficulty in rejecting excess heat to space. Although many options exist, NASA s current reference SFPS uses a fast spectrum, pumped-NaK cooled reactor coupled to a Stirling power conversion subsystem. The reference system uses technology with significant terrestrial heritage while still providing excellent performance. In addition, technologies from the SFPS system could be applicable to compact terrestrial systems. Recent non-nuclear testing at NASA s Early Flight Fission Test Facility (EFF-TF) has helped assess the viability of the reference SFPS and evaluate methods for system integration. In July, 2011 an Annular Linear Induction Pump (ALIP) provided by Idaho National Laboratory was tested at the EFF-TF to assess performance and verify suitability for use in a10 kWe technology demonstration unit (TDU). In November, 2011 testing of a 37-pin core simulator (designed in conjunction with Los Alamos National Laboratory) for use with the TDU will occur. Previous testing at the EFFTF has included the thermal and mechanical coupling of a pumped NaK loop to Stirling engines (provided by GRC). Testing related to heat pipe cooled systems, gas cooled systems, heat exchangers, and other technologies has also been performed. Integrated TDU testing will begin at GRC in 2013. Thermal simulators developed at the EFF-TF are capable of operating over the temperature and power range typically of interest to compact reactors. Small and large diameter simulators have been developed, and simulators (coupled with the facility) are able to closely match the axial and radial power profile of all potential systems of interest. A photograph of the TDU core simulator during assembly is provided in Figure 2.

Houts, Michael G.↗

Fit for Purpose Remote Technology Decommissioning Solutions - 18630

The Magnox Decommissioning Project is actively progressing clean-up and decommissioning of 12 reactor sites across England, Scotland and Wales. Funded and directed by the United Kingdom's Nuclear Decommissioning Authority (NDA) and managed by the Cavendish Fluor Partnership (CFP), the Magnox Decommissioning Project introduces a wide range of radiological and industrial hazards warranting deployment of remote technologies to safely de-inventory, decontaminate and decommission a vast array of nuclear facilities. The Magnox Decommissioning Project encompasses 22 former Magnox nuclear power production reactors across 10 reactor sites and five research/test reactors at two former research sites. Decommissioning activities have been underway at some sites for nearly 20 years with early focus on retrieving and stabilising wastes and draining and stabilising spent fuel ponds. The Magnox decommissioning strategy invokes a programme perspective to drive consistency in tackling similar decommissioning and waste challenges across multiple sites. Programme central teams have worked with technology suppliers to foster learning from industry experience to develop and deploy tooling and robotics. The programme approach has also facilitated learning from one site to the next. In many cases, this central programme approach has promoted an evolution of technologies resulting in optimisation of simple remote tooling. In other instances, collaboration with suppliers is producing state-of-the-art technologies to tackle more unique challenges including, most recently, early demonstration of laser cutting for reactor vessel dismantling. This paper will outline the programme management approach and the scalable optioneering process Magnox employs to select the engineered controls and technologies used in decommissioning and waste management activities. It will provide an overview of the broad range of remote tooling and robotics deployed across the 12 Magnox sites by exploring some specific examples. Lastly, the paper will summarise key lessons learned in the now extensive history of selecting and using remote technologies to decommission Magnox nuclear facilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SU-D-210-07: The Dependence On Acoustic Velocity of Medium On the Needle Template and Electronic Grid Alignment in Ultrasound QA for Prostate Brachytherapy

Purpose: To analyze the impact on acoustic velocity (AV) of two different media (water and milk) using the needle template/electronic grid alignment test. Water, easily available, makes a good material to test the alignment of the template and grid although water’s AV (1498 m/s at 25°C) is significantly different from tissue (1540 m/s). Milk, with an AV much closer (1548 m/s) to prostate tissue, may be a good substitute for water in ultrasound quality assurance testing. Methods: Tests were performed using a Hitachi ultrasound unit with a mechanical arrangement designed to position needles parallel to the transducer. In this work, two materials – distilled water and homogenized whole milk (AVs of 1498 and 1548 m/s at 25°C) were used in a phantom to test ultrasound needle/grid alignment. The images were obtained with both materials and analyzed for their placement accuracy. Results: The needle template/electronic grid alignment tests showed displacement errors between measured and calculated values. The measurements showed displacements of 2.3mm (water) and 0.4mm (milk), and 1.6mm (water) and 0.3mm (milk) at depths of 7cm and 5cm respectively from true needle positions. The calculated results showed a displacement of 2.36 mm (water); 0.435mm (milk), and 1.66mm (water) and 0.31mm (milk) at a depth of 7cm and 5cm respectively. The displacements in the X and Y directions were also calculated. At depths of 7cm and 5cm, the (ΔX,ΔY) displacements in water were (0.829mm, 2.21mm) and (0.273mm, 1.634mm) and for milk were (0.15mm, 0.44mm) and (0.05mm, 0.302mm) respectively. Conclusion: The measured and calculated values were in good agreement for all tests. They show that milk provides superior results when performing needle template and electronic grid alignment tests for ultrasound units used in prostate brachytherapy.

60 APPLIED LIFE SCIENCES↗

Ground test challenges in the development of the Space Shuttle orbiter auxiliary power unit

A conventional aircraft hydraulic system design approach was selected to provide fluid power for the Space Shuttle Orbiter. Developing the power unit, known as the Auxiliary Power Unit (APU), to drive the hydraulic pumps presented a major technological challenge. A small, high speed turbine drive unit powered by catalytically decomposed hydrazine and operating in the pulse mode was selected to meet the requirement. Because of limitations of vendor test facilities, significant portions of the development, flight qualification, and postflight anomaly testing of the Orbiter APU were accomplished at the Johnson Space Center (JSC) test facilities. This paper discusses the unique requirements of attitude, gravity forces, pressure profiles, and thermal environments which had to be satisfied by the APU, and presents the unique test facility and simulation techniques employed to meet the ground test requirements. In particular, the development of the zero-g lubrication system, the development of necessary APU thermal control techniques, the accomplishment of integrated systems tests, and the postflight investigation of the APU lube oil cooler behavior are discussed.

Chaffee, N. H.↗

Advanced Stirling Radioisotope Generator Engineering Unit 2 (ASRG EU2) Final Assembly

NASA Glenn Research Center (GRC) has recently completed the assembly of a unique Stirling generator test article for laboratory experimentation. Under the Advanced Stirling Radioisotope Generator (ASRG) flight development contract, NASA GRC initiated a task to design and fabricate a flight-like generator for in-house testing. This test article was given the name ASRG Engineering Unit 2 (EU2) as it was effectively the second engineering unit to be built within the ASRG project. The intent of the test article was to duplicate Lockheed Martin's qualification unit ASRG design as much as possible to enable system-level tests not previously possible at GRC. After the cancellation of the ASRG flight development project, the decision was made to continue the EU2 build, and make use of a portion of the hardware from the flight development project. GRC and Lockheed Martin engineers collaborated to develop assembly procedures, leveraging the valuable knowledge gathered by Lockheed Martin during the ASRG development contract. The ASRG EU2 was then assembled per these procedures at GRC with Lockheed Martin engineers on site. The assembly was completed in August 2014. This paper details the components that were used for the assembly, and the assembly process itself.

Stirling Cycle↗

Final Status Survey Report for Corrective Action Unit 117 - Pluto Disassembly Facility, Building 2201, Nevada National Security Site, Nevada

This document contains the process knowledge, radiological data and subsequent statistical methodology and analysis to support approval for the radiological release of Corrective Action Unit (CAU) 117 – Pluto Disassembly Facility, Building 2201 located in Area 26 of the Nevada National Security Site (NNSS). Preparations for release of the building began in 2009 and followed the methodology described in the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). MARSSIM is the DOE approved process for release of Real Property (buildings and landmasses) to a set of established criteria or authorized limits. The pre-approved authorized limits for surface contamination values and corresponding assumptions were established by DOE O 5400.5. The release criteria coincide with the acceptance criteria of the U10C landfill permit. The U10C landfill is the proposed location to dispose of the radiologically non-impacted, or “clean,” building rubble following demolition. However, other disposition options that include the building and/or waste remaining at the NNSS may be considered providing that the same release limits apply. The Final Status Survey was designed following MARSSIM guidance by reviewing historical documentation and radiological survey data. Following this review a formal radiological characterization survey was performed in two phases. The characterization revealed multiple areas of residual radioactivity above the release criteria. These locations were remediated (decontaminated) and then the surface activity was verified to be less than the release criteria. Once remediation efforts had been successfully completed, a Final Status Survey Plan (10-015, “Final Status Survey Plan for Corrective Action Unit 117 – Pluto Disassembly Facility, Building 2201”) was developed and implemented to complete the final step in the MARSSIM process, the Final Status Survey. The Final Status Survey Plan consisted of categorizing each individual room into one of three categories: Class 1, Class 2 or Class 3 (a fourth category is a “Non-Impacted Class” which in the case of Building 2201 only pertained to exterior surfaces of the building.) The majority of the rooms were determined to fall in the less restrictive Class 3 category, however, Rooms 102, 104, 106, and 107 were identified as containing Class 1 and 2 areas. Building 2201 was divided into “survey units” and surveyed following the requirements of the Final Status Survey Plan for each particular class. As each survey unit was completed and documented, the survey results were evaluated. Each sample (static measurement) with units of counts per minute (cpm) was corrected for the appropriate background and converted to a value with units of dpm/100 cm2. With a surface contamination value in the appropriate units, it was compared to the surface contamination limits, or in this case the derived concentration guideline level (DCGLw). The appropriate statistical test (sign test) was then performed. If the survey unit was statistically determined to be below the DCGLw, then the survey unit passed and the null hypothesis (that the survey unit is above limits) was rejected. If the survey unit was equal to or below the critical value in the sign test, the null hypothesis was not rejected. This process was performed for all survey units within Building 2201. A total of thirty-three “Class 1,” four “Class 2,” and one “Class 3” survey units were developed, surveyed, and evaluated. All survey units successfully passed the statistical test. Building 2201 meets the release criteria commensurate with the Waste Acceptance Criteria (for radiological purposes) of the U10C landfill permit residing within NNSS boundaries. Based on the thorough statistical sampling and scanning of the building’s interior, Building 2201 may be considered radiologically “clean,” or free of contamination.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of an integrated heat pipe-thermal storage system for a solar receiver

An integrated heat pipe-thermal storage system was developed as part of the Organic Rankine Cycle Solar Dynamic Power System solar receiver for space station application. The solar receiver incorporates potassium heat pipe elements to absorb and transfer the solar energy within the receiver cavity. The heat pipes contain thermal energy storage (TES) canisters within the vapor space with a toluene heater tube used as the condenser region of the heat pipe. During the insolation period of the earth orbit, solar energy is delivered to the heat pipe. Part of this thermal energy is delivered to the heater tube and the balance is stored in the TES units. During the eclipse period of earth orbit, the stored energy in the TES units is transferred by the potassium vapor to the toluene heater tube. A developmental heat pipe element was constructed that contains axial arteries and a distribution wick connecting the toluene heater and the TES units to the solar insolation surface of the heat pipe. Tests were conducted to demonstrate the heat pipe, TES units, and the heater tube operation. The heat pipe element was operated at design input power of 4.8 kW. Thermal cycle tests were conducted to demonstrate the successful charge and discharge of the TES units. Axial power flux levels up to 15 watts/sq cm were demonstrated and transient tests were conducted on the heat pipe element. Details of the heat pipe development and test procedures are presented.

Keddy, E.↗

Hermes-3: Multi-component plasma simulations with BOUT++

A new open source tool for fluid simulation of multi-component plasmas is presented, based on a flexible software design that is applicable to scientific simulations in a wide range of fields. Hermes-3 is built on plasma simulation framework BOUT++, consolidating earlier SD1D and Hermes models into a single code that can be configured at run-time to solve plasma models in 1D, 2D or 3D, either for transport (steady-state) or turbulent (time-evolving) problems, with an arbitrary number of ion and neutral species. Here, we describe the improved numerical algorithms and software design that have been implemented in Hermes-3. To demonstrate the capabilities of this tool, applications relevant to the boundary of tokamak plasmas are presented: 1D simulations of diveror plasmas evolving equations for all charge states of neon and deuterium; 2D transport simulations of tokamak equilibria in single-null X-point geometry with plasma ion and neutral atom species; and simulations of the time-dependent propagation of plasma filaments (blobs). Hermes-3 is publicly available on Github under the GPL-3 open source license. The repository includes documentation and a suite of unit, integrated and convergence tests.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗