Search NASA⌕ Search

SEARCH · Search NASA

Results for “performance monitoring”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,675 records · Page 93

Collaborative Communications Between A Human and A Resilient Safety Support System

Successful introductory UAM integration into the NAS will be contingent on resilient safety systems that support reduced-crew flight operations. In this paper, we present a system that performs three functions: 1) monitors an operator’s physiological state; 2) assesses when the operator is experiencing anomalous states; and 3) mitigates risks by a combination of dynamic, context-based unilateral or collaborative dynamic function allocation of operational tasks. The monitoring process receives high data-rate sensor values from eye-tracking and electrocardiogram sensors. The assessment process takes these values and performs a classification that was developed using machine learning algorithms. The mitigation process invokes a collaboration protocol called DFACCto which, based on context, performs vehicle operations that the operator would otherwise routinely execute. This system has been demonstrated in a UAM flight simulator for an operator incapacitation scenario. The methods and initial results as well as relevant UAM and AAM scenarios will be described.

Advanced air mobility↗

NetMOD v. 1.0

NetMOD is a tool to model the performance of global ground-based explosion monitoring systems. The version 2.0 of the software supports the simulation of seismic, hydroacoustic, and infrasonic detection capability. The tool provides a user interface to execute simulations based upon a hypothetical definition of the monitoring system configuration, geophysical properties of the Earth, and detection analysis criteria. NetMOD will be distributed with a project file defining the basic performance characteristics of the International Monitoring System (IMS), a network of sensors operated by the Comprehensive Nuclear-Test-Ban Treaty Organization (CTBTO). Network modeling is needed to be able to assess and explain the potential effect of changes to the IMS, to prioritize station deployment and repair, and to assess the overall CTBTO monitoring capability currently and in the future. Currently the CTBTO uses version 1.0 of NetMOD, provided to them in early 2014. NetMOD will provide a modern tool that will cover all the simulations currently available and allow for the development of additional simulation capabilities of the IMS in the future. NetMOD simulates the performance of monitoring networks by estimating the relative amplitudes of the signal and noise measured at each of the stations within the network based upon known geophysical principles. From these signal and noise estimates, a probability of detection may be determined for each of the stations. The detection probabilities at each of the stations may then be combined to produce an estimate of the detection probability for the entire monitoring network.

Merchant, Bion J↗

Houston, We Have a Problem-and a Solution: Solar Performance Initiative Helps Federal Building Boost Rooftop Production

In 2014, the Mickey Leland Federal Building in Houston, Texas installed a 192 kW PV system on top of its parking structure. To monitor and optimize its performance, the General Services Administration, which manages the site, responded to the Federal Energy Management Program’s request for federal agency participation in the Federal Energy Management Program Solar PV Performance Initiative.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

In Situ Decommissioning Sensor Network, Meso-Scale Test Bed - Phase 3 Fluid Injection Test Summary Report

The DOE Office of Environmental management (DOE EM) faces the challenge of decommissioning thousands of excess nuclear facilities, many of which are highly contaminated. A number of these excess facilities are massive and robust concrete structures that are suitable for isolating the contained contamination for hundreds of years, and a permanent decommissioning end state option for these facilities is in situ decommissioning (ISD). The ISD option is feasible for a limited, but meaningful number of DOE contaminated facilities for which there is substantial incremental environmental, safety, and cost benefits versus alternate actions to demolish and excavate the entire facility and transport the rubble to a radioactive waste landfill. A general description of an ISD project encompasses an entombed facility; in some cases limited to the blow-grade portion of a facility. However, monitoring of the ISD structures is needed to demonstrate that the building retains its structural integrity and the contaminants remain entombed within the grout stabilization matrix. The DOE EM Office of Deactivation and Decommissioning and Facility Engineering (EM-13) Program Goal is to develop a monitoring system to demonstrate long-term performance of closed nuclear facilities using the ISD approach. The Savannah River National Laboratory (SRNL) has designed and implemented the In Situ Decommissioning Sensor Network, Meso-Scale Test Bed (ISDSN-MSTB) to address the feasibility of deploying a long-term monitoring system into an ISD closed nuclear facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Energy Recovery Linac: Laser and Laser Light Transport

Operation of the photocathode gun in the ERL requires that a tightly controlled optical pulse train, consisting of temporally and spatially shaped pulses, be delivered at the photocathode in synchrony with the RF field in the gun cavity. The pulse train must also be dynamically variable, in order to tune or ramp up the current in the ERL. A laser was developed especially for this task by Lumera Laser GmbH, of Kaiserslautern Germany, under design supervision and review of the ERL project. Following the final design review, the laser was delivered in August 2009. Preliminary tests certifying its compliance with design specifications have been performed, with further tests to follow the final certification of the ERL laser room in January 2010. The development of the necessary spatial and temporal shaping techniques is an ongoing project: proof of principle experiments have been successfully carried out with a laser of similar pulse width, operating at 532 nm and 81.5 MHz. The next stage is to evaluate the application of these techniques and alternatives, using the operations laser. A transport line has been designed and the propagation of a shaped pulse through it to the photocathode simulated and tested experimentally. As the performance of the complete photocathode drive system is critical for ERL operation, an extensive set of diagnostics will be in place to monitor and maintain its performance. The block diagram in Fig. 1 breaks the optical system down into its basic components, which are discussed in turn in the following sections.

43 PARTICLE ACCELERATORS↗

NASA's Aerosol Sampling Experiment Summary

In a spacecraft cabin environment, the size range of indoor aerosols is much larger and they persist longer than on Earth because they are not removed by gravitational settling. A previous aerosol experiment in 1991 documented that over 90 of the mass concentration of particles in the NASA Space Shuttle air were between 10 m and 100 m based on measurements with a multi-stage virtual impactor and a nephelometer (Liu et al. 1991). While the now-retired Space Shuttle had short duration missions (less than two weeks), the International Space Station (ISS) has been continually inhabited by astronauts for over a decade. High concentrations of inhalable particles on ISS are potentially responsible for crew complaints of respiratory and eye irritation and comments about 'dusty' air. Air filtration is the current control strategy for airborne particles on the ISS, and filtration modeling, performed for engineering and design validation of the air revitalization system in ISS, predicted that PM requirements would be met. However, aerosol monitoring has never been performed on the ISS to verify PM levels. A flight experiment is in preparation which will provide data on particulate matter in ISS ambient air. Particles will be collected with a thermophoretic sampler as well as with passive samplers which will extend the particle size range of sampling. Samples will be returned to Earth for chemical and microscopic analyses, providing the first aerosol data for ISS ambient air.

Thermophoretic sampler↗

Sampling Indoor Aerosols on the International Space Station

In a spacecraft cabin environment, the size range of indoor aerosols is much larger and they persist longer than on Earth because they are not removed by gravitational settling. A previous aerosol experiment in 1991 documented that over 90 of the mass concentration of particles in the NASA Space Shuttle air were between 10 m and 100 m based on measurements with a multi-stage virtual impactor and a nephelometer (Liu et al. 1991). While the now-retired Space Shuttle had short duration missions (less than two weeks), the International Space Station (ISS) has been continually inhabited by astronauts for over a decade. High concentrations of inhalable particles on ISS are potentially responsible for crew complaints of respiratory and eye irritation and comments about 'dusty' air. Air filtration is the current control strategy for airborne particles on the ISS, and filtration modeling, performed for engineering and design validation of the air revitalization system in ISS, predicted that PM requirements would be met. However, aerosol monitoring has never been performed on the ISS to verify PM levels. A flight experiment is in preparation which will provide data on particulate matter in ISS ambient air. Particles will be collected with a thermophoretic sampler as well as with passive samplers which will extend the particle size range of sampling. Samples will be returned to Earth for chemical and microscopic analyses, providing the first aerosol data for ISS ambient air.

Thermophoretic sampler↗

Online Sensor Calibration Assessment in Nuclear Power Systems

Safe, efficient, and economic operation of nuclear systems (nuclear power plants, fuel fabrication and storage, used fuel processing, etc.) relies on transmission of accurate and reliable measurements. During operation, sensors degrade due to age, environmental exposure, and maintenance interventions. Sensor degradation can affect the measured and transmitted signals, including sensor failure, signal drift, sensor response time, etc. Currently, periodic sensor recalibration is performed to avoid these problems. Sensor recalibration activities include both calibration assessment and adjustment (if necessary). In nuclear power plants, periodic recalibration of safety-related sensors is required by the plant technical specifications. Recalibration typically occurs during refueling outages (about every 18 to 24 months). Non-safety-related sensors also undergo recalibration, though not as frequently. However, this approach to maintaining sensor calibration and performance is time-consuming and expensive, leading to unnecessary maintenance, increased radiation exposure to maintenance personnel, and potential damage to sensors. Online monitoring (OLM) of sensor performance is a non-invasive approach to assess instrument calibration. OLM can mitigate many of the limitations of the current periodic recalibration practice by providing more frequent assessment of calibration and identifying those sensors that are operating outside of calibration tolerance limits without removing sensors or interrupting operation. This can support extended operating intervals for unfaulted sensors and target recalibration efforts to only degraded sensors.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Single Quadrupole Multiple Fragment Ion Monitoring Quantitative Mass Spectrometry

Single quadrupole mass spectrometry (MS) with enhanced in-source multiple fragment ion monitoring was designed to perform high sensitivity quantitative mass analyses. Enhanced in-source fragmentation amplifies fragmentation from traditional soft electrospray ionization producing fragment ions that have been found to be identical to those generated in tandem MS. We have combined enhanced in-source fragmentation data with criteria established by the European Union Commission Directive 2002/657/EC for electron ionization single quadrupole quantitative analysis to perform quantitative analyses. These experiments were performed on multiple types of complex samples that included a mixture of 50 standards, as well as cell and plasma extracts. The dynamic range for these quantitative analyses was comparable to triple quadrupole multiple reaction monitoring (MRM) analyses at up to 5 orders of magnitude with the cell and plasma extracts showing similar matrix effects across both platforms. Amino acid and fatty acid measurements performed from certified NIST 1950 plasma with isotopically labeled standards demonstrated accuracy in the range of 91–110% for the amino acids, 76–129% for the fatty acids, and good precision (coefficient of variation <10%). To enhance specificity, a newly developed correlated ion monitoring algorithm was designed to facilitate these analyses. This algorithm autonomously processes, aligns, filters, and compiles multiple ions within one chromatogram enabling both precursor and in-source fragment ions to be correlated within a single chromatogram, also enabling the detection of coeluting species based on precursor and fragment ion ratios. Single quadrupole instrumentation can provide MRM level quantitative performance by monitoring/correlating precursor and fragment ions facilitating high sensitivity analysis on existing single quadrupole instrumentation that are generally inexpensive, easy to operate, and technically less complex.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Failure Analysis–Informed Risk Assessment Framework for Geological Carbon Storage Using Numerical Simulation and Machine Learning

Geological carbon storage (GCS) is recognized as a critical technology for achieving large-scale reductions in anthropogenic carbon dioxide (CO 2 ) emissions. Ensuring long-term containment and safety requires robust risk assessment frameworks that account for geological uncertainty and identify potential failure scenarios. Among various indicators, the area of review (AoR) serves as a key metric for evaluating storage performance, regulatory compliance, and monitoring design, as it delineates the spatial extent impacted by pressure buildup and plume migration. However, conventional AoR-based risk assessments typically perturb parameters within narrow uncertainty bounds, potentially overlooking rare but high-impact events arising from extreme geological conditions. In this study, we present a failure analysis–informed risk assessment framework for large-scale GCS projects to improve site prescreening and monitoring design. A suite of 300 numerical simulations was generated using stochastic geological models that vary five key parameters: net-to-gross ratio, anisotropy azimuth, porosity multiplier, permeability multiplier, and vertical-to-horizontal permeability ratio. Among these, 200 realizations represent normal geological uncertainty, while 100 additional cases explore extreme yet plausible conditions for failure-case analysis. The AoR was simulated and computed from pressure and CO 2 saturation fields, where the baseline AoR boundary, representing the extent predicted under typical geological uncertainty, was defined as the union of 200 normal-range simulations, and failure was identified when extreme-range cases exceeded this baseline. Results show that incorporating broader parameter uncertainty produces significantly larger AoR extents, underscoring the potential underestimation of risk under conventional uncertainty ranges. Furthermore, spatial probability maps derived from failure-induced AoR exceedance identify regions requiring enhanced monitoring attention. Various machine learning (ML)–based classifiers were developed to predict failure occurrence from geological parameters, with the random forest model achieving the highest performance (F1-score of 0.986). Consistent findings from correlation coefficient, feature importance, and Sobol sensitivity analyses reveal that low net-to-gross ratios and permeability multipliers are the dominant risk drivers, reflecting reduced reservoir connectivity and limited pressure dissipation. Altogether, these results provide a novel framework for risk-informed site prescreening and monitoring design that explicitly considers rare but high-impact geological scenarios in GCS projects.

25 ENERGY STORAGE↗

Statistical Analysis of Recent Go Around Flight Data to Study and Evaluate Skilled Pilot Monitoring

A statistical analysis was performed on a batch of recent go-around flight data of a few major US airlines spanning a one year period. The statistical analysis investigates a few select relevant aspects of these go arounds, such as initiation altitude and altitude change, aircraft configuration, deviation from the flightpath, and energy state. These data show that only one third of the landings are aborted below 400ft, but the majority of the go arounds occur at significantly higher altitudes. Current go-around training is specifically focused on the final approach and landing phase at low altitudes and low speeds. The results of this study will support the development of a broader set of relevant scenarios for an FAA simulator experiment to study and evaluate the skills of the pilots who monitor this wide spectrum of diverse go-around conditions, with the ultimate goal to help improve pilot go-around training and technologies.

go around↗

Preplanning for D and D: Monitoring the Vadose Zone at Radioactive Waste Trenches

Planning for ultimate Decontamination and Decommissioning (D and D) of a nuclear facility is as much a part of a successful nuclear strategy as is the ultimate disposal of radioactive waste. As facilities, in this case radioactive waste disposal trenches, are closed and abandoned leading to ultimate decommissioning, long term monitoring may be required. However, preplanning by characterizing, modeling, and monitoring the environment around the facility prior to and during operations will allow a performance assessment to be made and future behavior predicted. In the radioactive waste burial grounds of the Savannah River Site new slit trenches were constructed to receive demolition debris associated with site foot print reduction. Some of the construction debris and associated process waste contained small amounts of tritium. Since the trenches were constructed over an existing tritium groundwater plume the monitoring and performance assessment of the trench, particularly with respect to tritium contributions to the vadose zone and groundwater, were important. These disposal trenches vary in length and width but are typically constructed within the upper 7 to 8 meters (21 to 24 feet) of the local sediments. The unconfined aquifer (water table) typically underlies the area at depths varying from 20 to 24 meters (60 to 72 feet), depending on elevation. Therefore, with downward flow and 13 to 16 meters (40 to 48 feet) of unsaturated sediments separating the base of the waste trenches from the unconfined aquifer, there was potential for an environmental impact to the sediments within the vadose zone and to the underlying groundwater. Monitoring and predicting this impact can support ultimate D and D activities and future performance assessment evaluation. From this work several key observations were made that will support long term monitoring and subsequent D and D: - The observed lateral variation of thinly bedded sands and clays may be less than 20 meters particularly if lenticular sands are present. Ultimate D and D should consider monitoring and remedial activities that consider sampling on scales to address this issue. - The detailed modeling, when compared with the modeled depositional patterns, indicates flow paths for vadose zone fluids, therefore a plan should allow for these flow paths. - Detailed lithostratigraphic modeling, when based on correlations between soil properties, CPT soundings and borehole geophysical logs, can aid in precision placement of subsurface sensors and sample points for performance monitoring and D and D assessment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A PCR Based Microbial Monitoring Alternative Method of Detection and Identification of Microbes Aboard ISS

Previous research has shown that microorganisms and potential human pathogens have been detected on the International Space Station (ISS) with additional introduction of new microflora occurring with every exchange of crew or addition of equipment and supplies. These microbes are readily transferred between crew and subsystems (i.e. ECLSS, environmental control and life support systems). As this can be detrimental to astronaut health and optimal performance of ISS systems, monitoring of systems such as ECLSS to include identification of microbial contaminants could prevent adverse effects on human health and life support systems. Current monitoring on ISS is laborious and utilizes culture based methods followed by sample return to Earth for complete analysis. Future, long-distance spaceflight missions will require real-time monitoring capabilities that enable efficient and rapid assessments of the microbial environment allowing for expedited decisions and more targeted response to cope with anomalies. Polymerase chain reaction (PCR), a molecular microbial monitoring method was chosen and numerous PCR instruments investigated for their potential to perform in microgravity conditions. Using ISS as a test bed for PCR verification in microgravity will enable NASA to assess whether molecular based microbiological sensors may be components of reliable, closed-loop life support and habitation systems in spacecraft, enhancing infrastructure capabilities through increased efficiency, reliability, and time savings by enabling sample analysis on orbit. NASA selected the Water Monitoring Suite as one of the rapid spaceflight hardware demonstration activities utilizing a streamlined process to minimize the time required to fly experimental flight hardware. The RAZOR EX (BioFire Defense, Salt Lake City, UT) system was part of the water monitoring suite and is a commercial off-the-shelf (COTS) real-time PCR instrument designed for field work. The RAZOR EX was originally designed for Department of Defense (DoD) under a small business innovative research (SBIR) grant and is ruggedized, compact and provides a rapid, sample to answer in less than an hour. PCR assays using a fluorescent probe were optimized and spiked with known concentrations of DNA (Pseudomonas aeruginosa) ranging from 0.002 to 20 ng. PCR reagents were lyophilized and configured in customized pouches and tested for flight readiness. Three types of water were used to rehydrate the reagents and demonstrate the fidelity of the PCR reaction in microgravity. Molecular grade deionized water served as a control while filtered and unfiltered ISS potable water served to test for chemical or biological inhibitors. All three types were compared to parallel ground test results. Nine tests were run on ISS (3 of each water type) and the critical threshold cycle (Ct) was compared to parallel ground tests completed at Kennedy Space Center, FL and Johnson Space Center, TX. All concentrations of Pseudomonas aeruginosa DNA were detected. A comparison of the Ct produced in real time PCR indicated similarity between flight and ground samples. There appeared to be no significant difference between flight or ground PCR reactions or between any of the three water types. This testing demonstrated the ability to perform molecular testing during spaceflight operations with similar sensitivity. It will allow for future ground development of molecular protocols and minimize the need for spaceflight testing. Future testing will include development of additional targets including environmental and health related organisms.

Christina Khodadad↗

Use of Semi-Autonomous Tools for ISS Commanding and Monitoring

As the International Space Station (ISS) has moved into a utilization phase, operations have shifted to become more ground-based with fewer mission control personnel monitoring and commanding multiple ISS systems. This shift to fewer people monitoring more systems has prompted use of semi-autonomous console tools in the ISS Mission Control Center (MCC) to help flight controllers command and monitor the ISS. These console tools perform routine operational procedures while keeping the human operator "in the loop" to monitor and intervene when off-nominal events arise. Two such tools, the Pre-positioned Load (PPL) Loader and Automatic Operators Recorder Manager (AutoORM), are used by the ISS Communications RF Onboard Networks Utilization Specialist (CRONUS) flight control position. CRONUS is responsible for simultaneously commanding and monitoring the ISS Command & Data Handling (C&DH) and Communications and Tracking (C&T) systems. PPL Loader is used to uplink small pieces of frequently changed software data tables, called PPLs, to ISS computers to support different ISS operations. In order to uplink a PPL, a data load command must be built that contains multiple user-input fields. Next, a multiple step commanding and verification procedure must be performed to enable an onboard computer for software uplink, uplink the PPL, verify the PPL has incorporated correctly, and disable the computer for software uplink. PPL Loader provides different levels of automation in both building and uplinking these commands. In its manual mode, PPL Loader automatically builds the PPL data load commands but allows the flight controller to verify and save the commands for future uplink. In its auto mode, PPL Loader automatically builds the PPL data load commands for flight controller verification, but automatically performs the PPL uplink procedure by sending commands and performing verification checks while notifying CRONUS of procedure step completion. If an off-nominal condition occurs during procedure execution, PPL Loader notifies CRONUS through popup messages, allowing CRONUS to examine the situation and choose an option of how PPL loader should proceed with the procedure. The use of PPL Loader to perform frequent, routine PPL uplinks offloads CRONUS to better monitor two ISS systems. It also reduces procedure performance time and decreases risk of command errors. AutoORM identifies ISS communication outage periods and builds commands to lock, playback, and unlock ISS Operations Recorder files. Operation Recorder files are circular buffer files of continually recorded ISS telemetry data. Sections of these files can be locked from further writing, be played back to capture telemetry data that occurred during an ISS loss of signal (LOS) period, and then be unlocked for future recording use. Downlinked Operation Recorder files are used by mission support teams for data analysis, especially if failures occur during LOS. The commands to lock, playback, and unlock Operations Recorder files are encompassed in three different operational procedures and contain multiple user-input fields. AutoORM provides different levels of automation for building and uplinking the commands to lock, playback, and unlock Operations Recorder files. In its automatic mode, AutoORM automatically detects ISS LOS periods, then generates and uplinks the commands to lock, playback, and unlock Operations Recorder files when MCC regains signal with ISS. AutoORM also features semi-autonomous and manual modes which integrate CRONUS more into the command verification and uplink process. AutoORMs ability to automatically detect ISS LOS periods and build the necessary commands to preserve, playback, and release recorded telemetry data greatly offloads CRONUS to perform more high-level cognitive tasks, such as mission planning and anomaly troubleshooting. Additionally, since Operations Recorder commands contain numerical time input fields which are tedious for a human to manually build, AutoORM's ability to automatically build commands reduces operational command errors. PPL Loader and AutoORM demonstrate principles of semi-autonomous operational tools that will benefit future space mission operations. Both tools employ different levels of automation to perform simple and routine procedures, thereby offloading human operators to perform higher-level cognitive tasks. Because both tools provide procedure execution status and highlight off-nominal indications, the flight controller is able to intervene during procedure execution if needed. Semi-autonomous tools and systems that can perform routine procedures, yet keep human operators informed of execution, will be essential in future long-duration missions where the onboard crew will be solely responsible for spacecraft monitoring and control.

Brzezinski, Amy S.↗

Well Design, Operation and Maintenance and Proactive Rehabilitation to Optimize Remediation Well Performance - 18605

Optimizing performance of extraction, injection and monitoring wells, which are integral components of groundwater remediation systems, result in lower life cycle costs and a higher probability of meeting project objectives. These wells provide the means to extract contaminated groundwater, inject reagents, treated water and clean water to create groundwater reaction/flushing zones, and to provide groundwater level, contaminant concentration and geochemical data. Initial costs associated with well installation and associated pipelines and treatment systems are significant project expenditures related to site remediation. However, the life cycle costs for wells are dominated by the long-term operation and maintenance (O and M) expenditures. Remediation wells are particularly susceptible to various types of fouling that impact well performance and, therefore, drive up operating costs. Simply defined, fouling is the result of any biological, geochemical or physical process that negatively impacts the intended performance of a remediation well. Fouling decreases well performance by effectively reducing hydraulic communication between the well and the surrounding formation. Oftentimes this occurs via clogging screens and/or gravel pack/formation pore space by bacterial or chemical byproducts and gases, which can lead to corrosion of metal components and spreading fouling deposits to pipelines and surface treatment systems. Ultimately, this results in reduced hydraulic performance in extraction and injection wells and result in erroneous water level and chemical parameter concentration measurements in monitoring wells. Remediation well fouling cannot be eliminated, and natural fouling processes are exacerbated by the installation and operation of remedial systems. Steps required to extend the life of remediation wells and to lower life cycle costs are discussed in this paper in order to establish the required approach to effective system management. These optimization approaches have been developed through years of operation and maintenance of complex large-scale plume remediation systems utilizing a variety of subsurface in-situ and ex-situ technologies. Remediation well performance can be improved by: - careful site characterization, - appropriate well design, - proper well installation and development, - thoughtful and adaptable operation and maintenance, - well performance maintenance tracking and, - proactive well rehabilitation. Clear understanding of the site hydro-stratigraphy and geochemical settings places constraints on the compatibility of well materials and the configurations of well screens. Proper well design, including collection and analysis (sieve/grain-size) of screen zone formation samples, assures that wells can be optimally installed, developed and redeveloped during well rehabilitation. Design considerations should include proper sizing of filter packs and well screens, casing/screen diameter, well material selection/compatibility, expected life/use, and well head configuration to allow for future access. Applying appropriate and effective well installation and development methods are of paramount importance and rely on a good understanding of site characteristics (e.g., geologic setting) as well as local drilling company expertise and experience. Different approaches to operation and maintenance can greatly affect the degree of fouling, these include limiting reagent concentrations, maintaining submerged well screens and filtering injection water to prevent the introduction of fouling enhancing constituents. Tracking well performance by monitoring changes in system operation and metrics such as specific capacity or injectivity for extraction and injection wells, respectively, or turbidity and chemical analyses for monitoring wells is key to identifying well maintenance issues early when well rehabilitation can be most effective. Proactive well rehabilitation can include mechanical brushing, surging and jetting, chemical treatment or other specialized approaches; however, the approach needs to be based on a site-specific understanding of the predominant fouling mechanisms. Collection and analyses of fouling deposits can provide guidance for selection of rehabilitation methods and chemicals that will be most effective. Application of these approaches have led to extended operational life for reagent injection wells, which can foul quickly, from months to years. Additionally, proper maintenance will often lead to increased and extended productivity of the well. For extraction wells, this translates to a higher sustainable yield, which means shorter cleanup times. Similarly, for injection wells, proper maintenance allows for the introduction of a greater volume of reagents over a shorter period, thus, shorter cleanup times that reduce overall project costs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Final technical report

As proposed, the main effort in this project is the development of software capable of performing real-time monitoring of micro-seismic activity recorded by an array of sensors deployed around an EGS. The main milestones are defined by the development of software to perform the following tasks: • Real-time micro-earthquake detection and location • Real-time detection of shear-wave splitting • Delayed-time inversion of shear-wave splitting These algorithms, which are discussed in detail in this report, make possible the automatic and real-time monitoring of subsurface fracture systems in geothermal fields from data collected by an array of seismic sensors. Shear wave splitting (SWS) is parameterized in terms of the polarization of the fast shear wave and the time delay between the fast and slow shear waves, which are automatically measured and stored. The measured parameters are then combined with previously measured SWS parameters at the same station and used to invert for the orientation (strike and dip) and intensity of cracks under that station. In addition, this grant allowed the collection of seismic data from several geothermal regions in the US (Coso) and Iceland (Hengill) to use in the development and testing of the software.

15 GEOTHERMAL ENERGY↗

New Whole-House Solutions Case Study: Northwest Energy Efficient Manufactured Housing Program High-Performance Test Homes - Pacific Northwest

This project represents the third phase of a multi-year effort to develop and bring to market a High Performance Manufactured Home (HPMH). In this project, the Northwest Energy Efficient Manufactured Housing Program worked with Building America Partnership for Improved Residential Construction and Bonneville Power Administration to help four factory homebuilders build prototype zero energy ready manufactured homes, resulting in what is expected to be a 30% savings relative to the Building America Benchmark. (The actual % savings varies depending on choice of heating equipment and climate zone). Previous phases of this project created a HPMH specification and prototyped individual measures from the package to obtain engineering approvals and develop preliminary factory construction processes. This case study describes the project team's work during 2014 to build prototype homes to the HPMH specifications and to monitor the homes for energy performance and durability. Monitoring is expected to continue into 2016.

BA-PIRC↗

Development and testing of laser Doppler system components for wake vortex monitoring. Volume 1: Scanner development, laboratory and field testing and system modeling

A servo-controlled range/elevation scanner for the laser Doppler velocimeter (LDV) was developed and tested in the field to assess its performance in detecting and monitoring aircraft trailing vortices in an airport environment. The elevation scanner provides a capability to manually point the LDV telescope at operator chosen angles from 3.2 deg. to 89.6 deg within 0.2 deg, or to automatically scan the units between operator chosen limits at operator chosen rates of 0.1 Hz to 0.5 Hz. The range scanner provides a capability to manually adjust the focal point of the system from a range of 32 meters to a range of 896 meters under operator control, or to scan between operator chosen limits and at rates from 0.1 Hz to 6.9 Hz. The scanner controls are designed to allow simulataneous range and elevation scanning so as to provide finger scan patterns, arc scan patterns, and vertical line scan patterns. The development and testing of the unit is discussed, along with a fluid dynamic model of the wake vortex developed in a laser Doppler vortex sensor simulation program.

Wilson, D. J.↗