Search NASA⌕ Search

SEARCH · Search NASA

Results for “COST PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,693 records · Page 94

ATR NATIONAL SCIENTIFIC USER FACILITY INSTRUMENTATION ENHANCEMENT EFFORTS

A key component of the Advanced Test Reactor (ATR) National Scientific User Facility (NSUF) effort is to enhance instrumentation techniques available to users conducting irradiation tests in this unique facility. In particular, development of sensors capable of providing ‘real-time’ measurements of key irradiation parameters is emphasized because of their potential to offer increased fidelity data and reduced post-test examination costs. This paper describes the strategy for identifying new instrumentation needed for ATR irradiations and the program underway to develop and evaluate new sensors to address these needs. Accomplishments from this program are illustrated by describing several new sensors now available to users of the ATR NSUF. In addition, progress is reported on current research efforts to provide users improved in-pile instrumentation.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

New Lighting Technologies Demonstrated at Defense Commissaries

New and emerging lighting technologies, such as LEDs, can improve lighting quality while reducing maintenance and energy costs. The Defense Commissary Agency, with support from the Department of Energy's Federal Energy Management Program and the Pacific Northwest National Laboratory, demonstrsted the use of LED lighting in a large freezer storage room and fiber optic lighting in a series of verticial reach-in display freezer cases at the Fort George G. Meade Commissary. The LEDs resulted in an 85% reduction in lighting energy and a reduction in maintenance requirements. The fiber optic lighting system resulted in a 56% reduction in lighting energy.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

M & V Shootout: Setting the Stage For Testing the Performance of New Energy Baseline

Trustworthy savings calculations are critical to convincing investors in energy efficiency projects of the benefit and cost-effectiveness of such investments and their ability to replace or defer supply-side capital investments. However, today’s methods for measurement and verification (M&V) of energy savings constitute a significant portion of the total costs of efficiency projects. They also require time-consuming data acquisition and often do not deliver results until years after the program period has ended. A spectrum of savings calculation approaches are used, with some relying more heavily on measured data and others relying more heavily on estimated or modeled data, or stipulated information. The rising availability of “smart” meters, combined with new analytical approaches to quantifying savings, has opened the door to conducting M&V more quickly and at lower cost, with comparable or improved accuracy. Energy management and information systems (EMIS) technologies, not only enable significant site energy savings, but are also beginning to offer M&V capabilities. This paper expands recent analyses of public-domain, whole-building M&V methods, focusing on more novel baseline modeling approaches that leverage interval meter data. We detail a testing procedure and metrics to assess the performance of these new approaches using a large test dataset. We also provide conclusions regarding the accuracy, cost, and time trade-offs between more traditional M&V and these emerging streamlined methods. Finally, we discuss the potential evolution of M&V to better support the energy efficiency industry through low-cost approaches, and the long-term agenda for validation of building energy analytics.

Touzani, Samir↗

Hanford River Protection Project Life cycle Cost Modeling Tool to Enhance Mission Planning - 13396

The Life cycle Cost Model (LCM) Tool is an overall systems model that incorporates budget, and schedule impacts for the entire life cycle of the River Protection Project (RPP) mission, and is replacing the Hanford Tank Waste Operations Simulator (HTWOS) model as the foundation of the RPP system planning process. Currently, the DOE frequently requests HTWOS simulations of alternative technical and programmatic strategies for completing the RPP mission. Analysis of technical and programmatic changes can be performed with HTWOS; however, life cycle costs and schedules were previously generated by manual transfer of time-based data from HTWOS to Primavera P6. The LCM Tool automates the preparation of life cycle costs and schedules and is needed to provide timely turnaround capability for RPP mission alternative analyses. LCM is the simulation component of the LCM Tool. The simulation component is a replacement of the HTWOS model with new capability to support life cycle cost modeling. It is currently deployed in G22, but has been designed to work in any full object-oriented language with an extensive feature set focused on networking and cross-platform compatibility. The LCM retains existing HTWOS functionality needed to support system planning and alternatives studies going forward. In addition, it incorporates new functionality, coding improvements that streamline programming and model maintenance, and capability to input/export data to/from the LCM using the LCM Database (LCMDB). The LCM Cost/Schedule (LCMCS) contains cost and schedule data and logic. The LCMCS is used to generate life cycle costs and schedules for waste retrieval and processing scenarios. It uses time-based output data from the LCM to produce the logic ties in Primavera P6 necessary for shifting activities. The LCM Tool is evolving to address the needs of decision makers who want to understand the broad spectrum of risks facing complex organizations like DOE-RPP to understand how near-term programmatic decisions affect life cycle costs and commitments. (authors)

54 ENVIRONMENTAL SCIENCES↗

The Time Needed to Implement the Blue Ribbon Commission Recommendation on Interim Storage - 13124

The report of the Blue Ribbon Commission on America's Nuclear Future [1] makes a number of important recommendations to be considered if Congress elects to redirect U.S. high-level radioactive waste disposal policy. Setting aside for the purposes of this discussion any issues related to political forces leading to stopping progress on the Yucca Mountain project and driving the creation of the Commission, an important recommendation of the Commission was to institute prompt efforts to develop one or more consolidated storage facilities. The Blue Ribbon Commission noted that this recommended strategy for future storage and disposal facilities and operations should be implemented regardless of what happens with Yucca Mountain. It is too easy, however, to focus on interim storage as an alternative to geologic disposal. The Blue Ribbon Commission report does not go far enough in addressing the magnitude of the contentious problems associated with reopening the issues of relative authorities of the states and federal government with which Congress wrestled in crafting the Nuclear Waste Policy Act [2]. The Blue Ribbon Commission recommendation for prompt adoption of an interim storage program does not appear to be fully informed about the actions that must be taken, the relative cost of the effort, or the realistic time line that would be involved. In essence, the recommendation leaves to others the details of the systems engineering analyses needed to understand the nature and details of all the operations required to reach an operational interim storage facility without derailing forever the true end goal of geologic disposal. The material presented identifies a number of impediments that must be overcome before the country could develop a centralized federal interim storage facility. In summary, and in the order presented, they are: 1. Change the law, HJR 87, PL 107-200, designating Yucca Mountain for the development of a repository. 2. Bring new nuclear waste legislation to the floor of the Senate, overcoming existing House support for Yucca Mountain; 3. Change the longstanding focus of Congress from disposal to storage; 4. Change the funding concepts embodied in the Nuclear Waste Policy Act to allow the Nuclear Waste fund to be used to pay for interim storage; 5. Reverse the Congressional policy not to give states or tribes veto or consent authority, and to reserve to Congress the authority to override a state or tribal disapproval; 6. Promulgate interim storage facility siting regulations to reflect the new policies after such changes to policy and law; 7. Complete already underway changes to storage and transportation regulations, possibly incorporating changes to reflect changes to waste disposal law; 8. Promulgate new repository siting regulations if the interim storage facility is to support repository development; 9. Identify volunteer sites, negotiate agreements, and get Congressional approval for negotiated benefits packages; 10. Design, License and develop the interim storage facility. The time required to accomplish these ten items depends on many factors. The estimate developed assumes that certain of the items must be completed before other items are started; given past criticisms of the current program, such an assumption appears appropriate. Estimated times for completion of individual items are based on historical precedent. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Phase II Cost-Benefit Analysis: Economic Impact Assessment For Indonesia Building Sector Whole-Building Cooling Solutions

The Net Zero World (NZW) Initiative Collaborative Work Program with the Government of Indonesia (GoI) includes technical assistance and investment mobilization facilitation to accelerate deployment of energy efficiency technologies and solutions for the building sector. A February 2023 US–Indonesia Joint Workshop on Decarbonizing the Building Sector yielded a NZW Indonesia Building Decarbonization Working Group (NZW IBDWG) with four sub working groups (SWGs): SWG-A National Center, SWG-B Capacity Building, SWG-C Investment and Financing, and SWG-D Pilot Projects.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of Employee Health Services Scorecards and Dashboards for Sandia National Laboratories (SAND2020-2243 J)

The mission of Employee Health Services (EHS) at Sandia National Laboratories is to positively and efficiently impact the health of Sandia through patient-centered, cost-effective, community-connected care in support of its mission and people. We strive to continuously improve the delivery of health and wellness services. For the past few years, we have modeled our health programs around findings from the 2010 World Economics Forum (WEF): there are 8 top health risks and behaviors that drive 15 chronic conditions which account for 80% of the total health-care costs for all chronic illness worldwide. The WEF goes on to state that information and innovation are the keys to prevention, and EHS has decided to take a strong stand in both categories by utilizing health scorecards and department dashboards to visualize and share metrics with Sandia Leadership to foster improvements in employee wellness and optimize wellness offerings. Finally, these 2 types of information-sharing tools allow us to track the dollars spent and saved on our wellness programs, and show leadership where there is risk, where there is progress, and where there is need by providing current data that gives monthly, quarterly, and yearly feedback.

60 APPLIED LIFE SCIENCES↗

Bootstrapping a Sustainable North American PEM Fuel Cell Industry: Could a Federal Acquisition Program Make a Difference?

The North American Proton Exchange Membrane (PEM) fuel cell industry may be at a critical juncture. A large-scale market for automotive fuel cells appears to be several years away and in any case will require a long-term, coordinated commitment by government and industry to insure the co-evolution of hydrogen infrastructure and fuel cell vehicles (Greene et al., 2008). The market for non-automotive PEM fuel cells, on the other hand, may be much closer to commercial viability (Stone, 2006). Cost targets are less demanding and manufacturers appear to be close, perhaps within a factor of two, of meeting them. Hydrogen supply is a significant obstacle to market acceptance but may not be as great a barrier as it is for hydrogen-powered vehicles due to the smaller quantities of hydrogen required. PEM fuel cells appear to be potentially competitive in two markets: (1) Backup power (BuP) supply, and (2) electrically-powered MHE (Mahadevan et al., 2007a, 2007b). There are several Original Equipment Manufacturers (OEMs) of PEM fuel cell systems for these applications but production levels have been quite low (on the order of 100-200 per year) and cumulative production experience is also limited (on the order of 1,000 units to date). As a consequence, costs remain above target levels and PEM fuel cell OEMs are not yet competitive in these markets. If cost targets can be reached and acceptable solutions to hydrogen supply found, a sustainable North American PEM fuel cell industry could be established. If not, the industry and its North American supply chain could disappear within a year or two. The Hydrogen Fuel Cell and Infrastructure Technologies (HFCIT) program of the U.S. Department of Energy (DOE) requested a rapid assessment of the potential for a government acquisition program to bootstrap the market for non-automotive PEM fuel cells by driving down costs via economies of scale and learning-by-doing. The six week study included in-depth interviews of three manufacturers, visits to two production facilities, review of the literature on potential markets in North America and potential federal government procurements, development of a cost model reflecting economies of scale and learning-by-doing, and estimation of the impact of federal PEM fuel cell procurements on fuel cell system costs and the evolution of private market demand. This report presents the findings of that study. Section 2 outlines the status of the industry and describes potential markets based on interviews of manufacturers and the existing literature. Section 3 describes the modeling methodology including key premises and assumptions, and presents estimates of market evolution under four scenarios: (1) Base Case with no federal government procurement program, (2) Scenario 1, an aggressive program beginning with less than 200 units procured in 2008 ramping up to more than 2,000 units in 2012, (3) Scenario 2 which is identical to Scenario 1 except that the private market is assumed to be twice as sensitive to price, and (4) Scenario 3, a delayed, smaller federal procurement program beginning in 2011 increasing to a maximum of just over 1,000 units per year in 2012. The analysis suggests that the aggressive program of Scenario 1 would likely stimulate a sustainable, competitive North American non-automotive PEM fuel cell industry. Given plausible assumptions about learning rates and scale economies, the procurements assumed in Scenario 1 appear to be sufficient to drive down costs to target levels. These findings are conditional on the evolution of acceptable hydrogen supply strategies, which were not explicitly analyzed in this study. Success is less certain under Scenarios 2 and 3, and there appears to be a strong probability that existing OEMs would not survive until 2011. In the Base Case, no program, a viable North American industry does not emerge before 2020.

08 HYDROGEN↗

Intergovernmental Advanced Stationary PEM Fuel Cell System Demonstration (Final Report)

A program to complete the design, construction and demonstration of a PEMFC system fuelled by Ethanol, LPG or NG for telecom applications was initiated in October 2007. Early in the program the economics for Ethanol were shown to be unfeasible and permission was given by DOE to focus on LPG only. The design and construction of a prototype unit was completed in Jun 2009 using commercially available PEM FC stack from Ballard Power Systems. During the course of testing, the high pressure drop of the stack was shown to be problematic in terms of control and stability of the reformer. Also, due to the power requirements for air compression the overall efficiency of the system was shown to be lower than a similar system using internally developed low pressure drop FC stack. In Q3 2009, the decision was made to change to the Plug power stack and a second prototype was built and tested. Overall net efficiency was shown to be 31.5% at 3 kW output. Total output of the system is 6 kW. Using the new stack hardware, material cost reduction of 63% was achieved over the previous Alpha design. During a November 2009 review meeting Plug Power proposed and was granted permission, to demonstrate the new, commercial version of Plug Power's telecom system at CERL. As this product was also being tested as part of a DOE Topic 7A program, this part of the program was transferred to the Topic 7A program. In Q32008, the scope of work of this program was expanded to include a National Grid demonstration project of a micro-CHP system using hightemperature PEM technology. The Gensys Blue system was cleared for unattended operation, grid connection, and power generation in Aug 2009 at Union College in NY state. The system continues to operate providing power and heat to Beuth House. The system is being continually evaluated and improvements to hardware and controls will be implemented as more is learned about the system's operation. The program is instrumental in improving the efficiency and reducing costs of PEMFC based power systems using LPG fuel and continues to makes steps towards meeting DOE's targets. Plug Power would like to thank DOE for their support of this program.

24 POWER TRANSMISSION AND DISTRIBUTION↗

2022 GETEM Geothermal Drilling Cost Curve Update: Preprint

The Geothermal Electricity Technology Evaluation Model (GETEM) is an essential tool for the Department of Energy's (DOE) Geothermal Technology Office (GTO) to understand the performance and cost of technologies it is seeking to improve. This detailed model is used for supply curve analyses, assessing the current economic feasibility and Levelized Cost of Energy (LCOE) of hydrothermal geothermal systems and EGS, and evaluating the potential impact of advanced geothermal technologies. GETEM can be used to estimate the performance and costs of currently available U.S. geothermal power systems. It is also used to estimate the costs of technologies 5 to 20 years in the future, given the direction of potential research, development, and demonstration (RD&D) projects. The model is intended to help GTO determine which proposed RD&D programs and projects might offer the most efficient improvement when using taxpayer funding. The model requires annual updates as well as revisions to reflect the current state of the art. Drilling costs are a significant portion of total geothermal development costs. The current GETEM drilling cost inputs rely on drilling data from 2009 and require an updated analysis of more recent data to ensure they remain representative of current technologies. An updated, more accurate understanding of costs could help the geothermal industry secure project development financing and investment funding and better allow the oil and gas (O&G) industry (both operators and service companies) weigh potential geothermal market participation and customization. This report details recent drilling improvements from the Utah Frontier Observatory for Research in Geothermal Energy (FORGE) and O&G, comparing drilling performance and costs with values in GETEM, particularly the baseline drilling cost curves. Though drilling performance at FORGE has improved significantly, we did not find associated cost decreases that would justify lowering the GETEM baseline cost curves as of now.

API↗

2022 GETEM Geothermal Drilling Cost Curve Update

The Geothermal Electricity Technology Evaluation Model (GETEM) is an essential tool for the U.S. Department of Energy's (DOE) Geothermal Technologies Office (GTO) to understand the performance and cost of technologies it is seeking to improve. This detailed model is used for supply curve analyses, assessing the current economic feasibility and levelized cost of energy (LCOE) of hydrothermal geothermal systems and enhanced geothermal systems (EGS), and evaluating the potential impact of advanced geothermal technologies. GETEM can be used to estimate the performance and costs of currently available U.S. geothermal power systems. It is also used to estimate the costs of technologies 5 to 20 years in the future, given the direction of potential research, development, and demonstration (RD&D) projects. The model is intended to help GTO determine which proposed RD&D programs and projects might offer the most efficient improvement when using taxpayer funding. The model requires annual updates as well as revisions to reflect the current state of the art. Drilling costs are a significant portion of total geothermal development costs. The current GETEM drilling cost inputs rely on drilling data from 2009 and require an updated analysis of more recent data to ensure they remain representative of current technologies. An updated, more accurate understanding of costs could help the geothermal industry secure project development financing and investment funding and better allow the oil and gas (O&G) industry (both operators and service companies) to weigh potential geothermal market participation and customization. This report details recent drilling improvements from the Utah Frontier Observatory for Research in Geothermal Energy (FORGE) and the O&G sector, comparing drilling performance and costs with values in GETEM, particularly the baseline drilling cost curves. Although drilling performance at FORGE has improved significantly, we did not find associated cost decreases that would justify lowering the GETEM baseline cost curves at this time.

API↗

Artificial Intelligence for Natural Gas Utilities: A Primer

Modern natural gas utilities face numerous challenges and competing priorities from various stakeholders. Policymakers, customers, and advocacy groups want to see gas utilities improve performance on safety, reliability, resilience, affordability, and environmental stewardship. State utility regulators — public utility commissions — are responsible for overseeing utility performance, ensuring that ratepayer funds are being spent in the public interest, and aligning utility goals with public goals. The use of new technologies is critical to enabling cost-effective performance on these attributes. Artificial intelligence (AI) is a widely used term among utilities and regulators, but the term means different things to different stakeholders, and it is often used to describe data analytics approaches that fall short of the formal definition of AI, which is: “…the ability of a machine to receive inputs and produce a behavior or reaction similar to that of an intelligent human being.” AI (and related tools, techniques, and technologies) can help utilities solve current and emerging challenges. By combining customer and system data with analytical tools and technologies, AI can augment human decision-makers by assisting in identifying problems and events before they occur, enabling resources to be more efficiently directed across utility infrastructure. The intended primary audience for this primer is state regulators, although utilities and other stakeholders might also find it useful and relevant to improve their awareness of AI. The objectives of this primer are to: (a) offer a set of broadly applicable definitions for AI and related terms, allowing regulators, utilities, and other stakeholders to speak the same language; (b) discuss how AI is currently being implemented in the gas utility sector; and (c) understand the challenges affecting AI solutions and how tools might be implemented in the future. This primer fits within NARUC’s goals of providing impartial information to improve the ability of public utility commissions to regulate in the public interest. As such, this primer does not seek to recommend AI over any other investment, nor does it endorse any particular vendor, product, or approach. It does seek to prepare state regulators to oversee AI investments by sharing information about the current landscape of commercially available tools. To these ends, the primer is organized as follows: Section I discusses the current environment in which natural gas utilities operate and how AI, when thoughtfully designed and implemented, can enable utilities to achieve performance goals; Section II offers definitions of AI and related terms within the data analytics discipline; Section III provides three current opportunities for which AI can offer solutions: replacing aging gas distribution infrastructure, preventing excavator damage to gas distribution infrastructure, and improving energy efficiency programs. This section discusses each problem statement in detail. Second, Section III includes a discussion of how costs and benefits of investments to solve each problem are measured. And third, this section offers real-world examples of utility implementation of AI solutions; Section IV discusses challenges with implementing AI, both from the perspective of utilities and regulators; Section V suggests areas in which AI could feasibly be implemented in the near future; Finally, Section VI offers concluding thoughts and areas for further research.

03 NATURAL GAS↗

Feed-in Tariffs and Offshore Wind Power Development

This paper will briefly review the evolution and status of various feed‐in‐tariff programs (FITs) throughout Europe and North America. This paper will first outline feed-in tariffs in more detail and provide a summary of their design features, discuss how costs are calculated, address differences and adjustments to prices, highlight legal issues associated with FITs, and highlight some problems that FITs can face. The second part of the paper will give details of a number of FIT programs that have been established with a particular emphasis on those that relate to offshore wind. FITs have enjoyed widespread success in Europe, and by providing a reliable price and thereby leveling the playing field for renewable energy generators, FITs have fostered under‐developed renewable industries. Several European countries have experienced unprecedented growth in generation and industry after the adoption of feed-in tariffs, yet growth in the United States renewable energy sector has been markedly slow. An order by the Federal Energy Regulatory Commission (FERC) in July 2010 appeared to significantly hinder a state’s ability to develop flexible and fairly priced tariffs; however, a subsequent FERC clarification provided a platform for state tariff development based on practical price considerations. Continued federal leadership will be imperative to squarely address the needs of the renewable industry. By providing continued clarity and establishing state autonomy, FERC’s role can evolve to promote growth in this critical market segment. Absent direct guidance from Congress and federal regulatory agencies, this critical energy sector may languish as international markets capitalize on these flexible policies.

17 WIND ENERGY↗

Storage Futures Study: Distributed Solar and Storage Outlook: Methodology and Scenarios

This report is one in a series of NREL’s Storage Futures Study (SFS) publications. The SFS is a multiyear research project that explores the role and impact of energy storage in the evolution and operation of the U.S. power sector. The SFS is designed to examine the potential impact of energy storage technology advancement on the deployment of utility-scale storage and the adoption of distributed storage, and the implications for future power system infrastructure investment and operations. The research findings and supporting data will be published as a series of reports, with each report being released on its completion. The table below lists the specific research topics planned for examination under the SFS and the associated publication formats. This report, the fourth in the SFS series, provides a set of scenarios for cost-effectiveness and customer adoption for a range of scenarios that include future technology costs and valuation of backup power. The SFS series provides data and analysis in support of the U.S. Department of Energy’s Energy Storage Grand Challenge, a comprehensive program to accelerate the development, commercialization, and utilization of next-generation energy storage technologies and sustain American global leadership in energy storage. The Energy Storage Grand Challenge employs a use case framework to ensure storage technologies can cost-effectively meet specific needs, and it incorporates a broad range of technologies in several categories: electrochemical, electromechanical, thermal, flexible generation, flexible buildings, and power electronics. More information, any supporting data associated with this report, links to other reports in the series, and other information about the broader study are available at https://www.nrel.gov/analysis/storage-futures.html.

25 ENERGY STORAGE↗

Applying State-of-the-Art Tools for Safety-Optimized D and D - 17410

Decommissioning, Demolition and Disposal of 'hot' facilities (D3) is a relatively new science to the extent it has been part our public consciousness for ∼50-years. Due to the high hazard of uncontrolled exposure and the possibility of environmental release, the technologies applied to D3 have not embraced many of the recently developed engineering tools, especially those that leverage the digital and optical advances of the past 10-years. This summary paper provides an overview of how we are layering readily available technologies with sophisticated techniques to D3, ranging from agile program management to advanced modular construction to augmented reality. Using this approach, we are significantly improving safety and ALARA aspects while saving costs, optimizing schedules, maintaining quality and engaging the customer and the regulator in the D3 environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preparing California’s Cap-and-Trade Program for 2045: Integrating Carbon Dioxide Removal

To meet California’s legislatively mandated 2045 carbon neutrality target (AB 1279, Muratsuchi), analyses from the California Air Resources Board (CARB) and Lawrence Livermore National Laboratory (LLNL) have shown that carbon dioxide removal—activities that permanently remove carbon dioxide (CO 2 ) from the atmosphere—will be necessary to remove greenhouse gas emissions that are otherwise too costly or difficult to reduce. This policy brief explores the policy, legal, and technical considerations for integrating carbon dioxide removal into the Cap-and-Trade Program.

54 ENVIRONMENTAL SCIENCES↗

Joint Fleet Sizing and Charging System Planning for Autonomous Electric Vehicles

This paper studies the joint fleet sizing and charging system planning problem for a company operating a fleet of autonomous electric vehicles (AEVs) for passenger and goods transportation. Most of the relevant published papers focus on intracity scenarios and adopt heuristic approaches, e.g., agent based simulation, which do not guarantee optimality. In contrast, we propose a mixed integer linear programming model for intercity scenarios. This model incorporates comprehensive considerations of 1) limited AEV driving range; 2) optimal AEV routing and relocating operations; 3) time-varying origin-destination transport demands; and 4) differentiated operation cost structure of passenger and goods transportation. The proposed model can be computational expensive when the scale of the transportation network is large. We then exploit the structure of this program to expedite its solution. Numerical experiments are conducted to validate the proposed method. Our experimental results show that AEVs in passenger and goods transportation have remarkable planning and operation differences. We also demonstrate that intelligent routing and relocating operations, charging system and vehicle parameters, e.g., charging power, battery capacity, driving speed etc., can significantly affect the economic efficiency and the planning results of an AEV fleet.

33 ADVANCED PROPULSION SYSTEMS↗