Search NASA⌕ Search

SEARCH · Search NASA

Results for “Contingency”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,693 records · Page 94

Establishing no credible risk of inadvertent criticality for the K-25 demolition project - 14310

Demolition of the K-25 Gaseous Diffusion Plant required establishing a non-credible risk of inadvertent criticality because a Criticality Accident Alarm System (CAAS) could not be reliably maintained operable as the building was being torn down. Preparation for, and demolition of, the facility was a multi-year long effort with significant changes in approach. The most significant change was to demolish the facility with as much of the process gas equipment and piping left in the facility as possible, rather than removing all process gas equipment and piping from the facility prior to demolishing the building structure only. The contractor had to adapt their approach to accommodate these changes. The normal approach to demolition was to remove all process gas equipment and piping prior to demolition, using Nuclear Criticality Safety (NCS) controls based on the double contingency principle, while CAAS coverage was intact. Then, the building structure was demolished with no requirement for a CAAS. This was the method used to demolish the K-33 Building, for example. In the case of K-25 demolition, all equipment and piping that met the Environmental Management Waste Management Facility (EMWMF) disposal cell Waste Acceptance Criteria (WAC) was left in the building and removed as part of the building demolition process. This resulted in significant quantities of fissionable material remaining in the building and being handled during demolition. The NCS Organization worked closely with several groups during preparation activities. A Data Management organization was established to specifically identify every piece of process gas equipment and piping in the facility so that it could be accounted for and characterized. Deactivation and Decommissioning (D and D) personnel conducted internal visual inspections, by remote camera, of all process gas equipment and piping larger than 3' diameter, to reveal any large deposits that would require removal. Non-Destructive Assay (NDA) of the vast majority of equipment and piping was required to quantify the amount of fissionable material remaining. Finally, all process gas equipment and piping larger than 3'' diameter was internally filled with foam, which was credited by NCS with immobilizing the remaining fissionable material such that large migration and accumulation could not occur during demolition activities. NCS personnel worked closely with all of these groups in order to acquire the data and information needed to establish a non-credible risk of inadvertent criticality during building demolition. Good communication and a close working relationship between NCS, the various D and D/characterization personnel, and the Department of Energy (DOE) ensured the success of the modified approach to building demolition. The same successful approach is currently underway in the K-27 Building as well. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An overview of the 2014 revision of ANSI/ANS-ANS-8.1-2014, 'Nuclear criticality safety in operations with Fissionable Materials Outside Reactors' - 14577

A revision to the American National Standards Institute (ANSI)/American Nuclear Society (ANS) standard, 'Nuclear Criticality Safety in Operations with Fissionable Materials Outside Reactors' [ANSI/ANS-8.1 (ANS-8.1)], was completed and published in 2014. The approved scope for the 2014 revision included two major efforts: (1) an editorial revision to clarify the meaning of the process analysis requirement (PA) and the double contingency principle recommendation (DCP) and (2) the generation of new subcritical limits for uranium and uranium compounds for enrichments less than 10 wt % {sup 235}U. After a clarification request was submitted regarding the PA and DCP in 2009, the scope of the revision became focused almost entirely on the editorial revision. With approval from the ANS-8 subcommittee chairman, the computational effort was postponed until the editorial revision could be completed. The 2014 revision of ANS-8.1 involved nuclear criticality safety experts from 14 different sites, each with many years of experience, either maintaining the standard as a working group member or as a criticality safety practitioner. Many of the represented sites had implemented the PA with the language of the DCP to ensure that process operations with fissionable materials would be subcritical. However, the early working group deliberations made it clear that the general industry focus was on the DCP rather than the PA, which requires that 'all normal and credible abnormal conditions remain subcritical'. Over the course of the revision, two new definitions and a new appendix (Appendix B) were developed to enhance understanding of the PA and DCP. The emphasis of Appendix B is on the requirement for subcriticality (PA) rather than the DCP. The phrase 'credible abnormal conditions' in the PA is broader in meaning than 'changes in process conditions,' as recommended by the DCP. This is because a single credible abnormal condition can potentially affect multiple independent process conditions, and consequently, multiple process parameters, simultaneously. The DCP is a technical practice meant to support the PA and cannot be applied to all situations. However, when it can be properly applied, the DCP technical practice, in most cases, ensures compliance with the PA because two unlikely, independent, and concurrent changes in process conditions are generally judged not to be a credible abnormal condition, as specified in the PA. This paper elaborates on the intense working group discussions over the course of the ANSI/ANS-8.1 standard revision and summarizes the modifications made to the revised standard. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Status of French regulation regulations concerning nuclear criticality safety - 14585

Hitherto, in France, licensees used to demonstrate compliance with Fundamental Safety Rule I.3.c. This Rule sets out the principles for demonstrating Nuclear Criticality Safety in all nuclear facilities (excluding reactors). Although there is a good level of consensus between the licensees and the Regulator, this Rule is now somewhat dated (it came into force in 1984) and does not cover all aspects. The French Nuclear Safety Authority (ASN) used the 2006 Law on Transparency and Nuclear Safety as the catalyst for a thorough revision and updating of its regulatory documentation. Thus, in 2010, ASN decided to set up a 'criticality working group' involving ASN, the licensees (AREVA, CEA, EDF...) and the Technical Safety Organization (IRSN). This group was tasked with drafting a regulatory text (a 'resolution') and a criticality guide. The objectives were to update Rule I.3.c, clearly defining the scope for reactors and transport packages of fissile material, to further develop areas not covered in the existing rule and to take account of the feedback and lessons learned from past events. Thus, this paper presents the status of French regulations concerning Nuclear Criticality Safety (NCS). Firstly, it focuses on the existing Rule I.3.c and then explains how this will be modified by the forthcoming improvements to the resolution and the criticality guide. It in particular addresses the scope of the new regulations (concerning reactors and the transport of fissile material), how the principle of defence in depth is to be applied to criticality safety, the double contingency principle, control modes, the reference fissile medium, the organization, the role of the Criticality Engineer, admissibility criteria, validation, etc. (authors)

42 ENGINEERING↗

The application of ICASPA to critical and safe mass calculations - 14586

ICASPA, an Improved Critical and Safe Parameters Algorithm, calculates the size of a fissile body for a given value of k-effective. ICASPA uses an iterative predictor/corrector algorithm in which the MONK9A code is used to derive a precise k-effective value for a given candidate body size; auxiliary equations are then used to adjust the body size. The process is repeated until MONK9A outputs the chosen target value of k-effective. EDF Energy operates eight nuclear power stations comprising one Pressurized Water Reactor (PWR) and seven Advanced Gas-cooled Reactor (AGR) stations. At these sites, the term 'fuel route' is used to encompass all of the ex-reactor arrangements for the handling and storage of fuel. The criticality safety cases for these fuel routes are based on the use of geometrically safe arrangements for the required quantities of fuel. The allowed quantities and arrangements of fuel are safely sub-critical, even under the contingency of accidental moderator ingress. The fuel route safety cases consider all credible potential fault conditions, including events such as dropped fuel. Any such events might change the geometry of the fuel elements, but it is difficult to calculate exact k-effective values for realistic models of dropped fuel. This difficulty is overcome by the use of an alternative approach in which limiting safe masses are calculated for bounding (worst-case) rearrangements of fuel rods and moderators, using geometries similar to those covered by criticality handbook data. Where required, the resulting safe masses are used to set safety case limits and conditions. For example, some fire extinguishants, such as water and ABC dry powder, are also effective moderators. Hence, in some fuel route areas, administrative criticality controls are used to either prohibit or limit the permitted quantities of these materials. This paper describes the work that has been carried out to adopt ICASPA as the approved calculation method for these safe mass calculations. The work has been carried out within the company quality assurance requirements for nuclear safety related software. It has involved the development of a configuration controlled version of ICASPA and the local verification and validation of the resulting code. The benefits from the adoption of ICASPA are also presented. These include accuracy improvements and, because the method uses the MONK9A code for k-effective calculations, the ability to use more sophisticated models for limiting case geometries. (authors)

42 ENGINEERING↗

Training practices for CEA engineers qualified in criticality safety - 14598

Soon after the Tokai Mura criticality accident, the French nuclear authority addressed nuclear operators to take measures regarding criticality safety. In CEA in particular after a thorough assessment of the late 1990's - early 2000's practices, the decision was taken to put up a training program in criticality safety for young (and 'old') nuclear safety specialists. The evolution of the training practices for the IQC (Ingenieurs Qualifies en Criticite - Engineers Qualified in Criticality safety) are presented hereafter, beginning with the first training session set up in October 2001 until now. This primarily deals with the kind of audience this training addresses (professional background), what is taught, learned, used later on and how one becomes an IQC. Furthermore, a discussion involves who recognizes the qualification, how long does one need to become a real criticality safety specialist on an operational basis, how the staff uses (or not) the knowledge and how this ensemble contributes to the professional careers advancement (criticality safety is a strong 'card'). The methodological documents in support of the IQC are also presented, particularly the last version of the 'criticality guide fiches (files, cards, sheets)' collection which summarizes the main aspects and principles of criticality safety (including the rudiments of neutron physics, criticality control modes, double contingency principle, etc.). (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Improved Evaluation of Large Network Matrices for Linear Power Flow Within Optimization Problems: Preprint

This work discusses methods for evaluating the Power Transfer Distribution Factor (PTDF) and Line Outage Distribution Factor (LODF) matrices by employing sparse linear algebra for large-scale computing applications. These matrices are critical in many power systems applications, such as the Unit Commitment Problem (UC), pre- and post-contingency power flow analysis, and transmission expansion. These matrices are typically dense, which means they require a significant amount of time and memory to be computed for large networks. However, by analyzing the structure of the matrices and their computation method, it is possible to use reduced memory methods based on sparse matrix operations. This paper shows that sparse linear algebra algorithms are faster and require less memory and time than traditional dense approaches. Additionally, we explore the effect of matrix sparsification by eliminating trailing digits on power flow calculations.

ENERGY PLANNING, POLICY, AND ECONOMY↗

Sensitivity-Based Reactive Power Dispatch of DERs to Support Transmission Grid During Emergency

This paper proposes a TSO-DSO framework including DER set-point dispatch using sensitivity analysis. We address all three steps of TSO-DSO integration stating by estimating the capability curve of an unbalanced distribution system and then modeling of capability curve on the transmission side grid and estimating the reactive power needed from DSO during emergencies, and ending by dispatching the requested reactive power from TSO. The proposed interaction framework is tested on an IEEE 37-node distribution network connected to IEEE 9 bus transmission system. The simulation shows that using sensitivity-based dispatch would reduce the number of communication signals between DERs and DSO and that can decrease the risk of communication contingency.

Alkhonain, Ahmed↗

Solving the Grid Optimization Competition Challenge 3 Problem

The Grid Optimization Competition Challenge 3 Problem posed a multiperiod security-constrained unit commitment problem with base-case AC power flow. The problem formulation includes binary unit commitment decisions, nonlinear AC power flow and balance, dispatchable loads, and linearized contingency real power flow, among other features. This talk will present a modified consensus ADMM algorithm, which splits the problem into mixed-integer linear and nonlinear components, as a heuristic solution method for this large-scale mixed integer nonlinear program. We will present some computational results from the competition for our implementation and reflect on the challenges of participating the grid optimization competition.

AC power flow↗

Hub and Spoke Modeling to support Agile Combat Employment

Here, the 2022 National Defense Strategy (NDS) shifts focus primarily to the People’s Republic of China (PRC) as the pacing challenge, with acknowledgement of the other threats. President Joe Biden introduced the updated version by stating the U.S. is living in a decisive decade. While the country does not know when the next conflict will happen, leadership believes it will happen soon and the DoD is preparing for this eventuality in the Indo-Pacific region by rethinking operations and concepts. Traditionally, large, fixed installations have been the primary means of operating and generating airpower for the United States Air Force (USAF). Additionally, the service has the capabilities to establish contingency locations based on two primary criteria: a runway and a water source. However, policies and strategy must be updated to create a more agile and dispersed force.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Application of Banking Scoring and Rating for Coherent Risk Measures in Electricity Systems ABSCORES

This project developed a framework for asset and system risk management that can be incorporated into current electricity system operations to improve economic efficiency and establish an Electric Assets Risk Bureau. We leveraged scoring and ratings from banking and financial institutions alongside current optimization methods in dispatching power systems to help system operators and electricity markets schedule resources. This approach is based on the observation that there are major discrepancies between the power scheduled by a system operator and the actual power generated/consumed. These discrepancies—exacerbated by unplanned contingencies (e.g., natural disasters)—are caused by multiple factors, including the different financial, environmental and risk preferences of power producers, consumers, and aggregators. We developed a framework that counteracts two failures in electricity system operations: imperfect information and missing markets for products. The technical approach included five tasks. Tasks 1 and 2 supported the development of risk scores at the asset level with historical data collected for this project. Tasks 3, 4, and 5 incorporated scoring into decision-making at the system level. The proposed effort achieved PERFORM's Program Objectives because the proposed outputs and algorithms do not exist in the electricity industry and are an innovative approach to managing risk. Since the acknowledged need to better assess and act upon risk profiles for grid assets has not been met by the industry, this project will also impact ARPA-E's Mission Areas, including improving energy efficiency and giving the U.S. a technological lead in advanced energy technologies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Analysis and design of DC-link capacitor in cascaded H-bridge multilevel active front-end converter

Medium-voltage grid-tied systems often use a cascaded H-bridge multi-level active front-end. In this converter, dc link bus capacitors play an important role in stabilizing the converter and enabling both active and reactive power injections. The present work provides analytical expressions for the capacitor current, which are essential for optimizing system design (especially capacitor size vs. lifetime). Then, the expression is incorporated into the grid connected bidirectional power system model. Consequently, this work contributes to the guiding principles to choose accurate dc link capacitor ratings against grid-side power delivery requirements. DC-link capacitors come with an expiration date which is dependent on the operating power and voltage values. Lack of information about the lifetime of the dc-link capacitor creates uncertainty in the duration of online operation of the converter, thus increasing the probability of a contingency outage. The lifetime of the capacitor can range from only a few seconds of online operation of the station due to under-sizing, to a compromised quality of power flowing through other solid state devices which may not have been designed for the transients that are caused by over-sizing of the dc-link capacitor. A better estimate of the lifetime of these capacitors can help maximize usage and maintain scheduled outages more efficiently, without disruption in service.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Guide to Current Limiting and Stability with Grid-Forming Inverters

The electric power grid is changing. For many decades, the synchronous generator - an electromechanical device invented in 1887 - has been the workhorse and backbone of power grids across the globe. Our entire infrastructure is built around it. But times change, and so does the power grid. Since the early 21st century, we have seen a gradual shift in modern power grids away from synchronous generators to ones dominated by power electronic inverter-based resources (IBRs). Sources such as photovoltaics, wind turbines, battery storage, fuel cells, and other technologies like high-voltage DC transmission interconnections all rely on an inverter to connect and interface with the grid. They are increasingly being installed on the grid to augment, or even replace, traditional energy sources. This change is a fundamental shift that brings tremendous technical challenges and questions: Can a power grid remain stable with many more inverter-based resources? How do we avoid more blackouts on the grid? How do we keep the grid secure and resilient during disturbances? After all, power electronic inverters are nothing like the big, rotating, iron-and-copper machines that the grid heavily relies on. Many of these questions can be answered by using grid-forming (GFM) inverters, yet many research challenges remain. This document explores GFM inverters and how they can help stabilize the future grid, especially during disturbances and contingencies. It summarizes a two-year research and development fellowship program at NREL. We point interested readers to more detailed works developed during the project along the way. Let's dive in

24 POWER TRANSMISSION AND DISTRIBUTION↗

Co-Simulation of PSS/E, OpenDSS, and PSCAD for Power Systems Stability Analysis With Inverter-Based Resources: Preprint

The increasing penetration of inverter-based resources (IBRs) is reshaping the dynamic behavior of power systems. IEEE standard 1547-2018 suggests that distributed energy resources (DERs) should provide grid services such as voltage and frequency supports. On the other hand, dynamic events caused by IBRs such as sub-synchronous oscillation have been reported. These developments necessitate improvement in the current modeling capabilities to better understand the interdependencies within power systems. These include interactions between transmission and distribution systems, among IBRs themselves, and between IBRs and conventional resources. In this paper, we present a co-simulation model integrating PSS/E, OpenDSS, and PSCAD to analyze IBR impacts on the stability of transmission and distribution systems. A key challenge in developing a co-simulation model is ensuring interoperability among different simulators (interfacing and data flow) while maintaining accurate results. Using the developed model, we simulate the impact of IBRs on power systems in two test cases: 1) fault ride through (FRT) capability during a generation trip contingency; 2) IBR-induced sub-synchronous oscillation. The results show the effectiveness of the co-simulation model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Fuels Campaign Execution Plan

The Advanced Fuels Campaign (AFC) Execution Plan details the strategy, mission, scope, and goals—both near-term and long-term—along with the structure and organization of nuclear fuels and materials research, development, and demonstration (RD&D) activities within the Fuel Cycle Technologies (FCT) program. The FCT program, tasked by the U.S. Department of Energy (DOE), employs a science-based approach to advance fuel technologies. This approach integrates theory, experiments, and multi-scale modeling and simulation (M&S) to develop a predictive understanding of fuel fabrication processes and fuel/cladding performance under irradiation, moving beyond traditional empirical methods. The long-term goals of the AFC are guided by the AFC Strategic Plan and align with the DOE Office of Nuclear Energy (NE) Roadmap [1], which outlines a multi-decade vision for demonstrating and qualifying advanced fuel forms to support diverse fuel cycle options. Near-term goals focus on enhancing accident tolerant fuels (ATF) for Light Water Reactors (LWR), a significant challenge that demands balancing immediate objectives with ongoing progress toward advanced reactor missions. Accelerating the traditional fuel qualification process to meet ATF objectives is another critical challenge. A detailed set of 5-year goals, summarized below, has been developed in line with the overarching science-based fuel development approach: • Advanced LWR Fuel Technologies: By 2027, support the development of advanced LWR fuel technologies with improved performance and enhanced accident tolerance. This includes high burnup (HBu), low enriched uranium (LEU)+, coated cladding, and doped fuel, aimed at complementing industry-led significant LWR uprates and plant refurbishments. • Tristructural Isotropic (TRISO) Fuel: Achieve qualification by 2028 and develop improved designs for emerging markets. • Metal Fuel: Achieve qualification by 2028 and develop improved designs for emerging markets. • Molten Salt Fuel: By 2027, deploy a robust program that enables fuel salt qualification technologies needed to support fuel salt research and development (R&D), focusing on emergent needs to derisk fuel salt production and utilization in advanced reactors. • Long-Term ATF: Develop fuel technologies that enable significant power uprates (~50%) in refurbished or new LWRs while optimizing fissile material utilization and waste disposal. The 5-year milestones in the AFC Execution Plan are contingent on an assumed budget. This Execution Plan will be updated annually to reflect actual funding profiles as budget guidance becomes available, ensuring milestones are adjusted accordingly. In summary, the AFC Execution Plan presents a comprehensive strategy to advance nuclear fuel technologies through a science-based approach, addressing both near-term and long-term goals while adapting to funding realities.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Impact of Storage Conditions on the Quality and Viability of Switchgrass as a Bioenergy Crop

With growing energy demands and climate concerns, advancements in bioenergy have become imperative. Biofuels promote energy independence, reduce fossil fuel reliance, and cut greenhouse gas emissions. Switchgrass (Panicum virgatumis) is an ideal bioenergy crop due to its ability to thrive on marginal lands unsuitable for food crops and its drought tolerance, rendering it a low-maintenance, high-yield option. In the bioenergy industry, energy crops are typically stored to facilitate supply chain management and ensure a continuous supply despite seasonal availability. However, the effective utilization of bioenergy crops is typically contingent upon addressing the challenges associated with biomass storage. These challenges include high moisture content that promotes biological degradation of the biomass leading to increased risk of pathogenic microbes, and chemical degradation that increases the ratio of inconvertible, inorganic materials. These issues lead to a reduction of feedstock value, diminishing the biomass-to-biofuel conversion efficacy, making switchgrass and other bioenergy crops less effective as fuel sources. This project aims to improve the storage of purpose-grown energy crops. Aerobic storage trials were conducted under varying moisture contents to stimulate real-world environmental exposure. Switchgrass samples were rewetted to 30% or 35% and stored in a bioreactor for approximately one month, or until cellular respiration ceased. Degradation indicators, such as dry matter loss, temperature changes, and cellular respiration, were measured throughout this process. Samples for compositional analysis, 16S, and ITS were taken at three different time points: before, during, and after storage, to monitor changes in biomass, microbial communities, and metabolites over time. Preliminary data indicate that dry matter loss is proportional to cellular respiration, with higher moisture content (35%) leading to higher temperatures and elevated dry matter loss. Compositional analysis and microbial community analysis are in progress. This research will provide a comprehensive understanding of storage, helping to identify stability factors in energy crops and improve best management practices for biomass producers.

09 - BIOMASS FUELS↗

Best practices: Organizational execution

This article, the fourth and final installment in the DOE–IDEA series, focuses on organizational execution and how strong management practices, teamwork, and preparedness contribute to successful district energy systems. It highlights case studies from Ashley Energy and Cornell University to illustrate effective operational strategies. Ashley Energy demonstrates the importance of emergency preparedness and rapid response. After a major flood disrupted its plant, the organization restored service in under 72 hours by relying on pre-established plans, vendor relationships, and trained staff. The case emphasizes proactive contingency planning, understanding insurance processes, and empowering skilled personnel to improvise during crises. Cornell University’s example highlights the role of collaboration and transparency in long-term success. Its district energy system benefits from strong data sharing, real-time energy monitoring, and active involvement of faculty and students in system planning and innovation. This culture of teamwork and data-driven decision-making supports sustainability goals and continuous system improvement. Overall, the article shows that effective organizational execution—through preparedness, collaboration, and data transparency—is essential for maintaining reliable, efficient, and sustainable district energy systems.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Trial Implementation of a Multihazard Risk Assessment Framework for High-Impact Low-Frequency Power Grid Events

The Pacific Northwest National Laboratory developed a risk framework for modeling high-impact, low-frequency power grid events to support risk-informed decisions. In this research article, we briefly recap the framework and demonstrate its implementation for seismic and geomagnetic hazards using a benchmark reliability test system. We describe integration of a collection of models implemented to perform hazard analysis, fragility evaluation, consequence estimation and post-event restoration. We demonstrate the value of the framework as a multi-hazard power grid risk assessment and management tool. The research will benefit transmission planners and emergency planners by improving their ability to maintain a resilient grid infrastructure against impacts from major events.

power grid, risk assessment, seismic hazard, dynam↗