Search NASA⌕ Search

SEARCH · Search NASA

Results for “Distribution Systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,693 records · Page 94

Precision measurement of the magnetic field in run 1 of the g-2 experiment

The Proton Improvement Plan-II (PIP-II) is a superconducting linear accelerator being built at Fermilab that will provide 800 MeV proton beam for neutrino production. The linac consists of a total of twenty-three (23) cryomodules of five (5) different types. Cooling is required at 2K, 5K and 40K. The Cryogenic Distribution System (CDS) consists of a Distribution Valve Box, ~285 m of cryogenic transfer line, modular Bayonet Cans to interface with cryomodules, and a Turnaround Can. The cryogenic system must provide protection from over-pressure by sizing pressure relief devices for all volumes and process line circuits. The cryomodule cavity circuits have dual pressure ratings, 4.1 bara when cold and 2.05 bara when warm (T>80K). Worst case relieving cases will be identified. The methods for determining heat flux will be presented. For the relieving occurring in the linac tunnel, flow must vent to outside to avoid an oxygen deficiency hazard. Also, we will present vacuum vessel relief sizing to protect the cryogenic distribution system vacuum shells from over pressure during an internal line rupture. The project is funded by US DOE Offices of Science, High Energy Physics.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Co-simulation Framework for Community-scale Building-grid Integration [SWR-21-75]

Distributed energy resources (DERs), including rooftop solar, energy storage, and flexible loads, are gaining popularity as costs decline and as building owners and utilities realize their benefits. DERs can improve distribution system efficiency, help prevent the need for expensive grid upgrades, and increase the resilience of local communities. However, they can also cause difficulties in grid operations and can require controls to achieve their benefits. To address this challenge, NREL researchers have developed a community-scale solution that assesses the impacts of DERs and their control strategies on a distribution system. The framework has been shown to reduce solar photovoltaic (PV) curtailment to 0%, mitigate the adverse impact of solar variability on the distribution voltage, and provide up to 5-day critical load support during emergency events. Utilizing 5 different modules representing the feeder, buildings, home energy management systems, an aggregator, and a utility controller, NREL expects this simulation technology to play a critical role in the continued integration of DERs. According to the Energy Information Administration (EIA), solar curtailments accounted for 94% of the total energy curtailed in the California Independent System Operator (CAISO) in 2020. By enabling Independent System Operators (ISOs) and utility operators to bring solar curtailments to 0%, the electrical grid can become less dependent on fossil-fueled power generation sources. NREL's co-simulation framework contains five major components: Distribution Feeder Model: describes the distribution feeder topology using OpenDSS, including the locations of all DERs. Residential Building Model: simulates a large number of buildings at a high resolution using OCHRETM. The model is equipped to control equipment based on signals from an external module. The model includes major household appliances such as HVAC and a water heater, non-dispatchable load models, a distributed PV system, and a home battery system. Home Energy Management System: optimizes the controls for the devices in a home using foreseeTM. The control can adjust based on the user preferences including cost, comfort, and convenience. In hierarchical control scenarios, where the houses follow signals from an aggregator, the home energy management system provides a flexibility band with a range of power and follows the dispatch signals received from aggregator. Community-Level Aggregator: solves for optimal energy dispatch based on the flexibility bands received from each home and the grid service signal received from the utility controller. Utility-Level Controller: provides grid signals for voltage control using Distributed Energy Resources (DERs), such as solar systems, in the community.

Balamurugan, Sivasathya Pradha↗

Guidelines for Implementing Advanced Distribution Management Systems: Requirements for DMS Integration with DERMS and Microgrids

This guideline focuses on the integration of DMS with DERMS and microgrids connected to the distribution grid by defining generic and fundamental design and implementation principles and strategies. It starts by addressing the current status, objectives, and core functionalities of each system, and then discusses the new challenges and the common principles of DMS design and implementation for integration with DERMS and microgrids to realize enhanced grid operation reliability and quality power delivery to consumers while also achieving the maximum energy economics from the DER and microgrid connections.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Novel Modular Treatment System for Distributed Energy Recovery and Water Reclamation from Industrial Wastewaters

The overarching goal of this work was to accelerate the commercialization of a distributed, modular, agile treatment technology - the Modular Encapsulated Two-stage Anaerobic Biological (METAB) system - by advancing it to pilot-scale. Specifically, the METAB system was developed to treat high strength wastewater (5,000-35,000 mg/L chemical oxygen demand (COD)), produce hydrogen (H2) and methane (CH4), and achieve these outcomes without a membrane for retention of microorganisms.

42 ENGINEERING↗

Distributed computer system enhances productivity for SRB joint optimization

The Programming System for Structural Synthesis software package, which couples structural analysis and optimization, has been distributed over a network of work stations for use in Space Shuttle Solid Rocket Booster joint redesign optimization. Finite difference computing techniques were applied to the optimization gradients in parallel execution, allowing several work stations to simultaneously contribute to the problem's solution. An optimal joint shape was obtained which achieves minimum weight while keeping the gap between joints well closed and limiting structural stresses. The optimization cycle was reduced from two hours to one-half hour.

Rogers, James L., Jr.↗

Development of intelligent instruments with embedded HTTP servers for control and data acquisition in a cryogenic setup—The hardware, firmware, and software implementation

The power of Ethernet for control and automation technology is being largely understood by the automation industry in recent times. Ethernet with HTTP (Hypertext Transfer Protocol) is one of the most widely accepted communication standards today. Ethernet is best known for being able to control through internet from anywhere in the globe. The Ethernet interface with built-in on-chip embedded servers ensures global connections for crate-less model of control and data acquisition systems which have several advantages over traditional crate-based control architectures for slow applications. This architecture will completely eliminate the use of any extra PLC (Programmable Logic Controller) or similar control hardware in any automation network as the control functions are firmware coded inside intelligent meters itself. Here, we describe the indigenously built project of a cryogenic control system built for linear accelerator at Inter University Accelerator Centre, known as “CADS,” which stands for “Complete Automation of Distribution System.” CADS deals with complete hardware, firmware, and software implementation of the automated linac cryogenic distribution system using many Ethernet based embedded cryogenic instruments developed in-house. Each instrument works as an intelligent meter called device-server which has the control functions and control loops built inside the firmware itself. Dedicated meters with built-in servers were designed out of ARM (Acorn RISC (Reduced Instruction Set Computer) Machine) and ATMEL processors and COTS (Commercially Off-the-Shelf) SMD (Surface Mount Devices) components, with analog sensor front-end and a digital back-end web server implementing remote procedure call over HTTP for digital control and readout functions. At present, 24 instruments which run 58 embedded servers inside, each specific to a particular type of sensor-actuator combination for closed loop operations, are now deployed and distributed across control LAN (Local Area Network). A group of six categories of such instruments have been identified for all cryogenic applications required for linac operation which were designed to build this medium-scale cryogenic automation setup. These devices have special features like remote rebooters, daughter boards for PIDs (Proportional Integral Derivative), etc., to operate them remotely in radiation areas and also have emergency switches by which each device can be taken to emergency mode temporarily. Finally, all the data are monitored, logged, controlled, and analyzed online at a central control room which has a user-friendly control interface developed using LabVIEW{sup ®}. This paper discusses the overall hardware, firmware, software design, and implementation for the cryogenics setup.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Programming model for distributed intelligent systems

A programming model and architecture which was developed for the design and implementation of complex, heterogeneous measurement and control systems is described. The Multigraph Architecture integrates artificial intelligence techniques with conventional software technologies, offers a unified framework for distributed and shared memory based parallel computational models and supports multiple programming paradigms. The system can be implemented on different hardware architectures and can be adapted to strongly different applications.

Sztipanovits, J.↗

Efficiency and Reliability Analyses of AC and 380V DC Distribution in Data Centers

Modern data centers consume large amounts of electricity, resulting in high operational costs. The efficiency of a data center power distribution system can be increased, and the operational cost reduced, if the number of power conversion stages can be minimized and more efficient converters, such as wide bandgap (WBG) converters, are used. This can be achieved by using DC distribution voltage at the rack level by eliminating extra conversion stages. In this paper, benchmarks for both AC and 380V DC data centers were developed and efficiency analyses were performed for an entire year. The impact of integrating photovoltaic (PV) systems into the data centers has also been analyzed in both cases in terms of efficiency. The results show that 380V DC data centers are more efficient than AC data centers with and without PV integration. Furthermore, the reliability of an AC system was compared to a 380V DC architecture with Tier-IV standard. Monte-Carlo simulations were used to perform reliability analyses for different levels of redundancy in the Uninterruptible Power Supply (UPS) system for both cases. In conclusion, the simulation results showed that the 380V DC distribution system had a higher level of reliability than the AC distribution system in data centers.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Optimum Aggregation and Control of Spatially Distributed Flexible Resources in Smart Grid

This paper presents an algorithm to optimally aggregate spatially distributed flexible resources at strategic microgrid/smart-grid locations. The aggregation reduces a distribution network having thousands of nodes to an equivalent network with a few aggregated nodes, thereby enabling distribution system operators (DSOs) to make faster operational decisions. Moreover, the aggregation enables flexibility from small distributed flexible resources to be traded to different power and energy markets. A hierarchical control architecture comprising a combination of centralized and decentralized control approaches is proposed to practically deploy the aggregated flexibility. The proposed method serves as a great operational tool for DSOs to decide the exact amount of required flexibilities from different network section(s) for solving grid constraint violations. The effectiveness of the proposed method is demonstrated through simulation of three operational scenarios in a real low voltage distribution system having high penetrations of electric vehicles and heat pumps. Finally, the simulation results demonstrated that the aggregation helps DSOs not only in taking faster operational decisions, but also in effectively utilizing the available flexibility.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Prototyping Environment for Research on Human-Machine Interfaces in Process Control: Use of Microsoft WPF for Microworld and Distributed Control System Development

Operators of critical processes, such as nuclear power production, must contend with highly complex systems, procedures, and regulations. Developing human-machine interfaces (HMIs) that better support operators is a high priority for ensuring the safe and reliable operation of critical processes. Human factors engineering (HFE) provides a rich and mature set of tools for evaluating the performance of HMIs, but the set of tools for developing and designing HMIs is still in its infancy. Here we propose that Microsoft Windows Presentation Foundation (WPF) is well suited for many roles in the research and development of HMIs for process control.

99 GENERAL AND MISCELLANEOUS↗

Cassini Information Management System in Distributed Operations Collaboration and Cassini Science Planning

Launched on October 15, 1997, the Cassini-Huygens spacecraft began its ambitious journey to the Saturnian system with a complex suite of 12 scientific instruments, and another 6 instruments aboard the European Space Agencies Huygens Probe. Over the next 6 1/2 years, Cassini would continue its relatively simplistic cruise phase operations, flying past Venus, Earth, and Jupiter. However, following Saturn Orbit Insertion (SOI), Cassini would become involved in a complex series of tasks that required detailed resource management, distributed operations collaboration, and a data base for capturing science objectives. Collectively, these needs were met through a web-based software tool designed to help with the Cassini uplink process and ultimately used to generate more robust sequences for spacecraft operations. In 2001, in conjunction with the Southwest Research Institute (SwRI) and later Venustar Software and Engineering Inc., the Cassini Information Management System (CIMS) was released which enabled the Cassini spacecraft and science planning teams to perform complex information management and team collaboration between scientists and engineers in 17 countries. Originally tailored to help manage the science planning uplink process, CIMS has been actively evolving since its inception to meet the changing and growing needs of the Cassini uplink team and effectively reduce mission risk through a series of resource management validation algorithms. These algorithms have been implemented in the web-based software tool to identify potential sequence conflicts early in the science planning process. CIMS mitigates these sequence conflicts through identification of timing incongruities, pointing inconsistencies, flight rule violations, data volume issues, and by assisting in Deep Space Network (DSN) coverage analysis. In preparation for extended mission operations, CIMS has also evolved further to assist in the planning and coordination of the dual playback redundancy of highvalue data from targets such as Titan and Enceladus. This paper will outline the critical role that CIMS has played for Cassini in the distributed ops paradigm throughout operations. This paper will also examine the evolution that CIMS has undergone in the face of new science discoveries and fluctuating operational needs. And finally, this paper will conclude with theoretical adaptation of CIMS for other projects and the potential savings in cost and risk reduction that could potentially be tapped into by future missions.

Equils, Douglas J.↗

Energy Equity Opportunities in Distributed Wind Hybrid Systems for Rural Loads

Distributed wind (DW) hybrid systems, or combinations of distributed energy resources with wind technologies, have the potential to provide energy equity benefits for rural loads. However, project developers and end-users do not understand these benefits well. This report outlines energy equity opportunities that result directly from DW-hybrid projects and proposes a framework that demonstrates how to consider equity in the DW-hybrid system, which can enhance existing resilience and valuation tools by incorporating a way to include equity considerations. Energy equity opportunities achievable with DW-hybrid systems for rural loads are defined by the core principles of energy justice for use in a proposed equity framework. As well, a catalog of equity resources, metrics, technology-agnostic frameworks, and best practices are linked in an attached Excel file. Electric cooperatives, technical assistance providers (including national laboratory and DOE staff), DW project developers, and technology providers can use this work to understand, evaluate, and define equitable outcomes for potential DW-hybrid projects.

17 WIND ENERGY↗

Net-zero energy building design and life-cycle cost analysis with air-source variable refrigerant flow and distributed photovoltaic systems

Net-zero energy building (NZEB) design has been gaining widespread acceptance as a major driver to reach feasible long-term goals of energy reductions in a building sector for the coming decades. Accordingly, net-zero energy targets for commercial buildings have been specified by federal and/or local government agencies in U.S. Although moving toward NZEB goals has technically feasible long-term advantages, economic issues are one of primarily concerns by building owners and designers for the application of advanced building technologies in NZEB design of their retrofit or new building construction. However, the lack of life cycle cost (LCC) data has still hindered reliable understanding of adopting NZEB design by building owners in a cost-effective manner. In response to this gap, this study conducts life-cycle cost analysis (LCCA) of NZEB design with an energy-efficient heating, ventilation, and air conditioning (HVAC) system and a solar power generation system. Here, to enable NZEB design, an air-source VRF heat pump (HP) type system is considered for energy-efficient HVAC equipment in an office building model with a grid-tied photovoltaic (PV) system. Results reveal that the LCC of NZEBs varies primarily due to a combined effect of annual site EUIs, on-site power generation, and cost-items of each location in U.S. climates. Some hot and mild climate zones in the U.S. represent that LCC values of NZEBs are considerably lower. In contrast, some other cold zones result in unattractive LCC values for NZEBs, caused by a combined effect of relatively lower potential of on-site PV electricity generation and city cost indices. Yet, with subsidized financing by the federal government for PV installation costs, LCC values of NZEBs become significantly attractive in most climate locations.

42 ENGINEERING↗

CyDER – an FMI-based co-simulation platform for distributed energy resources

The increased integration of distributed energy resources (DERs) is bringing a number of challenges to the power grid. These include reverse power flows in distribution systems and potentially transmission systems and grid stability. So far, specialized tools have been developed to capture some of the impact of DERs at the distribution level. However, distribution system operators lack visibility into the overall system conditions. Furthermore, the impact of increasing DERs is not limited to the distribution level but also influences the transmission grid. To support the planning and operation of the grid, we developed a co-simulation platform called CyDER (A Cyber Physical Co-simulation Platform for Distributed Energy Resources in Smart Grids) that integrates various domain-specific simulation tools. CyDER is based on the functional mock-up interface standard. This paper gives an overview of CyDER and demonstrates its use based on two applications.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Power Hardware-in-the-Loop-Based Anti-Islanding Evaluation and Demonstration

The National Renewable Energy Laboratory (NREL) teamed with Southern California Edison (SCE), Clean Power Research (CPR), Quanta Technology (QT), and Electrical Distribution Design (EDD) to conduct a U.S. Department of Energy (DOE) and California Public Utility Commission (CPUC) California Solar Initiative (CSI)-funded research project investigating the impacts of integrating high-penetration levels of photovoltaics (PV) onto the California distribution grid. One topic researched in the context of high-penetration PV integration onto the distribution system is the ability of PV inverters to (1) detect islanding conditions (i.e., when the distribution system to which the PV inverter is connected becomes disconnected from the utility power connection) and (2) disconnect from the islanded system within the time specified in the performance specifications outlined in IEEE Standard 1547. This condition may cause damage to other connected equipment due to insufficient power quality (e.g., over-and under-voltages) and may also be a safety hazard to personnel that may be working on feeder sections to restore service. NREL teamed with the Florida State University (FSU) Center for Advanced Power Systems (CAPS) to investigate a new way of testing PV inverters for IEEE Standard 1547 unintentional islanding performance specifications using power hardware-in-loop (PHIL) laboratory testing techniques.

14 SOLAR ENERGY↗

Petri net controllers for distributed robotic systems

Petri nets are a well established modelling technique for analyzing parallel systems. When coupled with an event-driven operating system, Petri nets can provide an effective means for integrating and controlling the functions of distributed robotic applications. Recent work has shown that Petri net graphs can also serve as remarkably intuitive operator interfaces. In this paper, the advantages of using Petri nets as high-level controllers to coordinate robotic functions are outlined, the considerations for designing Petri net controllers are discussed, and simple Petri net structures for implementing an interface for operator supervision are presented. A detailed example is presented which illustrates these concepts for a sensor-based assembly application.

Lefebvre, D. R.↗