Search NASA⌕ Search

SEARCH · Search NASA

Results for “Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,693 records · Page 94

Planning Electric Transmission Lines: A Review of Recent Regional Transmission Plans

The first Quadrennial Energy Review (QER) recommends that the U.S. Department of Energy (DOE) conduct a national review of transmission plans and assess the barriers and incentives to their implementation. DOE tasked Lawrence Berkeley National Laboratory (LBNL) to prepare two reports to support the agency’s response to this recommendation. This report reviews regional transmission plans and regional transmission planning processes that have been directed by Federal Energy Regulatory Commission (FERC) Order Nos. 890 and 1000. We focus on the most recent regional transmission plans (those issued in 2015 and through approximately mid-year 2016) and current regional transmission planning processes. A companion report focuses on non-plan-related factors that affect transmission projects.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Microgrid Handbook for Army Resilience: A Technical Review

The Army recognizes the need for its installations to operate as independently and efficiently as possible with secure energy and water resource that cannot be limited or shut off by external forces or events, whether natural or man-made . In an effort to make this possible, the Army has identified microgrids as an effective way to achieve the goal of secure power for operations, both for domestic and international installations. This document is designed to educate Army Installation leaders about what microgrids are, options for their components, financing, and operations, as well as other regulatory and technological considerations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NASA CARA Prelaunch Analysis and Process

NASA implemented an official Procedural Requirement (NPR) 8079.1 in June 2023, establishing the minimum collision avoidance requirements and associated operational protocols for NASA space flight programs, projects, and spacecraft to protect the space environment by reducing the risk of collision to an acceptable level. Part of the requirement employs a two-fold approach to analyze the satellite design process with conjunction assessment and risk mitigation in mind, during the pre-launch process, led by the Conjunction Assessment Risk Analysis (CARA) Program for non-Human Space Flight (HSF) Missions. This presentation outlines CARA coordination with missions, informed by the NPR, that spans early mission development to operations. CARA is an Agency-level resource that provides support to all NASA non-HSF missions. CARA protects the orbital environment from collision between NASA non-HSF missions and other tracked on-orbit objects. During the pre-formulation and formulation phases, NASA missions undergo a series of conjunction assessment analyses captured in the Orbital Collision Avoidance Plan (OCAP) prior to transitioning to the implementation phase (typically at the Preliminary Design Review (PDR) or equivalent). The OCAP analyses consist of a thorough review of the spacecraft(s) orbit selection and placement, deployment, cataloguing performance, trackability, ephemeris generation, conjunction mitigation options, autonomous maneuvering, and risk assessment parameters which are performed by a dedicated CARA Analysis Team. The results of these analyses, CARA’s formal recommendations, and the mission’s methods for implementing them, are documented in the OCAP. The intent of engaging in this process so early in the mission design phase, is to ensure that conjunction assessment is considered from the outset, thus mitigating costly design changes and operational risks down the road. NASA missions are also required to coordinate their operational processes and conjunction mitigation procedures with CARA in a Conjunction Assessment Operations Implementation Agreement (CAOIA). The aim of this process is to document the conjunction assessment screening process, conjunction risk assessment parameters, conjunction mitigation steps, flight dynamics operations concepts and maneuvers, and the communication and coordination process between the mission’s project manager and CARA. The intent of the CAOIA document is for it to be completed iteratively, and as missions update these elements, corresponding changes are made in the CAOIA. With this process in place, the engagement and coordination between the missions and CARA from early in the design process into mission operations, helps to ensure that missions not only have a robust conjunction assessment concept of operations to reduce conjunction risk for space sustainability, but are also able to achieve their science goals and have a successful mission.

conjunction assessment↗

NASA CARA Prelaunch Analysis and Process

NASA implemented an official Procedural Requirement (NPR) 8079.1 in June 2023, establishing the minimum collision avoidance requirements and associated operational protocols for NASA space flight programs, projects, and spacecraft to protect the space environment by reducing the risk of collision to an acceptable level. Part of the requirement employs a two-fold approach to analyze the satellite design process with conjunction assessment and risk mitigation in mind, during the pre-launch process, led by the Conjunction Assessment Risk Analysis (CARA) Program for non-Human Space Flight (HSF) Missions. This presentation outlines CARA coordination with missions, informed by the NPR, that spans early mission development to operations. CARA is an Agency-level resource that provides support to all NASA non-HSF missions. CARA protects the orbital environment from collision between NASA non-HSF missions and other tracked on-orbit objects. During the pre-formulation and formulation phases, NASA missions undergo a series of conjunction assessment analyses captured in the Orbital Collision Avoidance Plan (OCAP) prior to transitioning to the implementation phase (typically at the Preliminary Design Review (PDR) or equivalent). The OCAP analyses consist of a thorough review of the spacecraft(s) orbit selection and placement, deployment, cataloguing performance, trackability, ephemeris generation, conjunction mitigation options, autonomous maneuvering, and risk assessment parameters which are performed by a dedicated CARA Analysis Team. The results of these analyses, CARA’s formal recommendations, and the mission’s methods for implementing them, are documented in the OCAP. The intent of engaging in this process so early in the mission design phase, is to ensure that conjunction assessment is considered from the outset, thus mitigating costly design changes and operational risks down the road. NASA missions are also required to coordinate their operational processes and conjunction mitigation procedures with CARA in a Conjunction Assessment Operations Implementation Agreement (CAOIA). The aim of this process is to document the conjunction assessment screening process, conjunction risk assessment parameters, conjunction mitigation steps, flight dynamics operations concepts and maneuvers, and the communication and coordination process between the mission’s project manager and CARA. The intent of the CAOIA document is for it to be completed iteratively, and as missions update these elements, corresponding changes are made in the CAOIA. With this process in place, the engagement and coordination between the missions and CARA from early in the design process into mission operations, helps to ensure that missions not only have a robust conjunction assessment concept of operations to reduce conjunction risk for space sustainability, but are also able to achieve their science goals and have a successful mission.

conjunction assessment↗

StarPlan: A model-based diagnostic system for spacecraft

The Sunnyvale Division of Ford Aerospace created a model-based reasoning capability for diagnosing faults in space systems. The approach employs reasoning about a model of the domain (as it is designed to operate) to explain differences between expected and actual telemetry; i.e., to identify the root cause of the discrepancy (at an appropriate level of detail) and determine necessary corrective action. A development environment, named Paragon, was implemented to support both model-building and reasoning. The major benefit of the model-based approach is the capability for the intelligent system to handle faults that were not anticipated by a human expert. The feasibility of this approach for diagnosing problems in a spacecraft was demonstrated in a prototype system, named StarPlan. Reasoning modules within StarPlan detect anomalous telemetry, establish goals for returning the telemetry to nominal values, and create a command plan for attaining the goals. Before commands are implemented, their effects are simulated to assure convergence toward the goal. After the commands are issued, the telemetry is monitored to assure that the plan is successful. These features of StarPlan, along with associated concerns, issues and future directions, are discussed.

Heher, Dennis↗

Post Irradiation Examination Plan for High-Burnup Demonstration Project Sister Rods

This test plan describes the experimental work to be implemented by the U.S. Department of Energy (DOE) Office of Nuclear Energy (NE) to characterize high burnup (HBU) spent nuclear fuel (SNF) in conjunction with the High Burnup Dry Storage Cask Research and Development Project and serves to coordinate and integrate the multi-year experimental program to collect and develop data regarding the continued storage and eventual transport of HBU (i.e., >45 GWd/MTU) SNF. The work scope involves the development, performance, technical integration, and oversight of measurements and collection of relevant data, guided by analyses and demonstration of need.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Quality assurance for online adapted treatment plans: Benchmarking and delivery monitoring simulation

Purpose: An important challenge facing online adaptive radiation therapy is the development of feasible and efficient quality assurance (QA). This project aimed to validate the deliverability of online adapted plans and develop a proof-of-concept online delivery monitoring system for online adaptive radiation therapy QA. Methods: The first part of this project benchmarked automatically online adapted prostate treatment plans using traditional portal dosimetry IMRT QA. The portal dosimetry QA results of online adapted plans were compared to original (unadapted) plans as well as randomly selected prostate IMRT plans from our clinic. In the second part, an online delivery monitoring system was designed and validated via a simulated treatment with intentional multileaf collimator (MLC) errors. This system was based on inputs from the dynamic machine information (DMI), which continuously reports actual MLC positions and machine monitor units (MUs) at intervals of 50 ms or less during delivery. Based on the DMI, the system performed two levels of monitoring/verification during the delivery: (1) dynamic monitoring of cumulative fluence errors resulting from leaf position deviations and visualization using fluence error maps (FEMs); and (2) verification of MLC positions against the treatment plan for potential errors in MLC motion and data transfer at each control point. Validation of the online delivery monitoring system was performed by introducing intentional systematic MLC errors (ranging from 0.5 to 2 mm) to the DMI files for both leaf banks. These DMI files were analyzed by the proposed system to evaluate the system’s performance in quantifying errors and revealing the source of errors, as well as to understand patterns in the FEMs. In addition, FEMs from 210 actual prostate IMRT beams were analyzed using the proposed system to further validate its ability to catch and identify errors, as well as establish error magnitude baselines for prostate IMRT delivery. Results: Online adapted plans were found to have similar delivery accuracy in comparison to clinical IMRT plans when validated with portal dosimetry IMRT QA. FEMs for the simulated deliveries with intentional MLC errors exhibited distinct patterns for different MLC error magnitudes and directions, indicating that the proposed delivery monitoring system is highly specific in detecting the source of errors. Implementing the proposed QA system for online adapted plans revealed excellent delivery accuracy: over 99% of leaf position differences were within 0.5 mm, and >99% of pixels in the FEMs had fluence errors within 0.5 MU. Patterns present in the FEMs and MLC control point analysis for actual patient cases agreed with the error pattern analysis results, further validating the system’s ability to reveal and differentiate MLC deviations. Calculation of the fluence map based on the DMI was performed within 2 ms after receiving each DMI input. Conclusions: The proposed online delivery monitoring system requires minimal additional resources and time commitment to the current clinical workflow while still maintaining high sensitivity to leaf position errors and specificity to error types. The presented online delivery monitoring system therefore represents a promising QA system candidate for online adaptive radiation therapy.

07 ISOTOPE AND RADIATION SOURCES↗

Automated analysis of complex data

We have examined some of the issues involved in automating exploratory data analysis, in particular the tradeoff between control and opportunism. We have proposed an opportunistic planning solution for this tradeoff, and we have implemented a prototype, Igor, to test the approach. Our experience in developing Igor was surprisingly smooth. In contrast to earlier versions that relied on rule representation, it was straightforward to increment Igor's knowledge base without causing the search space to explode. The planning representation appears to be both general and powerful, with high level strategic knowledge provided by goals and plans, and the hooks for domain-specific knowledge are provided by monitors and focusing heuristics.

Saintamant, Robert↗

Planning for Compilation of a Quantum Algorithm for Graph Coloring

Recently, the problem of compiling general quantum algorithms for implementation on near-term quantum processors has been introduced to the AI community. Previous work demonstrated that temporal planning is an attractive approach for part of this compilation task, specifically, the routing of circuits that implement the Quantum Alternating Operator Ansatz (QAOA) applied to theMaxCut problem on a quantum processor architecture. In this paper, we extend the earlier work to route circuits that implement QAOAfor Graph Coloring problems. QAOA for coloring requires execution of more, and more complex, operations on the chip, which makes routing a more challenging problem. We evaluate the approach on state-of-the-art hardware architectures from leading quantum computing companies. Additionally, we investigate applying the planning approach to qubit initialization as well as routing. Our empirical evaluation shows that temporal planning compares well to reasonable analytic upper bounds [20], and that solving qubit initialization with a classical planner generally helps temporal planners in finding shorter-makespan compilations for QAOA for Graph Coloring.These advances suggest that temporal planning can be an effective approach for more complex quantum computing algorithms and architectures.

Minh Do↗

SU-F-BRA-14: Optimization of Dosimetric Guidelines for Accelerated Partial Breast Irradiation (APBI) Using the Strut-Adjusted Volume Implant (SAVI)

Purpose: Treatment planning guidelines for accelerated partial breast irradiation (ABPI) using the strut-adjusted volume implant (SAVI) are inconsistent between the manufacturer and NSABP B-39/RTOG 0413 protocol. Furthermore neither set of guidelines accounts for different applicator sizes. The purpose of this work is to establish guidelines specific to the SAVI that are based on clinically achievable dose distributions. Methods: Sixty-two consecutive patients were implanted with a SAVI and prescribed to receive 34 Gy in 10 fractions twice daily using high dose-rate (HDR) Ir-192 brachytherapy. The target (PTV-EVAL) was defined per NSABP. The treatments were planned and evaluated using a combination of dosimetric planning goals provided by the NSABP, the manufacturer, and our prior clinical experience. Parameters evaluated included maximum doses to skin and ribs, and volumes of PTV-EVAL receiving 90%, 95%, 100%, 150%, and 200% of the prescription (V90, etc). All target parameters were evaluated for correlation with device size using the Pearson correlation coefficient. Revised dosimetric guidelines for target coverage and heterogeneity were determined from this population. Results: Revised guidelines for minimum target coverage (ideal in parentheses): V90≥95%(97%), V95≥90%(95%), V100≥88%(91%). The only dosimetric parameters that were significantly correlated (p<0.05) with device size were V150 and V200. Heterogeneity criteria were revised for the 6–1 Mini/6-1 applicators to V150≤30cc and V200≤15cc, and unchanged for the other sizes. Re-evaluation of patient plans showed 90% (56/62) met the revised minimum guidelines and 76% (47/62) met the ideal guidelines. All and 56/62 patients met our institutional guidelines for maximum skin and rib dose, respectively. Conclusions: We have optimized dosimetric guidelines for the SAVI applicators, and found that implementation of these revised guidelines for SAVI treatment planning yielded target coverage exceeding that required by existing guidelines while preserving heterogeneity constraints and minimizing dose to organs at risk.

60 APPLIED LIFE SCIENCES↗

The flight planning - flight management connection

Airborne flight management systems are currently being implemented to minimize direct operating costs when flying over a fixed route between a given city pair. Inherent in the design of these systems is that the horizontal flight path and wind and temperature models be defined and input into the airborne computer before flight. The wind/temperature model and horizontal path are products of the flight planning process. Flight planning consists of generating 3-D reference trajectories through a forecast wind field subject to certain ATC and transport operator constraints. The interrelationships between flight management and flight planning are reviewed, and the steps taken during the flight planning process are summarized.

Sorensen, J. A.↗

Fault-free behavior of reliable multiprocessor systems: FTMP experiments in AIRLAB

This report describes a set of experiments which were implemented on the Fault tolerant Multi-Processor (FTMP) at NASA/Langley's AIRLAB facility. These experiments are part of an effort to formulate and evaluate validation methodologies for fault-tolerant computers. This report deals with the measurement of single parameters (baselines) of a fault free system. The initial set of baseline experiments lead to the following conclusions: (1) The system clock is constant and independent of workload in the tested cases; (2) the instruction execution times are constant; (3) the R4 frame size is 40mS with some variation; (4) the frame stretching mechanism has some flaws in its implementation that allow the possibility of an infinite stretching of frame duration. Future experiments are planned. Some will broaden the results of these initial experiments. Others will measure the system more dynamically. The implementation of a synthetic workload generation mechanism for FTMP is planned to enhance the experimental environment of the system.

Clune, E.↗

Status Report on Regulatory Criteria Applicable to the Use of Artificial Intelligence (AI) and Machine Learning (ML)

Although the interest in the use of artificial intelligence (AI) and machine learning (ML) in nuclear energy is increasing rapidly, at present their implementation is limited. This rapid increase in interest is not surprising considering that implementing AI and ML technology would allow for continuous monitoring, facilitate the implementation of predictive maintenance with optimized staffing plans, enable automation and autonomy opportunities that could drastically reduce fixed operation and maintenance costs, and provide training for operations and maintenance. Other industries are using AI for construction, and in the nuclear arena AI could provide great benefit in decommissioning activities. The ability of AI and ML to operate in real time vastly increases their potential impact. Before AI can be used in design, operations, or as a regulatory tool, the specifics on the regulations applicable to the use of AI for nuclear power applications need to be established. The difficulty is that the specific use cases will dictate the applicability of regulations. For example, even within the application domain associated with operations, the regulations might vary if the AI is used to create a virtual reference for plant operations or is used for training, optimization of maintenance intervals, prioritization of maintenance activities, etc. Different still is if the AI is to be used for design or setting technical specifications, which will introduce additional requirements. US Nuclear Regulatory Commission (NRC) licensing reviews are based on an applicant’s design meeting its performance assessment based on (1) safety goals and objectives, (2) deterministic and/or probabilistic analysis of accident scenarios, and (3) quantitative assessment of design alternatives against the safety goals and objectives using accepted engineering tools, methodologies, and performance criteria. The current regulatory framework does not explicitly address AI or autonomous control. However, as implementing AI technology will require the use of a digital platform, it must meet the requirements of an instrumentation and control (I&C) system. The regulatory requirements for AI, which will be incorporated into the I&C system, will be very dependent on how it is used (i.e., its functionality, safety classification, etc.). The licensing process is primarily risk-based with the identification of components and systems as nonsafety, important to safety, or safety related. A risk-informed approach allows further gradation of components and systems based on risk metrics such as core damage frequency or large early release fractions. Thus, the use cases and the risk categorization of impacted systems and components will determine the regulatory requirements. Regardless of how AI is used it presents new opportunities for risk-informing operating, maintenance, and regulatory decisions. Trustworthiness, transparency, and the ability to validate and verify the results will be paramount in showing that the systems and plant still meet their performance requirements. This report describes the results of research to identify regulatory implications of AI technologies and their uses. Specifically, this report reviews current regulatory guidance relevant to the application of AI for design (including design changes or new designs including advanced reactors), construction, operations, training, maintenance, research, testing, and as a regulatory tool. AI can be automated at different levels from purely informative purposes to autonomous controls. The focus of this review included determination of constraints on the application of AI technology, identification of any regulatory gaps or uncertainties, and clarification of anticipated technical basis information likely to be important for regulatory acceptance of these technologies. Currently, any use of AI at nuclear power plants is focused on nonsafety-related applications. The NRC and other regulatory bodies are evaluating providing guidance to address gaps rather than create new regulations to address the use of AI and ML. This approach seems to be the best to encourage AI development without adding regulatory uncertainty.

97 MATHEMATICS AND COMPUTING↗

Interactive access and management for four-dimensional environmental data sets using McIDAS

Significant accomplishments in the following areas are presented: (1) enhancements to the visualization of 5-D data sets (VIS-5D); (2) development of the visualization of global images (VIS-GI) application; (3) design of the Visualization for Algorithm Development (VIS-AD) System; and (4) numerical modeling applications. The focus of current research and future research plans is presented and the following topics are addressed: (1) further enhancements to VIS-5D; (2) generalization and enhancement of the VIS-GI application; (3) the implementation of the VIS-AD System; and (4) plans for modeling applications.

Hibbard, William L.↗

Reliability and Resiliency in South Asia's Power Sector - Pathways for Research, Modeling, and Implementation

Reliability and resilience are the core principles of power system planning and operations around the world. Power systems in South Asia are transforming with increasing penetration of clean energy generation resources, emerging technologies, increasing electricity demand and electrification. At the same time, these power systems are facing challenges posed by extreme weather events and climate change. All these factors would add furthermore importance to the reliability and resilience of future power systems in South Asia. This has motivated us to better understand the country specific challenges and chalk out the pathways for research, modelling and implementation in South Asia. Our research, experience in the region and feedback from key stakeholders indicate following as the key areas where more work is needed to improve reliability and resilience of power systems in the region: Renewable energy Data for power system studies, New Tools and Studies, Resilience Planning, Resource Adequacy, Advanced RE Forecasting, Cybersecurity, Load Forecasting, and Coordinated Planning and Operations.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Next-generation system analysis model for studying alternative Waste Management Systems - 15232

The U.S. Department of Energy's Office of Nuclear Energy (DOE-NE) is conducting planning activities within the Nuclear Fuels Storage and Transportation Planning Project (NFST). The plans involve (1) laying the groundwork for implementing interim storage (including dealing with any associated transportation that is needed) per the Administration's Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste of January 2013 and (2) developing a foundation for a new nuclear waste management organization. An overarching goal is to develop options for designing an integrated system that will be considered by decision-makers. Based on the dynamic system analysis and software specification requirements that must be met, Argonne National Laboratory (Argonne) is leading the development of a consolidated waste management system tool known as the Next-Generation System Analysis Model (NGSAM). The development of NGSAM leverages the approaches and methods used previously to develop the Transportation Storage Logistics (TSL) and Total System Model (TSM) system analysis tools, but the new tool takes advantage of advanced computational capabilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SU-F-BRD-10: Improving Plan Delivery Efficiency of Intensity Modulated Proton Plans with Prioritized Optimization

Purpose: To integrate treatment delivery time into plan optimization in spot scanning intensity modulated proton therapy. Utilizing a dedicated research treatment planning system we present an optimization approach to explore the trade-off between the correlated parameters treatment time and plan quality on an astrocytoma patient case. Methods: The planning system is based on prioritized optimization, a stepwise approach of implementing clinical goals. After each optimization step, dosimetric achievements are turned into hard constraints to maintain the achieved plan quality. Prior achievements can be violated by a so-called slip-factor which allows to study possible trade-offs of conflicting goals. Plan quality is obtained in the first two steps, while the third step optimizes delivery efficiency by working on the spot weight distribution via four alternative Methods: elimination of low weighted spots (1), elimination of spots hardly contributing to PTV dose, followed by reoptimization of the resulting smaller optimization problem (2), reduction of spot weights variance within each energy layer (3), and reduction of the overall spot weight sum (4). Treatment times were calculated assuming either constant or variable beam current depending on the lowest spot weight. Results: Delivery efficiency can be improved remarkably without influencing the plan quality. Absolute time savings depend on the utilized method and facility properties. By varying slip-factor and spot reduction limits, a border of worsening quality is detectable for all methods.Deleting low weighted spots by 10% results in a noticeable decrease in minimum target dose. Further reduction results in more heterogeneous dose distributions and insufficient coverage. Option 2 showed constant plan quality for spot reductions of more than 10%. Conclusion: Including treatment time optimization as a final step into prioritized optimization allows for more efficient treatment plans by redistributing the spot patterns without compromising plan quality, which has to remain the main intent of radiotherapy treatment. The authors report grants from German Research Foundation (DFG) during the conduct of the study.

60 APPLIED LIFE SCIENCES↗