Search NASA⌕ Search

SEARCH · Search NASA

Results for “Integrated Resource Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,693 records · Page 94

Integrated Building Energy Systems Design Considering Storage Technologies

The addition of storage technologies such as flow batteries, conventional batteries, and heat storage can improve the economic, as well as environmental attraction of micro-generation systems (e.g., PV or fuel cells with or without CHP) and contribute to enhanced demand response. The interactions among PV, solar thermal, and storage systems can be complex, depending on the tariff structure, load profile, etc. In order to examine the impact of storage technologies on demand response and CO2 emissions, a microgrid's distributed energy resources (DER) adoption problem is formulated as a mixed-integer linear program that can pursue two strategies as its objective function. These two strategies are minimization of its annual energy costs or of its CO2 emissions. The problem is solved for a given test year at representative customer sites, e.g., nursing homes, to obtain not only the optimal investment portfolio, but also the optimal hourly operating schedules for the selected technologies. This paper focuses on analysis of storage technologies in micro-generation optimization on a building level, with example applications in New York State and California. It shows results from a two-year research projectperformed for the U.S. Department of Energy and ongoing work. Contrary to established expectations, our results indicate that PV and electric storage adoption compete rather than supplement each other considering the tariff structure and costs of electricity supply. The work shows that high electricity tariffs during on-peak hours are a significant driver for the adoption of electric storage technologies. To satisfy the site's objective of minimizing energy costs, the batteries have to be charged by grid power during off-peak hours instead of PV during on-peak hours. In contrast, we also show a CO2 minimization strategy where the common assumption that batteries can be charged by PV can be fulfilled at extraordinarily high energy costs for the site.

25 ENERGY STORAGE↗

Integrated Human Futures Modeling in Egypt

The Integrated Human Futures Project provides a set of analytical and quantitative modeling and simulation tools that help explore the links among human social, economic, and ecological conditions, human resilience, conflict, and peace, and allows users to simulate tradeoffs and consequences associated with different future development and mitigation scenarios. In the current study, we integrate five distinct modeling platforms to simulate the potential risk of social unrest in Egypt resulting from the Grand Ethiopian Renaissance Dam (GERD) on the Blue Nile in Ethiopia. The five platforms simulate hydrology, agriculture, economy, human ecology, and human psychology/behavior, and show how impacts derived from development initiatives in one sector (e.g., hydrology) might ripple through to affect other sectors and how development and security concerns may be triggered across the region. This approach evaluates potential consequences, intended and unintended, associated with strategic policy actions that span the development-security nexus at the national, regional, and international levels. Model results are not intended to provide explicit predictions, but rather to provide system-level insight for policy makers into the dynamics among these interacting sectors, and to demonstrate an approach to evaluating short- and long-term policy trade-offs across different policy domains and stakeholders. The GERD project is critical to government-planned development efforts in Ethiopia but is expected to reduce downstream freshwater availability in the Nile Basin, fueling fears of negative social and economic impacts that could threaten stability and security in Egypt. We tested these hypotheses and came to the following preliminary conclusions. First, the GERD will have an important short-term impact on water availability, food production, and hydropower production in Egypt, depending on the short- term reservoir fill rate. Second, the GERD will have a very small impact on water availability in the Nile Basin over the longer term. Depending on the GERD fill rate, short-term (e.g., within its first 5 years of operation) annual losses in Egyptian food production may peak briefly at 25 percent. Long-term (e.g., 15 to 30 year) cumulative losses in Egypt's food production may be less than 3 percent regardless of the fill rate, with the GERD having essentially no impact on projected annual food production in Egypt about 25 years after opening. For the quick fill rates, the short-term losses may be sufficient to create an important decrease in overall household health among the general population, which, along with other economic stressors and different strategies employed by the government, could lead to social unrest. Third, and perhaps most importantly, our modeling suggests that the GERD's effect on Egypt's food and water resources is small when compared to the effect of projected Egyptian population and economic growth (and the concomitant increase in water consumption). The latter dominating factors are exacerbated in the modeling by natural climate variability and may be further exacerbated by climate change. Our modeling suggests that these growth dynamics combine to create long-term water scarcity in Egypt, regardless of the Ethiopian project. All else being equal, filling strategies that employ slow fill rates for the GERD (e.g., 8 to 13 years) may mitigate the risks in future scenarios for Egypt somewhat, but no policy or action regarding the GERD is likely to significantly alleviate the projected water scarcity in Egypt's Nile Basin. However, general beliefs among the Egyptian populace regarding the GERD as a major contributing factor for scarcities in Egypt could make Ethiopia a scapegoat for Egyptian grievances -- contributing to social unrest in Egypt and generating undesirable (and unnecessary) tension between these two countries. Such tension could threaten the constructive relationships between Egypt and Ethiopia that are vital to maintaining stability and security within and between their respective regional spheres of influence, Middle East and North Africa, and the Horn of Africa.

97 MATHEMATICS AND COMPUTING↗

Building a Prospective LCA Framework to Analyze Emerging Technologies in a Dynamic System Context

NREL's Lifecycle Analysis Integration into Opensource Numerical models (LiAISON) framework computes temporally explicit life cycle impacts and resource uses for specific technologies (foreground) in a dynamic system context (background). LiAISON computes results for a series of environmental mid-points enabling an analysis of prospective tradeoffs of emerging technologies toward 2100. This prospective feature is of critical importance when analyzing present-day emerging technologies whose large-scale impacts during deployment phases will occur in different, future system contexts. LiAISON systematically accounts for dynamic system changes by applying an integrated background of the future energy-economy-land-climate system, generated by exogenous integrated assessment models (IAMs). Using IAM scenarios, LiAISON generates a time-series of life cycle inventory (LCI) databases, which are then used to calculate the impacts per functional unit per time step. This expands current practice of using static, future system assumptions, e.g., a specific grid-mix each year. Further, IAM scenarios are provided in a standardized format of shared-socioeconomic pathways (SSP) and representative concentration pathways (RCP) combinations. These are coherent, regularly, published, and peer-reviewed scenario combinations that establish a reproducible and standardized societal and climate mitigation futures context. They are comparable across IAMs and expand the system boundary of the traditional LCA by including dimensions such as societal and behavioral changes. We apply the framework to assess two emerging Power-to-Hydrogen processes, high temperature electrolysis using solid oxide fuel cell (HT-SOE) and polymer electrolyte membrane electrolysis (PEME). We compare the technologies to a baseline Hydrogen production process via steam methane reforming. Despite the decarbonized electricity systems' beneficial effects on the PtH2 processes' carbon intensities, we find environmental tradeoffs, which require technology improvements via learning-by-doing to be alleviated. Future work via ongoing collaborations will focus on linking the framework to other energy-economy-land-climate models and open-source life cycle inventory databases.

ENERGY PLANNING, POLICY, AND ECONOMY↗

Transcribing Air Traffic Control System Command Center Planning Telecons Using Cloud-Based Automatic Speech Recognition

This paper addresses the challenge of using Automatic Speech Recognition (ASR) technology to transcribe regular teleconferences that happen between FAA Air Traffic Control System Command Center (ATCSCC) planners, stakeholders and air users. These planning teleconferences (aka telecons or planning webinars) are an integral part of managing air traffic in the U.S. National Airspace System (NAS). In particular, the meetings facilitate the creation and modification of various traffic management initiatives (TMIs), that are used to regulate the flow of air traffic. This is typically a human intensive process, requiring specialists to listen to the entire meeting audio (10-20 minutes duration) and inferring the state of the NAS (e.g., weather phenomenon) that was discussed. It would be advantageous to have digital transcripts of the audio and have useful information (e.g., related to TMIs) automatically extracted from the transcripts. In this regard, we are exploring the adoption of state-of-the-art speech to text and Natural Language Processing (NLP) tools that will achieve our objective of digitizing the webinar audio. Unfortunately, the highly technical phraseology present in the audio and limited data availability for model building make ASR difficult. To overcome this challenge, we have taken the critical first step in creating a human transcription dataset from ~20 hours of speech in the ATCSCC audio with the help of subject matter experts. A novelty of our work is the creation of a ground truth transcription dataset for ATCSCC teleconference webinars, which is particularly important for Aviation domain-specific NLP tasks. Using Microsoft Speech Studio, a cloud-based ASR platform, we have fine-tuned the English pre-trained ASR models (available in speech studio) and achieved an average word error rate (WER) of 6.81%. The baseline ASR also provides a digital version of each planning webinar, making it accessible and text-searchable for future references. Additionally, the transcriptions can serve as a bridge between raw audio data and a range of text-based NLP tasks, such as named entity recognition (NER) and intent classification, potentially enhancing the digital footprint of the webinars and other connected data sources. Our work has several potential applications. Firstly, the transcriptions can be analyzed to understand the complex decision process of creating, implementing and modifying TMIs and may also contribute to TMI prediction services. Secondly, our dataset and model can be used to develop more accurate ASR systems for aviation-specific language, which can bring about digital communication in the aviation industry (and aid current “voice only” communications, which are inherently error-prone). Lastly, the transcriptions themselves can be used as a valuable resource for training other NLP models.

Stephen S. B. Clarke↗

Hydrogen Storage for Flexible Fossil Fuel Power Generation: Integration of Underground Hydrogen Storage with Gas Turbine (Final Report)

As the nation continues to encourage, through market structures and financial incentives, the proliferation of intermittent renewable electricity, how to optimize the ever-changing electric grid and identify means to retain and improve resilience, while ensuring continued reductions in GHG emissions, will be critical. According to Bloomberg, wind & solar generated 10.5% of US electricity in 2020 and that percentage continues to grow. In support of expanding renewable energy use, and to address its intermittent nature, this project will develop the Hydrogen Storage for Flexible Fossil Fuel Power Generation platform that is dispatchable, reliable, repeatable and have the ability to produce zero or negative carbon power while interfacing with geology capable of CO2 and hydrogen storage. GTI Energy (GTIE) and team members Illinois State Geological Survey (ISGS), Mitsubishi Heavy Industries America (MHIA), Ameren Illinois, Hexagon Purus, and the Low Carbon Resources Initiative (LCRI) completed a Phase I Conceptual Study under contract DE-FE0032012 for Hydrogen Storage for Flexible Fossil Fuel Power Generation: Integration of Underground Hydrogen Storage with Gas Turbine. The Hydrogen Storage for Flexible Fossil Fuel Power Generation platform addresses the intermittent nature of the expanding use of Variable Renewable Energy (VRE) generation. The low cost of the electricity (COE) generated results in greater dispatch and more operation at higher power levels (higher efficiency), fewer short intervals, and fewer start/stop cycles. The reliable, resilient system can produce zero carbon power and store hydrogen. It will demonstrate hydrogen storage in geologic formations like those used in natural gas underground storage thus enabling large scale storage of hydrogen in sedimentary strata across the United States rather than in geographically restricted salt caverns. The Phase I study confirmed the system is feasible and generates power at lower cost than other low carbon approaches. The demonstration defines the pathway for broad commercial application and will accelerate the development of larger systems suitable for centralized utility scale electricity production. The study advanced the maturity of the H 2 storage-based system with flexible power generation by completing a Pre-FEED study (Phase II). The Pre-FEED focused on the selected Energy Farm on the University of Illinois Urbana-Champaign (UIUC) site that includes above ground and underground hydrogen storage, low-carbon hydrogen production (GTI’s Compact Hydrogen Generator, CHG) with underground CO2 sequestration, and a 40-MW class gas turbine. The Pre-FEED addressed the entire system and its interconnection to the natural gas and electric grid and mitigation of key risks, such as storage behavior, load-following, and system operation. During Phase 1 of the project, the team completed key tasks, which moved the entire demonstration project, specific components and approaches closer to commercialization. These Phase I Accomplishments include: Completing System Requirements Review; Completing System Layout and Modeling - Heat & Mass Balance and Process Flow Diagram; Completing modelling of 9 turbine performance cases; Evaluating rock strata for underground storage of hydrogen and sequestration of carbon dioxide; Completing initial modelling of underground storage of hydrogen and withdrawal with evaluation of loss and water production; Identifying roadable storage for above ground hydrogen storage; Identifying existing electrical infrastructure for receiving/delivering electricity; Identifying existing gas supply infrastructure for receiving natural gas; Document concept design/development plans in required reports. Conclusions: The 12-month Feasibility study in Phase I study was completed and confirmed the system is feasible and generates power at lower cost than other low carbon approaches and even lower cost than the reference NGCC plant without carbon capture when taking advantage of 45Q carbon credits. The study enabled the fidelity of the concept to be improved and allowed identification of the requirements for the system. Defining the individual system and component requirements was performed via the system requirements review with the whole team. These requirements were then incorporated into and iterated with our Heat & Mass Balance process model and process flow diagrams were generated to reflect the overall system. This information was then used to complete the TEA and show economic feasibility. Large scale non-salt geologic storage of hydrogen is an enabling technology for a hydrogen-fired turbine that can be retrofitted into large-scale electric generating units (EGU). Our demonstration will include 428 MWh or ~4 hours full load of hydrogen storage (above and underground). Carbon capture inherent to the CHG process can capture 90% CO 2 (with upgrades to >98%). This system provides a COE of 23% savings relative to an NGCC with a post combustion amine system. Our proposed storage system decouples carbon capture and hydrogen production from power production; therefore, we expect our proposed system’s efficiency and variable COE to be superior resulting in overall higher dispatch and reduced deep cycling. Our demonstration will be full to multi-day hydrogen storage and has the potential for longer (seasonal) duration commercially. The demonstration defines the pathway for broad commercial application and will accelerate the development of larger systems suitable for centralized utility scale electricity production.

03 NATURAL GAS↗

Clearance Analysis of Node 3 Aft CBM to the Stowed FGB Solar Array

In early 2011, the ISS Vehicle Configuration Office began considering the relocation of the Permanent Multipurpose Module (PMM) to the aft facing Common Berthing Mechanism (CBM) on Node 3 to open a berthing location for visiting vehicles on the Node 1 nadir CBM. In this position, computer-aided design (CAD) models indicated that the aft end of the PMM would be only a few inches from the stowed Functional Cargo Block (FGB) port solar array. To validate the CAD model clearance analysis, in the late summer of 2011 the Image Science and Analysis Group (ISAG) was asked to determine the true geometric relationship between the on-orbit aft facing Node 3 CBM and the FGB port solar array. The desired measurements could be computed easily by photogrammetric analysis if current imagery of the ISS hardware were obtained. Beginning in the fall of 2011, ISAG used the Dynamic Onboard Ubiquitous Graphics (DOUG) program to design a way to acquire imagery of the aft face of Node 3, the aft end-cone of Node 1, the port side of pressurized mating adapter 1 (PMA1), and the port side of the FGB out to the tip of the port solar array using cameras on the Space Station Remote Manipulator System (SSRMS). This was complicated by the need to thread the SSRMS under the truss, past Node 3 and the Cupola, and into the space between the aft side of Node 3 and the FGB solar array to acquire more than 100 images from multiple positions. To minimize the number of SSRMS movements, the Special Purpose Dexterous Manipulator (SPDM) would be attached to the SSRMS. This would make it possible to park the SPDM in one position and acquire multiple images by changing the viewing orientation of the SPDM body cameras using the pan/tilt units on which the cameras are mounted. Using this implementation concept, ISAG identified four SSRMS/SPDM positions from which all of the needed imagery could be acquired. Based on a photogrammetric simulation, it was estimated that the location of the FGB solar array could be measured within an accuracy of about 1 in. in each axis relative to the ISS Analysis Coordinate System (ISSACS). In October 2011, a proposed image-acquisition plan was drafted by ISAG and released for review. The ISS Robotics flight control team (ROBO) proposed minor changes to SPDM positions 1 and 4 to meet ISS proximity requirements. The updated image acquisition plan and draft chit were presented to and approved by the Systems Working Group (SWG) November 18 and were sent to the Vehicle Configuration Board (VCB) in early December 2011. Working with ROBO on 3 successive days (February 21, 22, and 23), ISAG collected 161 images of the ISS. Approximately 40 images were collected from each of the four different SSRMS/SPDM positions, with each set mapping the region from the Node 3 end cone, across Node 1, along the forward port side portion of the FGB, and out the port side FGB solar arrays. From this imagery, the best 80 images were selected for use in the analysis. The images were radiometrically enhanced to improve color and contrast and loaded into the FotoG analysis software along with the camera parameters and control data, which consisted of the coordinates for 54 handrail attachment bolts on the aft face of Node 3, in the ISSACS coordinate system. The results of this analysis produced the measured coordinates of 116 points distributed across the face of the FGB solar array panels (see figure 3) along with propagated uncertainty estimates in each coordinate axis. These results were sent to the ISS Vehicle Configuration Office, which sent them to the Configuration Analysis Modeling and Mass Properties (CAMMP) team for comparison with the Russian-provided CAD model for the retracted FGB solar arrays. The CAMMP analysis unexpectedly showed that the measured location of the port FGB solar array was up to 41-in. further outboard than the design and was slightly twisted about its rotational axis. The unexpected comparison results produced some initial concern regarding the accuracy of the photogrammetric measurements. To verify the measured results, ISAG personnel conducted a second analysis using just the imagery of the solar arrays in an arbitrary coordinate system defined by the three corner points of the inboard-most panel, with the design distance between points A1 and A10 as the only scale. The new measurements agreed with the original results to within less than 1 in. RMS in each axis, confirming the original solar array measurements. ISAG produced a final report for the ISS Vehicle Configuration Office documenting an apparent anomaly in the retracted configuration of the port FGB solar arrays. A copy of the measurement report was translated and sent to the Russian Space Agency. During a Vehicle Integrated Performance and Resources (VIPeR) teleconference September 24, 2012, the Russians acknowledged receipt of a translated copy of the ISAG report. The Russian representative stated that the head of the solar array design team claimed that the measured configuration was impossible unless the structure was physically broken. The Russians acknowledged that they had no expertise in photogrammetry, so the analysis technique employed was a "black box" to them, and they did not know how to use the ISAG results. They asked for a single image in which the overextension of the port solar array could be obviously seen. On November 10, 2012, during a face-to-face meeting with their Russian counterparts at JSC, ISAG presented nadir-view imagery of the FGB acquired during Space Shuttle rendezvous. Using the known width of the pressurized portion of the FGB as a scale, this analysis clearly showed that the port FGB solar array was extended outboard further than the Russian design for the retracted solar array.

Liddle, Donn↗

Assessing the Needs of NASA's Near Real-Time Earth Observation Products

"The 2017-2027 Decadal Survey for Earth Science and Applications from Space stated that NASA's Earth Science with planned implementation of applications provides sustained earth observations for societal benefits [1]. The Decadal Survey indicated that data latency is invaluable for time-sensitive applications including disaster risk reduction, wildland fire carbon emissions quantification, real-time measurements of the state of the hydrologic systems and many more. Data latency refers to the time between earth observation and data products available to users. During the past 13 years, NASA's Land, Atmosphere Near Real-Time Capability for Earth Observing Systems (LANCE) continues to provide free access to earth observation products that are made available much quicker than routine processing allows. The latency of most LANCE data products is Near Real-time (NRT) which is defined as less than three hours from satellite observations [2]. LANCE is managed by the Earth Science Data and Information System (ESDIS) Project at NASA Goddard Space Flight Center [3], and a User Working Group (UWG) is responsible for providing guidance to LANCE. LANCE data are used by direct users and brokers who add value to the data [4]. NASA Earth Applied Sciences Program (ASP) is one of the primary users of LANCE, which collaborates with partner organizations and provides support to scientists to solve problems in applications of earth observations. ASP promotes the use of LANCE NRT data products to demonstrate applications in decision making, facilitates end-user feedback to the science team to improve data products, and provides information on future demands for research. LANCE supports applications that need a rapid response including detecting wildland fires and volcanic eruptions, tracking smoke, ash and dust plumes, monitoring air quality and tracking extreme weather events such as hurricanes, landslides, and floods. To gather feedback regarding the availability, accessibility and actionability of NASA's NRT data products for societal benefit, three surveys and a few discussions with experts involved in the topic within ASP were conducted from the perspective of users. Feedback has been collected from users who are interested in using low latency NASA data within application communities of agriculture, disasters, water resources, health and air quality, ecological conservation, wildland fires and capacity building. Analysis-ready NRT data products in a variety of formats have been mentioned many times in the collected feedback, especially for applied users with little to no experience using research-grade earth observation products. Users prefer to have products that can be easily integrated into their existing workflows and take their analysis to the data. HDF5 is a commonly used data format for research, but typically requires some conversion to a more friendly format for applications and regular use in decision-making. Users prefer the GeoTIFF data format that can be directly ingested into a GIS mapping software and platform for data analysis and visualization. For example, LANCE’s fire, flood, SO2 and Black Marble Nighttime Blue/Yellow Composite data products have been integrated into NASA Disasters Mapping Portal, which is an GIS-based open data portal, for users in the disaster management community. There are 291 LANCE NRT layers available through GIBS and Worldview, where users can download a snapshot in GeoTIFF format. Operational users expect data to be processed as close to the user as possible. The collected feedback indicates that LANCE fire products within 3 hours latency would meet the needs of the wildland fire community. The ideal latency for volcanic application is 10-15 minutes. Users in Volcanic Ash Advisory Centers (VAAC) reported that the first forecast volcanic product should be issued within 75 minutes from the volcano eruption [5]. Overall, for disaster applications, data latency within 3 hours is useful while latency greater than 12 hours is not timely enough for operational use. Capacity building and training are critical for users to be able to access, interpret and use data products and tools for their decision making, especially for applied users with limited experience using earth observation products. LANCE data products have been used in a number of capacity building projects domestically and internationally [6]. As LANCE continues to bring new products into the system, users request training to utilize LANCE new and upcoming data products and capabilities in their applications. Due to the limitation of bandwidth and downstream flow paths, users in some developing countries need tools to select and download data for a specific area of interest instead of bulk downloads. The collected feedback also shows the lack of available SAR satellite low latency data products. The advantages of SAR to monitor conditions and changes on the ground through darkness, clouds, volcanic ash, and other atmospheric conditions, are appealing to low latency users. For example, terabytes of low latency but cloudy optical images are not helpful in rapidly identifying the extent of flood or fire impacts. LANCE could be complemented with low latency measurements via the upcoming NASA-ISRO Synthetic Aperture Radar (NISAR) mission [7]. Requests for higher spatial resolution products are expressed. A user from the wildland fire management community reported that products with 30-m spatial resolution could be used to detect small fires. The 30-m Landsat OLI fire data is now part of NASA’s Fire Information for Resource Management System (FIRMS) US/Canada [8]. Within the open and free NASA resources, LANCE disseminates NRT data products in a manner that allows them to be accessible and understandable to both scientific and applied users. In many application areas, latency plays an important or even decisive role where low latency earth observations help people to observe areas of interest, detect and track changes in the environment and make timely decisions. NASA’s Earth Applied Sciences Program promotes the use of LANCE NRT products and builds a bridge between application users and research teams. The collected feedback indicates data latency within 3 hours is useful for most of the applications, and shows the needs of user-friendly, analysis-ready products, and requests training on LANCE’s new and upcoming data products. User feedback has been provided to LANCE UWG for guidance and recommendations, and for translating findings into something actionable.

Tian Yao↗

Encouraging Combined Heat and Power in California Buildings

Governor Brown’s research priorities include an additional 6.5 GW of combined heat and power (CHP) by 2030. As of 2009, roughly 0.25 GW of small natural gas and biogas fired CHP is documented by the Self-Generation Incentive Program (SGIP) database. The SGIP is set to expire, and the anticipated grid de-carbonization based on the development of 20 GW of renewable energy will influence the CHP adoption. Thus, an integrated optimization approach for this analysis was chosen that allows optimizing the adoption of distributed energy resources (DER) such as photovoltaics (PV), CHP, storage technologies, etc. in the California commercial sector from the building owners’ perspective. To solve this DER adoption problem the Distributed Energy Resources Customer Adoption Model (DER-CAM), developed by the Lawrence Berkeley National Laboratory and used extensively to address the problem of optimally investing and scheduling DER under multiple settings, has been used. The application of CHP at large industrial sites is well known, and much of its potential is already being realized. Conversely, commercial sector CHP, especially those above 50 to 100 kW peak electricity load, is widely overlooked. In order to analyze the role of DER in CO 2 reduction, 147 representative sites in different climate zones were selected from the California Commercial End Use Survey (CEUS). About 8000 individual optimization runs, with different assumptions for the electric tariffs, natural gas costs, marginal grid CO 2 emissions, and nitrogen oxide treatment costs, SGIP, fuel cell lifetime, fuel cell efficiency, PV installation costs, and payback periods for investments have been performed. The most optimistic CHP potential contribution in this sector in 2020 will be 2.7 GW. However, this result requires a SGIP in 2020, 46% average electric efficiency for fuel cells, a payback period for investments of 10 years, and a CO 2 focused approach of the building owners. In 2030 it will be only 2.5 GW due to the anticipated grid decarbonization. The 2030 result requires a 60% electric efficiency and 20 year life time for fuel cells, a payback period of 10 years, and a CO 2 minimization strategy of building owners. Finally, the possible CHP potential in 2030 shows a significant variance between 0.2 GW and 2.5 GW, demonstrating the complex interactions between technologies, policies, and customer objectives.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Terawatt-scale photovoltaics: Transform global energy

Solar energy has the potential to play a central role in the future global energy system because of the scale of the solar resource, its predictability, and its ubiquitous nature. Global installed solar photovoltaic (PV) capacity exceeded 500 GW at the end of 2018, and an estimated additional 500 GW of PV capacity is projected to be installed by 2022-2023, bringing us into the era of TW-scale PV. Given the speed of change in the PV industry, both in terms of continued dramatic cost decreases and manufacturing-scale increases, the growth toward TW-scale PV has caught many observers, including many of us (1), by surprise. Two years ago, we focused on the challenges of achieving 3 to 10 TW of PV by 2030. Here, we envision a future with ~10 TW of PV by 2030 and 30 to 70 TW by 2050, providing a majority of global energy. PV would be not just a key contributor to electricity generation but also a central contributor to all segments of the global energy system. We discuss ramifications and challenges for complementary technologies (e.g., energy storage, power to gas/liquid fuels/chemicals, grid integration, and multiple sector electrification) and summarize what is needed in research in PV performance, reliability, manufacturing, and recycling.

14 SOLAR ENERGY↗

Keep it short: Exploring the impacts of configuration choices on the recent economics of solar-plus-battery and wind-plus-battery hybrid energy plants

Coupled renewable-battery powerplants differ from the traditional concept of independent siting of electricity resources within transmission networks. Prior research on the value proposition and cost savings from coupling did not consider the geographic constraint of co-location. This paper fills the gap by assessing how pricing volatility differences between nodes within electricity markets impact the system value of coupled renewable-battery projects as compared to independent VRE and battery installations. We use wholesale power market prices from 2012–2019 across the seven main U.S. independent system operators (ISOs) with a linear optimization program to compare the electricity market value of coupled projects to the value of the same underlying sub-components, deployed separately. We find that additional value from adding a 4-hour battery sized to 50% of renewable-plant nameplate capacity is $\$10$/MWh across ISOs on average. The highest boost occurs in California ($\$15$/MWh), where the value of adding storage to solar rises over time in tandem with increased solar penetration in the region. If renewables and batteries are deployed independently, we estimate that $\$12.5$/MWh of additional value could be achieved because of more flexibility on battery siting and operation. The $\$12.5$/MWh coupling penalty is reduced to $\$1.6$/MWh when considering alternative approaches to integrating battery storage. This result implies that renewable-battery power plants will play an increasing role in electricity systems if they can be built for $\$2$–$\$13$/MWh less than independent projects of comparable size. However, the wide regional variation in coupling penalties, along with the importance of conditions captured in our sensitivity cases, suggests the tradeoff between coupling penalties and savings will vary by situation. Therefore, roles exist for independent and coupled projects from a system optimization perspective.

14 SOLAR ENERGY↗

Beyond Price-Taker: Multiscale Optimization of Wind and Battery Integrated Energy Systems

Integrating renewable energy into the electric grid is challenging due to the intermittency and variability of wind and other non-dispatchable resources. Integrated energy systems (IESs) combine multiple energy technologies (e.g., fossil, nuclear, renewables, storage) to reduce costs and improve flexibility and reliability. However, standard techno-economic analysis (TEA) methods often overestimate the benefits of IESs because they fail to account for energy market adjustments. This paper systematically studies the limitations of the prevailing price-taker assumption for TEA and optimization of hybrid energy systems. As an illustrative case study, we retrofit an existing wind farm in the RTS-GMLC test system (which loosely mimics the Southwest U.S.) with battery energy storage to form an IES. We show that the standard price-taker model overestimates the electricity revenue and the net present value (NPV) of the IES up to 178% and 30.4%, respectively, compared to our more rigorous multiscale optimization. These differences arise because introducing storage creates a more flexible resource that impacts the larger wholesale electricity market. Moreover, this work highlights the impact of the IES has on the market via various strategic bidding, and underscores the importance of moving beyond price-taker for optimal storage sizing and TEA of IESs. We conclude by discussing opportunities to generalize the proposed framework to other IESs, and highlight emerging research questions regarding the complex interactions between IESs and markets.

25 ENERGY STORAGE↗

Learning Lessons from the X-37 Project

The X-37 was planned as an automated vehicle capable of flight-testing new aerospace technologies in combined environments that are beyond the capability of existing ground or flight platforms. Flight demonstration with the X-37 architecture and configuration in relevant environments was planned to reduce the risk of developing launch vehicle technologies for sustainable, affordable exploration and other aerospace applications. Current plans are for the X-37 Approach and Landing Test Vehicle (ALTV) to be atmospheric tested in 2005 from Scaled Composite's White Knight carrier aircraft at up to 40,000 feet over California's Mojave Spaceport, with and turnaround maintenance performed. The fight Operations Control Center will conduct the mission, using a streamlined operations concept. Taxi-tow and captive-carry tests will be conducted prior to the atmospheric-test series. Sponsored by the Defense Advanced Research Projects Agency (DARPA) with NASA participation, technical objectives are to: (1) mature Computed Air Data System/Remote Pressure Sensor technology, (2) manage energy during Terminal Area Energy Management/Heading Alignment Cone maneuvers, and (3) validate the aerodatabase. The X-37 Project began in 1999 under a cooperative agreement as an element of NASA's Future X Program and transitioned to a NASA Research Announcement under the Space Launch Initiative. In mid-2004, NASA transferred ownership to DARPA, with its heritage of performing high-risk, high-payoff research and development. NASA contributes technical expertise, including risk analysis and system integration. The Boeing Company is the prime contractor, with nationwide suppliers. This recent partnership exemplifies the synergy attainable when NASA Centers, other Government agencies, and industry work together toward a common goal - contributing to the knowledge base for U.S. exploration and other aerospace endeavors. The X-37 team represents a range of space transportation disciplines - from engineering to management. Some members have been with the project since its inception. All have gained priceless experience during the design, manufacturing, and testing of the ALTV, as well as through developing advanced orbital flight technologies, such as state-of-the-art Thermal Protection Systems and hot structures. Throughout this process, the X-37 Project team captures lessons that are directly applicable to other such efforts. The upcoming ALTV flights offer another dimension of data and first-hand experience that will prove invaluable to those designing new generations of reusable spacecraft. And ongoing technology developments will expand the aerospace knowledge base. Delivering prototype hardware is always a risky proposition. During the course of the X-37 effort, the team has experienced many challenging opportunities, delivering significant accomplishments and learning numerous lessons in the process. The ability to manage the risk landscape is key to overcoming obstacles, especially technical hurdles that are encountered in progressing hardware from design to flight. The approach to managing risk under this partnership is evolving but, in general, the team allocates resources to reduce the likelihood of severe-consequence risks, thus maximizing mission success and ensuring that the X-37 Project delivers value to its stakeholders. As the team sharpens its focus on operations, it continues to contribute knowledge to those who would undertake high-risk, high-payoff research and development and provides valuable experience to implement the exploration vision.

Turner, Susan↗

Are coupled renewable-battery power plants more valuable than independently sited installations?

Coupled renewable-battery powerplants differ from the traditional concept of independent siting of electricity resources within transmission networks. Prior research on the value proposition and cost savings from coupling did not consider the geographic constraint of co-location. This paper fills the gap by assessing how pricing volatility differences between nodes within electricity markets impact the system value of coupled renewable-battery projects as compared to independent VRE and battery installations. We use wholesale power market prices from 2012–2019 across the seven main U.S. independent system operators (ISOs) with a linear optimization program to compare the electricity market value of coupled projects to the value of the same underlying sub-components, deployed separately. We find that additional value from adding a 4-hour battery sized to 50% of renewable-plant nameplate capacity is $\$$10/MWh across ISOs on average. The highest boost occurs in California ($\$$15/MWh), where the value of adding storage to solar rises over time in tandem with increased solar penetration in the region. If renewables and batteries are deployed independently, we estimate that $\$$12.5/MWh of additional value could be achieved because of more flexibility on battery siting and operation. The $\$$12.5/MWh coupling penalty is reduced to $\$$1.6/MWh when considering alternative approaches to integrating battery storage. This result implies that renewable-battery power plants will play an increasing role in electricity systems if they can be built for $\$$2–$\$$13/MWh less than independent projects of comparable size. However, the wide regional variation in coupling penalties, along with the importance of conditions captured in our sensitivity cases, suggests the tradeoff between coupling penalties and savings will vary by situation. Therefore, roles exist for independent and coupled projects from a system optimization perspective.

14 SOLAR ENERGY↗

Cyber-Physical Dynamic System (CPDS) Modeling for Frequency Regulation and AGC Services of Distributed Energy Resources

The substantial integration of renewable energy brings significant challenges to balance the system in real time because of the variability and intermittency of renewable power. For the reliable system operation, the frequency regulation service is used to stabilize the system frequency through automatically balancing the system generation and load. On one hand, with the substantially increasing deployment of renewable energy in electricity system, the requirement of frequency regulation (FR) services increases significantly. On the other hand, the current main resource of FR services, the controllable conventional generation, is continuously decreasing in the system generation mix. This means that in the future high renewable penetration power system, additional and alternative reliable FR services providers such as distributed energy storage (DES) resources should be explored. Although the capability of utility-scale energy storage to provide FR services has been demonstrated, the integrated control and dynamic modeling of distributed energy resource (DER) providing frequency regulation grid services has been rarely explored. There are several challenges to adopt DERs to provide reliable grid services as illustrated in FERC 755. First, the distributed installation of DES requires a comprehensive cyber-physical dynamic system (CPDS) modeling to fully consider the impacts of the communication latency variability on its real time FR provision capability. Unlike the conventional generators, there are two-layer communication between DERs and system operators which increase the communication delay. Second, unlike the conventional generators whose dynamic models have been comprehensively studied, the difference among individual DER components' power-dynamic characteristic brings challenges in the accurate dynamic AGC modeling of its power-frequency relationship. Third, the temporal dependent state of charge uncertainty of DERs challenges DERs' power and frequency regulation capacities scheduling in the look-ahead generation scheduling. Therefore, the aggregator should optimize the frequency regulation provision from individual DER in real time. To overcome these challenges, this project proposes a cyber-physical dynamic system (CPDS) model to handle the uncertainty of DERs two-layer communication latency and power dynamics. The variability of DERs' communication delay and dynamic constraints will be comprehensively modeled. The DERs' AGC model with communication delay is designed to validate DESs' frequency regulation services. Like current performance-based frequency regulation evaluation, the delivery of DERs' frequency regulation will be assessed through post-analysis of the actual AGC response with respect to the AGC control signal from system operators. Consequently, the reliability improvement with DERs providing reliable frequency regulation services can be evaluated from a comprehensive perspective considering all the dynamics of communication and power.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Learning Lessons from the X-37 Project

The X-37 was planned as an automated vehicle capable of flight-testing new aerospace technologies in combined environments that are beyond the capability of existing ground or flight platforms. Flight demonstration with the X-37 architecture and configuration in relevant environments was planned to reduce the risk of developing launch vehicle technologies for sustainable, affordable exploration and other aerospace applications. Current plans are for the X-37 Approach and Landing Test Vehicle (ALTV) to be atmospheric tested in 2005 from Scaled Composite s White Knight carrier aircraft at up to 40,000 feet over California's Mojave Spaceport, with landing and turnaround maintenance performed. The Flight Operations Control Center will conduct the mission, using a streamlined operations concept. Taxi-tow and captive-carry tests will be conducted prior to the atmospheric-test series. Sponsored by the Defense Advanced Research Projects Agency (DARPA) with NASA participation, technical objectives are to: (1) mature Computed Air Data System/Remote Pressure Sensor technology, (2) manage energy during Terminal Area Energy Management/Heading Alignment Cone maneuvers, and (3) validate the aerodatabase. The X-37 Project began in 1999 under a cooperative agreement as an element of NASA's Future X Program and transitioned to a NASA Research Announcement under the Space Launch Initiative. In mid-2004, NASA transferred ownership to DARPA, with its heritage of performing high-risk, high-payoff research and development (R&D). NASA contributes technical expertise, including risk analysis and system integration. The Boeing Company is the prime contractor, with nationwide suppliers. This partnership exemplifies the synergy attainable when NASA Centers, other Government agencies, and industry work together toward a common goal - contributing to the knowledge base for U.S. exploration and other aerospace endeavors. The X-37 team represents a range of space transportation disciplines - from engineering to management. Some members have been with the project since its inception. All have gained priceless experience during the design, manufacturing, and testing of the ALTV, as well as through developing advanced orbital flight technologies, such as state-of-the-art Thermal Protection Systems and hot structures. Throughout this process, the X-37 Project team captures lessons that are directly applicable to other such efforts. The upcoming ALTV flights offer another dimension of data and first-hand experience that will prove invaluable to those designing new generations of reusable spacecraft. And ongoing technology developments will expand the aerospace knowledge base. Delivering prototype hardware is always a risky proposition. During the course of this effort, the X-37 team has experienced many challenging opportunities, delivering significant accomplishments and learning numerous lessons in the process. The ability to manage the risk landscape is key to overcoming obstacles, especially technical hurdles that are encountered in progressing hardware from design to flight. The approach to managing risk under this partnership is evolving but, in general, the team allocates resources to reduce the likelihood of severe-consequence risks, thus maximizing mission success and ensuring that the X-37 Project delivers value to its stakeholders. As the team sharpens its focus on operations, it continues to contribute knowledge to those who would undertake high-risk, high-payoff R&D and provides valuable experience to implement the Vision for Space Exploration.

Turner, Susan↗

TTEthernet for Integrated Spacecraft Networks

Aerospace projects have traditionally employed federated avionics architectures, in which each computer system is designed to perform one specific function (e.g. navigation). There are obvious downsides to this approach, including excessive weight (from so much computing hardware), and inefficient processor utilization (since modern processors are capable of performing multiple tasks). There has therefore been a push for integrated modular avionics (IMA), in which common computing platforms can be leveraged for different purposes. This consolidation of multiple vehicle functions to shared computing platforms can significantly reduce spacecraft cost, weight, and design complexity. However, the application of IMA principles introduces significant challenges, as the data network must accommodate traffic of mixed criticality and performance levels - potentially all related to the same shared computer hardware. Because individual network technologies are rarely so competent, the development of truly integrated network architectures often proves unreasonable. Several different types of networks are utilized - each suited to support a specific vehicle function. Critical functions are typically driven by precise timing loops, requiring networks with strict guarantees regarding message latency (i.e. determinism) and fault-tolerance. Alternatively, non-critical systems generally employ data networks prioritizing flexibility and high performance over reliable operation. Switched Ethernet has seen widespread success filling this role in terrestrial applications. Its high speed, flexibility, and the availability of inexpensive commercial off-the-shelf (COTS) components make it desirable for inclusion in spacecraft platforms. Basic Ethernet configurations have been incorporated into several preexisting aerospace projects, including both the Space Shuttle and International Space Station (ISS). However, classical switched Ethernet cannot provide the high level of network determinism required by real-time spacecraft applications. Even with modern advancements, the uncoordinated (i.e. event-driven) nature of Ethernet communication unavoidably leads to message contention within network switches. The arbitration process used to resolve such conflicts introduces variation in the time it takes for messages to be forwarded. TTEthernet1 introduces decentralized clock synchronization to switched Ethernet, enabling message transmission according to a time-triggered (TT) paradigm. A network planning tool is used to allocate each device a finite amount of time in which it may transmit a frame. Each time slot is repeated sequentially to form a periodic communication schedule that is then loaded onto each TTEthernet device (e.g. switches and end systems). Each network participant references the synchronized time in order to dispatch messages at predetermined instances. This schedule guarantees that no contention exists between time-triggered Ethernet frames in the network switches, therefore eliminating the need for arbitration (and the timing variation it causes). Besides time-triggered messaging, TTEthernet networks may provide two additional traffic classes to support communication of different criticality levels. In the rate-constrained (RC) traffic class, the frame payload size and rate of transmission along each communication channel are limited to predetermined maximums. The network switches can therefore be configured to accommodate the known worst-case traffic pattern, and buffer overflows can be eliminated. The best-effort (BE) traffic class behaves akin to classical Ethernet. No guarantees are provided regarding transmission latency or successful message delivery. TTEthernet coordinates transmission of all three traffic classes over the same physical connections, therefore accommodating the full spectrum of traffic criticality levels required in IMA architectures. Common computing platforms (e.g. LRUs) can share networking resources in such a way that failures in non-critical systems (using BE or RC communication modes) cannot impact flight-critical functions (using TT communication). Furthermore, TTEthernet hardware (e.g. switches, cabling) can be shared by both TTEthernet and classical Ethernet traffic.

Loveless, Andrew↗

Harnessing Artificial Intelligence for Medical Diagnosis and Treatment During Space Exploration Missions

BACKGROUND The medical capabilities necessary for long-duration exploration missions (LDEMs) will differ tremendously from those currently available to crew medical officers (CMOs) on the International Space Station (ISS). Ground support will be more challenging due to distance-related communication delays and data transmission, and resource utilization must be optimized given limited ability for resupply. Clinical decision support systems (CDSSs) can help mitigate these limitations. The recent launch of generative artificial intelligence (AI) tools based upon large language models (LLM) support the creation of a smart assistant for onboard triage, diagnosis, and guided treatment of medical conditions during these missions. The Informing Mission Planning via Analysis of Complex Tradespaces (IMPACT) tool can help predict which clinical problems and outcomes are likely to occur for a design reference mission (DRM) and assist Medical Operations and systems engineering teams in creating a medical system that may optimally mitigate the predicted risks. The purpose of this study was to identify AI tools currently available or in development for the assistive diagnosis and care of medical conditions predicted for an extended duration Lunar mission. METHODS The 119 medical conditions currently built into the IMPACT suite were categorized into systems, and these diagnoses were used as keywords for our literature search. Using PubMed and Google Scholar, we performed a literature survey of AI tools applicable to these conditions. Article inclusion criteria included publication between the years 2017-2023, as the sentinel paper discussing the “selective attention” driving ChatGPT and other generative transformer models was published in June 2017. Where applicable, we reviewed only the top 1000 research articles (based on relevance) for each of the keywords/phrases. AI tools whose training sets were exclusive to a pediatric patient population were excluded. We also excluded any medical diagnostic tools (such as CT, MRI, mass spectrometry) or procedures (such as endoscopy, surgery) that are unlikely to be available during LDEMs due to mass and volume constraints, CMO knowledge, skills, and abilities, and/or inherent procedural risks. RESULTS Our survey highlighted several AI-driven tools for the triage, diagnosis, and management of those medical conditions highlighted by IMPACT. Selected publications for each medical condition were then screened for inclusion within ten systems-based categories including: general diagnostic tools (25), tools to diagnose and manage respiratory (40), dermatologic (34), neurologic (28), auditory and vestibular (30), ophthalmic (34), musculoskeletal (104), infection-associated (92), and gynecologic (19) conditions, as well as tools that could be deployed in the setting of trauma and emergency (34). CONCLUSIONS Numerous AI-driven tools were highlighted within this literature survey, ranging from chatbot assistants that triage knee pain to vision transformer models for diagnosis of ophthalmic conditions using ocular surface images captured with a mobile phone. Remaining challenges include optimizing connectivity and integration of existing and developing systems into the vehicles or habitats. Notably, findings from this survey could help guide the initial design of an all-encompassing, onboard medical AI assistant for use during future LDEMs.

R A Lacinski↗

Integrated Multi-Scale Data Analytics and Machine Learning for the Distribution Grid and Building-to-Grid Interface

This white paper introduces the application of advanced data analytics to the modernized grid. In particular, we consider the field of machine learning and where it is both useful, and not useful, for the particular field of the distribution grid and buildings interface. While analytics, in general, is a growing field of interest, and often seen as the golden goose in the burgeoning distribution grid industry, its application is often limited by communications infrastructure, or lack of a focused technical application. Overall, the linkage of analytics to purposeful application in the grid space has been limited. In this paper we consider the field of machine learning as a subset of analytical techniques, and discuss its ability and limitations to enable the future distribution grid and the building-to-grid interface. To that end, we also consider the potential for mixing distributed and centralized analytics and the pros and cons of these approaches. Machine learning is a subfield of computer science that studies and constructs algorithms that can learn from data and make predictions and improve forecasts. Incorporation of machine learning in grid monitoring and analysis tools may have the potential to solve data and operational challenges that result from increasing penetration of distributed and behind-the-meter energy resources. There is an exponentially expanding volume of measured data being generated on the distribution grid, which, with appropriate application of analytics, may be transformed into intelligible, actionable information that can be provided to the right actors – such as grid and building operators, at the appropriate time to enhance grid or building resilience, efficiency, and operations against various metrics or goals – such as total carbon reduction or other economic benefit to customers. While some basic analysis into these data streams can provide a wealth of information, computational and human boundaries on performing the analysis are becoming significant, with more data and multi-objective concerns. Efficient applications of analysis and the machine learning field are being considered in the loop.

24 POWER TRANSMISSION AND DISTRIBUTION↗