Search NASA⌕ Search

SEARCH · Search NASA

Results for “MONITOR PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,693 records · Page 94

Performance analysis of Wald-statistic based network detection methods for radiation sources

There have been increasingly large deployments of radiation detection networks that require computationally fast algorithms to produce prompt results over ad-hoc sub-networks of mobile devices, such as smart-phones. These algorithms are in sharp contrast to complex network algorithms that necessitate all measurements to be sent to powerful central servers. In this work, at individual sensors, we employ Wald-statistic based detection algorithms which are computationally very fast, and are implemented as one of three Z-tests and four chi-square tests. At fusion center, we apply the K-out-of-N fusion to combine the sensors hard decisions. We characterize the performance of detection methods by deriving analytical expressions for the distributions of underlying test statistics, and by analyzing the fusion performances in terms of K, N, and the false-alarm rates of individual detectors. We experimentally validate our methods using measurements from indoor and outdoor characterization tests of the Intelligence Radiation Sensors Systems (IRSS) program. In particular, utilizing the outdoor measurements, we construct two important real-life scenarios, boundary surveillance and portal monitoring, and present the results of our algorithms.

Sen, Satyabrata↗

Progress in the Investigation of Nuclear Power Plant Cable Aging

The thousands of miles of polymer-insulated cables used for power, control and communications in nuclear power plants were originally qualified for forty years of plant operation. Continued use of cable in existing plants for periods much beyond their original qualified life will require a detailed understanding of cable degradation under plant operating conditions to assess and mitigate risk of continued use. The effect and relative importance of individual and combined environmental stresses including radiation, heat and moisture on reliable cable performance is essential to inform condition monitoring, lifetime prediction and required cable replacement planning. We present an overview and update of the nuclear cable aging program at the Pacific Northwest National Laboratory and the Oak Ridge National Laboratory supported by the U.S. Department of Energy, Office of Nuclear Energy, Light Water Reactor Sustainability program

Fifield, Leonard S.↗

Houston, We Have a Problem-and a Solution: Solar Performance Initiative Helps Federal Building Boost Rooftop Production

In 2014, the Mickey Leland Federal Building in Houston, Texas installed a 192 kW PV system on top of its parking structure. To monitor and optimize its performance, the General Services Administration, which manages the site, responded to the Federal Energy Management Program’s request for federal agency participation in the Federal Energy Management Program Solar PV Performance Initiative.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

PROGRESS IN THE INVESTIGATION OF NUCLEAR POWER PLANT CABLE AGING

The thousands of miles of polymer-insulated cables used for power, control and communications in nuclear power plants were originally qualified for forty years of plant operation. Continued use of cable in existing plants for periods much beyond their original qualified life will require a detailed understanding of cable degradation under plant operating conditions to assess and mitigate risk of continued use. The effect and relative importance of individual and combined environmental stresses including radiation, heat and moisture on reliable cable performance is essential to inform condition monitoring, lifetime prediction and required cable replacement planning. We present an overview and update of the nuclear cable aging program at the Pacific Northwest National Laboratory and the Oak Ridge National Laboratory supported by the U.S. Department of Energy, Office of Nuclear Energy, Light Water Reactor Sustainability program.

cable, insulation, polymer, EPR, XLPE, aging, degr↗

Modernization of existing VVER-1000 surveillance programs

According to generally accepted world practice, evaluation of the reactor pressure vessel (RPV) material behavior during operation is carried out using tests of surveillance specimens. The main objective of the surveillance program consists in insurance of safe RPV operation during the design lifetime and lifetime-extension period. At present, the approaches of pressure vessels residual life validation based on the test results of their surveillance specimens have been developed and introduced in Russia and are under consideration in other countries where vodo-vodyanoi energetichesky reactors- (VVER-) 1000 are in operation. In this case, it is necessary to ensure leading irradiation of surveillance specimens (as compared to the pressure vessel wall) and to provide uniformly irradiated specimen groups for mechanical testing. Standard surveillance program of VVER-1000 has several significant shortcomings and does not meet these requirements. Taking into account program of lifetime extension of VVER-1000 operating in Russia, it is necessary to carry out upgrading of the VVER-1000 surveillance program. This paper studies the conditions of a surveillance specimen's irradiation and upgrading of existing sets to provide monitoring and prognosis of RPV material properties for extension of the reactor's lifetime up to 60 years or more. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A New Class of Risk-Importance Measures to Support Reactor Aging Management and the Prioritization of Materials Degradation Research

As the US fleet of light water reactors ages, the risks of operation might be expected to increase. Although probabilistic risk assessment has proven a critical resource in risk-informed regulatory decision-making, limitations in current methods and models have constrained their prospective value in reactor aging management. These limitations stem principally from the use of static component failure rate models (which do not allow the impact of component aging on failure rates to be represented) and a very limited treatment of passive components (which would be expected to have an increasingly significant risk contribution in an aging system). Yet, a PRA captures a substantial knowledge base that could be of significant value in addressing plant aging. In this paper we will describe a methodology and a new class of risk importance measures that allow the use of an existing PRA model to support the management of plant aging, the prioritization of improvements to non-destructive examination and monitoring techniques, and the establishment of research emphases in materials science. This methodology makes use of data resources generated under the USNRC Proactive Management of Materials Degradation program which addresses the anticipated effects of numerous aging degradation mechanisms on a wide variety of component types.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Final Scientific/Technical Report, DE-FG02-06ER64171, Integrated Nucleic Acid System for In-Field Monitoring of Microbial Community Dynamics and Metabolic Activity – Subproject to Co-PI Eric E. Roden

This report summarizes research conducted in conjunction with a project entitled “Integrated Nucleic Acid System for In-Field Monitoring of Microbial Community Dynamics and Metabolic Activity”, which was funded through the Integrative Studies Element of the former NABIR Program (now the Environmental Remediation Sciences Program) within the Office of Biological and Environmental Research. Dr. Darrell Chandler (originally at Argonne National Laboratory, now with Akonni Biosystems) was the overall PI/PD for the project. The overall project goals were to (1) apply a model iron-reducer and sulfate-reducer microarray and instrumentation systems to sediment and groundwater samples from the Scheibe et al. FRC Area 2 field site, UMTRA sediments, and other DOE contaminated sites; (2) continue development and expansion of a 16S rRNA/rDNA¬-targeted probe suite for microbial community dynamics as new sequences are obtained from DOE-relevant sites; and (3) address the fundamental molecular biology and analytical chemistry associated with the extraction, purification and analysis of functional genes and mRNA in environmental samples. Work on the UW subproject focused on conducting detailed batch and semicontinuous culture reactor experiments with uranium-contaminated FRC Area 2 sediment. The reactor experiments were designed to provide coherent geochemical and microbiological data in support of microarray analyses of microbial communities in Area 2 sediments undergoing biostimulation with ethanol. A total of four major experiments were conducted (one batch and three semicontinuous culture), three of which (the batch and two semicontinuous culture) provided samples for DNA microarray analysis. A variety of other molecular analyses (clone libraries, 16S PhyloChip, RT-PCR, and T-RFLP) were conducted on parallel samples from the various experiments in order to provide independent information on microbial community response to biostimulation.

54 ENVIRONMENTAL SCIENCES↗

Slitless spectrophotometry with forward modelling: Principles and application to measuring atmospheric transmission

Context.In the next decade, many optical surveys will aim to answer the question of the nature of dark energy by measuring its equation-of-state parameter at the per mill level. This requires trusting the photometric calibration of the survey with a precision never reached so far on many sources of systematic uncertainties. The measurement of the on-site atmospheric transmission for each exposure, or for each season or for the full survey on average, can help reach the per mill precision for the magnitudes. Aims.This work aims at proving the ability to use slitless spectroscopy for standard-star spectrophotometry and its use to monitor on-site atmospheric transmission as needed, for example, by theVera C. RubinObservatory Legacy Survey of Space and Time supernova cosmology program. We fully deal with the case of a disperser in the filter wheel, which is the configuration chosen in theRubinAuxiliary Telescope. Methods.The theoretical basis of slitless spectrophotometry is at the heart of our forward-model approach to extract spectroscopic information from slitless data. We developed a publicly available software calledSpectractor, which implements each ingredient of the model and finally performs a fit of a spectrogram model directly on image data to obtain the spectrum. Results.We show through simulations that our model allows us to understand the structure of spectrophotometric exposures. We also demonstrate its use on real data by solving specific issues and illustrating that our procedure allows the improvement of the model describing the data. Finally, we discuss how this approach can be used to directly extract atmospheric transmission parameters from the data and thus provide the base for on-site atmosphere monitoring. We show the efficiency of the procedure in simulations and test it on the limited available data set.

Astronomy & Astrophysics↗

Full-Scale Vessel Testing for the Hanford Waste Treatment and Immobilization Plant - 18333

Concerns over the mixing performance of the planned pulse jet mixed (PJM) vessels for high-solids applications in the Hanford Waste Treatment and Immobilization Plant (WTP) Pretreatment (PT) Facility, led to the development of a standard high-solids vessel (SHSV) design and full-scale vessel testing program. The SHSV is intended as a potential replacement for several high-level waste feed receipt and lag storage vessels (High-Level Waste Facility lag storage and feed blending process), ultrafiltration feed preparation vessels (ultrafiltration process system), and plant wash vessels (plant wash and disposal system). The SHSV concept uses multiple smaller vessels (60 500 L - 79 500 L nominal batch size) to replace larger vessels, providing redundancy, improved mixing (PJM design and spargers), monitoring (multi-level bubblers), reduced material at risk, and improved structural features. The SHSV also requires qualification of a single vessel design for high solids Newtonian and non-Newtonian slurry processing, rather than having to qualify earlier multiple vessel designs. An Integrated Technical Team consisting of the U.S. Department of Energy, Bechtel National, Inc., and independent experts was established to accelerate and provide oversight and direction of the test program and SHSV qualification. Qualification of the SHSV for mixing has now been achieved through a comprehensive full-scale vessel testing program conducted in 2017 with a prototypic SHSV under a set of most adverse design conditions, in conjunction with additional engineering analyses. This paper will present an overview of the SHSV, results from the three-phase full-scale vessel test and qualification program completed in September 2017, and the management program to achieve resolution of the PJM mixing technical issue. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Irradiation of the First Advanced Gas Reactor Fuel Development and Qualification Experiment in the Advanced Test Reactor

The United States Department of Energy’s Advanced Gas Reactor (AGR) Fuel Development and Qualification Program will be irradiating eight separate tri-isotopic (TRISO) particle fuel (in compact form) experiments in the Advanced Test Reactor (ATR) located at the Idaho National Laboratory (INL). These irradiations and fuel development are being accomplished to support development of the next generation reactors in the United States. The ATR has a long history of irradiation testing in support of reactor development and the INL has been designated as the United States Department of Energy’s lead laboratory for nuclear energy development. These AGR fuel experiments will be irradiated over the next ten years to demonstrate and qualify new particle fuel for use in high temperature gas reactors. The experiments, which will each consist of six separate capsules, will be irradiated in an inert sweep gas atmosphere with individual on-line temperature monitoring and control for each capsule. The swept gas will also have on-line fission product monitoring to track performance of the fuel in each individual capsule during irradiation. The design of the first experiment (designated AGR-1) was completed in 2005, and the fabrication and assembly of the test train as well as the support systems and fission product monitoring system that monitor and control the experiment during irradiation were completed in September 2006. The experiment was inserted in the ATR in December 2006, and is serving as a shakedown test of the multi-capsule experiment design that will be used in the subsequent irradiations as well as a test of the early variants of the fuel produced under this program. The experiment test train as well as the monitoring, control, and data collection systems are discussed and the status of the experiment is provided.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Grid Service for User-Centric Job

The User Centric Monitoring (UCM) project was aimed at developing a toolkit that provides the Virtual Organization (VO) with tools to build systems that serve a rich set of intuitive job and application monitoring information to the VO’s scientists so that they can be more productive. The tools help collect and serve the status and error information through a Web interface. The proposed UCM toolkit is composed of a set of library functions, a database schema, and a Web portal that will collect and filter available job monitoring information from various resources and present it to users in a user-centric view rather than and administrative-centric point of view. The goal is to create a set of tools that can be used to augment grid job scheduling systems, meta-schedulers, applications, and script sets in order to provide the UCM information. The system provides various levels of an application programming interface that is useful through out the Grid environment and at the application level for logging messages, which are combined with the other user-centric monitoring information in a abstracted “data store”. A planned monitoring portal will also dynamically present the information to users in their web browser in a secure manor, which is also easily integrated into any JSR-compliant portal deployment that a VO might employ. The UCM is meant to be flexible and modular in the ways that it can be adopted to give the VO many choices to build a solution that works for them with special attention to the smaller VOs that do not have the resources to implement home-grown solutions.

99 GENERAL AND MISCELLANEOUS↗

Fission Product Monitoring and Release Data for the Advanced Gas Reactor -1 Experiment

The AGR-1 experiment is a fueled multiple-capsule irradiation experiment that was irradiated in the Advanced Test Reactor (ATR) from December 26, 2006 until November 6, 2009 in support of the Very High Temperature Reactor (VHTR) Technology Development Office (TDO) Fuel Development and Qualification program. An important measure of the fuel performance is the quantification of the fission product releases over the duration of the experiment. To provide this data for the inert fission gasses(Kr and Xe), a fission product monitoring system (FPMS) was developed and implemented to monitor the individual capsule effluents for the radioactive species. The FPMS continuously measured the concentrations of various krypton and xenon isotopes in the sweep gas from each AGR-1 capsule to provide an indicator of fuel irradiation performance. Spectrometer systems quantified the concentrations of Kr-85m, Kr-87, Kr-88, Kr-89, Kr-90, Xe-131m, Xe-133, Xe 135, Xe 135m, Xe-137, Xe-138, and Xe-139 accumulated over repeated eight hour counting intervals.-. To determine initial fuel quality and fuel performance, release activity for each isotope of interest was derived from FPMS measurements and paired with a calculation of the corresponding isotopic production or birthrate. The release activities and birthrates were combined to determine Release-to-Birth ratios for the selected nuclides. R/B values provide indicators of initial fuel quality and fuel performance during irradiation. This paper presents a brief summary of the FPMS, the release to birth ratio data for the AGR-1 experiment and preliminary comparisons of AGR-1 experimental fuels data to fission gas release models.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Annual Site Environmental Report: 2008 (ASER) for the SLAC National Accelerator Laboratory

This report provides information about environmental programs during the calendar year of 2008 at the SLAC National Accelerator Laboratory (SLAC), Menlo Park, California. Activities that span the calendar year, i.e., stormwater monitoring covering the winter season of 2008/2009 (October 2008 through May 2009), are also included. Production of an annual site environmental report (ASER) is a requirement established by the United States Department of Energy (DOE) for all management and operating (M&O) contractors throughout the DOE complex. SLAC is a federally-funded research and development center with Stanford University as the M&O contractor. Under Executive Order (EO) 13423, Strengthening Federal Environmental, Energy, and Transportation Management, and DOE Order 450.1A, Environmental Protection Program, SLAC effectively implements and integrates the key elements of an Environmental Management System (EMS) to achieve the site's integrated safety and environmental management system goals. For normal daily activities, SLAC managers and supervisors are responsible for ensuring that policies and procedures are understood and followed so that: (1) Worker safety and health are protected; (2) The environment is protected; and (3) Compliance is ensured. Throughout 2008, SLAC continued to improve its management systems. These systems provided a structured framework for SLAC to implement 'greening of the government' initiatives such as EO 13423 and DOE Orders 450.1A and 430.2B. Overall, management systems at SLAC are effective, supporting compliance with all relevant statutory and regulatory requirements. SLAC continues to demonstrate significant progress in implementing and integrating EMS into day-to-day operations and construction activities at SLAC. The annual management review and ranking of environmental aspects were completed this year by SLAC's EMS Steering Committee, the Environmental Safety Committee (ESC), and twelve objectives and targets were established for 2008. For each objective and target, a work plan, or Environmental Management Program (EMP) was completed and progress reports were routinely provided to SLAC senior management and the DOE SLAC Site Office (SSO). During 2008, there were no reportable releases to the environment from SLAC operations. In addition, many improvements in waste minimization, recycling, stormwater management, groundwater restoration, and SLAC's chemical management system (CMS) were continued during the year. The following are amongst SLAC's environmental accomplishments for 2008: a composting program at SLAC's onsite cafeteria was initiated, greater than 800 cubic feet of legacy radioactive waste were packaged and shipped from SLAC, a chemical redistribution program was developed, SLAC reduced the number of General Services Administration leased vehicles from 221 to 164, recycling of municipal waste was increased by approximately 140 tons during 2008, and site-wide releases of sulfur hexafluoride were reduced by 50 percent. In 2008, no radiological incidents occurred that increased radiation levels or released radioactivity to the environment. In addition to managing its radioactive wastes safely and responsibly, SLAC worked to reduce the amount of waste generated. SLAC has implemented programs and systems to ensure compliance with all radiological requirements related to the environment. Specifically, the Radiation Protection Radiological Waste Management Group developed a training course to certify Radioactive Waste Generators, conducted a training pilot, and developed a list of potential radioactive waste generators to train. Twenty eight generators were trained in 2008. As a best management practice, SLAC also reduced its tritium inventory by at least 95 percent by draining one of its accelerator cooling water systems; with the cooperation of the South Bayside System Authority, the West Bay Sanitary District and the DOE, SLAC discharged the cooling water to the sanitary sewer according to federal regulations and replenished the system with clean water. In 2008, the SLAC Environmental Restoration Program personnel continued work on site characterization and evaluation of remedial alternatives at four sites with volatile organic compounds in groundwater and several areas with polychlorinated biphenyls and low concentrations of lead in soil. SLAC is regulated under a site cleanup requirements order (board order) issued by the California Regional Water Quality Control Board (RWQCB), San Francisco Bay Region in May 2005 for the investigation and remediation of impacted soil and groundwater at SLAC. The board order lists specific tasks and deadlines for completion of groundwater and soil characterization and other remediation activities. All 2008 submittals to the RWQCB were completed and submitted on time.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Changes in Cleanup Strategies and Long-Term Monitoring Costs for DOE FUSRAP Sites - 17241

The Department of Energy (DOE) Office of Legacy Management (LM) is responsible for the post-closure management of remediated DOE sites. LM's objective for Formerly Utilized Sites Remedial Action Program (FUSRAP) includes the long-term surveillance and maintenance (LTSM) of sites that have been remediated by the US Army Corps of Engineers (USACE). FUSRAP was initiated in 1974 by the US Atomic Energy Commission, a predecessor agency of DOE. FUSRAP was managed by DOE from 1981 to 1997. Through a congressional act, the scope to remediate FUSRAP sites was transferred to USACE in 1997. By 1997, DOE had completed the cleanup of 25 of the 46 sites that were active within the program, and had begun cleanups at 13 additional sites. USACE assumed responsibility for the cleanup of the 21 remaining FUSRAP sites, and 8 additional sites that have been recommended for cleanup. Presently, LM provides long-term stewardship for 30 completed FUSRAP sites while USACE is actively remediating 23 sites. FUSRAP sites are typically privately-owned factories or research facilities. However, there are four DOE owned FUSRAP sites. These sites are Maywood and Middlesex in New Jersey, and Colonie and Niagara Falls in New York. In support of LM's Beneficial Reuse strategic mission, the site in Wayne, New Jersey has been transferred to a municipality and the site in New Brunswick, New Jersey has been sold. Historically, most sites in FUSRAP were remediated to 'unlimited exposure and unrestricted use' cleanup levels consistent with residential use. Some sites were remediated using supplemental limits due to inaccessible areas while remaining sites have been remediated to other-than residential standards based on site-specific long-term land use assumptions. Of the 31 completed FUSRAP sites under LM stewardship, one site requires land-use controls and no site requires groundwater monitoring. Over the next 10 years USACE plans to transfer 11 sites to LM. Several of these sites will have additional long-term monitoring requirements as per their Records of Decisions (RODs). These transitioning sites include the Colonie, New York site, the Maywood and Deepwater, New Jersey, sites and the St. Louis, Missouri site. The additional stewardship requirements will include groundwater monitoring, enforcement of institutional and engineered controls, and five-year reviews. In addition to these sites, more than 100 vicinity properties will also be transferred to LM for stewardship. Given the increase in long-term stewardship activities for these sites and their associated vicinity properties, initiatives are under way to incorporate the additional LTSM requirements into the program's out-year planning. LM will be evaluating several methods to customize LTSM cost and liability estimates for all of the completed FUSRAP sites, planning to address the sites not yet transferred and those that are in LM's custody. Where necessary, LM will use remedial process optimization techniques and evaluate monitored natural attenuation protocols to reduced long-term monitoring costs. Methods for identifying costs include the cost estimates provided in RODs, cost estimates refined during remediation, operation and maintenance costs provided by USACE prior to transition, and presumptive remedies using USACE and Environmental Management / LM historic costs at similar sites. On the basis of this evaluation, a strategy for estimating site-specific LTSM costs will be selected. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Site Environmental Report, 2007(ASER)

This report provides information about environmental programs during the calendar year (CY) of 2007 at the Stanford Linear Accelerator Center (SLAC), Menlo Park, California. Activities that span the calendar year, i.e., stormwater monitoring covering the winter season of 2007/2008 (October 2007 through May 2008), are also included. Production of an annual site environmental report (ASER) is a requirement established by the United States Department of Energy (DOE) for all management and operating (M&O) contractors throughout the DOE complex. SLAC is a federally-funded research and development center with Stanford University as the M&O contractor. Under Executive Order (EO) 13423 and DOE Order 450.1, 'Environmental Protection Program', SLAC effectively implemented and integrated the key elements of an Environmental Management System (EMS) to achieve the site's integrated safety and environmental management system goals. For normal daily activities, SLAC managers and supervisors are responsible for ensuring that policies and procedures are understood and followed so that: (1) Worker safety and health are protected; (2) The environment is protected; and (3) Compliance is ensured. Throughout 2007, SLAC focused on development and implementation of SLAC management systems to ensure continual improvement. These systems provided a structured framework for SLAC to implement 'greening of the government' initiatives such as EO 13148. Overall, management systems at SLAC are effective, supporting compliance with all relevant statutory and regulatory requirements. SLAC continues to demonstrate significant progress in implementing and integrating EMS into day-to-day operations at SLAC. The annual management review and ranking of environmental aspects were completed this year by SLAC's EMS Steering Committee, the Environmental Safety Committee (ESC) and thirteen objectives and targets were established for 2007. For each objective and target, a work plan, or Environmental Management Program (EMP) was completed and progress reports were routinely provided to SLAC senior management. During 2007, there were no reportable releases to the environment from SLAC operations. In addition, many improvements in waste minimization, recycling, stormwater management, groundwater restoration, and SLAC's chemical management system (CMS) were continued during 2007. SLAC replaced two process tanks at the Plating Shop which previously contained chromium solutions with non-chromium containing solutions, reducing the overall use of hazardous chemicals. In addition, 346 polychlorinated biphenyl (PCB)-contaminated capacitors were replaced with non-PCB capacitors, reducing the potential of a release of oil with PCBs during an event such as a fire or an earthquake. SLAC operates its industrial and sanitary wastewater management program in compliance with established permit conditions. During 2007, SLAC obtained a new facility-wide wastewater discharge permit which replaced four separate permits that were previously issued to SLAC. In 2007, no radiological incidents occurred that increased radiation levels or released radioactivity to the environment. In addition to managing its radioactive wastes safely and responsibly, SLAC worked to reduce the amount of waste generated. SLAC has implemented programs and systems to ensure compliance with all radiological requirements related to the environment. Specifically, the Radiation Protection Radiological Waste Management (RPRWM) Group developed a training course to certify Radioactive Waste Generators, conducted a training pilot, and developed a list of potential radioactive waste generators to train. In 2007, the SLAC Environmental Restoration Program continued work on site characterization and evaluation of remedial alternatives at four sites with volatile organic compounds in groundwater and several areas with polychlorinated biphenyls and low concentrations of lead in soil. SLAC is regulated under a site cleanup requirements order (board order) issued by the California Regional Water Quality Control Board (RWQCB), San Francisco Bay Region in May 2005 for the investigation and remediation of impacted soil and groundwater at SLAC. The board order lists specific tasks and deadlines for completion of groundwater and soil characterization and other remediation activities. All 2007 submittals to the RWQCB were completed and submitted on time.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Jointly Sponsored Research Program on Energy Related Research

Cooperative Agreements, DE-FC26-08NT43293, DOE-WRI Cooperative Research and Development Program for Fossil Energy-Related Resources began in June 2009. The goal of the Program was to develop, commercialize, and deploy technologies of value to the nation’s fossil and renewable energy industries. To ensure relevancy and early commercialization, the involvement of an industrial partner was encouraged. In that regard, the Program stipulated that a minimum of 20% cost share be achieved in a fiscal year. This allowed WRI to carry a diverse portfolio of technologies and projects at various development technology readiness levels. Depending upon the maturity of the research concept and technology, cost share for a given task ranged from none to as high as 67% (two-thirds). Over the course of the Program, a total of twenty six tasks were proposed for DOE approval. Over the period of performance of the Cooperative agreement, WRI has put in place projects utilizing a total of $\$$7,089,581 in USDOE funds. Against this funding, cosponsors have committed $\$$7,398,476 in private funds to produce a program valued at $\$$14,488,057. Tables 1 and 2 presented at the end of this section is a compilation of the funding for all the tasks conducted under the program. The goal of the Cooperative Research and Development Program for Fossil Energy-Related Resources was to through collaborative research with the industry, develop or assist in the development of innovative technology solutions that will: • Increase the production of United States energy resources – coal, natural gas, oil, and renewable energy resources; • Enhance the competitiveness of United States energy technologies in international markets and assist in technology transfer; • Reduce the nation's dependence on foreign energy supplies and strengthen both the United States and regional economies; and • Minimize environmental impacts of energy production and utilization. Success of the Program can be measured by several criteria. Using the deployment of the federal funding with industrial participation as a performance criterion, over the course of the program, the cosponsors contributed more dollars than the federal funds. As stated earlier, a little more than half of the funding for the Program was derived from industrial partners. The industrial partners also enthusiastically supported the research and development activities with cash contribution of $\$$4,710,372.67, nearly 65% of the required cost share. Work on all of the tasks proposed under the Cooperative Agreement has been completed. This report summarizes and highlights the results from the Program. Under the Cooperative Agreement Program, energy-related tasks emphasized petroleum processing, upgrading and characterization, coal and biomass beneficiation and upgrading, coal combustion systems development including oxy-combustion, emissions monitoring and abatement, coal gasification technologies including gas clean-up and conditioning, hydrogen and liquid fuels production, and the development of technologies for the utilization of renewable energy resources. Environmental-related activities emphasized cleaning contaminated soils using microbial fuel cells, development of processes and sorbents for emissions reduction and recovery of water from power plant flue gas, and biological carbon capture and reuse. Technology enhancement activities included resource characterization studies, development of improved methods, monitors and sensors. In general the goals of the tasks proposed were to enhance competitiveness of U.S. technology, increase production of domestic resources, and reduce environmental impacts associated with energy production and utilization. Technologies being brought to commercialization as a result of the funds provided by the Cooperative Agreement contribute to the overall goals of the USDOE and the nation. Each has broad applicability both within the United States and abroad, thereby helping to enhance the competitiveness of U.S. energy technologies in international markets and assisting in technology transfer. Under the Cooperative Agreement Program, WRI has furthered the development of two different coal upgrading technologies. River Basin Energy technology was scaled-up and demonstrated at a nominal 40 tpd size. Similarly, WRI’s patented mercury removal technology further developed into WRITE Coal technology which was then integrated into oxy-combustion and gasification systems for IGCC and fuels production. Integrated systems with WRITE Coal technology applied at the front end represent substantial environmental and efficiency gains. A variation of the RBE coal upgrading technology is being commercialized as a torrefaction technology for woody biomass. WRI worked with EPRI and NIST to develop and improve mercury calibration standards for emissions monitoring. Working with Chart Energy and Chemicals, WRI scaled-up compact reactor technology for the synthesis of fuels and chemicals from syngas. Compact reactor technology represents a five-fold increase in productivity over conventional reactors making smaller-scale distributed synthesis plants an economical viability. Similarly, WRI's patented mixed alcohol synthesis catalyst production is being scaled-up in collaboration with a commercial catalyst manufacturer.

99 GENERAL AND MISCELLANEOUS↗

Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2007.

The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by the Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.

13 HYDRO ENERGY↗