Search NASA⌕ Search

SEARCH · Search NASA

Results for “WASTE PROCESSING PLANTS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,693 records · Page 94

MODEL IMPLEMENTATION TO EVALUATE THE COLLECTIVE FUTURE RADIONUCLIDE RELEASES FROM MULTIPLE FACILITIES AT THE SAVANNAH RIVER SITE

A comprehensive Composite Analysis (CA) has been performed considering 152 sources of residual radioactive material at the Savannah River Site (SRS). As part of the CA a model was developed to perform deterministic base case calculations using the commercial GoldSim software. The model treated transport and decay of radionuclides as they are released at the source location and transported through the source region, vadose zone and aquifer to stream outcrops and from there to the Savannah River. A dose to the public was calculated assuming recreational use of stream water and residential use of river water. The specific results from the GoldSim modeling evaluation conducted as part of the CA indicate that the collective maximum dose resulting from the release of radionuclides from all 152 anticipated SRS End State sources of residual radionuclides demonstrate that maximum exposures expected to occur to any offsite MOP will not approach the 300 uSv/yr (30 mrem/yr) dose constraint, and in fact are currently estimated to be only 10% of this. For each of the POA's evaluated, the highest cumulative dose is realized at the Lower Three Runs POA and is calculated to be 29.7 uSv/yr (2.97 mrem/yr). The major dose contributing radionuclide for all of the POA's, with the exception of Upper Three Runs, was {sup 137}Cs in the contaminated streambed sediments. In Upper Three Runs {sup 237}Np from the H-Area Canyon Building was the major dose contributing radionuclide. The major exposure pathway for the SRS streams (where the Recreational Scenario was evaluated) was by the ingestion of fish. In the Savannah River, where the Residential Scenario was evaluated, ingestion of vegetation was the dominant exposure pathway. The uncertainty evaluation lends added assurance to the conclusion that the 30 mrem/yr dose constraint will not be exceeded, in that even at the 95th Percentile, this performance measure is not expected to be exceeded. It must also be added that these conclusions should be regarded as 'preliminary' since the DOE review process of the SRS CA has not yet been completed.

54 ENVIRONMENTAL SCIENCES↗

Remediation of Mercury Contaminated Soils at the Miramas Site - 12243

Beneficial 'new' use of the Miramas Site is the remediation objective for a former light isotope manufacturing facility. Remediation operations will remove contaminated soils and materials and deconstruct facilities. The remediation objective is faced with project challenges and regulatory requirements that dictate/influence the outcome. The operation consists of the remediation of approximately 100,000 cubic meters of soil and the decommissioning of facilities. The types and ranges of waste are the result of historical processing activities (chemical facilities, pyrotechnic components storage, mining component treatment and light isotope manufacturing activities). Mercury is the primary component of the waste, but metals and organic compounds are also possible waste components. A thermal desorption process is used to remove Mercury from the polluted soil while a biological treatment is considered to the organic nitrate compound removal. A focus is done on the technologies used to remediate the Mercury contaminated soil. After few months of operation, the first results confirm that the technology choices were relevant and the soil remediation project is a success. The first successful month of operation at an industrial scale demonstrate that the Thermal Desorption is an efficient and relevant process to remediate large quantity of mercury contaminated soils. The project is on cost and the mercury removal should be end by 2014. The scrubbing is a good way to limit the volume of material to be treated with the Thermal Desorption Unit. The biological treatment is a promising process for the organic nitrate compound removal and testing at a pilot scale will be done in 2012. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Multistage bioassociation of uranium onto an extremely halophilic archaeon revealed by a unique combination of spectroscopic and microscopic techniques

The interactions of two extremely halophilic archaea with uranium were investigated in this paper at high ionic strength as a function of time, pH and uranium concentration. Halobacterium noricense DSM-15987 and Halobacterium sp. putatively noricense, isolated from the Waste Isolation Pilot Plant repository, were used for these investigations. The kinetics of U(VI) bioassociation with both strains showed an atypical multistage behavior, meaning that after an initial phase of U(VI) sorption, an unexpected interim period of U(VI) release was observed, followed by a slow reassociation of uranium with the cells. By applying in situ attenuated total reflection Fourier-transform infrared spectroscopy, the involvement of phosphoryl and carboxylate groups in U(VI) complexation during the first biosorption phase was shown. Differences in cell morphology and uranium localization become visible at different stages of the bioassociation process, as shown with scanning electron microscopy in combination with energy dispersive X-ray spectroscopy. Finally, our results demonstrate for the first time that association of uranium with the extremely halophilic archaeon is a multistage process, beginning with sorption and followed by another process, probably biomineralization.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

A Synergistic Combination of Advanced Separation and Chemical Scale Inhibitor Technologies for Efficient Use of Imparied Water As Cooling Water in Coal-based Power Plants

Nalco Company is partnering with Argonne National Laboratory (ANL) in this project to jointly develop advanced scale control technologies that will provide cost-effective solutions for coal-based power plants to operate recirculating cooling water systems at high cycles using impaired waters. The overall approach is to use combinations of novel membrane separations and scale inhibitor technologies that will work synergistically, with membrane separations reducing the scaling potential of the cooling water and scale inhibitors extending the safe operating range of the cooling water system. The project started on March 31, 2006 and ended in August 30, 2010. The project was a multiyear, multi-phase project with laboratory research and development as well as a small pilot-scale field demonstration. In Phase 1 (Technical Targets and Proof of Concept), the objectives were to establish quantitative technical targets and develop calcite and silica scale inhibitor chemistries for high stress conditions. Additional Phase I work included bench-scale testing to determine the feasibility of two membrane separation technologies (electrodialysis ED and electrode-ionization EDI) for scale minimization. In Phase 2 (Technology Development and Integration), the objectives were to develop additional novel scale inhibitor chemistries, develop selected separation processes, and optimize the integration of the technology components at the laboratory scale. Phase 3 (Technology Validation) validated the integrated system's performance with a pilot-scale demonstration. During Phase 1, Initial evaluations of impaired water characteristics focused on produced waters and reclaimed municipal wastewater effluents. Literature and new data were collected and evaluated. Characteristics of produced waters vary significantly from one site to another, whereas reclaimed municipal wastewater effluents have relatively more uniform characteristics. Assessment to date confirmed that calcite and silica/silicate are two common potential cycle-limiting minerals for using impaired waters. For produced waters, barium sulfate and calcium sulfate are two additional potential cycle-limiting minerals. For reclaimed municipal wastewater effluents, calcium phosphate scaling can be an issue, especially in the co-presence of high silica. Computational assessment, using a vast amount of Nalco's field data from coal fired power plants, showed that the limited use and reuse of impaired waters is due to the formation of deposit caused by the presence of iron, high hardness, high silica and high alkalinity in the water. Appropriate and cost-effective inhibitors were identified and developed - LL99B0 for calcite and gypsum inhibition and TX-15060 for silica inhibition. Nalco's existing dispersants HSP-1 and HSP-2 has excellent efficacy for dispersing Fe and Mn. ED and EDI were bench-scale tested by the CRADA partner Argonne National Laboratory for hardness, alkalinity and silica removal from synthetic make-up water and then cycled cooling water. Both systems showed low power consumption and 98-99% salt removal, however, the EDI system required 25-30% less power for silica removal. For Phase 2, the EDI system's performance was optimized and the length of time between clean-in-place (CIP) increased by varying the wafer composition and membrane configuration. The enhanced EDI system could remove 88% of the hardness and 99% of the alkalinity with a processing flux of 19.2 gal/hr/m{sup 2} and a power consumption of 0.54 kWh/100 gal water. Bench tests to screen alternative silica/silicate scale inhibitor chemistries have begun. The silica/silicate control approaches using chemical inhibitors include inhibition of silicic acid polymerization and dispersion of silica/silicate crystals. Tests were conducted with an initial silica concentration of 290-300 mg/L as SiO{sub 2} at pH 7 and room temperature. A proprietary new chemistry was found to be promising, compared with a current commercial product commonly used for silica/silicate control. Additional pilot cooling tower testing confirmed the bench study. We also developed a molecule to inhibit calcium carbonate precipitation and calcium sulfate precipitation at high supersaturations. During Phase 3, a long-term test of the EDI system and scale inhibitors was done at Nalco's cooling tower water testing facility, producing 850 gallons of high purity water (90+% salt removal) at a rate of 220 L/day. The EDI system's performance was stable when the salt concentration in the concentrate compartment (i.e. the EDI waste stream) was controlled and a CIP was done after every 48 hours of operation time. A combination of EDI and scale inhibitors completely eliminated blowdown discharge from the Pilot cooling Tower. The only water-consumption came from evaporation, CIP and EDI concentrate. Silica Inhibitor was evaluated in the field at a western coal fired power plant.

01 COAL, LIGNITE, AND PEAT↗

Impact of Crystalline Silicotitanate Particle Size on Cesium Removal Efficiency

Washington River Protection Solutions is working on a Tank-Side Cesium Removal (TSCR) system to remove Cs from Hanford tank waste supernate. Removal of 137 Cs from tank waste supernate by TSCR results in a low-activity waste (LAW) form that can be fed directly to the Hanford Waste Treatment and Immobilization Plant (WTP) LAW vitrification facility, where the supernate can be vitrified into a glass form. Crystalline silicotitanate (CST) ion exchange media, manufactured by Honeywell UOP, LLC (product IONSIV TM R9140-B), was selected for use as the ion exchange media to remove Cs at TSCR. The particle size used in testing is expected to impact the kinetic performance of the ion exchange media. Therefore, two single-column systems were tested with CST Lot 2002009604. One column contained <25 mesh sieve cut fraction and the other column contained <35 mesh sieve cut fraction. Flowrate through both test systems was adjusted to match the CST contact time expected for the full-scale operation, i.e., matched bed volumes per hour (BV/h) at 1.83 BV/h. The feed was processed downflow through the columns until ~1000 BVs of feed were processed. The waste acceptance criteria (WAC) limit for the WTP LAW vitrification facility is <3.18E-5 Ci 137 Cs per mole Na. For a tank waste containing 156 µCi/mL 137 Cs and 5.6 M Na, up to 0.114% of the influent 137 Cs concentration may be delivered to the WTP (based on 137 Cs content in AP-107 tank waste); this required a Cs decontamination factor of 876. The WAC limit was used as one of the relevant process parameters, along with the 50% breakthrough point, Cs loading per gram of CST, and the mass transfer zone.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Depowering of Batteries to Reduce Cost of Ownership

(1) Executive Summary: End of life batteries (EOLBs) present a cost and safety liability for their owners and stakeholders. This is due flammability, energy, and power with EOLBs. Current approaches include cumbersome, expensive packaging, specialized shipping, regulated storage, and they are responsible for over half of the cost of recycling. They all expensively and inadequately address symptoms. OnTo has developed and proven a simple way to resolve the problem systemically, through depowering of lithium-ion batteries (and most any battery other than lead). The low-cost process removes flammability, power, and energy in EOLBs through non-toxic chemical processing. The opportunity for commerce of inert scrap is at least $5 billion greater than the commerce in hazardous scrap, all made possible through OnTo’s technology for efficiency and safety. (2) Depowering Improves Safety and Decreases Cost of Battery Ownership: OnTo’s depowering technology will remove half of the cost of EOLB management and recycling. Without this technology, EOLB recycling will always be a liability. EOLB is hazardous due to inherent flammability of electrolyte and lithium. The shipping and commerce of EOLBs is costly and dangerous all along the chain of custody from owner, dealership/shop, shipper, second-life sorter, (shipper again), and finally to the destination facility recycler. OnTo’s depowering service renders inert most any EOLB packs, modules, and cells. The technology uses a brief, non-toxic treatment applicable to most any chemistry. The industry needs a safe, simple, modular, and inexpensive method to render EOLBs as inert scrap. OnTo’s deactivation system is scalable to the needs of any customer along the EOLB chain of custody. (3) Evidence of Successful Depowering: Untreated batteries will catch fire and explode under abuse conditions such as heat or crush. Slide 2 below shows that untreated batteries will blow-up and expel their internal components with heating, after OnTo’s depowering treatment, the same battery is inert with the same heat treatment (Fig. 7 in the slide). Depowering also removes electrolyte reactivity, eliminating the production of HF and other toxins (Fig 6. in the slide) The depowering process is applicable to large, 26 Ah cells. Fig. 5 in the slide shows the removal of all the electrolyte from whole cells. Removal of flammable material from an EOLB contributes to the inert behavior. OnTo developed this technology through a project supported by the US Department of Energy EERE program, with partners including Seattle King County Metro Transit. While OnTo has generated evidence of successful depowering of batteries, in 2020, a follow-on voucher opportunity for third party analysis of depowered cells and materials was approved through CalTestBed. The expertise of the battery and materials research groups at Lawrence Berkeley National Laboratory will characterize these depowered cells to provide better understanding of the materials level changes in depowering. (4) Pilot Plant for Depowering EOLBs: Making the spoke work in hub-and-spoke While other companies are marketing the hub-and-spoke approach for recycling EOLBs, they rely on dangerous, expensive shredding methods with flimsy IP protection. OnTo offers the only patented, proven ability to depower EOLBs from most any chemistry – at half of the capital cost required for shredding, while eliminating the liability, danger, and waste streams inherent with shredding. The proposed commercial pilot facility is (5) OnTo Technology LLC Company: OnTo develops advanced battery recycling innovations that produce manufacturing quality electrode materials from recycled batteries. Their patented Cathode-healing™ and Deactivation/Depowering processes improve safety and reduce the cost of recycling. OnTo’s breakthrough technologies produce advanced materials for manufacturing batteries useful in applications from portable power to electric vehicles. Contact: Steve Sloop OnTo Technology LLC, 63221 Service Road, STE F, Bend, OR 97703, ssloop@onto-technology.com , 541-389-7897

deactivation↗

Vitrification of Hanford Tank Wastes for Condensate Recycle and Feed Composition Changeover Testing

During the vitrification of Hanford Site nuclear waste at the Waste Treatment and Immobilization Plant (WTP), which is a part of the safe and efficient retrieval, treatment, and disposal mission of the U.S. Department of Energy Office of River Protection, the offgas condensate generated from the waste-to-glass conversion is currently planned to be concentrated by evaporation in the Effluent Management Facility (EMF). This concentrated condensate can then be recycled back to the incoming waste and vitrified. To test the recycle process, an apparatus was designed and built to mimic the EMF evaporator and was then used to concentrate a volume of condensate produced during the vitrification of a sample of Hanford tank 241-AP-107 (referred to herein as AP-107) waste in a continuous laboratory-scale melter (CLSM). The concentrated condensate was added to an additional sample of AP-107 waste, to mimic one round of the recycle process, and the combined solution was vitrified, producing a second round of recycle condensate. In the current study, the EMF test apparatus was used to concentrate the second-round recycle condensate under evaporation conditions (at 45 °C and 1.4 psia) designed to emulate EMF operation. The condensate was successfully concentrated by a factor of ~10 while retaining over 95 % of the technetium-99 ( 99 Tc), Cs, and I inventories in the concentrate. Another portion of AP-107 waste was retrieved by Washington River Protection Solutions, LLC (WRPS) and transferred to Pacific Northwest National Laboratory (PNNL), where it was pretreated and then combined with the second-round recycle AP-107 condensate concentrate and glass-forming chemicals (GFCs) to form the two-time recycle AP-107 melter feed, approximating a second round to the recycling action to be performed at the WTP. A portion of AP-105 waste was also retrieved by WRPS and provided to PNNL for pretreatment and combining with GFCs to form AP-105 melter feed. The two-time recycle AP-107 and AP-105 melter feeds were processed consecutively in the CLSM. The CLSM run proceeded for 13.63 hours, producing 9.70 kg of glass for an average glass production rate of 1464 kg m 2 d -1 during the two-time recycle AP-107 feed charging and 1568 kg m 2 d -1 during the AP-105 feed charging. The rate during AP-107 charging was essentially equivalent to the rate when processing no-recycle AP-107 feed and lower than that achieved when processing one-time recycle AP-107 feed. However, all rates were within the potential range of variability when processing melter feeds with similar composition in the CLSM. Likewise, the rate during AP-105 charging was higher than the previous rate processing AP-105, but within the potential CLSM range. The cold-cap characteristics changed from the typically thin AP-107 cold cap to a foamy-edged cold cap as previously seen with AP-105 shortly after transitioning to the AP-105 melter feed. The glass produced during the CLSM run was within 10 % of its target composition for the primary glass components. The CaO and Li 2 O targets varied by more than 1 wt% between the two-time recycle AP-107 and AP-105 glass targets and it took about 2 turnovers of the CLSM glass inventory to reach a relative chemical steady state in the glass for CaO and Li 2 O after the melter feed inputs were switched. The 99 Tc and total cesium content in the melter feeds were maintained at concentrations expected to be experienced at the WTP. During the CLSM run, while processing the two-time recycle AP-107 melter feed at a relative chemical steady state, the 99 Tc/Cs ratio was 10, and 34% of 99 Tc and 74% of Cs were retained in the glass. These values were higher than those measured in the CLSM run with one-time recycle AP-107 melter feed. After the transition to processing the AP-105 melter feed, when the production reached a relative chemical steady state, the 99 Tc/Cs ratio was 77 while 44% of 99 Tc was retained in the glass. The C's retention during this time frame reached 200% due to the excess C's in the glass after the target content decreased to 15% of its initial level in the two-time recycle AP-107 melter feed to the lower target in the Ap-105 melter feed. While iodine was below inductively coupled plasma mass spectrometry analytical reporting limits in the melter feed and glass samples, it was detected in quantities above the analytical reporting limits in the liquid and filter samples collected from the CLSM offgas treatment system. The behavior of iodine in the CLSM offgas treatment system followed a similar pattern to those of 99 Tc and Cs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vitrification of Hanford Tank Wastes for Condensate Recycle and Feed Composition Changeover Testing (Rev. 1)

During the vitrification of Hanford Site nuclear waste at the Waste Treatment and Immobilization Plant (WTP), which is a part of the safe and efficient retrieval, treatment, and disposal mission of the U.S. Department of Energy Office of River Protection, the offgas condensate generated from the waste-to-glass conversion is currently planned to be concentrated by evaporation in the Effluent Management Facility (EMF). This concentrated condensate can then be recycled back to the incoming waste and vitrified. To test the recycle process, an apparatus was designed and built to mimic the EMF evaporator and was then used to concentrate a volume of condensate produced during the vitrification of a sample of Hanford tank 241-AP-107 (referred to herein as AP-107) waste in a continuous laboratory-scale melter (CLSM). The concentrated condensate was added to an additional sample of AP-107 waste, to mimic one round of the recycle process, and the combined solution was vitrified, producing a second round of recycle condensate. In the current study, the EMF test apparatus was used to concentrate the second-round recycle condensate under evaporation conditions (at 45 °C and 1.4 psia) designed to emulate EMF operation. The condensate was successfully concentrated by a factor of ~10 while retaining over 95 % of the technetium-99 (99Tc), Cs, and I inventories in the concentrate. Another portion of AP-107 waste was retrieved by Washington River Protection Solutions, LLC (WRPS) and transferred to Pacific Northwest National Laboratory (PNNL), where it was pretreated and then combined with the second-round recycle AP-107 condensate concentrate and glass-forming chemicals (GFCs) to form the two-time recycle AP-107 melter feed, approximating a second round to the recycling action to be performed at the WTP. A portion of AP-105 waste was also retrieved by WRPS and provided to PNNL for pretreatment and combining with GFCs to form AP-105 melter feed. The two-time recycle AP-107 and AP-105 melter feeds were processed consecutively in the CLSM. The CLSM run proceeded for 13.63 hours, producing 9.70 kg of glass for an average glass production rate of 1464 kg m 2 d -1 during the two-time recycle AP-107 feed charging and 1568 kg m 2 d -1 during the AP-105 feed charging. The rate during AP-107 charging was essentially equivalent to the rate when processing no-recycle AP-107 feed and lower than that achieved when processing one-time recycle AP-107 feed. However, all rates were within the potential range of variability when processing melter feeds with similar composition in the CLSM. Likewise, the rate during AP-105 charging was higher than the previous rate processing AP-105, but within the potential CLSM range. The cold-cap characteristics changed from the typically thin AP-107 cold cap to a foamy-edged cold cap as previously seen with AP-105 shortly after transitioning to the AP-105 melter feed. The glass produced during the CLSM run was within 10 % of its target composition for the primary glass components. The CaO and Li 2 O targets varied by more than 1 wt% between the two-time recycle AP-107 and AP-105 glass targets and it took about 2 turnovers of the CLSM glass inventory to reach a relative chemical steady state in the glass for CaO and Li 2 O after the melter feed inputs were switched.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Burn coal cleanly in a fluidized bed - The key is in the controls

The fluidized-bed combustion (FBC) process produces few sulfur emissions, and can burn wood, municipal solid waste as well as every kind of coal available in the U.S. The presurized, coal-burning fluidized-bed reactor at NASA's Lewis Research Center is described, together with a discussion of the operating results. The FBC system at Lewis, having a completely instrumented reactor, is used to test turbine blade alloys for future power plant applications. With the same type of coal and limestone used in the first testing phase covering 136 hours, it was found that all NOx values were below the EPA standard of 0.7 lb/MBtu, whereas the maximum observed level of SO2 was above the EPA standard of 1.3 lb/MBtu, but with the average SO2 level, however, only 0.63 lb/MBtu. Unburned hydrocarbon and CO levels were very low, indicating combustion efficiencies of close to 99% in almost all tests. Testing is now underway using high temperature cyclones and gas turbine to eliminate erosion and corrosion effects which were observed after the initial tests on the turbine and blades.

Kobak, J. A.↗

High Level Waste Remote Handling Equipment in the Melter Cave Support Handling System at the Hanford Waste Treatment Plant

Cold war plutonium production led to extensive amounts of radioactive waste stored in tanks at the Department of Energy's (DOE) Hanford site. Bechtel National, Inc. is building the largest nuclear Waste Treatment Plant in the world located at the Department of Energy's Hanford site to immobilize the millions of gallons of radioactive waste. The site comprises five main facilities; Pretreatment, High Level Waste vitrification, Low Active Waste vitrification, an Analytical Lab and the Balance of Facilities. The pretreatment facilities will separate the high and low level waste. The high level waste will then proceed to the HLW facility for vitrification. Vitrification is a process of utilizing a melter to mix molten glass with radioactive waste to form a stable product for storage. The melter cave is designated as the High Level Waste Melter Cave Support Handling System (HSH). There are several key processes that occur in the HSH cell that are necessary for vitrification and include: feed preparation, mixing, pouring, cooling and all maintenance and repair of the process equipment. Due to the cell's high level radiation, remote handling equipment provided by PaR Systems, Inc. is required to install and remove all equipment in the HSH cell. The remote handling crane is composed of a bridge and trolley. The trolley supports a telescoping tube set that rigidly deploys a TR 4350 manipulator arm with seven degrees of freedom. A rotating, extending, and retracting slewing hoist is mounted to the bottom of the trolley and is centered about the telescoping tube set. Both the manipulator and slewer are unique to this cell. The slewer can reach into corners and the manipulator's cross pivoting wrist provides better operational dexterity and camera viewing angles at the end of the arm. Since the crane functions will be operated remotely, the entire cell and crane have been modeled with 3-D software. Model simulations have been used to confirm operational and maintenance functional and timing studies throughout the design process. Since no humans can go in or out of the cell, there are several recovery options that have been designed into the system including jack-down wheels for the bridge and trolley, recovery drums for the manipulator hoist, and a wire rope cable cutter for the slewer jib hoist. If the entire crane fails in cell, the large diameter cable reel that provides power, signal, and control to the crane can be used to retrieve the crane from the cell into the crane maintenance area. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Functionalized Magnetic Nanoparticles for Technetium Sequestration from Groundwater

Technetium 99 (Tc) is among the most common environmental contaminants at DOE sites and one of the most common risk drivers in low- and high-level waste disposal sites. The majority of Tc is generated from anthropogenic sources, such as nuclear power plants, global weapons, nuclear storage facilities and medical applications. Through these sources, Tc contamination has been unintentionally introduced in to the environment. The most common chemical form of Tc is Tc(VII)O{sub 4}{sup -}. Due to its high solubility and mobility, Tc can enter the food chain and cause adverse health effects to humans. Currently, ion exchange resins and reduction processes are the most common approaches for Tc immobilization. Although these techniques have shown to be effective, they also possess major drawbacks, such as high cost, low adsorption capacity, and complex creation and maintenance. Therefore, development of more efficient and simple technologies for the remediation of Tc-contaminated systems are needed. Functionalized magnetic nanoparticles have been used to remove organic and inorganic contaminants from water resources. These nanoparticles have attracted extensive attention as an adsorbent material due to their large surface area, high efficiency, low-cost, easy functionalization and separation with a magnet. This study seek to develop functionalized magnetic iron oxide nanoparticles for the efficient removal of Tc and other heavy metal contaminants from water resources under ambient conditions. Objectives: Synthesize magnetic iron oxide nanoparticles and functionalize their surface with Cetyltrimethylammonium Bromide (CTAB) and tetraethyl-orthosilicate (TEOS). Characterize the synthesized nanoparticles using scanning electron microscopy (SEM) coupled with energy dispersive X-ray spectroscopy (EDS), Dynamic Light Scattering (DLS) and Zeta PALS. Perform adsorption studies to evaluate their adsorption behavior and capacity for (a) Technetium using Rhenium (ReO{sub 4}{sup -}) as a surrogate and (b) heavy metals, e.g. Cu{sup 2+}. Conclusions: Magnetic iron oxide nanoparticles were successfully functionalized with CTAB and TEOS. The functionalization of the iron oxide nanoparticles affects their surface charge and their hydrodynamic diameter. The addition of CTAB or TEOS decreased the hydrodynamic diameter of the nanoparticles due to repulsive and steric forces. The SEM micrographs show spherical nanoparticles of different sizes. The EDX analysis shows the presence of iron and oxygen from the iron oxide crystalline structure, and the different constituents of the CTAB and TEOS molecules. Proof-of-concept shows the successful adsorption of rhenium (ReO{sub 4}{sup -}) and copper Cu{sup 2+}) onto CTAB-Fe{sub 2}O{sub 3} and TEOS-Fe{sub 2}O{sub 3} respectively.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pyrolysis of municipal plastic wastes II: Influence of raw material composition under catalytic conditions

Highlights: > ZSM-5 zeolite catalytic pyrolysis transforms municipal plastic waste into liquids and gases useful as fuels or source of chemicals. > The composition of the waste sample plays an important role on the catalyst activity and the products obtained. > ZSM-5 zeolite is somehow deactivated when high proportions of fine inorganic materials are present in the sample. > When the sample contains cellulose-based materials, the formation of a two-phase liquid fraction can be avoided by a low temperature step. - Abstract: In this work, the results obtained in catalytic pyrolysis of three plastic waste streams which are the rejects of an industrial packing wastes sorting plant are presented. The samples have been pyrolysed in a 3.5 dm{sup 3} reactor under semi-batch conditions at 440 {sup o}C for 30 min in nitrogen atmosphere. Commercial ZSM-5 zeolite has been used as catalyst in liquid phase contact. In every case, high HHV gases and liquids which can be useful as fuels or source of chemicals are obtained. A solid fraction composed of the inorganic material contained in the raw materials and some char formed in the pyrolysis process is also obtained. The zeolite has shown to be very effective to produce liquids with great aromatics content and C3-C4 fraction rich gases, even though the raw material was mainly composed of polyolefins. The characteristics of the pyrolysis products as well as the effect of the catalyst vary depending on the composition of the raw material. When paper rich samples are pyrolysed, ZSM-5 zeolite increases water production and reduces CO and CO{sub 2} generation. If stepwise pyrolysis is applied to such sample, the aqueous liquid phase can be separated from the organic liquid fraction in a first low temperature step.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

25 Years Of Environmental Remediation In The General Separations Area Of The Savannah River Site: Lessons Learned About What Worked And What Did Not Work In Soil And Groundwater Cleanup

The Savannah River Site (SRS) is owned and administered by the US Department of Energy (DOE). SRS covers an area of approximately 900 square kilometers. The General Separation Area (GSA) is located roughly in the center of the SRS and includes: radioactive material chemical separations facilities, radioactive waste tank farms, a variety of radioactive seepage basins, and the radioactive waste burial grounds. Radioactive wastes were disposed in the GSA from the mid-1950s through the mid-1990s. Radioactive operations at the F Canyon began in 1954; radioactive operations at H Canyon began in 1955. Waste water disposition to the F and H Seepage Basins began soon after operations started in the canyons. The Old Radioactive Waste Burial Ground (ORWBG) began operations in 1952 to manage solid waste that could be radioactive from all the site operations, and ceased receiving waste in 1972. The Mixed Waste Management Facility (MWMF) and Low Level Radioactive Waste Disposal Facility (LLRWDF) received radioactive solid waste from 1969 until 1995. Environmental legislation enacted in the 1970s, 1980s, and 1990s led to changes in waste management and environmental cleanup practices at SRS. The US Congress passed the Clean Air Act in 1970, and the Clean Water Act in 1972; the Resource Conservation and Recovery Act (RCRA) was enacted in 1976; the Comprehensive Environmental Response Compensation, and Liability Act (CERCLA) was enacted by Congress in 1980; the Federal Facilities Compliance Act (FFCA) was signed into law in 1992. Environmental remediation at the SRS essentially began with a 1987 Settlement Agreement between the SRS and the State of South Carolina (under the South Carolina Department of Health and Environmental Control - SCDHEC), which recognized linkage between many SRS waste management facilities and RCRA. The SRS manages several of the larger groundwater remedial activities under RCRA for facilities recognized early on as environmental problems. All subsequent environmental remediation projects tend to be managed under tri-party agreement (DOE, Environmental Protection Agency, and SCDHEC) through the Federal Facilities Agreement. During 25 years of environmental remediation SRS has stabilized and capped seepage basins, and consolidated and capped waste units and burial grounds in the GSA. Groundwater activities include: pump and treat systems in the groundwater, installation of deep subsurface barrier systems to manage groundwater flow, in situ chemical treatments in the groundwater, and captured contaminated groundwater discharges at the surface for management in a forest irrigation system. Over the last 25 years concentrations of contaminants in the aquifers beneath the GSA and in surface water streams in the GSA have dropped significantly. Closure of 65 waste sites and 4 RCRA facilities has been successfully accomplished. Wastes have been successfully isolated in place beneath a variety of caps and cover systems. Environmental clean-up has progressed to the stage where most of the work involves monitoring, optimization, and maintenance of existing remedial systems. Many lessons have been learned in the process. Geotextile covers outperform low permeability clay caps, especially with respect to the amount of repairs required to upkeep the drainage layers as the caps age. Passive, enhanced natural processes to address groundwater contamination are much more cost effective than pump and treat systems. SRS operated two very large pump and treat systems at the F and H Seepage Basins to attempt to limit the release of tritium to Fourmile Branch, a tributary of the Savannah River. The systems were designed to extract contaminated acidic groundwater, remove all contamination except tritium (not possible to remove the tritium from the water), and inject the tritiated groundwater up-gradient of the source area and the plume. The concept was to increase the travel time of the injected water for radioactive decay of the tritium. The two systems were found to be non-effective and potentially mobilizing more contamination. SRS invested approximately $50 million in construction and approximately $100 million in 6 years of operation. The H Seepage Basin pump and treat system was replaced by a series of subsurface barriers that alters the groundwater velocity; the F Seepage Basin pump and treat system was replaced by subsurface barriers forming a funnel and gate augmented by chemical treatment within the gates. These replacement systems are mostly passive and cost approximately $13 million to construct, and have reduced the tritium flux to Fourmile Branch, in these plumes, by over 70%. SRS manages non-acidic tritiated groundwater releases to Fourmile Branch from the southwest plume of the MWMF with a forest irrigation system. Tritiated water is captured with a sheetpile dam below the springs that caused releases to Fourmile Branch. Water from the irrigation pond is pumped to a filter plant prior to irrigation of approximately 26 hectares of mixed forest and developing pine plantation. SRS has almost achieved a 70% reduction in tritium flux to the Branch from this plume. The system cost approximately $5 million to construct with operation cost of approximately $500K per year. In conclusion, many lessons have been learned in 25 years of relatively aggressive remedial activities in the GSA. Geotextile covers outperform low permeability clay caps, especially with respect to the amount of repairs required to upkeep the drainage layers as the caps age. Passive, enhanced natural processes to address groundwater contamination are much more cost effective than pump and treat systems. In water management situations with non-accumulative contaminants (tritium, VOCs, etc.) irrigation in a forest setting can be very effective.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Chemical Composition Analysis and Product Consistency Tests of the ORP Phase 5 Nepheline Study Glasses

In this report, the Savannah River National Laboratory (SRNL) provides chemical analyses and Product Consistency Test (PCT) results for a series of simulated high-level waste glass compositions fabricated by the Pacific Northwest National Laboratory (PNNL). These data will be used in the development of improved models for the prediction of nepheline crystallization in support of the Hanford Tank Waste Treatment and Immobilization Plant (WTP).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrating remediation and resource recovery: On the economic conditions of landfill mining

Highlights: • We compare two remediation scenarios; one with resource recovery and one without. • Economic analysis includes relevant direct costs and revenues for the landfill owner. • High degrees of metal and/or combustible contents are important economic factors. • Landfill tax and the access to a CHP can have a large impact on the result. • Combining landfill mining and remediation may decrease the project cost. - Abstract: This article analyzes the economic potential of integrating material separation and resource recovery into a landfill remediation project, and discusses the result and the largest impact factors. The analysis is done using a direct costs/revenues approach and the stochastic uncertainties are handled using Monte Carlo simulation. Two remediation scenarios are applied to a hypothetical landfill. One scenario includes only remediation, while the second scenario adds resource recovery to the remediation project. Moreover, the second scenario is divided into two cases, case A and B. In case A, the landfill tax needs to be paid for re-deposited material and the landfill holder does not own a combined heat and power plant (CHP), which leads to disposal costs in the form of gate fees. In case B, the landfill tax is waived on the re-deposited material and the landfill holder owns its own CHP. Results show that the remediation project in the first scenario costs about €23/ton. Adding resource recovery as in case A worsens the result to −€36/ton, while for case B the result improves to −€14/ton. This shows the importance of landfill tax and the access to a CHP. Other important factors for the result are the material composition in the landfill, the efficiency of the separation technology used, and the price of the saleable material.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CONVERSION OF COAL WASTES AND MUNICIPAL SOLIDS MIXTURES BY PYROLYSIS TORREFACTION AND ENTRAINED FLOW GASIFICATION

Hundreds of millions of tons of underutilized high-ash, low-energy-density bituminous and anthracite waste coal can be found in the U.S. These stockpiles contribute to water pollution from leaching that is harmful to waterways downstream of the piles. Conventional circulating fluidized combustion power plants use this coal to generate energy but emit toxic trace metals into groundwater (e.g., lead, mercury, arsenic). In addition, refuse-derived fuel (RDF) including municipal solid waste (MSW), biomass, waste plastics, and industrial waste are an enormous and untapped resource that is currently filling landfills or incinerated for low-quality energy with poor emissions. Mainstream Engineering has developed a combined pyrolysis torrefaction entrained flow gasification (PT-EFG) process that utilizes combined waste coal and RDF to create an alternative energy source, increasing energy independence and security and reducing the environmental burden from coal mines and processing facilities. Mainstream’s self-sustaining PT process converts RDF into feedstocks that can be pulverized and handled like conventional coal, enabling combined RDF-waste coal co-feeding into an EFG. The EFG operates at temperatures high enough to slag the ash completely, destroying any residual polycyclic aromatic hydrocarbons (PAHs), converting ash into nonporous vitrified slag or non-leachable ash, and generating high-hydrogen syngas for power generation or liquid fuels. During Phase II, Mainstream successfully demonstrated PT of biomass and MSW into a coal-like feedstock, which was co-gasified with waste coal in an EFG in a combined PT EFG process

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Request for Information on Establishing a New Manufacturing Institute (DE-FOA-0002564)

Deep decarbonization of major industries such as metals manufacturing requires extensive process integration and controls to manage feedstocks, side reactions, heat, water, and waste streams. The scale of the energy and capital investment requires that process integration be validated to a high level of confidence with no bias. Industries such as steel production have very thin profit margins. Therefore, lack of confidence in process integration, product quality, and economics is a major deterrence to changes in manufacturing capital investment. Public sector investment in reconfigurable pilot testbeds and a first-of-a-kind plant would be necessary to de-risk technical and financial barriers prior to industry-wide buildout. DOE should consider a National Lab-led hub for the testbeds. Lab testbeds could be utilized in campaigns and allow multiple industrial partners to evaluate and validate technologies prior to making major capital investments.

08 HYDROGEN↗

Preliminary Economics for the Production of Pyrolysis Oil from Lignin in a Cellulosic Ethanol Biorefinery

Cellulosic ethanol biorefinery economics can be potentially improved by converting by-product lignin into high valued products. Cellulosic biomass is composed mainly of cellulose, hemicellulose and lignin. In a cellulosic ethanol biorefinery, cellulose and hemicellullose are converted to ethanol via fermentation. The raw lignin portion is the partially dewatered stream that is separated from the product ethanol and contains lignin, unconverted feed and other by-products. It can be burned as fuel for the plant or can be diverted into higher-value products. One such higher-valued product is pyrolysis oil, a fuel that can be further upgraded into motor gasoline fuels. While pyrolysis of pure lignin is not a good source of pyrolysis liquids, raw lignin containing unconverted feed and by-products may have potential as a feedstock. This report considers only the production of the pyrolysis oil and does not estimate the cost of upgrading that oil into synthetic crude oil or finished gasoline and diesel. A techno-economic analysis for the production of pyrolysis oil from raw lignin was conducted. comparing two cellulosic ethanol fermentation based biorefineries. The base case is the NREL 2002 cellulosic ethanol design report case where 2000 MTPD of corn stover is fermented to ethanol (NREL 2002). In the base case, lignin is separated from the ethanol product, dewatered, and burned to produce steam and power. The alternate case considered in this report dries the lignin, and then uses fast pyrolysis to generate a bio-oil product. Steam and power are generated in this alternate case by burning some of the corn stover feed, rather than fermenting it. This reduces the annual ethanol production rate from 69 to 54 million gallons/year. Assuming a pyrolysis oil value similar to Btu-adjusted residual oil, the estimated ethanol selling price ranges from $1.40 to $1.48 (2007 $) depending upon the yield of pyrolysis oil. This is considerably above the target minimum ethanol selling price of $1.33 for the 2012 goal case process as reported in the 2007 State of Technology Model (NREL 2008). Hence, pyrolysis oil does not appear to be an economically attractive product in this scenario. Further research regarding fast pyrolysis of raw lignin from a cellulosic plant as an end product is not recommended. Other processes, such as high-pressure liquefaction or wet gasification, and higher value products, such as gasoline and diesel from fast pyrolysis oil should be considered in future studies.

02 PETROLEUM↗