Search NASA⌕ Search

SEARCH · Search NASA

Results for “conflicts”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,693 records · Page 94

From Policy to Compliance: Federal Energy Efficient Product Procurement

Federal buyers are required to purchase energy-efficient products in an effort to minimize energy use in the federal sector, save the federal government money, and spur market development of efficient products. The Federal Energy Management Program (FEMP)’s Energy Efficient Product Procurement (EEPP) Program helps federal agencies comply with the requirement to purchase energy-efficient products by providing technical assistance and guidance and setting efficiency requirements for certain product categories. Past studies have estimated the savings potential of purchasing energy-efficient products at over $500 million per year in energy costs across federal agencies.1 Despite the strong policy support for EEPP and resources available, energy-efficient product purchasing operates within complex decision-making processes and operational structures; implementation challenges exist that may hinder agencies’ ability to comply with purchasing requirements. The shift to purchasing green products, including energy-efficient products, relies on “buy in” from a variety of potential actors throughout different purchasing pathways. Challenges may be especially high for EEPP relative to other sustainable acquisition programs given that efficient products frequently have a higher first cost than non-efficient ones, which may be perceived as a conflict with fiscal responsibility, or more simply problematic for agency personnel trying to stretch limited budgets. Federal buyers may also face challenges in determining whether a given product is subject to EEPP requirements. Previous analysis on agency compliance with EEPP, conducted by the Alliance to Save Energy (ASE), shows that federal agencies are getting better at purchasing energy-efficient products. ASE conducted two reviews of relevant solicitations for product and service contracts listed on Federal Business Opportunities (FBO), the centralized website where federal agencies are required to post procurements greater than $25,000. In 2010, ASE estimated a compliance rate of 46% in 2010, up from an estimate of 12% in 2008. Our work updates and expands on ASE’s 2010 analysis to gauge agency compliance with EEPP requirements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cyber Deterrence and Stability

Throughout the 20th and early 21st centuries, deterrence and arms control have been cornerstones of strategic stability between the superpowers. However, the weaponization of the cyber realm by State actors and the multipolar nature of cyber conflict now undermines that stability. Strategic stability is the state in which nations believe that if they act aggressively to undermine U.S. national interests and the post-World War II liberal democratic order, the consequences will outweigh the benefits. The sense of lawlessness and lack of consequences in the cyber realm embolden States to be more aggressive in taking actions that undermine stability. Accordingly, this paper examines 1) the role of deterrence and arms control in securing cyber stability, and 2) the limitations and challenges associated with these traditional national security paradigms as applied to this emerging threat domain. This paper demonstrates that many 20th-century deterrence and arms control concepts are not particularly applicable in the cyber realm. However, they are not entirely irrelevant. The United States can distill lessons learned from this rich deterrence and arms control experience to develop and deploy a strategy to advance cyber stability.

97 MATHEMATICS AND COMPUTING↗

The Proliferation of Unmanned Aerial Vehicles: Terrorist Use, Capability, and Strategic Implications

There has been unparalleled proliferation and technological advancement of consumer unmanned aerial vehicles (UAVs) across the globe in the past several years. As witnessed over the course of insurgency tactics, it is difficult to restrict terrorists from using widely available technology they perceive as advantageous to their overall strategy. Through a review of the characteristics, consumer market landscape, tactics, and countertactics, as well as operational use of consumer-grade UAVs, this open-source report seeks to provide an introductory understanding of the terrorist-UAV landscape, as well as insights into present and future capabilities. The caveat is evaluating a developing technology haphazardly used by terrorists in asymmetric conflicts.

42 ENGINEERING↗

Summary Analysis: Hanford Site Composite Analysis Update

The Hanford Site’s currently maintained Composite Analysis, originally completed in 1998, requires an update. A previous update effort was undertaken by the U.S. Department of Energy (DOE) in 2001-2005, but was ended before completion to allow the Tank Closure & Waste Management Environmental Impact Statement (TC&WM EIS) (DOE/EIS-0391) to be prepared without potential for conflicting sitewide models. This EIS was issued in 2012, and the deferral was ended with guidance in memorandum “Modeling to Support Regulatory Decision Making at Hanford” (Williams, 2012) provided with the aim of ensuring subsequent modeling is consistent with the EIS.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Low Loss Graded Index Polymer Optical Fiber for Local Networking

Here, the objective of this Department of Energy SBIR program has been to develop technology for the advancement of advanced computing systems. NanoSonic worked with two subcontractors, the Polymicro Division of Molex, a U.S.-based manufacturer of specialized optical fiber and fiber components, and Virginia Tech, a research university involved through the Global Environment for Network Innovations (GENI) program in high-speed computer networking research. NanoSonic developed a patented molecular-level self-assembly process to manufacture polymer-based optical fibers in a way similar to the modified chemical vapor deposition (MCVD) approach typically used to make glass optical fibers. Although polymer fiber has a higher attenuation per unit length than glass fiber, short connectorized polymer fiber jumpers offer significant cost savings over their glass counterparts, particularly due to the potential use of low-cost plastic fiber connectors. As part of the SBIR commercialization process, NanoSonic exclusively licensed this technology to a large ($100B+ market cap) U.S.-based manufacturing conglomerate near the end of the first year of the Phase II program. With this base technology developed and licensed, NanoSonic then worked with Polymicro to address secondary program goals of using related but not conflicting production methods to enhance the performance of other specialty optical fiber products and components, and Virginia Tech continued its evaluation of developed polymer fibers in its network infrastructure system on the university campus. We also report our current understanding of the observation during the Phase I program of quantum conductance and partial quantum conductance in metal-insulator-metal (MIM) devices. Such conductance behavior may be modeled as singlemode behavior in one-dimensional electrically conducting waveguides, similar in principle to singlemode optical propagation in dielectric fiber waveguides. Although NanoSonic has not licensed any of the additional technology developed during the second year of the program, several proprietary discussions with major materials companies are underway as of the conclusion of Phase II.

36 MATERIALS SCIENCE↗

Analyses in Support of Risk-Informed Natural Gas Vehicle Maintenance Facility Codes and Standards: Phase II

Safety standards development for maintenance facilities of liquid and compressed natural gas fueled vehicles is required to ensure proper facility design and operating procedures. Standard development organizations are utilizing risk-informed concepts to develop natural gas vehicle (NGV) codes and standards so that maintenance facilities meet acceptable risk levels. The present report summarizes Phase II work for existing NGV repair facility code requirements and highlights inconsistencies that need quantitative analysis into their effectiveness. A Hazardous and Operability study was performed to identify key scenarios of interest using risk ranking. Detailed simulations and modeling were performed to estimate the location and behavior of natural gas releases based on these scenarios. Specific code conflicts were identified, and ineffective code requirements were highlighted and resolutions proposed. These include ventilation rate basis on area or volume, as well as a ceiling offset which seems ineffective at protecting against flammable gas concentrations. ACKNOWLEDGEMENTS The authors gratefully acknowledge Bill Houf (SNL -- Retired) for his assistance with the set-up and post-processing of the numerical simulations. The authors also acknowledge Doug Horne (retired) for his helpful discussions. We would also like to acknowledge the support from the Clean Cities program of DOE's Vehicle Technology Office.

03 NATURAL GAS↗

Nebraska Integrated Carbon Capture and Storage Pre-Feasibility Study

In collaboration with the Nebraska Public Power District (NPPD), the Energy & Environmental Research Center (EERC) has conducted a pre-feasibility study for a commercial-scale carbon dioxide (CO 2 ) geologic storage complex in western Nebraska integrated with potential CO 2 capture at Gerald Gentleman Station (GGS). GGS is the largest coal-fired electricity-generating station in Nebraska, emitting 8.5 million metric tons (Mt) of CO 2 annually, and is located near the town of Sutherland. This pre-feasibility (Phase 1) project has been executed as part of the U.S. Department of Energy (DOE) CarbonSAFE program, a multiphase initiative to support the deployment of large-scale carbon capture and storage (CCS) projects. Each CarbonSAFE project is required to demonstrate the potential to capture and store at least 50 million tonnes (Mt) of CO 2 over a 25-year operational period. The EERC and NPPD established a coordination team to identify challenges to a potential Nebraska CCS project, comprising local stakeholder organizations, which met twice in Lincoln and via several Webinars, providing feedback and guidance throughout the pre-feasibility study. The EERC also secured the technical support of Schlumberger Carbon Services and Computer Modelling Group Ltd. (CMG). The project comprised four technical themes, all using published information sources. Regional and stakeholder analysis, including identification of sensitive environmental areas, potential resource conflicts, and strategies for public outreach. A review of geographic and socioeconomic characteristics, in combination with geologic characterization in the subbasinal analysis described below, identified an area to the southwest and within a 75-mile radius of GGS as the most prospective for development of a storage site. This area largely avoided lands with protected status such as wetlands. A public outreach plan has also been developed for implementation in any further phases of CCS assessment in western Nebraska, for example a CarbonSAFE Phase 2 feasibility study. Scenario analysis, addressing economic and regulatory factors. GGS is the only single major source of CO 2 emissions capable of satisfying the CarbonSAFE 50-Mt scale requirement within the study region. Chemical absorption using amines was identified as the most viable technology for postcombustion CO 2 capture at GGS. The total cost of a CCS project at GGS was estimated to be between $67/tonne CO 2 for capture and auxiliary boiler to minimize parasitic load and $70/tonne CO 2 avoided cost, using the Carnegie-Mellon University Integrated Environmental Control Model (IECM). The total avoided cost included the capture facility and parasitic load, a flue gas desulfurization plant required for the use of amine solvent technology, transport via pipeline, and dedicated storage infrastructure. Nebraska has no legislation in place to address typical CCS-specific issues, for example pore space ownership for storage. Long-term liability, therefore, falls under the U.S. Environmental Protection Agency Underground Injection Control (UIC) Class 6 program regulations. Subbasinal analysis, addressing the potential for a dedicated subsurface “container” to store the required 50-Mt quantity of CO 2 . Modeling and simulation studies identified an area to the southwest of GGS with the potential for storage of 50 Mt CO 2 in the Cloverly Formation, comprising sandstones with interbedded and intermingled shales. The area of review (AOR) that would be required for monitoring under a Class VI operating permit was estimated to be as high as 400–700 square miles, due to uncertain pressure effects. The viability of this storage option is subject to significant uncertainty due to the relatively limited amount of existing characterization data available to the pre-feasibility study; for example, dynamic simulation indicated that the proposed storage rate might require as little as two or as many as 14 injection wells. A key uncertainty is the relative proportion and distribution of sandstone and shale within the Cloverly Formation. A preliminary, semiquantitative risk assessment also suggested uncertainty over storage capacity and injectivity constitute the most significant project risks at this pre-feasibility stage. No assessed risks were considered to rule out the possibility of a project moving to deployment. National Risk Assessment Partnership (NRAP) validation, using software tools developed by the National Energy Technology Laboratory (NETL) to assess risks associated with the potential 50-Mt CO 2 storage complex. NRAP tools were used to assess hypothetical leakage scenarios. Results broadly supported the conclusion of the semiquantitative risk analysis – for example, even worst-case analysis of theoretical leakage scenarios found limited migration rates and impacts. In summary, the work undertaken in this Phase 1 pre-feasibility study has shown that western Nebraska has potential to host a commercial-scale CCS project, including a dedicated storage “container” for 50 Mt of CO 2 . However, the following key challenges would need to be overcome: The business case for deploying CCS projects is uncertain; recently announced federal tax credits and sales of CO 2 for enhanced oil recovery may not cover the full costs of a CCS project at GGS, as estimated by this pre-feasibility study. The potential 50-Mt CO 2 dedicated storage container defined in this pre-feasibility study should be regarded as having a relatively low level of readiness to support a CCS project. Public outreach would be a vital element in western Nebraska, where sensitivities around such environmental issues as water resource protection and pipeline construction would need to be carefully addressed.

54 ENVIRONMENTAL SCIENCES↗

Standoff Over the LRSO: Assessing the long-range stand-off missile's impact on strategic stability.

Mutual vulnerability to strategic forces seems to remain the de facto foundation for strategic stability across the U.S.-Russia and U.S.-China dyadic relationships; This work has suggested the bomber force tasked with delivering the LRSO is characterized by relatively long flight times and rich signature sets which make its use inconsistent with the requirements for a disarming first-strike. Therefore, the LRSO would not be expected to disrupt mutual vulnerability by making a disarming strike more possible or attractive; Even if a stealthy air-launched cruise missile is paired with a stealth bomber aircraft, the signatures associated with bomber generation and aerial refueling from non-stealth tanker aircraft make it unlikely the LRSO could be launched against a peer or near-peer nation-state without advance warning; To the extent a nuclear armed air-launched cruise missile deters would-be U.S. adversaries from nuclear use, maintaining a survivable weapon system is crucial for maintaining that stable deterrent effect. A modern stand-off weapon and stealth delivery platform increase the probability this capability will be maintained in the future against other nations' increasingly capable A2/AD systems; The LRSO has been touted as a flexible option to deter, or conduct should deterrence fail, limited nuclear strikes pursuant to Russia's reported "escalate-to-deescalate" doctrine. The concept of limited nuclear use is still intensely debated, and there is no guarantee that escalation could be controlled even with tailored LRSO employment; The challenge of warhead discrimination has not historically led to a nuclear response to a cruise missile launch, but there is no guarantee that cannot change. Having accurate military intelligence coupled with discerning analysis of the context in which cruise missiles are employed (e.g., how escalated is the conflict, how many missiles have been launched, have there been signatures of strategic force mobilization, or has the nuclear threshold been crossed?) will likely be essential for reducing the danger of misperception. Developing norms and/or communication channels in the aforementioned dyadic relationships may also further these ends. In sum, this work has identified and analyzed many of the major arguments in the debate regarding the LRSO's impact on strategic stability. During this study and survey of other nation's conceptions of strategic stability, it became clear that the LRSO is neither inherently stabilizing or destabilizing; rather, it is one instrument in addition to unambiguous U.S. policy, clear messaging, and signaling of intent that may promote stability by reducing the risk of miscalculation and unintended escalation.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

A Strawman for an HPC PowerStack

The landscape of High-Performance Computing (HPC) is changing as we enter the exascale era and power and energy management are key design points for any next generation of supercomputers. Efficiently utilizing procured power and optimizing performance of scientific applications under power and energy constraints is challenging due to several reasons including dynamic phase behavior, processor manufacturing variability and increasing heterogeneity of node-level components. Extending the scope from the node- and application-level up to the system-level introduces further challenges on top of power-unaware job scheduling, which is known to be NP-hard on its own. While there exists several individual efforts across the community to research automatic techniques for managing power and energy better, the majority of these techniques have been specialized to meet the needs of a specific HPC center or specific optimization goals and provide little support to connect them to each other. Some projects, most notably the PowerAPI efforts [1], discuss interfaces that form a good starting point for full stack integration, but these interfaces still need to be hooked up to the wide range of software components offered by academic partners, developers or vendors. Furthermore, a recent survey conducted by the EE HPC WG concluded that the majority of such techniques have lacked the application-awareness required to achieve the best system performance and throughput. Other observations were that each technique tended to target management of power and energy for a different subset of the site or system hardware and that the different techniques tended to perform management at different (and often conflicting) granularities. Unfortunately, the existing techniques have not been designed to coexist simultaneously on one site and cooperate on management in an integrated manner [2]. The lack of application-awareness, lack of coordinated management across different granularities, and the lack of widely accepted interfaces and consequent limited connectivity between modules, can result in substantially underutilized Watts and FLOPS. To address these gaps, the HPC community needs a holistic stack for power and energy management and none currently exists. In our view, a holistic stack is one that is extensible enough to support the present and anticipated future needs of various different HPC centers, one that achieves best system performance and throughput through application-awareness, one that is designed to coordinate management at different granularities, and one that enables the seamless integration of software components from different developers and vendors. In this seminar, our goal is bring together experts from academia, research laboratories, and industry in order to take stock of existing approaches, design points and power management concepts and requirements at the various participant’s institutions, and to design concepts for a holistic power and energy management stack, which we refer to as the HPC PowerStack. Further, we hope to take steps toward defining the interfaces necessary for providing a complete prototype shared among many groups. The intention is to align development and research efforts across the community so that we may share development resources, avoid duplicating effort, agree on common interfaces and reap the rewards together as a community. The intended final outcome of this collaboration will be a holistic, flexible and extensible concept of a software stack ecosystem that allows us to combine product-grade open-source software components to enable runtime optimization of system power, energy, and performance.

97 MATHEMATICS AND COMPUTING↗

Decision Trees for Analysis of Strategies to Deter Limited Nuclear Use in a Generic Scenario

We assert that analysis of a decision tree model can reveal key insights for deterring limited nuclear use in a conventional conflict. To illustrate the method, we develop a decision analysis model to explore the choices an attacker would make and how they can be influenced by his perceptions of the defender’s capabilities and potential responses. Sensitivity analysis with the model can provide insights into strategies and actions the defender might take in order to influence the choices the attacker would make. This methodology is widely applicable and could provide insight into a variety of scenarios.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Examining Efficacy of Strategic Stability in South Asia: An Analysis

This paper highlights how, in the backdrop of prevalent tensions between India and Pakistan, deterrence stability is endangered even when overall strategic stability prevails. Unresolved legacy issues including an outstanding boundary dispute, conflict over Kashmir, and terrorism mar India-Pakistan relations. Variables undermining the prospects for long term peace, among others, include growing mutual mistrust, the proxy war that India believes is state perpetrated, increasing conventional asymmetry, rapid advancement in weapon technologies, growing size of nuclear arsenals, doctrinal mismatch and above all, bilateral gridlock in confidence building measures and arms control measures.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

High Performance Computing - Power Application Programming Interface Specification

Achieving practical exascale supercomputing will require massive increases in energy efficiency. The bulk of this improvement will likely be derived from hardware advances such as improved semiconductor device technologies and tighter integration, hopefully resulting in more energy efficient computer architectures. Still, software will have an important role to play. With every generation of new hardware, more power measurement and control capabilities are exposed. Many of these features require software involvement to maximize feature benefits. This trend will allow algorithm designers to add power and energy efficiency to their optimization criteria. Similarly, at the system level, opportunities now exist for energy-aware scheduling to meet external utility constraints such as time of day cost charging and power ramp rate limitations. Finally, future architectures might not be able to operate all components at full capability for a range of reasons including temperature considerations or power delivery limitations. Software will need to make appropriate choices about how to allocate the available power budget given many, sometimes conflicting considerations.

97 MATHEMATICS AND COMPUTING↗

Sampling for Confidence: Guidance for Evaluating the Quality of Canister Sampling Plans

There is a need for an inspection frequency that demonstrates reasonable assurance that the confinement function of dual-purpose-canisters (DPCs) is maintained as these DPCs are returned to storage service following transportation. The DPCs contain spent fuel from shutdown reactor sites. The currently-proposed 100% DPC inspection frequency is overly conservative and unnecessary to demonstrate reasonable assurance that the confinement function of all DPCs is maintained for return to storage service. Testing all DPCs does not appropriately reflect the very low risk of leakage (i.e., low probability based on design and low consequences based on analysis). Currently, there are 1066 DPCs forecast to be loaded at reactor sites which either are shutdown or plan to cease operations by 2025. These DPCs may be transported by rail in sets of 3 to 5 DPCs per shipment. Assuming each rail consist originates at a single reactor site, an alternative proposal to test one canister/consist/site would result in 356 to 214 canisters, respectively, being tested given the population of 1,066 canisters This Savannah River National Laboratory (SRNL) report outlines statistically-based, random sampling plans that provide guidance on the number of samples of these canisters that are needed to establish bounds on the quality of the outcome of such sampling. The quality of each proposed sampling plan is expressed in the form of a statement that the number of undetected, unacceptable canisters in the population is less than some number, call it D, at a high level of confidence. In addition, evaluations using a similar approach for random sampling at the proposed levels of 214 and 356 canisters are provided. This is a technical report that does not take into account the contractual limitations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). Under the provisions of the Standard Contract, DOE does not consider spent nuclear fuel in multi-assembly canisters to be an acceptable waste form, absent a mutually agreed upon contract amendment. To the extent discussions or recommendations in this report conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated Energy-Water Planning in the Western and Texas Interconnections

While long-term regional electricity transmission planning has traditionally focused on cost, infrastructure utilization, environmental impact, and reliability, the availability of water is an emerging issue. Toward this growing need, thermoelectric expansion should consider competing demands from other water use sectors balanced with fresh and non-traditional water supplies subject to climate variability. To address this need the Department of Energy's Office of Electricity Delivery and Energy Reliability supported an integrated planning project with funding through the American Reinvestment and Recovery Act (2009). Specifically, an integrated energy-water analysis was performed to support transmission system planners in the Western and Texas Interconnections to explore the potential implications of water availability and cost for long-term transmission planning. The project brought together electric transmission planners (e.g., Western Electricity Coordinating Council (WECC) and the Electric Reliability Council of Texas (ERCOT)) with western water planners (e.g., Western Governors' Association and the Western States Water Council). Efforts were organized into ten specific tasks: (1) project coordination and outreach; (2) thermoelectric water use; (3) non-thermoelectric water use; (4) water availability; (5) water cost; (6) environmental risk; (7) climate variability; (8) energy for water; (9) decision support system interface; and, (10) transmission planning support. Major accomplishments associated with this effort include: For the first time water availability was used to inform generation expansion planning by WECC and ERCOT. For the first time, projections of intensifying drought and its effect on reservoir levels, and thermal effluent discharge permitting were used to inform operational and expansion planning by ERCOT. Water withdrawal and consumption were characterized for each power plant in the WECC and ERCOT service areas/regions. Water use factors were also developed for a range of unit processes that allowed projection of future water demands related to electric generation expansion planning. Working with state water managers current and future water use (withdrawal and consumption) were projected throughout the Western United States at an 8-digit Hydraulic Unit Code (HUC-8) level (over 1200 watersheds). In a similar fashion water availability and cost were mapped across the Western United States. Considered were five different sources of water: unappropriated surface water, unappropriated groundwater, appropriated water, municipal wastewater and brackish groundwater. Water basins (at the HUC-8 level) were mapped across the Western United States with regard to their potential for conflicts between aquatic and riparian species and habitats listed under the Endangered Species Act and water availability for future energy development. Water planners were engaged through the Western States Water Council and thus reflects their membership of the 17 contiguous western states (i.e., Texas up through the Dakotas and West). Power plants at greatest risk to the impacts of drought were identified. The analysis considered the hazards of low flows, insufficient reservoir storage, and elevated water temperatures under intensifying drought conditions projected for the future. The electricity used to provide water-related services was mapped at a county level throughout the Western U.S. Considered was the electricity required for interbasin conveyance, agricultural pumping, drinking water and wastewater services. To communicate our results the project has produced 6 journal articles, 1 book chapter, 11 reports, and 47 presentations at related conferences.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Spent Nuclear Fuel and High-Level Radioactive Waste Inventory Report

This report provides information on the inventory of commercial spent fuel (SNF) and high-level radioactive waste (HLW) in the United States, as well as non-commercial SNF and HLW in the U.S. Department of Energy (DOE) complex. Actual or estimated quantitative values for current inventories are provided along with inventory forecasts derived from examining different future commercial nuclear power generation scenarios. The report also includes select information on the characteristics associated with the wastes examined (e.g., type, packaging, heat generation rate, decay curves). This report was produced for the U.S. Department of Energy (DOE) to support various analyses on options for storage and transport of SNF and HLW and sponsored by DOE’s Office of Spent Fuel and Waste Disposition (SFWD). The report draws from and complements a previously issued report, Fuel Cycle Potential Waste Inventory for Disposition, developed for DOE’s Used Nuclear Fuel Research & Development Campaign. The current report is not intended as a revision to either Fuel Cycle Potential Waste Inventory for Disposition or Evaluation of Options for Permanent Geologic Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste in Support of a Comprehensive National Nuclear Fuel Cycle Strategy from which some underlying data is used as referenced in the current report. Rather, this report is intended as a stand-alone report providing estimates of current and projected SNF and HLW inventory and has been generated for SFWD planning purposes. This is a technical report that does not take into account contractual limitations or obligations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). For example, under the provisions of the Standard Contract, spent nuclear fuel in multi-assembly canisters is not an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this report conflict with the provisions of the Standard Contract, the Standard Contract governs the obligations of the parties, and this report in no manner supersedes, overrides, or amends the Standard Contract. This report reflects technical work which could support future decision making by DOE. No inferences should be drawn from this report regarding future actions by DOE, which are limited both by the terms of the Standard Contract and a lack of Congressional appropriations for the Department to fulfill its obligations under the Nuclear Waste Policy Act including licensing and construction of a spent nuclear fuel repository.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Drone Strikes: An Overview, Articulation and Assessment of the United States' Position Under International Law

The United States unmanned aerial vehicle (UAV or drone) program has origins dating back to the early part of the twentieth century. From crude target tug vessels to sophisticated Hellfire missile delivery vehicles, United States drones have undergone a gradual metamorphosis from their early days as an obscure technology to their present status as a center piece in global counterterrorism operations. Since the attacks of September 11, 2001 and the onset of the war on terror, weaponized drones have effectuated thousands of strikes in numerous countries spanning multiple continents in the course of a claimed non-international armed conflict with “al-Qaida, the Taliban and their associated forces.” A plethora of scholarship has evaluated aspects of the legal underpinnings of the nearly two decade-long campaign and its utilization of weaponized drones. This article builds upon that analytic foundation to date in articulating and assessing the present United States legal position vis-à-vis its lethal drone strike operations under relevant principles of international law. It identifies numerous instances in which the United States position departs to varying degree from general international understanding and concludes that, in the aggregate, these deviations are sufficient to pose serious international rule of law concerns. It then goes further to briefly consider possible alternatives for mitigating these concerns, but notes their challenges given prevailing political circumstances. The article is organized in four parts. Part I provides a condensed history of the development of drone capabilities in the United States and their use under the administrations of Clinton, Bush, Obama and Trump. Part II surveys principles of international law relevant to the analysis of United States drone strike operations abroad. Part III draws on key government documents to articulate the United States legal position, including its jus ad bellum justifications and stance on international humanitarian and international human rights law principles, and offers a legal assessment. Part IV briefly considers and evaluates possible alternatives to the present position.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Additively Manufactured Photovoltaic Inverter (AMPVI)

Successful integration of hundreds of gigawatts of solar photovoltaics (PV) into the electric power system requires transformative power conversion system design that optimizes various trade-offs among conflicting objectives, such as performance, reliability, functionality, and cost. To address this need, National Renewable Energy Laboratory, Oak Ridge National Laboratory, and Purdue University teamed up to develop a unique PV inverter design. The Additively Manufactured Photovoltaic Inverter (AMPVI) combines newer wide bandgap high-voltage silicon carbide (SiC) semiconductor devices with revolutionary concepts such as additive manufacturing and multi-objective magnetic design optimization. The AMPVI will not only provide superior technical capabilities in terms of energy conversion but also mitigate market barriers for SiC-based PV inverters. The benefits for this design will include better utilization of PV power due to higher DC voltage, lower operations and maintenance costs, better system efficiency, longer system lifetime, and advanced grid support functionalities for easier grid integration. All these advantages will lead to a significant reduction of the levelized cost of energy for PV systems. Activities in Budget Period 1 (BP1) of this 3-year integrated project were focused on development and component-level validation of the foundational building blocks needed for the AMPVI. Multiple interrelated tasks were completed in parallel during work towards the initial development of the high-voltage SiC-based power block, gate driver, controller board, and control algorithms. Initial development of magnetic design tools and initial inverter thermal and mechanical design was also completed in this period. All these activities ensured that the initial prototype (called “alpha-prototype”) power block and controller would be ready after BP1 for integration into the first inverter prototype (i.e., the alpha-prototype inverter) in BP2.

14 SOLAR ENERGY↗

Of Clouds and Craters: The History of U.S. Nuclear Weapons Testing

“Now!” With that word, the Atomic Age – and the era of nuclear weapons testing – dawned. The advent of World War II’s first irresistible weapon, which had been secretly tested in the New Mexico desert in July 1945, would help hasten the inevitable: complete victory for the Allies. Codenamed Trinity, the test was the first of over a thousand conducted by the United States between 1945 and 1992. Nuclear weapons would change future clashes as well. The looming Cold War, with roots stretching all the way back to 1917, was history’s first conflict between two, major nations armed with nuclear weapons. It is clear the existence of those weapons played an important role in maintaining a tenuous peace between the United States and the Soviet Union; it is also clear nuclear weapons testing played a prominent role in fueling both the arms race and the success of deterrence. Yet, the history of nuclear weapons testing is rarely remembered, even though nuclear tests have been performed in the very recent past. Of the estimated 2,000-plus nuclear tests ever performed, the U.S. is responsible for approximately half. This is the story of U.S. full-scale nuclear weapons testing.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗