Search NASA⌕ Search

SEARCH · Search NASA

Results for “operating systems security”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,693 records · Page 94

Capturing Dynamics in the Power Grid: Formulation of Dynamic State Estimation through Data Assimilation

With the increasing complexity resulting from uncertainties and stochastic variations introduced by intermittent renewable energy sources, responsive loads, mobile consumption of plug-in vehicles, and new market designs, more and more dynamic behaviors are observed in everyday power system operation. To operate a power system efficiently and reliably, it is critical to adopt a dynamic paradigm so that effective control actions can be taken in time. The dynamic paradigm needs to include three fundamental components: dynamic state estimation; look-ahead dynamic simulation; and dynamic contingency analysis (Figure 1). These three components answer three basic questions: where the system is; where the system is going; and how secure the system is against accidents. The dynamic state estimation provides a solid cornerstone to support the other 2 components and is the focus of this study.

97 MATHEMATICS AND COMPUTING↗

Acoustic Channel Link Models for Digital Communication Protocols

Integration of advanced communication technologies into nuclear facility operation has the potential for enhancing safety and accident -resiliency of the existing fleet of aging light water reactors, as well those of future advanced reactors. Conventional wired and wireless communication systems face implementation challenges at nuclear facilities due to the presence of thick reinforced concrete walls with steel liners throughout much of nuclear facility, especially the containment building. In addition, concerns related to security gaps in conventional communication networks have to be addressed when developing communication systems for nuclear facilities. To address communication technology gaps for nuclear energy, we are currently developing the acoustic communication (AC) hardware and network protocols for efficient and secure transfer of data, and will provide a preliminary experimental demonstration of the AC system prototype in a representative environment.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

MSGP Stormwater Pollution Prevention Plan for: TA-60-01 Heavy Equipment Shop, Triad National Security, LLC (Triad), Los Alamos National Laboratory, January 2019, Revision 0

This Stormwater Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the United States Environmental Protection Agency (EPA) National Pollutant Discharge Elimination System (NPDES) Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity (MSGP) (U.S. EPA, June 2015) issued by EPA, and using the industry specific permit requirements for Sector P – Land Transportation & Warehousing as a guide. The applicable stormwater discharge permit is EPA General Permit Tracing Number NMR050013 [Triad National Security, LLC (Triad)]. This SWPPP applies to discharges of stormwater from the operational areas of the TA-60-01 Heavy Equipment Shop at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Triad. Throughout this document, the term “facility” refers to the TA-60-01 Heavy Equipment Shop (HES). The current MSGP expires at midnight on June 4, 2020.

54 ENVIRONMENTAL SCIENCES↗

Agent-Based Coordination Scheme for PV Integration (ABC4PV)

Renewables and especially photovoltaics (PV) have benefitted significantly from a host of incentives and policies targeted toward enhanced integration and adoption of specific energy technologies. However, with the push to move forward into a subsidy-free market framework, behind-the-meter residential PV applications have generally struggled to retain their value (unlike utility scale and commercial projects) [1]. This project focused on developing control-theoretic solutions aimed at improving the integration and interaction of behind-the-meter residential PV with other distribution system assets (controllable and non-controllable) to enhance the integrated value of residential PV. To this end, a suite of decentralized control methodologies have been developed to enable effective coordination and control of behind-the-meter residential load customers’ PV, battery storage systems (BSS), controllable loads and other similar assets within a distribution feeder. This interaction aims at procuring energy savings and, thus, energy bill savings. The main source of savings is drawn from reducing the effect of demand charge pricing and is realized at the feeder level, assuming community level interaction and management among the aforementioned assets. Optimal control of the assets is implemented with a distributed optimization methodology, leveraging consensus-based algorithms. The results gathered from the optimal control simulations demonstrates that the savings can be duly achieved and the algorithm decision times (to dynamically control asset set points, for example) are fast. As for the overall efficiency of PV+BSS systems, to procure energy savings from curtailment of the demand charge pricing effects, the optimal control is set up so as to minimize the variance of the load for all customers, throughout a feeder and throughout time in a rolling horizon scheduling with model predictive control. The control takes into account inter-temporal electrochemical storage (battery) degradation costs: specifically, we have developed a long-term lifetime model for the BSS that weighs in the effect of the degradation factor in the dispatch formulations, thus, a considerable operating cost that affects energy decision making. The levelized cost of energy (LCOE – redefined for the purpose of quantifying asset integration effectiveness through the customers’ energy cost) is shown to be below the threshold set for the combined PV+BSS topology of $ 0.14/kWh for multiple cases of PV penetration all the way up to 50%, provided that a policy of shared ownership of and savings is in place. Further, the LCOE calculated for the case before the deployment PV+BSS systems is also achievable, i.e. the deployment of PV+BSS, if planned and scheduled optimally. will have no effect on customers’ energy costs. From the control methodology viewpoint, the developed consensus-based algorithms are shown to converge for a wide range of problem cases (spanning normal operating scenarios and contingencies), guaranteeing dispatch solutions under forecasting errors, communication break-downs and cyber-security attacks. The proposed control solutions are scalable and real-time implementable, with dispatch computations and device set-point updates converging in less than 2s in most practical instances of the above events.

14 SOLAR ENERGY↗

Corrective Action Management Unit Report of Post-Closure Care Activities. Calendar Year 2020

he Corrective Action Management Unit (CAMU) at Sandia National Laboratories, New Mexico (SNL/NM) consists of a containment cell and ancillary systems that underwent closure in 2003 in accordance with the Closure Plan in Appendix D of the Class 3 Permit Modification (SNL/NM September 1997). The containment cell was closed with wastes in place. On January 27, 2015, the New Mexico Environment Department issued the Hazardous Waste Facility Operating Permit (Permit) for Sandia National Laboratories (NMED January 2015) to the U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA) and its Management and Operating (M&O) contractor. The current M&O contractor is National Technology & Engineering Solutions of Sandia, LLC (NTESS). The Permit became effective February 26, 2015. The CAMU is undergoing post-closure care in accordance with the Permit, as revised and updated. This CAMU Report of Post-Closure Care Activities documents all activities and results for calendar year (CY) 2020, as required by the Permit.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Smart Packaging for Critical Energy Shipment (SPaCES)

Recent technical advances have brought forth revolutionary Smart Packaging (SP) technology. SP incorporates multiple electronics, chemical, and mechanical sensing technologies into packaging materials, and utilizes them to monitor and display package content status. SP can also employ embedded micro actuators to react to undesirable package conditions such as moisture/temperature anomalies or harmful chemical reactions and neutralize it. When further integrated with wireless sensing and secure networking, SP provides wholistic system-wide remote situation awareness capability for real-time crisis management. Finally, we also see that SP can be further integrated with 3D printing technology to offer form-factor customization and application specific solutions suitable for DOE (Department of Energy) NNSA’s (National Nuclear Security Administration) R/N (radiological/nuclear) material shipment and management needs; this has the potential to improve safety, security, and overall operation process quality. This report surveys SP technology as the state of the art (SOTA) and analyzes how it can integrate with cybersecurity and 3D printing to address NNSA’s critical R/N material shipment and storage requirements. This report further presents our FY23/24 investigation plan describing project background, goal, motivation, proposed work, and statement of work and cost.

47 OTHER INSTRUMENTATION↗

MSD CoP Webinar: Applied Science for Decision-Making at the Water-Energy Nexus

Context: This webinar was hosted by the MultiSector Dynamics Community of Practice (MSD CoP; https://multisectordynamics.org). Abstract: The energy transition is a game-changer across multiple sectors, requiring researchers and practitioners to re-evaluate the evolving connections between climate, water, and power systems, as well as the associated co-management of resources and decision-making. In anticipation of new technologies, policies, business models, and other solutions, applied science for decision-making at the climate-water-energy nexus is needed to support transitions with the expected climate resilience, maintained and enhanced energy security, thriving economies, and equity considerations. Through panelists' applied research and operational experience, the webinar will provide lesson-learnt in how to increase the readiness of water-energy research and become actionable in the context of energy transitions. A number of themes will be discussed, including the connection between growing computational resources and complexity of models, and the implications on the intended users, the actual actionable products, the availability of data for validation of the models, uncertainty characterization and decision-making under uncertainty, and the communication of the novelty to decision-makers and the public. Presenters : David McCollum (Oak Ridge National Laboratory; Co-Chair), and Gokul Iyer (Pacific Northwest National Laboratory; Co-Chair), Curt Jawdy (Tennessee Valley Authority), Nathalie Voisin (Pacific Northwest National Laboratory), and Andrew D. Jones (Lawrence Berkeley National Laboratory) Moderator: Pat M. Reed (MSD CoP Facilitation Team) This webinar was held on: April 30, 2024 from 1-2 PM ET

Energy↗

The evolution of a release-engage mechanism for use on the orbiter

The Release-Engage Mechanism (REM) is designed to secure a deployable payload in the orbiter during launch and to enable the payload to be released, deployed, and reattached for re-entry. This paper presents the following: (1) the initial design concepts of the Release-Engage Mechanism; (2) the problems encountered during assembly, (3) the abnormalities that occurred during vibration testing, (4) the incompatibility of the Remote Manipulator System and REM operation, and (5) the resulting modifications to the REM that assured its successful performance on two Shuttle flights.

Calvert, J.↗

UTM UAS Service Supplier Specification

Within the Unmanned Aircraft Systems (UAS) Traffic Management (UTM) system, the UAS Service Supplier (USS) is a key component. The USS serves several functions. At a high level, those include the following: Bridging communication between UAS Operators and Flight Information Management System (FIMS) Supporting planning of UAS operations Assisting strategic deconfliction of the UTM airspace Providing information support to UAS Operators during operations Helping UAS Operators meet their formal requirements This document provides the minimum set of requirements for a USS. In order to be recognized as a USS within UTM, successful demonstration of satisfying the requirements described herein will be a prerequisite. To ensure various desired qualities (security, fairness, availability, efficiency, maintainability, etc.), this specification relies on references to existing public specifications whenever possible.

UTM↗

UAS Service Supplier Specification

Within the Unmanned Aircraft Systems (UAS) Traffic Management (UTM) system, the UAS Service Supplier (USS) is a key component. The USS serves several functions. At a high level, those include the following: Bridging communication between UAS Operators and Flight Information Management System (FIMS) Supporting planning of UAS operations Assisting strategic deconfliction of the UTM airspace Providing information support to UAS Operators during operations Helping UAS Operators meet their formal requirements This document provides the minimum set of requirements for a USS. In order to be recognized as a USS within UTM, successful demonstration of satisfying the requirements described herein will be a prerequisite. To ensure various desired qualities (security, fairness, availability, efficiency, maintainability, etc.), this specification relies on references to existing public specifications whenever possible.

Rios, Joseph L.↗

Concurrent Uranium Overmass and Hydraulic Fluid Leak

In the Spring of 2017, the Y-12 National Security Complex had a NCS operational event involving hydraulic fluid leaking into a glovebox containing fissile material. The hydraulic fluid intermixed with fissile material in the glovebox but remained in a safe slab-like configuration. Unknown at the time, a large enough mass of uranium to support a moderated nuclear criticality accident resided below the glovebox floor in an unfavorable volume sand separator system. Thanks to the operator following procedures and shutting down the hydraulic pump supplying the jolter, a potential accident was adverted. As a result of the event, significant physical modifications were made to the process to enhance safety. Additionally, changes were made in how the materials in the glovebox are processed in order to prevent liquid intrusion and significant uranium accumulation in the sand separator system.

42 ENGINEERING↗

Qualification of Y-12 Legacy Criticality Accident Alarm System Detectors

The Y-12 National Security Complex has had a criticality accident alarm system (CAAS) capable to detect a criticality accident since 1945. With the exception of Y-12’s new High-enriched Uranium Materials Storage facility (HEUMF), the system installed in Y-12’s existing facilities dates to 1957. This legacy system has received many upgrades since installation and detector stations have been removed and relocated as enriched uranium operations have evolved, but the basic design and electronic configuration of the system is the same as that in 1957.

61 RADIATION PROTECTION AND DOSIMETRY↗

Regulating Operational Safety at a Future Geological Disposal Facility in the UK - 18038

The United Kingdom (UK) has generated commercial nuclear energy for over 60 years; generating a significant and varied inventory of higher activity radioactive waste (HAW). In accordance with international practice, UK Government policy for long-term management of HAW is disposal in a geological disposal facility (GDF). The nuclear materials comprising HAW include high level waste, intermediate level waste and some low level waste, not suitable for disposal to the Low Level Waste Repository. In addition, other nuclear materials may be reclassified as waste in the future and will require to be managed as HAW for disposal to a GDF; these include spent fuel, uranium and plutonium. The operator of a GDF will be required to obtain a nuclear site licence from the Office for Nuclear Regulation (ONR), as the nuclear safety and security regulator, in order to construct and operate the facility. In the period prior to submission of a licence application, ONR is working to develop its regulatory expectations and provide advice on its regulatory role with regards to a future GDF. ONR has developed regulatory guidance on operational safety, benchmarked against the relevant IAEA Safety Standards and the Western European Nuclear Regulators Association (WENRA) Safety Reference Levels for Disposal. This guidance draws upon ONR's current expectations for nuclear sites; including operational reactors, fuel manufacture and reprocessing facilities, and reactors undergoing decommissioning; and incorporates relevant good practice drawn from international programmes for geological disposal and related industries (eg mining). In addition to the technical assessment guidance, ONR has developed guidance on the licensing process specific to a GDF; providing clarity for example on when a licence will be required. A review of the standard licence conditions applied to all nuclear sites concluded no significant amendment would be required for application to a GDF. Through its voluntary agreement with Radioactive Waste Management Limited (RWM), the developer and future operator of a GDF in the UK, ONR exerts regulatory influence on the design and organisational development of the future licensee. As part of this scrutiny, ONR has assessed RWM's generic Disposal System Safety Case. Subjecting the generic design and safety case to regulatory review provides opportunity for early engagement to ensure the appropriate standards will be achieved. ONR will only grant the necessary regulatory permissions if RWM adequately demonstrates the GDF will be constructed, operated and closed safely. Future challenges faced by ONR with respect to a GDF include building and maintaining regulatory competence and confidence, and engaging effectively with the public as the UK begins its search for a suitable site to provide appropriate assurance that a GDF will be operated safely and securely. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Lake Charles CCS Project

The Lake Charles CCS Project is a large-scale industrial carbon capture and sequestration (CCS) project which will demonstrate advanced technologies that capture and sequester carbon dioxide (CO{sub 2}) emissions from industrial sources into underground formations. Specifically the Lake Charles CCS Project will accelerate commercialization of large-scale CO{sub 2} storage from industrial sources by leveraging synergy between a proposed petroleum coke to chemicals plant (the LCC Gasification Project) and the largest integrated anthropogenic CO{sub 2} capture, transport, and monitored sequestration program in the U.S. Gulf Coast Region. The Lake Charles CCS Project will promote the expansion of EOR in Texas and Louisiana and supply greater energy security by expanding domestic energy supplies. The capture, compression, pipeline, injection, and monitoring infrastructure will continue to sequester CO{sub 2} for many years after the completion of the term of the DOE agreement. The objectives of this project are expected to be fulfilled by working through two distinct phases. The overall objective of Phase 1 was to develop a fully definitive project basis for a competitive Renewal Application process to proceed into Phase 2 - Design, Construction and Operations. Phase 1 includes the studies attached hereto that will establish: the engineering design basis for the capture, compression and transportation of CO{sub 2} from the LCC Gasification Project, and the criteria and specifications for a monitoring, verification and accounting (MVA) plan at the Hastings oil field in Texas. The overall objective of Phase 2, provided a successful competitive down-selection, is to execute design, construction and operations of three capital projects: (1) the CO{sub 2} capture and compression equipment, (2) a Connector Pipeline from the LLC Gasification Project to the Green Pipeline owned by Denbury and an affiliate of Denbury, and (3) a comprehensive MVA system at the Hastings oil field.

01 COAL, LIGNITE, AND PEAT↗

Universal Utility Data Exchange (UUDEX) – Security and Administration: Cybersecurity of Energy Delivery Systems (CEDS) Research and Development

A critical component of the Universal Utility Data Exchange (UUDEX) approach is the integrated security contained within its processing. This document describes how that security is designed and expected to be implemented by UUDEX Implementations (U-Implementations), including the UUDEX Server (U-Server) and UUDEX Clients (U-Clients). The UUDEX security hierarchy consists of three levels: 1. The UUDEX Instance (U-Instance) itself, which sits at the top of the hierarchy and contains the U-Server, the UUDEX Identity Authority (U-Identity Authority), and the UUDEX Administrator (U-Administrator) functions; 2. A group of one or more UUDEX Participants (U-Participants) that present “organizations” that participate in the U-Instance and contains the UUDEX Administrator Participant (U-U-Administrator Participant) function; 3. A group of one or more UUDEX Endpoints (U-Endpoints) that represent the individual UUDEX Publish Clients (U-Publish Client) responsible for supplying data to the U-Instance that is consumed by UUDEX Subscriber Clients (U-Subscriber Clients). U-Endpoints can be either autonomous devices that publish and subscribe data such as data exchange servers found in supervisory control and data acquisition and energy management systems, or they can be tied to users of applications that, for example, submit DOE OE-417 disturbance reports. U-Participants and U-Endpoints can be organized into UUDEX Groups (U-Groups). Any number of U-Participants or U-Endpoints can be members of a U-Group. A given U-Participant or U-Endpoint can be a member of multiple U-Groups, but a U-Group cannot contain other U-Groups. For example, a U-Group could be created to contain all U-Participant Transmission Operators within the purview of a Reliability Coordinator, and another U-Group could be created to contain all U-Participant Generator Operators within the purview of a Reliability Coordinator. U-Participants that are both Transmission Operators and Generator Operators would be members of both U-Groups. U-Participants, U-Endpoints, and U-Groups are used in the access control structures to provide access to individual UUDEX Subjects (U-Subjects). U-Groups are created by the U-Administrator and are managed by the U-Administrator or the designated U-Group Managers. U-Endpoints can be assigned UUDEX Roles (U-Roles) that can be used to further restrict access. U-Roles are assigned to individual U-Endpoints. For example, a U-Role of “Security Analyst” could be used to restrict which U-Endpoints can publish or subscribe security incident reports and vulnerability notifications, while a U-Role of “Transmission Planner” can be used to restrict which U-Endpoints can publish power system model updates. U-Role definitions are created by the U-Administrator, but the U-Roles are assigned to U-Endpoints by their respective UUDEX Participant Administrators (U-Participant Administrator). Because all information required to make security decisions is either included within the U-Endpoint’s X.509 digital certificate or stored in a datastore on the U-Server, all security decisions are performed and enforced within the U-Server. This reduces the complexity of the U-Client code and minimizes the chance for compromise of the integrity of the UUDEX security features.

97 MATHEMATICS AND COMPUTING↗

Scalable Unit Commitment with Security Constrained AC Power Flow via ADMM and Hybrid Modeling Strategies

This research introduces a more efficient way to optimize power grid operations, breaking the problem into manageable steps and using advanced mathematical techniques to speed up calculations. By incorporating smart heuristics, improved preprocessing, and contingency analysis, the approach allows operators to make better decisions faster. These innovations enhance our understanding of how to optimize energy generation, making it possible to anticipate failures before they happen, reduce system costs, and improve overall grid performance. Ultimately, this research helps bridge the gap between theoretical models and real-world applications, paving the way for a smarter, more resilient power grid. This research directly benefits the public by making electricity more affordable, reliable, and sustainable. By improving how power grids schedule and distribute electricity, the project helps energy providers reduce operational costs, which can lead to lower electricity prices for consumers. Additionally, the ability to predict and prevent power system failures enhances grid reliability, reducing the likelihood of blackouts that can disrupt homes, businesses, and critical infrastructure such as hospitals. From an environmental perspective, optimizing power generation reduces energy waste and lowers carbon emissions, contributing to cleaner air and a more sustainable energy system. Furthermore, with extreme weather events becoming more frequent, these advancements make the power grid more resilient, ensuring communities are better prepared for emergencies and natural disasters. By strengthening the nation's energy infrastructure, this research plays a crucial role in improving economic stability, public safety, and environmental sustainability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Insecurity of position-based quantum-cryptography protocols against entanglement attacks

Recently, position-based quantum cryptography has been claimed to be unconditionally secure. On the contrary, here we show that the existing proposals for position-based quantum cryptography are, in fact, insecure if entanglement is shared among two adversaries. Specifically, we demonstrate how the adversaries can incorporate ideas of quantum teleportation and quantum secret sharing to compromise the security with certainty. The common flaw to all current protocols is that the Pauli operators always map a codeword to a codeword (up to an irrelevant overall phase). We propose a modified scheme lacking this property in which the same cheating strategy used to undermine the previous protocols can succeed with a rate of at most 85%. We prove the modified protocol is secure when the shared quantum resource between the adversaries is a two- or three-level system.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Corrective Action Management Unit Report of Post-Closure Care Activities Calendar Year 2019

The Corrective Action Management Unit (CAMU) at Sandia National Laboratories, New Mexico (SNL/NM) consists of a containment cell and ancillary systems that underwent closure in 2003 in accordance with the Closure Plan in Appendix D of the Class 3 Permit Modification (SNL/NM September 1997). The containment cell was closed with wastes in place. On January 27, 2015, the New Mexico Environment Department (NMED) issued the Hazardous Waste Facility Operating Permit (Permit) for Sandia National Laboratories (NMED January 2015) to the U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA) and its Management and Operating (M&O) contractor. The current M&O contractor is National Technology & Engineering Solutions of Sandia, LLC (NTESS). The Permit became effective February 26, 2015. The CAMU is undergoing post-closure care in accordance with the Permit, as revised and updated. This CAMU Report of Post-Closure Care Activities documents all activities and results for calendar year (CY) 2019, as required by the Permit.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗