DOE: Integrating Southwest Power Pool Wind Energy into Southeast Electricity Markets

Wind power development in the United States is outpacing previous estimates for many regions, particularly those with good wind resources. The pace of wind power deployment may soon outstrip regional capabilities to provide transmission and integration services to achieve the most economic power system operation. Conversely, regions such as the Southeastern United States do not have good wind resources and will have difficulty meeting proposed federal Renewable Portfolio Standards with local supply. There is a growing need to explore innovative solutions for collaborating between regions to achieve the least cost solution for meeting such a renewable energy mandate. The DOE-funded project 'Integrating Southwest Power Pool Wind Energy into Southeast Electricity Markets' aims to evaluate the benefits of coordination of scheduling and balancing for Southwest Power Pool (SPP) wind transfers to Southeastern Electric Reliability Council (SERC) Balancing Authorities (BAs). The primary objective of this project is to analyze the benefits of different balancing approaches with increasing levels of inter-regional cooperation. Scenarios were defined, modeled and investigated to address production variability and uncertainty and the associated balancing of large quantities of wind power in SPP and delivery to energy markets in the southern regions of the SERC. The primary analysis of the project is based on unit commitment (UC) and economic dispatch (ED) simulations of the SPP-SERC regions as modeled for the year 2022. The UC/ED models utilized for the project were developed through extensive consultation with the project utility partners, to ensure the various regions and operational practices are represented as accurately as possible realizing that all such future scenario models are quite uncertain. SPP, Entergy, Oglethorpe Power Company (OPC), Southern Company, and the Tennessee Valley Authority (TVA) actively participated in the project providing input data for the models and review of simulation results and conclusions. While other SERC utility systems are modeled, the listed SERC utilities were explicitly included as active participants in the project due to the size of their load and relative proximity to SPP for importing wind energy. The analysis aspects of the project comprised 4 primary tasks: (1) Development of SCUC/SCED model of the SPP-SERC footprint for the year 2022 with only 7 GW of installed wind capacity in SPP for internal SPP consumption with no intended wind exports to SERC. This model is referred to as the 'Non-RES' model as it does not reflect the need for the SPP or SERC BAs to meet a federal Renewable Energy Standard (RES). (2) Analysis of hourly-resolution simulation results of the Non-RES model for the year 2022 to provide project stakeholders with confidence in the model and analytical framework for a scenario that is similar to the existing system and more easily evaluated than the high-wind transfer scenarios that are analyzed subsequently. (3) Development of SCUC/SCED model of the SPP-SERC footprint for the year 2022 with sufficient installed wind capacity in SPP (approximately 48 GW) for both SPP and the participating SERC BAs to meet an RES of 20% energy. This model is referred to as the 'High-Wind Transfer' model with several different scenarios represented. The development of the High-Wind Transfer model not only included identification and allocation of SPP wind to individual SERC BAs, but also included the evaluation of various methods to allow the model to export the SPP wind to SERC without developing an actual transmission plan to support the transfers. (4) Analysis of hourly-resolution simulation results of several different High-Wind Transfer model scenarios for the year 2022 to determine balancing costs and potential benefits of collaboration among SPP and SERC BAs to provide the required balancing.

17 WIND ENERGY↗

Alaska Meteorology, Energy, and Transmission (MET) Toolkit

The Alaska MET (Meteorology, Energy, and Transmission) Toolkit is the National Laboratory of the Rockies' (NLR) new flagship atmospheric dataset, designed to support comprehensive long-term planning and operations across the entire power sector. Serving as the regional counterpart to CONUS-wide HRRR MET Toolkit, this dataset provides a comprehensive, high-fidelity meteorological record covering Alaska.The Alaska MET Toolkit is delivered at an hourly resolution on a standardized 2-km horizontal grid. This dataset is repackaged from the National Oceanic and Atmospheric Administration's (NOAA) operational High-Resolution Rapid Refresh for Alaska (HRRR-AK) forecasts. Spanning from 2019 to 2025, it overcomes the technical barriers of native weather models by providing spatial regridding from the native 3-km HRRR-AK horizontal resolution to a 2-km grid, temporal gap-filling, and vertical interpolation at key energy-relevant heights. By delivering highly accurate, validation-backed data across a comprehensive suite of atmospheric variables - including temperature, pressure, humidity, and wind characteristics - the Alaska MET Toolkit provides a highly accessible and strictly standardized foundation for modern power system modeling.

17 WIND ENERGY↗

Learned adaptive properties for mitigation of weight perturbations in embedded spiking networks

Recent years have seen an increased importance of neural network inference in edge-based scenarios, which impose size and power constraints requiring novel computing devices. These same edge scenarios may require operating over long periods of time, or exposure to extreme environments, resulting in a drift of neural network weights that cause degraded performance. In searching for ways to develop neural network approaches that perform robustly under these conditions, we propose a biologically-inspired mechanism for the dynamic adaptation of within-neuron parameters that is guided by a global context signal carrying information about perturbations and variability in incoming stimuli. Specifically, we demonstrate that adaptive voltage thresholds or neuronal time constants, when informed by a global context signal, can enable network-level mechanisms to recover from perturbed synaptic weights. Consistent with prior literature, the context-modulated approach is effective for recurrent, but not feedforward networks, by modulating network level dynamics. We demonstrate this approach successfully recovers performance in image classification tasks and spatiotemporal tracking tasks under idealized and Gaussian noise as well as for realistic perturbations from a memristive device when exposed to ionizing radiation. Finally, we discuss how this approach enables the design of robust and energy-efficient neuromorphic systems that perform well, even in resource-constrained scenarios with extreme environments such as edge processing.

context modulation↗

Extreme Wind and Waves in U.S. East Coast Offshore Wind Energy Lease Areas

The Outer Continental Shelf along the U.S. east coast exhibits abundant wind resources and is now a geographic focus for offshore wind deployments. This analysis derives and presents expected extreme wind and wave conditions for the sixteen lease areas that are currently being developed. Using the homogeneous ERA5 reanalysis dataset it is shown that the fifty-year return period wind speed (U50) at 100 m a.s.l. in the lease areas ranges from 29.2 to 39.7 ms -1 . After applying corrections to account for spectral smoothing and averaging period, the associated pseudo-point U50 estimates are 34 to 46 ms -1 . The derived uncertainty in U50 estimates due to different distributional fitting is smaller than the uncertainty associated with under-sampling of the interannual variability in annual maximum wind speeds. It is shown that, in the northern lease areas, annual maximum wind speeds are generally associated with intense extratropical cyclones rather than cyclones of tropical origin. Extreme wave statistics are also presented and indicate that the 50-year return period maximum wave height may substantially exceed 15 m. From this analysis, there is evidence that annual maximum wind speeds and waves frequently derive from the same cyclone source and often occur within a 6 h time interval.

16 TIDAL AND WAVE POWER↗

MPC solution for optimal load shifting for buildings with ON/OFF staged packaged units: Experimental demonstration, and lessons learned

Small and medium-sized commercial buildings (SMCB) are significant demand response resources, and it is important to develop grid-responsive control algorithms that exploit those resources and create financial benefits for building owners and HVAC service providers. Furthermore, unlike large-sized commercial buildings, there is an opportunity to have universally applicable control solutions for many SMCBs since those buildings have a consistent HVAC system configuration: SMCBs are commonly served by multiple-staged air conditioning units controlled by their own thermostats. Despite the demand response potential and scalability, however, very few control solutions are available for SMCBs. Typical model predictive control (MPC) and heuristic control approaches for cooling load shifting that lower thermostat setpoints before an electric price jump are suitable mainly for large-sized commercial buildings where a continuous capacity modulation is possible, e.g., via dampers in variable air volume terminal units. However, those approaches can cause undesired, high peaks for SMCBs due to the nature of ON/OFF unit staging and narrow thermostat deadbands. This could discourage the use of advanced grid-responsive controls for SMCBs due to the concern of high demand charges, and has to be resolved. This paper presents a MPC solution that overcomes this challenge. It has a hierarchical MPC structure where an upper level MPC is responsible for electrical load shifting in response to an electric price signal while a lower level MPC is responsible for coordinating compressor stages to eliminate unnecessary peaks and follows the setpoints determined by the upper level MPC. In this work, two one-month, comprehensive laboratory tests have been carried out to demonstrate load shifting and cost savings for the algorithm. Interesting trade-offs between energy efficiency and load flexibility were observed and are discussed, and lessons learned for applying MPCs for SMCBs are also presented.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The National Solar Radiation Database (NSRDB) Fiscal Years 2019-2021(Final Report)

The National Solar Radiation Database (NSRDB) is the leading public source of high-resolution solar resource data in the United States, with more than 166,000 users annually. This database represents the state of the art in satellite-based estimation of solar resource information and uses a unique physics-based modeling approach that enables improvements in accuracy with the deployment of the next-generation geostationary satellites. Making the highest quality, state-of-the-art, regularly updated data sets available on a timely basis for users reduces costs of solar deployment by providing accurate information for siting studies and system output prediction, and thereby reduces levelized cost of energy. Also, high-resolution information from the NSRDB enables moving beyond levelized cost of energy when valuing the impact of renewables on the grid. Additionally, the NSRDB enables the integration of large amounts of solar on the grid by providing critical information about solar availability and variability that is used to enhance grid reliability and power quality.

14 SOLAR ENERGY↗

Advanced Hydropower and PSH Capacity Expansion Modeling (Final Report on HydroWIRES D1 Improvements to Capacity Expansion Modeling)

Hydropower and pumped-storage hydropower (PSH) have played a key role in providing flexible, low-carbon electricity to the U.S. electricity system for over a century. As variable generation (VG) deployment increases the demand for flexible, dispatchable generation, it is important to use all available methods for understanding how hydropower and PSH interfaces with VG in a future low-carbon grid. Capacity expansion models (CEMs) of electricity systems are often used to study future electricity scenarios, but these tools often have difficulty representing site- and technology-details of hydropower and PSH due to limited spatial, temporal, or process resolution. This report demonstrates a set of model advancements to improve hydropower and PSH representations in CEMs and other models that consider hydropower and PSH's role in electricity systems. Model advancements include new data integration to define closed-loop PSH resource availability and cost, along with site-level parameterizations of existing PSH capacity and energy storage specifications. Shifting energy across seasons for both hydropower and PSH is explored to demonstrate the potential value of long-duration storage. New representations of hydropower upgrades offer opportunities to increase dispatchability, add pumps, or independently add capacity or energy depending on what is most valuable. New model structures and data are demonstrated individually and in combination to observe their impact on model results and provide initial insights into what is most important for analysts, electricity system planners, and hydropower decision-makers to consider when assessing future roles of hydropower. Improving flexibility of existing hydropower assets has the potential to reduce CO 2 emissions through complementing VG technologies and/or improve electricity system economics by reducing the need to deploy higher-cost systems. Large-scale energy storage is also shown to provide opportunities for balancing seasonal differences in VG, particularly solar photovoltaics (PV). Initial analysis with a new closed-loop PSH resource and cost dataset also demonstrate the potential for new PSH deployment to offer new grid flexibility opportunities. Future analysis and modeling of hydropower's role in the U.S. and other electricity systems could include methodological improvements based on those discussed here along with sensitivity analysis to better represent current and future potential hydropower and PSH flexibility. Improvements to geospatial and site-level data can further improve the understanding of how hydropower and PSH can be upgraded and operated in response to future electricity system needs. This work lays the groundwork to use advanced planning models to explore the range of roles hydropower and PSH can play in the grid of the future.

13 HYDRO ENERGY↗

Evolving Competitive Markets in SAPP: Leveraging Competitive Wholesale Electricity Markets to Drive Renewable Generation Capacity in the Southern African Power Pool (SAPP)

The SADC region has significant natural resource potential to increase renewable energy generation, improve electricity reliability, and support economic development. This research finds an apparent lack of confidence from electricity infrastructure investors in SAPP wholesale electricity markets, which increases risk perception and lowers the likelihood of capital deployment. With respect to free market fundamentals, competitive market obstacles and renewable energy development obstacles are characterized. Stakeholders identified the top obstacles to well-functioning competitive markets as insufficient transmission infrastructure for interconnection and regional movement of electricity, dominance of national single-buyer markets, and lack of or weak nation-state regulatory frameworks. Stakeholders prioritized the top three obstacles for renewable energy development as a lack of viable commercial arrangements for variable renewable energy (VRE) balancing, lack of functional and consistent nation-level regulations, and higher project costs related to reliance on imported equipment. With respect to potential solution options, stakeholders prioritized the development of new cost allocation and finance methods to facilitate new transmission expansion, training to educate new or potential new market entrants on SAPP processes, as well as modeling and analysis of regional SAPP participation benefits disaggregated to the nation-state level. From these perspectives, this research identified strategy options for consideration including transitioning SAPP to a regional transmission operator (RTO) for operation and planning of cross-border transmission facilities and market administration, shifting operations of SAPP member transmission systems to Independent System Operators (ISOs), establishing a regional regulatory authority and enhancing market data transparency. Implementing these reforms is expected to be challenging, but not insurmountable, given the domestic political, legal, and jurisdictional complexities of the SADC region.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Bi-Level Linear Programming Model for Automatic Load Shedding: A Distributed Wide-Area Measurement System-based Solution

Load shedding is currently implemented as a two-step based approach. In the first step, manual load shedding is taken place, were system operators, using estimates, inform distribution utilities of predicted stressful conditions. Information provided include the potential use of energy reserves, as well as load shedding amount. In a second step, automatic load shedding is done. The latter is realized using protection relays. While considering frequency variation, pre-defined values of load to be shed and correspondent number of stages for such to be realized are transformed into relay settings. Under-frequency protection relays use only local measurements towards decision making, thus operate in a decentralized architecture. Decision making is done in milliseconds plus breaker time. While this approach has provided much system reliability, considering the new smart grid paradigm, where system dynamics are much faster due to increasing renewable resources penetration, in some operating conditions it will generate sub-optimal solutions, such as islanding. Phasor measurement units provide a source of information which can be useful for this problem. Centralized architecture-based solutions for automatic load shedding, as present in the state-of-the-art, require though total processing times which are not acceptable for real-life implementation. In this work, considering the above, a bi-level linear programming model is presented. The model is implemented considering a distributed architecture while leveraging phasor measurement units data. The upper-level model estimates the current system state. Results of this model are embedded in a lower-level model, which decision variables are the location and load value to be shed. Easy-to-implement model, built-on the classic weighted least squares solution, highlight potential aspects towards real-life applications.

Bretas, Arturo Suman↗

Economic Analysis of an Electric Thermal Energy Storage System Using Solid Particles for Grid Electricity Storage

As renewable power generation becomes the mainstream new-built energy source, energy storage will become an indispensable need to complement the uncertainty of renewable resources to firm the power supply. When phasing out fossil-fuel power plants to meet the carbon neutral utility target in the midcentury around the world, large capacity of energy storage will be needed to provide reliable grid power. The renewable power integration with storage can support future carbon-free utility and has several significant impacts including increasing the value of renewable generation to the grid, improving the peak-load response, and balancing the electricity supply and demand. Long-duration energy storage (10–100 hours duration) can potentially complement the reduction of fossil-fuel baseload generation that otherwise would risk grid security when a large portion of grid power comes from variable renewable sources. Current energy storage methods based on pumped storage hydropower or batteries have many limitations. Thermal energy storage (TES) has unique advantages in scale and siting flexibility to provide grid-scale storage capacity. A particle-based TES system has promising cost and performance for the future growing energy storage needs. This paper introduces the system and components required for the particle TES to be technically and economically competitive. A technoeconomic analysis based on preliminary component designs and performance shows that the particle TES integrated with an efficient air-Brayton combined cycle power system can provide power for several days by low-cost, high-performance storage cycles. It addresses grid storage needs by enabling large-scale grid integration of intermittent renewables like wind and solar, thereby increasing their grid value. The design specifications and cost estimations of major components in a commercial scale system are presented in this paper. The cost model provides insights for further development and cost comparison with competing technologies.

27 ARPA - Advanced Research Projects Agency-Energy↗

Results for the first quarter calendar year 2017 tank 50H salt solution sample

In this memorandum, the chemical and radionuclide contaminant results from the First Quarter Calendar Year 2017 (CY17) sample of Tank 50H salt solution are presented in tabulated form. The First Quarter CY17 Tank 50H samples [a 200 mL sample obtained 6” below the surface (HTF-50-17-7) and a 1 L sample obtained 66” from the tank bottom (HTF-50-17-8)] were obtained on January 15, 2017 and received at Savannah River National Laboratory (SRNL) on January 16, 2017. Prior to obtaining the samples from Tank 50H, a single pump was run at least 4.4 hours and the samples were pulled immediately after pump shut down. All volatile organic analysis (VOA) and semi-volatile organic analysis (SVOA) were performed on the surface sample and all other analyses were performed on the variable depth sample. The information from this characterization will be used by Savannah River Remediation (SRR) for the transfer of aqueous waste from Tank 50H to the Saltstone Production Facility, where the waste will be treated and disposed of in the Saltstone Disposal Facility. This memorandum compares results, where applicable, to Saltstone Waste Acceptance Criteria (WAC) limits and targets. The chemical and radionuclide contaminant results from the characterization of the First Quarter CY17 sampling of Tank 50H were requested by SRR personnel and details of the testing are presented in the SRNL Task Technical and Quality Assurance Plan (TTQAP). This memorandum is part of Deliverable 2 from SRR request. Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals will be documented at a later time per the TTQAP for the Tank 50H saltstone task.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Economic Analysis of a Novel Thermal Energy Storage System Using Solid Particles for Grid Electricity Storage: Preprint

As renewable power generation becomes the mainstream new-built energy source, energy storage will become an indispensable need to complement the uncertainty of renewable resources to firm the power supply. When phasing out fossil-fuel power plants to meet the carbon neutral utility target in the midcentury around the world, large capacity of energy storage will be needed to provide reliable grid power. The integration of renewable power and storage to support future carbon-free utility has several significant and positive impacts including expanding the renewable generation into the grid, improving the peak-load response, and balancing the electricity supply and demand. Long-duration energy storage (10–100 hours duration) can potentially complement the reduction of fossil-fuel baseload generation that otherwise would risk grid security when a large portion of grid power comes from variable renewable sources. Current energy storage methods based on pumped storage hydropower or batteries have many limitations. Thermal energy storage (TES) has unique advantages in scale and siting flexibility to provide grid-scale storage capacity. A particle-based TES system has promising cost and performance for the future growing energy storage needs. This paper introduces the system and components required for the particle TES to be technically and economically competitive. A technoeconomic analysis based on preliminary component designs and performance shows that the particle TES integrated with an efficient air-Brayton combined cycle power system can provide power for several days by low-cost, high-performance storage cycles. It addresses grid storage needs by enabling large-scale grid integration of intermittent renewables like wind and solar, thereby increasing their grid value. The design specifications and cost estimations of major components in a commercial scale system are presented in this paper. The cost model provides insights for further development and cost comparison with competing technologies.

27 ARPA - Advanced Research Projects Agency-Energy↗

Spatially varying seasonal modulation to tidal stream energy potential due to mixed tidal regimes in the Aleutian Islands, AK

We provide an assessment of the tidal stream energy resource of the Aleutian Islands, Alaska via a validated barotropic tidal numerical model of the region. Eight island passes are identified as energy “hotspots”. The annual mean kinetic energy fluxes, KEF , calculated at each pass vary from 1000 to 11,000 MW, while the annual available energy, AAE , varies from 5 to 42 MWh m −2 . Notable seasonal modulation to monthly power density averages and ranges are noted at some passes and not others. Seasonal adjustment is linked to the semi-annual solar declination cycle which enhances (dampens) diurnal (D 1 ) tidal amplitudes in summer/winter (spring/fall) as well as the time-varying phase lag between D 1 and semidiurnal (D 2 ) fortnightly tidal cycles. Annual variability in monthly mean power density scales with the tidal current form factor, F u , with the largest seasonal change occurring for F u > 1 (D 1 dominated tide). The spread in power density over a month is on average smaller for passes with mixed tides (F u = 1 ) than those with D 1 or D 2 dominance, as changes to fortnightly phase lag become influential to net power density ranges when tides are mixed. This study outlines overlooked, but relevant, long-term modulation to tidal streams in regions with mixed tides.

16 TIDAL AND WAVE POWER↗

Species traits and network structure predict the success and impacts of pollinator invasions

Species invasions constitute a major and poorly understood threat to plant–pollinator systems. General theory predicting which factors drive species invasion success and subsequent effects on native ecosystems is particularly lacking. We address this problem using a consumer–resource model of adaptive behavior and population dynamics to evaluate the invasion success of alien pollinators into plant–pollinator networks and their impact on native species. We introduce pollinator species with different foraging traits into network models with different levels of species richness, connectance, and nestedness. Among 31 factors tested, including network and alien properties, we find that aliens with high foraging efficiency are the most successful invaders. Networks exhibiting high alien–native diet overlap, fraction of alien-visited plant species, most-generalist plant connectivity, and number of specialist pollinator species are the most impacted by invaders. Our results mimic several disparate observations conducted in the field and potentially elucidate the mechanisms responsible for their variability.

59 BASIC BIOLOGICAL SCIENCES↗

Power demand risk models on milling machines

The measurement of power demand risks in manufacturing power systems will benefit manufacturers and the wider society. If the risks can be characterized using manufacturing parameters, manufacturers can better control risks originating in those parameters, select less power-risky production plans, and reduce utility costs and resource consumption. The measurement of risk can also help manufacturers and power suppliers to protect their power systems from unexpected disturbances. Existing measures of risk, however, do not consider time duration, and thus cannot accurately quantify the risks in manufacturing power systems; the risks of a period of high power demand must be evaluated with the duration of the surge. Therefore, new methods of measuring power demand risks are proposed, adapting measures drawn from the field of finance. With a focus on milling operations, processing power is shown to be a function of processing amount and processing time, and a power demand distribution is directly derived as a joint distribution of and A and T. A bivariate random variable model with copulas is applied to examine the correlation in the joint distribution. Then, based on evaluation of a probability distribution of power demand from and, new risk measures are introduced. Herein illustrative examples are provided to show how the proposed measures can quantify the power demand risks from milling machines, based on manufacturing parameters. Certain manufacturing parameters are found to affect overall power demand risks, including i) raw material type, ii) variability in processing time, and iii) correlation between and. In the examples, these three factors increase power demand risks by up to 108%, 67%, and 1% respectively.

42 ENGINEERING↗

Hybrid Power Plants: Status of Operating and Proposed Plants, 2023 Edition [Slides]

Improving battery technology and the growth of variable renewable generation are driving a surge of interest in “hybrid” power plants that combine, for example, wind or solar generating capacity with co-located batteries. While most of the current interest involves pairing photovoltaic (PV) plants with batteries, other types of hybrid or co-located plants with wide-ranging configurations have been part of the U.S. electricity mix for decades. This annually updated briefing tracks and maps existing hybrid or co-located plants across the United States while also synthesizing data from power purchase agreements (PPAs) and generation interconnection queues to shed light on near- and long-term development pipelines. The scope includes “co-located hybrids” that pair two or more resources (e.g., multiple types of generation and/or generation with storage) that are operated largely independently behind a single point of interconnection, and “full hybrids” that also feature coordinated operations of the co-located resources. The focus is on plants with one megawatt (MW) or more of capacity; smaller (often behind-the-meter) projects are also increasingly common, but are not included in this data synthesis. Key findings from the latest briefing include: -At the end of 2022, there were 374 hybrid plants (>1 MW) operating across the United States (+25% compared to the end of 2021), totaling nearly 41 GW of generating capacity (+15%) and 5.4 GW/15.2 GWh of energy storage (+69%/+88%). PV+storage plants are by far the most common, dominating in terms of plant number (213), storage capacity (4.0 GW/12.5 GWh), storage:generator capacity ratio (49%), and storage duration (3.1 hours). But there are nearly twenty other hybrid plant configurations as well, including several different fossil hybrid categories (each dominated by the fossil component) as well as wind+storage, wind+PV, wind+PV+storage, geothermal+PV, and others. -Last year was another strong year for PV+storage hybrids in particular: 59 of the 62 hybrids added in 2022 were PV+storage. As of the end of 2022, there was roughly as much storage capacity operating within PV+storage hybrid plants as in standalone storage plants (~4 GW each). In storage energy terms, however, PV+storage edged out standalone storage by ~2 GWh (12.5 GWh vs. 10.4 GWh, respectively). -Interconnection queue data show continued strong developer interest in hybridization. At the close of 2022, there were 51% more hybrid plants—representing 59% more generating capacity—in interconnection queues across the United States than there were at the end of 2021. Solar dominates these proposed plants as well: at the close of 2022, there were 457 GW of solar capacity proposed as a hybrid (representing ~48% of all solar capacity in the queues), most typically pairing PV with battery storage. At the same time, there were 24 GW of wind capacity proposed as a hybrid (representing ~8% of all wind capacity in the queues), again most-often pairing wind with storage. Meanwhile, more than half of all storage in the queues is estimated to be part of a hybrid plant. While many of the plants proposed in the queues will not ultimately reach commercial operations, the depth of interest in hybrid plants—especially PV+storage—is notable, particularly in certain regions. For example, in CAISO, 97% of all solar capacity and 45% of all wind capacity in the queues is proposed as a hybrid. -The report also surveys power purchase agreement (PPA) price data from a sample of operating and proposed PV+storage plants. Though PV+storage PPA prices have fallen over time, “levelized storage adders” have recently increased somewhat to ~$\$ $7000/MW-month, ~$\$ $60/MWh-stored (assuming one full cycle per day), or ~$\$ $15/MWh-PV. Some of the recent price increase could simply reflect a trend towards higher battery:PV capacity ratios over time, which increases costs, all else being equal. The well-publicized impact of inflationary and supply chain pressures on battery prices is no doubt a contributor as well.

25 ENERGY STORAGE↗

Hybrid Power Plants: Status of Operating and Proposed Plants, 2024 Edition [Slides]

Improving battery technology and the growth of variable renewable generation are driving a surge of interest in “hybrid” power plants that combine, for example, wind or solar generating capacity with co-located batteries. While most of the current interest involves pairing photovoltaic (PV) plants with batteries, other types of hybrid or co-located plants with wide-ranging configurations have been part of the U.S. electricity mix for decades. This annually updated briefing tracks and maps existing hybrid or co-located plants across the United States while also synthesizing data from power purchase agreements (PPAs) and generation interconnection queues to shed light on near- and long-term development pipelines. The scope includes “co-located hybrids” that pair two or more resources (e.g., multiple types of generation and/or generation with storage) that are operated largely independently behind a single point of interconnection, and “full hybrids” that also feature coordinated operations of the co-located resources. The focus is on plants with one megawatt (MW) or more of capacity; smaller (often behind-the-meter) projects are also increasingly common, but are not included in this data synthesis.

14 SOLAR ENERGY↗

Transmission-distribution long-term volt-var planning considering reactive power support capability of distributed PV

High penetration of grid-edge, inverter-based photovoltaic (PV) can cause significant voltage fluctuations not only at the distribution but also at the sub-transmission levels due to PV output intermittency. Traditional reactive power planning approaches do not consider intermittency, nor the possibility of coordinating the control of existing and future volt-ampere reactive resources. This paper proposes a reactive power planning tool for sub-transmission systems to mitigate voltage violations and fluctuations caused by high PV penetration and intermittency with a minimum investment cost. The planning tool coordinates with an optimization-based volt-var operational tool for: a) modeling the coordination of all existing var assets in both sub-transmission and distribution systems to reduce the need of new equipment, and b)selecting a set of scenarios with voltage violations, derived from PV intermittency c) testing the final investment decision. The tool obtains an investment need for each intermittency scenario with a proposed optimal power-flow framework with efficient techniques to handle a high number of discrete variables. Two options are provided for final planning decision: i) a conservative direct combination of investment need solutions and ii) a machine learning-based selection of representative investment needs at most time steps. The final investment decision options are verified using a realistic large-scale sub-transmission system and 5-minute PV and load data. The results show a significant voltage performance improvement with a lower investment cost for additional var equipment compared to conventional approaches.