Search NASA⌕ Search

SEARCH · Search NASA

Results for “DOCUMENTATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,711 records · Page 95

Delayed Critical and Subcritical Experiments with Polyethylene Moderated Unreflected Thin 15 in. Diameter HEU Metal Plates

The thin ~15 in. diameter highly enriched uranium (HEU) metal plates were assembled to delayed criticality at the Oak Ridge Critical Experiments Facility (ORCEF) in 1969 with various thicknesses of polyethylene (varying from 1/16 to 2$\frac{3}{8}$ inches) between uranium metal plates. The average 235 U enrichment was 93.27 wt. %. These unreflected critical configurations contained 4$\frac{2}{3}$ to 20$\frac{5}{6}$ thin 15 in. diameter HEU metal plates (on loan from Los Alamos National Laboratory [LANL] and shipped to Oak Ridge National Laboratory [ORNL] on June 3, 1969). Depending on the thickness of polyethylene, the enriched uranium masses varying from 28,053 to 135,148 grams. Fractional plate sections consisted of the appropriate number of 60° pie sections. In addition to the measurement at delayed criticality, subcritical measurements were also performed by the inverse kinetic rod drop method. Prompt neutron decay constant measurements were also performed by the Rossi alpha and randomly pulsed neutron method using a time-tagged spontaneous fission californium neutron source; these are briefly reported here. At the time of these measurements in 1969, the thin HEU metal plates were in near-pristine condition with extremely little oxidation, allowing better descriptions of the uranium plates than the use of these plates in a heavily oxidized and deteriorated condition in recent reflected benchmark experiments at the LANL facility at the Nevada Test Site with these same thin highly enriched uranium metal plates. This report documents the experimental information for the measurements performed so that later researchers can perform the required uncertainty and calculational analyses and documentation to use these data for an International Nuclear Criticality Safety Benchmark Evaluation Program (ICSBEP) or a Nuclear Energy Agency (NEA) benchmark. Data from the experiments described should be acceptable for use as criticality safety benchmark experiments for the ICSBEP and the NEA nuclear criticality safety benchmark program once the uncertainty analysis on the measured neutron multiplication factors is completed. Additional data—such as the dimensional inspection reports, uranium isotopic information, and other relevant particulars—should be retrieved from the Y-12 Plant or LANL and incorporated in the final ICSBEP benchmark. Based on previous ICSBEP benchmarks with this enriched uranium metal at ORCEF, the uncertainties in $k_{eff}$ could be as low as ± 0.0002 for some configurations. Other experiments with smaller-diameter than 15 in. diameter HEU metal plates have been benchmarked in HEU-METFAST-001. The prompt neutron time decay measurements could be the basis for an International Reactor Physics Benchmark Program. Preparation of the present report is part of an effort at ORNL to document more than 15 undocumented critical and subcritical experiments enumerated in ORNL/TM-2019/18 and performed by ORNL at ORCEF and other US Department of Energy critical experiments facilities using more than 500 operational days of critical facility time. This work for this report publication was supported by the Nuclear Criticality, Radiation Transport and Safety NCSP Program at ORNL.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Baseline Fuel Fabrication Facility

PRO-RR is the research reactor focused program element of the broader Proliferation Resistance Optimization program (PRO-X) under the National Nuclear Safety Administration (NNSA) in the U.S. Department of Energy (DOE). PRO-X provides a framework for integrating proliferation resistance in nuclear system designs to minimize weapons usable nuclear materials (WUNM) production and diversion pathways while optimizing systems performance for peaceful use missions. PRO-RR applies the PRO-X mission objectives to research reactor system design. This document serves as one of the foundational documents for the PRO-RR-Fuel System Design technical team by documenting a baseline fuel fabrication facility to be used for further optimization studies. The PRO-RR-Fuel System Design technical team consists of subject matter experts from Argonne National Laboratory (Argonne) and Savannah River National Laboratory (SRNL). In order to develop specific strategies for fuel fabrication facilities to optimize proliferation resistance, performance, and safety, a baseline fuel fabrication facility design basis was developed. Having a baseline design basis allows for the qualitative and quantitative comparison of design choices in the optimization process. This report describes the baseline fuel fabrication facility and general optimization strategy. Chapter 2 describes the fuel system selected for examination, the fabrication process used as the baseline, a description of the model developed to track uranium utilization, and a generic floorplan of the fabrication facility. Chapter 3 describes the overarching optimization strategy that could be implemented for a fabrication facility.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Community Resilience Options: A Menu for Enhancing Local Energy Resilience

This document highlights areas of potential community resilience improvements, especially those that relate to clean energy deployment for communities and municipalities. The National Renewable Energy Laboratory (NREL) defines resilience as "a system's ability to anticipate, prepare for, and adapt to changing conditions and withstand, respond to, and recover rapidly from disruptions through sustainable, adaptable, and holistic planning and technical solutions." This document introduces 10 categories of resilience-enhancing projects at a high level, intended for community members and decision-makers new to the topic to build their understanding of which solutions fit their community best. These categories focus primarily on community-scale measures and different options may be available at larger scales. Full implementation of the measures described here requires in-depth, site-specific considerations that go beyond the scope of this document.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cultural Resource Management Plan for Brookhaven National Laboratory

The Cultural Resource Management Plan (CRMP) for Brookhaven National Laboratory (BNL) provides an organized guide that describes or references the facets and interrelationships of cultural resources at BNL. Management strategies included within this CRMP are designed to adequately identify the cultural resources that BNL and DOE consider significant and to acknowledge associated management actions. A principal objective of the CRMP is to reduce the need for additional regulatory documents and to serve as the basis for a formal agreement between the DOE and the New York State Historic Preservation Officer (NYSHPO). The BNL CRMP is designed to be a “living document.” Each section includes identified gaps in the management plan, with proposed goals and actions for addressing each gap. The plan will be periodically revised to incorporate new documentation. The current (2023) update incorporates new findings and/or updated text based on completed or ongoing projects related to cultural resources at BNL since inception of the last updated CRMP in 2013. Historically, Brookhaven National Laboratory had little need for cultural resource management because many of its buildings were less than 50 years old. Most of the features that are potentially eligible for inclusion in the National Register of Historic Places were protected simply by avoiding the features. Compliance with cultural resource laws and regulations has included archeological surveys, such as those associated with the 1977 Final Environmental Impact Statement for Brookhaven National Laboratory and the 1978 Final Environmental Impact Statement for the Proton-Proton Storage Accelerator Facility (ISABELLE). In 1979, World War I trenches associated with the former Camp Upton and located near ISABELLE were determined to be eligible for inclusion in the National Register of Historic Places; however, many of these trenches had been destroyed by construction work. In 1991, the NYSHPO provided BNL with a letter indicating that only three structures and features were likely to be eligible for inclusion in the National Register of Historic Places. Between 1991 and 1999, little work associated with cultural resource management was accomplished. Beginning in 1999, awareness for the need of a program to manage cultural resources grew out of the realization that over half of the buildings at BNL were either 50 years old or were reaching that age and were, therefore, subject to the requirements in Section 106 of the National Historic Preservation Act. This fact, concomitant with the decontamination and decommissioning of the Brookhaven Graphite Research Reactor (BGRR) and the subsequent determination of BGRR’s eligibility for listing as an historical site, fueled the need for developing and implementing a more structured program for managing cultural resources at BNL.

54 ENVIRONMENTAL SCIENCES↗

Real Time and Forecasted DLR: Use Cases

This document contains two use cases for the utilization of dynamic line ratings in operational practices. These use cases were developed in support of the Transmission Optimization and Grid Enhancing Technology (TOGETS) task force aimed at facilitating the deployment of dynamic line rating and power flow technologies across the United States. The project included a demonstration of the technology on the Idaho National Laboratory system. The procurement documents, tests scripts, and field-validated results from multiple vendors will be published to improve industry’s familiarity with the products. Because of the urgency in performing this work and INL’s unique test setup, the Task Force identified a need for additional public information on the information exchanges required for operationalizing DLR (i.e. integrating DLR’s within actual system operations). As such, this use case document and an accompanying interoperability profile have been developed with input from the Task Force and various vendors whose systems would ultimately support the functionality described. The use case and interoperability profile support two distinct functionalities with different purposes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Low-Yield Nuclear Monitoring (LYNM) Experimental Science Plan

The Low-Yield Nuclear Monitoring (LYNM) Program is a long-term NNSA research and development effort designed to improve the United States’ explosion monitoring capabilities, particularly with respect to low-yield and potentially evasive underground nuclear testing. The LYNM Program focuses on researching, discovering, and exploiting unique and useful signatures, from all available technologies and sensors (e.g., seismic, acoustic, electromagnetic, gases, and particulates (both stable and radioactive)). Four Department of Energy laboratories participate in LYNM and together are referred to as the ‘quad-lab’. The R&D program execution is performed under NNSA defined structures known as “ventures”. Four science ventures were established: 1) Explosion Source Functions; 2) Containment of Low-Yield Underground Tests; 3) Local Signatures; 4) Dynamic Monitoring Networks. To organize and execute the large field scale experiment a fifth venture was established: 5) Physics Experiment One (PE-1). As part of the LYNM Program, a series of experiments are planned at various scales and levels of venture involvement. These vary from those that involve a subset of labs and/or LYNM ventures (e.g., small experiments), to full quad-lab LYNM Program field-scale integrated experiments. Such experiments may involve chemical explosions with tracer materials or other means of simulating the expected signals from a nuclear explosion. The LYNM Program does not conduct actual nuclear explosions. Since 1992, the U.S. has observed a moratorium on underground nuclear explosions. This document is intended to provide the underlying scientific basis for the LYNM planned experimental work. Each specific LYNM experiment will develop a goals, objectives, and requirements (GOR) plan following the guidance in this document. The LYNM technical staff will define the numbers and types of experiments required over the course of the Program based on technical needs and within funding constraints. As with any scientific experiment series, the number and types of experiments may change based upon the experimental results obtained. An experiment that agrees with models/codes/software signature predictions may need fewer repetitions/variations, depending upon the level of statistical rigor desired, as compared to one in which the predictions and experimental data do not match. The large LYNM field-scale integrated experiments require the longest lead-time for planning, and these are discussed in more detail near the end of this document.

58 GEOSCIENCES↗

Electrical Power Engineering Academic Landscape (November 2011)

University Outreach Initiative Overview The GridWise ® Architecture Council (GWAC) is a team of experts with diverse, relevant industry backgrounds that has documented the guiding principles for the architecture and interoperability of a future, intelligent, transactive, energy system. One of GWAC’s goals includes sharing information about their work broadly with industry and other communities that have a need to understand smart grid architecture and interoperability. The concept of a University Outreach Initiative was developed in the spring of 2011 as a set of market research and outreach activities. These activities were developed to identify opportunities for the dissemination of information about GWAC to academic and workforce development communities. Grant recipients of the Smart Grid Workforce Training Program, funded through the American Recovery and Reinvestment Act (ARRA), were identified as initial outreach recipients. This community consists of academic and workforce program managers involved in the development of electrical power engineering or other closely related smart grid technology and business programs at two and four-year institutions, via private sector curriculum development companies, and governmental or collaborate workforce development agencies. The Outreach Initiative started with the development of the Landscape Database and Contact Directory. These documents provide descriptive project and contact information for the Smart Grid Workforce Training Program recipients. Contact information was gathered through telephone calls and Internet research. Contacts identified by telephone were introduced in conversation to the project and were asked if they wished to participate. Their knowledge of GWAC was assessed. Contacts we could not reach by phone received introductory emails explaining the Outreach Initiative and providing links to important GWAC documents for background. A survey to identify contact interest in the initiative was circulated to all contacts several weeks later.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modeling Needs to Support the Reconstruction Strategy of Ukraine

Ukraine has been facing difficult times. Russia started a full-scale invasion on February 24, 2022, and has caused huge human and infrastructure losses. As a result of the invasion, more than 8 million people left their homes. The Russian army has targeted Ukrainian energy sources, destroying or damaging over 50% of thermal power generation capacity (coal and gas), 30% of solar generation, and 90% of wind generation. The Russians are also threatening Ukrainian energy security, as they currently control the Zaporizhzhia nuclear power plant – Europe’s largest. In addition, Russia has destroyed 121,000 buildings, including 5,300 multistory buildings - more buildings than Ukraine built during the past five years. The occupiers destroyed or damaged 343 district heat boiler stations (destroyed 12 / damaged 331) and 8 CHPs (destroyed 4/ damaged 4). There is no doubt that Ukraine will be able to protect its sovereignty and restore its territorial integrity; however, this will be a long process. The Government of Ukraine needs to simultaneously focus on many issues, from waging war to the restoration of electricity, water, and heat supply in the territories close to the front line. In addition to these time-sensitive issues, the government also needs to plan a long term multi-sector strategy for the reconstruction of Ukraine’s economy. Ukraine initiated a broad-based political process for recovery at the International Ukraine Recovery Conference (URC 2022) in Lugano, Switzerland. Prior to URC 2022, Ukraine applied for EU membership on February 28 and was granted the status of candidate country by the European Council on June 23, 2022. More than 40 nations are fully committed to supporting Ukraine throughout its path from early to long-term recovery. In addition, these countries link a successful recovery to Ukraine’s European future (URC, 2022a). The reconstruction process will be long. The government also recognizes that it is not enough to build energy infrastructure back – it should be built back better. The government is committed to building a more sustainable and cleaner energy sector. Energy modeling can provide important insights into paths to decarbonize Ukraine’s economy while rebuilding it after the war. Pacific Northwest National Laboratory (PNNL) and the Institute for Economics and Forecasting of the National Academy of Sciences of Ukraine (IEF) work on modeling decarbonization scenarios in the energy sector of Ukraine. The teams focus on the heat sector, which includes district heat, autonomous and individual heating, and energy consumption by final energy consumption sectors, including buildings. Since the teams use world-class integrated assessment models, other sectors will be analyzed as well. The purpose of the document is to describe the needs of key Ukrainian ministries in modeling the reconstruction process. The scope of this document is limited to modeling energy consumption by the power and heat sectors, final energy consumption by buildings, and GHG emissions from these two sectors. The rest of this policy memo is organized as follows. After this introduction, Chapter 2 discusses key provisions of the reconstruction strategy with a focus on energy, buildings, heat supply, environment, and European integration aspirations. Section 3 provides an overview of recent developments and key decisions of the Government of Ukraine in the area of energy efficiency and decarbonization. Finally, Section 4 provides key suggestions on how PNNL and IEF can help the Government of Ukraine in developing strategic documents.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Supplement to M&V Guidelines: Measurement and Verification for Performance-Based Contracts Version 4.0

Measurement and verification (M&V) are key to determining and confirming the continued operation of, and savings associated with, performance-based contracts. The Federal Energy Management Program (FEMP) updates these guidelines to reflect the evolution of M&V to incorporate industry best practices and ensure that savings from these performance-based projects are properly planned, communicated, and realized. FEMP released M&V Guidelines: Measurement and Verification for Federal Energy Projects Version 3.0 in 2008. This document was developed with input from industry-government working groups, previous M&V guideline authors, and national laboratory subject matter experts. The document provided the methods and guidelines, with a focus on federal energy savings performance contracts (ESPCs). When FEMP released M&V Guidelines: Measurement and Verification for Performance-Based Contracts Version 4.0 in 2015, FEMP expanded the intended audience to include anyone (energy managers, procurement officers, and contractors) involved in implementing performance-based contracts. The streamlined M&V Guidelines Version 4.0 provided the procedures and guidelines needed to quantify savings resulting from installing energy-efficient equipment, water conservation, improved operation and maintenance (O&M), renewable energy, and cogeneration projects with a performance-based contract; however, it removed some of the associated details on topics such as developing regression models and sampling plans. The details and information provided in M&V Guidelines v. 3.0 are still pertinent to M&V for performance-based contracts. The objective is to keep FEMP M&V version 4.0 condensed, providing the reference document for specifying M&V methods and procedures and a resource for developing project-specific M&V plans; this supplement provides additional details. The content of this supplement has been updated to include pertinent revisions between M&V version 3.0 and M&V version 4.0 by providing details and updating the content to ensure relevancy.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Summary of Technical Peer Review on the Risk Assessment Framework proposed in Report INL/RPT-22-68656 for Digital Instrumentation and Control Systems

This report summarizes the peer review activities initiated by Idaho National Laboratory (INL) during fiscal year (FY) 2023 for the evaluation and improvement of the methodology developed under the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) risk assessment project. In FY 2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a technical basis to support effective and secure DI&C technologies for digital upgrades/designs. A framework was proposed for this strategy, which aims to (1) provide a best-estimate, risk-informed capability to quantitatively and accurately estimate the risk impact of plant modernization, considering the introduction of high safety-significant safety-related (HSSSR) DI&C systems, (2) support and supplement existing risk-informed DI&C design guides by providing quantitative risk information and evidence, (3) offer a capability of design architecture evaluation of various DI&C systems, (4) assure the long-term safety and reliability of HSSSR DI&C systems, and (5) reduce uncertainty in costs and support integration of DI&C systems in the plant. The R&D efforts of this project from FY 2019 through FY 2022 were focused on methodology improvement and demonstration of the proposed framework for the risk assessment and design optimization of safety-critical DI&C systems. Collaborations with the nuclear industry have been initiated to support the reliability and risk assessment of their DI&C systems by using the proposed framework. In FY 2023, the framework has reached to a point for a technical peer review and obtain stakeholder feedback. This peer review activity includes coordination of the reviews performed by a group of industry stakeholders, documentation of the peer review suggestions, providing resolutions and responses to the peer review comments. The objective of this technical peer review is to obtain representative feedback on the proposed framework to improve the technical qualities of its methodology and readiness for deployment to the industry. Feedback may identify potential areas for improvement and further development. The Subject Matter experts were invited to review the latest project report documenting the methodology developed in the project and provide evaluations of the technical qualities of the proposed framework and relevant methods. The reviewed project report is “An Integrated Framework for Risk Assessment of High Safety-significant Safety-related Digital Instrumentation and Control Systems in Nuclear Power Plants: Methodology and Demonstration” INL/RPT-22-68656 (short as “INL/RPT-22-68656” in this report). This peer review report documents the technical questions provided for technical peer review and introduces the technical peer reviewers from the stakeholders including nuclear utilities, regulators, and universities. Comments from technical peer reviewers and the resolutions and responses to these comments are outlined. Insights and lessons learned from the technical peer review are summarized in conclusions and future work. The primary audience of this report are DI&C designers, engineers, and probabilistic risk assessment (PRA) practitioners. This includes stakeholders, such as the nuclear utilities and regulators who consider the deployment and upgrade of DI&C systems, DI&C software developers and reviewers, and cybersecurity specialists.

99 GENERAL AND MISCELLANEOUS↗

Performance Assessment Closure Plan for the Active Low-Level Burial Ground Trenches 31, 34, and 94 at the Hanford Site

This report documents the closure plan for the active trenches within the Low-Level Burial Grounds of the Hanford Site, namely Trenches 31 and 34 in the 200 West Area and Trench 94 in 200 East Area. This closure plan is developed to meet the requirements of DOE O 435.1, Radioactive Waste Management. It is one of the several technical basis documents, along with the performance assessment (DOE/RL-2021-26, Performance Assessment of Active Trenches in 200 East and West Low-Level Burial Grounds at the Hanford Site), which is required for maintaining the Operating Disposal Authorization Statement as described in DOE-STD-5002-2017, Disposal Authorization Statement and Tank Closure Documentation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Refining Processing Engines from SAPHIRE: Initialization of Fault Tree/Event Tree Solver

SAPHIRE has been extensively employed for over 35 years to model risk-important systems and quantify risk models. As a well-established and thoroughly documented Probabilistic Risk Assessment (PRA) tool, SAPHIRE has continuously tracked computational trends and received regular updates. Despite its ongoing evolution, there remains a need for further enhancements, particularly in dealing with the quantification of exceptionally large models. These improvements could take the form of algorithmic advancements, harnessing the power of parallel computing, and exploring the potential benefits of cloud computing solutions. Considering these aspirations, the notion of a remote solve option was introduced and subsequently evolved into a dedicated project within the SAPHIRE development team. A significant outcome of this initiative is SAPHSOLVE, an engine extracted from the SageRisk API designed specifically for remote solving capabilities. The ongoing project is nearing its culmination, marked by a series of discoveries that have brought undocumented aspects to light. Among these revelations is the intricacy of the input and output format for the SAPHSOLVE engine. This document serves the crucial purpose of meticulously delineating the precise formats for both input and output, as they form an indispensable foundation. The importance of documenting these formats cannot be overstated, as it is a pivotal step in facilitating rigorous testing and comparison. Whether it involves scrutinizing SAPHSOLVE results against those of the internal integrated solver or other external solvers, the ability to construct models or transform existing ones into a compatible SAPHSOLVE format is imperative. Chapter 1 offers a succinct introduction to both SAPHIRE and SAPHSOLVE, followed by Chapter 2 which outlines the roadmap for enhancing SAPHSOLVE. The core of this report is Chapter 3, which intricately elucidates the intricacies of the input and output file formats. To provide a tangible illustration of these formats, a rudimentary example has been compiled and is available in Appendix. SAPHSOLVE represents a novel external solving mechanism developed by the SAPHIRE team, although it has not yet reached the full spectrum of capabilities possessed by SAPHIRE's internal solver. However, the SAPHIRE team has set a comprehensive course for incorporating the functionalities of SAPHSOLVE. A comprehensive outlook on the future of SAPHSOLVE is expounded upon in Chapter 4.

97 MATHEMATICS AND COMPUTING↗

MARVEL 90% Final Design Report

This document provides documentation of the Microreactor Applications Research Validation and Evaluation Project’s (MARVEL) 90% Final Design, as required by U.S. Department of Energy (DOE) Standard-1189, “Integration of Safety into the Design Process." Per DOE-STD-1189-2016, the 90% Final Design documentation focuses on design completion, at a level capable of supporting procurement, construction, testing, and operation. At this phase, the design organization finalizes the hazards and accident analyses, Fire Hazard Analysis (FHA), security vulnerability assessments, and other supporting analyses for design completion. The objective of this report is to provide a high-level summary of the design thus far and provide references including, but not limited to, the following design deliverables: • Complete final drawings, specifications and commercial grade dedications that may be released for bid and/or construction. • Clearly defined testing plans for the safety and functionality of all subsystems. • Quality Assurance Program for Design, Testing and Procurement. • Software Quality Assurance Plan. • Code of Record (COR), applicable design requirements including codes and standards. • Final design that meets all the requirements stipulated in the COR. • Final design review, consisting of final validation of comment resolution from previous reviews, and a review of any additional developments since the last review. • Updated Safety Design Strategy. • Hazard Analysis. • Fire Hazard Analysis. • Accident analysis. • Security vulnerability assessment. • Current and detailed cost estimate. • Current construction schedule, and • Risk & Opportunities Assessment.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Renewable Energy Guidance for Industry

This document is intended to help Better Plants partners navigate the renewable energy market by providing background on renewable technologies and their benefits as well as a wide range of purchasing options available to organizations. This guidance provides helpful information on adopting renewables by highlighting tools and resources for evaluating renewable energy projects. It also provides information on how renewable energy resources are accounted for by Better Plants reporting requirements. A separate supplemental document to this guidance is available that provides more in-depth information about renewable technologies. This guidance document is applicable to Better Plants partners participating at either the program or challenge level. Although the guidance is primarily intended to assist companies participating in Better Plants, the methodologies and information within are applicable to any organization interested in exploring and adopting renewable energy.

09 BIOMASS FUELS↗

Advanced Fuel Cycle Cost Basis Report: Module D1-1: Uranium-based Ceramic LWR Fuel Fabrication (Rev.2)

Cost module on LWR fuel fabrication to accompany the Advanced Fuel Cycle Cost Basis Report. In this update, we are adding detailed life cycle cost data and a calculated, levelized fabrication cost derived from a non-proprietary bottom-up estimate prepared in 1978 by Oak Ridge National Laboratory (ORNL) (Judkins and Olsen 1978a). In 2018, the 1978 ORNL estimate was escalated by SA&I authors to 2017 USD using factors that represent inflation, escalation above inflation typical of nuclear projects, and the effects of more stringent safety and environmental regulations. In this FY-21 document, the $/kgU results in 2017 USD from the unpublished 2018 interim study (Williams and Ganda 2018) can be escalated to 2020 USD using a factor of 1.052. The literature-based unit cost (or price) data from previous (2004–2017) AFC-CBRs are escalated to 2020 USD using factors from Chapter 8 of the main FY-21 AFC-CBR document. This data, in addition to the results of the updated bottom-up estimate, are used to define the “what-it-takes” (WIT) range for the unit fabrication costs for conventional ceramic UOX light-water reactor (LWR) fuel. This FY-23 document also includes calculated unit costs for accident-tolerant LWR fuels (ATFs) of three different types. Some of these fuels constitute a ceramic pelletized form with fuel meat uranium compounds other than UO2 (a.k.a.,. UOX), thus the change in the title of this module in which the word “UO2” is changed to “Uranium-based Ceramic.”

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

L4-3 Developing DOE M441.1-1 Compliant Container Components: Filter Cup Experimental Fixture Test Data Verification

This document serves to provide technical documentation and justification for using the Filter Cup Experimental Fixture (FCEP) for filter efficiency and pressure drop testing in the Enhanced Filter Test System (EFTS). This document assumes that the reader has prior knowledge related to both of these systems, as well as the SAVY-4000® nuclear material container series filter technology.

42 ENGINEERING↗

Annual Transuranic Waste Inventory Report – 2015 (Data Cutoff Date 12/31/2014)

The purpose of this Annual Transuranic Waste Inventory Report – 2015 (ATWIR-2015) is to document the updated inventory estimate of transuranic (TRU) waste reported by the TRU waste generator sites as of December 31, 2014. This updated inventory information is provided to the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) and is available to the DOE TRU waste complex, Waste Isolation Pilot Plant (WIPP) stakeholders, and regulators. The TRU waste inventory information is used for strategic planning, supports DOE/CBFO’s input into documents (e.g., WIPP Documented Safety Analysis and National Environmental Policy Act analyses), the development of new containers or shipping packages, planned change requests, and other design changes that may take place in the repository. Furthermore, if requested by DOE/CBFO, this report will provide the basis for the Performance Assessment Inventory Report for performance assessment modeling. This report focuses on the TRU waste stored or projected to be generated (up through calendar year [CY] 2033) at the TRU waste generator sites.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Transuranic Waste Inventory Report – 2016 (Data Cutoff Date 12/31/2015)

The purpose of this Annual Transuranic Waste Inventory Report – 2016 (ATWIR-2016), using a cutoff date of December 31, 2015, is to document the updated inventory estimate of transuranic (TRU) waste reported by the TRU waste generator sites in the Annual Transuranic Waste Inventory Report – 2015 (ATWIR-2015) (DOE 2015a) that had a cutoff date of December 31, 2014. This updated inventory information is provided to the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) and is available to the DOE TRU waste complex, Waste Isolation Pilot Plant (WIPP) stakeholders, and regulators. The TRU waste inventory information is used for strategic planning, and supports DOE/CBFO’s input into documents (e.g., WIPP Documented Safety Analysis and National Environmental Policy Act analyses), the development of new containers or shipping packages, planned change requests, and other design changes that may take place in the repository. Furthermore, if requested by DOE/CBFO, this report will provide the basis for the Performance Assessment Inventory Report for performance assessment (PA) modeling. This report focuses on the TRU waste stored or projected to be generated (up through calendar year [CY] 2050) at the TRU waste generator sites.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗