Search NASA⌕ Search

SEARCH · Search NASA

Results for “Integrated Resource Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,711 records · Page 95

Technology Strategy Assessment: Findings from Storage Innovations 2030 Thermal Energy Storage

The concept of thermal energy storage (TES) can be traced back to early 19th century, with the invention of the ice box to prevent butter from melting. Modern TES development began with building heating and cooling and concentrated solar thermal technologies for power generation in the early 1900s and late 1970s, respectively. TES systems provide many advantages compared with other long-duration energy storage (LDES) technologies, which include low costs, long operational lives, high energy density, synchronous power generation capability with inertia that inherently stabilizes the grid, and the ability to output both heat and electricity. TES Use Cases TES technologies can couple with most renewable energy systems, including wind, photovoltaic, and concentrated solar thermal energy, and can be used for heat-to-heat, heat-to-electricity, electricity-to-heat, and electricity-to-electricity (bidirectional electricity) applications. The three types of TES that have heat as an input or output are grouped together for the purposes of this report. Retrofitting retired thermal power plants can be a potential cost-effective option for TES with electricity output because they both use a similar thermal-to-electricity type of conversion. Additionally, TES can directly serve heat demand for buildings and industrial processes, displacing fossil fuels to achieve broad decarbonization. Bidirectional Electricity Figure 1 shows a bidirectional electricity TES (ETES) architecture that is emerging as a prime technology for LDES at a grid scale. The ETES technology can utilize existing TES technology infrastructures, has no geological limitations (such as mountains and water for pumped storage hydro, underground natural caverns for compressed-air energy storage, etc.), and is capable of deployment anywhere in the United States and the world for broad uses. Particularly, ETES technology can be placed at retired fossil-fueled thermal power plants to reuse decommissioned assets, protect job security in associated communities, and provide resilient and high-inertia (i.e., spinning) power to the grid. Heat Input and Output There also are many ways to integrate TES within heat-to-electricity, heat-to-heat, and electricity-to-heat applications, such as those used in concentrating solar power (CSP), buildings, district heating, and industry process heat applications. These categories can be further classified for low- and high-temperature applications. High-temperature thermal energy storage (HTTES) heat-to-electricity TES applications are currently associated with CSP deployments for power generation. TES with CSP has been deployed in the Southwestern United States with rich solar resources and has proved its value to the electric grid. Electricity-to-heat and heat-to-heat HTTES applications present great potential for decarbonizing energy-intensive industrial process heat applications [8, 9], such as iron ore processing, iron smelting, cement production, glass manufacturing, mineral processing, and chemical production. Some industrial processes require process heat at temperatures > 1,400°C, so HTTES can be utilized to reduce fuel consumption in those processes through fuel, oxidizer, and process material pre-heating. Thermal energy storage for augmenting existing industrial process heat applications makes a much more attractive economic case because the energy penalty due to thermal-to-electric conversion is eliminated. Co-located applications of power production and heat also can add to the value stacking of integrating utility-scale TES; however, these scenarios are very case specific and not practically possible in many cases. These constraints are primarily attributed to the existing infrastructure being designed, developed, and constructed for many decades around the most economically feasible technologies, such as electricity and a selection of fossil fuels for heat input. Low-temperature TES can be utilized for building and district heating and cooling, as well as some process heat applications in electricity-to-heat and heat-to-heat configurations. Lower temperature TES (LTTES) can be added to heat pump equipment (electric input), either directly interacting with the refrigerant in the condenser or evaporator, or through a secondary heat transfer fluid. It also can be integrated in the building envelope or within the ducts of the heating, ventilation, and air conditioning (HVAC) system. Cost-effective integration of TES into buildings adds significant cost, and it is one of the key barriers preventing the commercialization and deployment of TES. The optimal strategy for integrating TES with buildings has yet to be determined for various applications of TES. Nevertheless, thermal storage materials are far less costly per unit of energy stored than electricity storage materials. This means that thermal storage has the potential to reduce the cost to society of energy storage.

25 ENERGY STORAGE↗

Design and implementation of two two-week Teacher Enhancement Institutes

During this summer, I have been part of a four team effort that planned and executed two two-week Teacher Enhancement Institutes (TEI) for 40 K-8 teachers from this area. The TEI was designed to enhance teachers' background in aeronautics and technology so that they would be better equipped to encourage and to train students in the mathematics, science, and technology fields. The teachers were given a stipend and three graduate credits from Christopher Newport University for their participation in this program. The four ASEE fellows worked together to develop objectives and a schedule of activities for each two-week session based on the program outline given in the grants that were funding this effort. We divided the responsibilities in coordinating and implementing each part of the TEI based on the specific strengths and background of each ASEE fellow. My specific responsibilities were: (1) to develop the course syllabus and generally handle all matters involved with the graduate course; (2) coordinate the follow-up sessions; and (3) design and manage half of the technology sessions that we had scheduled (approximately 30% of the TEI was devoted to technology). Because the first two responsibilities were primarily administrative in nature, I will address only the last. The technology sessions were divided into computer-only and other technologies (e.g., television and digital technology including scanning, digital photography and CD-ROM). I had responsibility for the computer-only technology sessions. The emphasis of these sessions was on use of the Internet specifically to locate and use educational resources. To maximize learning, these sessions were hands-on with two teachers at each computer. Each teacher received instruction in, and actually used, the most popular tools available on the Internet: email (they were given temporary accounts at NASA LaRC), anonymous ftp and archie, gopher and veronica, mosaic, and telnet. Teachers participated in hands-on workshops to learn about these programs, but were also given time during the two-week session to explore on their own and to find resources on the Net that specifically met their needs. In order to ensure that Internet access continues after their return to the classroom, aIl teachers who did not have them also applied for Learning Link accounts (from WHRO, the local public television station) and Virginia Pen accounts (from the Department of Education of Virginia), both of which allow textbased access to Internet. In addition to getting exposure to and practice with Internet tools, teachers were aIso given a hands-on seminar (and also given practice time) on ClarisWorks, an integrated word processing, spreadsheet, database, and paint package. The technology sessions (and TEI as a whole) were enthusiastically received by both new and more experienced teachers as extremely helpful in improving their ability to use technology in developing lesson pIans.

Lambert, Lynn↗

Evolution of Stakeholder Relations at the Mound Laboratory-End of DoE's Mission to the Present - 19551

In November 1989, the same month the Berlin Wall fell, the US Environmental Protection Agency (EPA) placed the Mound Laboratory (Mound Plant or Mound site) in Ohio on the National Priorities List (NPL) due to volatile organic compound contamination in the groundwater. As a result of the Cold War ending, the United States sought to greatly reduce the nation's nuclear weapons arsenal, consolidate the US Department of Energy's (DOE) mission, and close many DOE facilities. In 1991, the City of Miamisburg learned that DOE was planning to close the Mound Laboratory. The city spent two years lobbying in Washington, DC, to keep the facility open; however, that effort was not successful. By 1993, DOE, EPA, and Ohio EPA had signed a Federal Facility Agreement that formalized EPA and Ohio EPA oversight of the DOE environmental cleanup of the Mound NPL site under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The decontamination and cleanup of the Mound site fell under two federal laws, CERCLA and the Resource Conservation and Recovery Act. DOE, EPA, Ohio EPA, the City of Miamisburg, and other local stakeholders all agreed that the Mound site should be cleaned up to an industrial/commercial land use standard. This would allow the site to transition into a privately owned business park. In 1994, the City of Miamisburg created the nonprofit Miamisburg Mound Community Improvement Corporation (MMCIC) that would own, market, and redevelop the site. The City also chartered the Mound Reuse Committee to act as an independent advisory organization, composed of representatives from the local community and business, government, education, and special interest groups. In 1994, DOE and the MMCIC entered into a lease agreement that facilitated immediate reuse of site buildings that were no longer required by DOE and did not require remediation. In 1995, DOE, EPA, and Ohio EPA developed the Mound 2000 Process to more effectively use CERCLA Removal Action authority to evaluate and remediate, as necessary, disparate areas of the Mound site. The Mound 2000 process divided the site into smaller, more manageable areas that accelerated cleanup and allowed areas to be reused more quickly. All areas of the Mound site were cleaned up to meet the EPA standard for industrial/commercial land use. The CERCLA process included opportunities for the public to review proposed cleanup strategies. Public input on cleanup and reuse included that from local citizens, businesses, Miamisburg City Council, local schools and financial institutions, Ohio EPA, Montgomery County, and the State of Ohio. In 1998, while site cleanup was still in process, DOE agreed to sell the entire Mound property to the MMCIC for $10.00. The site sales agreement accelerated reuse by allowing DOE to offer ownership of discrete land parcels to MMCIC as soon as EPA confirmed those areas met CERCLA standards for property transfer. This allowed the Mound site to become one of the first former DOE weapons sites to transition to reuse as a privately owned and operated community asset. Many other former DOE production facilities require continued federal ownership to protect the integrity of the environmental cleanup. In 2011, the MMCIC changed its name to the Mound Development Corporation (MDC) and continued to transition the site for reuse as part of the Mound Business Park. The MMCIC/MDC is a nonprofit economic development arm of the City of Miamisburg. DOE supported the economic development efforts with grants and matching funds. Individual land parcels were transferred from DOE to the MDC according to the DOE Mound Land Transfer Process. Ownership of parcels was transferred to the MDC via quitclaim deeds with no repair, replacements, or rebuild of areas. Each parcel's quitclaim deed contains the CERCLA institutional controls. To reduce the property tax burden, the Miamisburg City Council passed an ordinance that allowed the City to accept temporary ownership of specific parcels and hold ownership until the MDC could either lease or sell them. With the exception of one 23-acre parcel that includes the Operable Unit 1 area (site of former sanitary landfill), the entire site has been transferred to the MDC. Today, the former Mound Laboratory site is home to the vibrant Mound Business Park operated by the MDC. The site contains numerous buildings with active businesses and multiple areas suitable for new construction. Private companies continue cutting-edge work that carries forward the legacy of more than 50 years of DOE research, development, production, and inspiration from the former Mound Laboratory scientists, engineers, technicians, and support personnel. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Science and the Constellation Systems Program Office

An underlying tension has existed throughout the history of NASA between the human spaceflight programs and the external scientific constituencies of the robotic exploration programs. The large human space projects have been perceived as squandering resources that might otherwise be utilized for scientific discoveries. In particular, the history of the relationship of science to the International Space Station Program has not been a happy one. The leadership of the Constellation Program Office, created in NASA in October, 2005, asked me to serve on the Program Manager s staff as a liaison to the science community. Through the creation of my position, the Program Manager wanted to communicate and elucidate decisions inside the program to the scientific community and, conversely, ensure that the community had a voice at the highest levels within the program. Almost all of my technical contributions at NASA, dating back to the Apollo Program, has been within the auspices of what is now known as the Science Mission Directorate. However, working at the Johnson Space Center, where human spaceflight is the principal activity, has given me a good deal of incidental contact and some more direct exposure through management positions to the structures and culture of human spaceflight programs. I entered the Constellation family somewhat naive but not uninformed. In addition to my background in NASA science, I have also written extensively over the past 25 years on the topic of human exploration of the Moon and Mars. (See, for example, Mendell, 1985). I have found that my scientific colleagues generally have little understanding of the structure and processes of a NASA program office; and many of them do not recognize the name, Constellation. In many respects, the international ILEWG community is better informed. Nevertheless, some NASA decision processes on the role of science, particularly with respect to the formulation of a lunar surface architecture, are not well known, even in ILEWG. At the recent annual Lunar and Planetary Science Conference, I reviewed the evolution of the program as a function of Agency leadership and the constraints put on NASA by the President in his 2004 announcement. I plan to continue my long-time ILEWG tradition of reporting a personal view of the state of development of human exploration of the solar system, this time coming from within the program office tasked to implement the vision for the United States. The current NASA implementation of the Vision for Space Exploration is consistent with certain classical scenarios that have been discussed extensively in the literature. I will discuss the role of science within the Vision, both from official policy and from a de facto interaction. While science goals are not officially driving the implementation of the Vision, the tools of scientific exploration are integral to defining the extraterrestrial design environments. In this respect the sharing of results from international missions to the Moon can make significant contributions to the success of the future human activities.

Mendell, Wendell↗

3D Play Fairway Analysis for Examining of Superhot Reservoir Production Scenarios

The DEEPEN (DE-risking Exploration for geothermal Plays in magmatic ENvironments) project was a multi-laboratory, international effort to reduce uncertainty and improve resource characterization in superhot geothermal systems. Building on this foundation, this work advances open-source tools designed to lower the exploration risk and cost of superhot geothermal projects while promoting transparency, reproducibility, and efficiency in exploration workflows. These tools are being tested at two key sites: (1) the Nesjavellir Geothermal Area in Iceland, where the Icelandic Deep Drilling Project (IDDP) will drill its third well, and (2) Newberry Volcano in Oregon, USA, where Mazama Energy will pilot the first superhot enhanced geothermal system (EGS). A major outcome is the creation of a modular, open-source Python framework for play fairway analysis (PFA) in 2D and 3D, called geoPFA. The PFA workflow has been expanded to produce pseudo conceptual models, and will soon be refined to assess reservoir components through integration with the thermo-hydraulic-mechanical-chemical (THMC) simulator TReactMech, to enable iterative coupling between PFA and THMC models, improving characterization of superhot systems. All three of the Icelandic Deep Drilling Project's production scenarios were analyzed via this framework: (1) a superhot deep injection well paired with conventional production wells at Nesjavellir, (2) a superhot deep production well at Nesjavellir, and (3) superhot enhanced geothermal system at Newberry Volcano. This analysis provides useful insights around conceptual modeling of these production scenarios, helping to inform decisions around which scenario is best suited for which types of environments.

15 GEOTHERMAL ENERGY↗

3D Play Fairway Analysis for Examining of Superhot Drilling Production Scenarios: Preprint

The DEEPEN (DE-risking Exploration for geothermal Plays in magmatic ENvironments) project was a multi-laboratory, international effort to reduce uncertainty and improve resource characterization in superhot geothermal systems. Building on this foundation, this work advances open-source tools designed to lower the exploration risk and cost of superhot geothermal projects while promoting transparency, reproducibility, and efficiency in exploration workflows. These tools are being tested at two key sites: (1) the Nesjavellir Geothermal Area in Iceland, where the Icelandic Deep Drilling Project (IDDP) will drill its third well, and (2) Newberry Volcano in Oregon, USA, where Mazama Energy will pilot the first superhot enhanced geothermal system (EGS). A major outcome is the creation of a modular, open-source Python framework for play fairway analysis (PFA) in 2D and 3D, called geoPFA. The PFA workflow has been expanded to produce pseudo conceptual models, and will soon be refined to assess reservoir components through integration with the thermo-hydraulic-mechanical-chemical (THMC) simulator TReactMech, to enable iterative coupling between PFA and THMC models, improving characterization of superhot systems. All three of the Icelandic Deep Drilling Project's production scenarios were analyzed via this framework: (1) a superhot deep injection well paired with conventional production wells at Nesjavellir, (2) a superhot deep production well at Nesjavellir, and (3) superhot enhanced geothermal system at Newberry Volcano. This analysis provides useful insights around conceptual modeling of these production scenarios, helping to inform decisions around which scenario is best suited for which types of environments.

15 GEOTHERMAL ENERGY↗

Third-Party Aggregation Rulemaking in MISO and SPP Footprints

The report highlights key considerations for retail regulators in the footprints of the Southwest Power Pool (SPP) or Midcontinent Independent System Operator (MISO) in states that previously opted out of allowing third-party aggregation participation under FERC Order 719 and that may want to explore reversing the decision due to a changing policy environment under new FERC orders (i.e., 2222) and/or tightening resource adequacy constraints. Through a document review and a series of 27 interviews with regulators, aggregators, and other industry professionals, this document provides a high-level policy overview of the retail regulator’s role in a selection of processes, rules, and regulations to better understand how states have treated and/or integrated aggregators into wholesale markets. The report summarizes findings in two sections: General Findings and Specific Policy Findings. The General Findings offer high level takeaways such as the fact that 17 of the 20 states in MISO and SPP footprints opted out of third party aggregations following Order 719. Additionally, there is only one state that is fully restructured in the MISO and SPP footprints whereas the rest are vertically integrated, and the majority of third-party aggregations in the U.S. take place in restructured states outside of these footprints. Even so, third-party aggregations do take place in MISO and SPP albeit in small numbers and in an ad hoc regulatory environment. The specific policy findings delve deeper into specific examples of state actions on the topics of jurisdiction, registration and licensing, data governance, dual participation, and dispute resolution. Tables in each category organize state actions into Tiers I-III, which roughly correspond to the possible level of involvement or possible change necessary by state regulators and/or legislators to implement these actions. The tier level does not indicate any value judgement, as each state has respective regulatory limitations and each decision comes with various tradeoffs. One main tradeoff is between simplicity and quick implementation versus comprehensive and prolonged implementation. In many cases, actions in Tier I could be implemented without significant changes by relying on the use of existing processes for an aggregator context. On the other hand, many actions in Tier III are more narrowly designed to address aggregators specifically, but often require more significant changes including the involvement of additional parties through stakeholder engagement or legislative action. In some cases, these tiers are discrete. However, state regulators may also choose to progress through these various tiers sequentially as they phase in aggregators while learning from their experience. With the ability to stack bulk system level services, distributed energy resource aggregations in MISO and SPP could provide various private benefits (e.g., increased value streams to the owner) as well as societally beneficial grid services (e.g., peaking capacity, ancillary services, and other services that increase the grid’s overall operational efficiency). In deciding how to best to enable these benefits, states and retail regulators must weigh various tradeoffs if considering reversing a previous opt out.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Western States Building Energy & Controls Apprenticeship (BECA) Program

How does this project help to understand the challenges of workforce development in the commercial building energy management industry? The purpose of this project was to create a replicable, scalable, and portable apprenticeship program for building energy management and controls. This paper will demonstrate how local processes can be more adaptable and inclusive than federal processes in achieving workforce development goals. Our work provides insights into the technical effectiveness of the program, enabling others to achieve greater success in their workforce development initiatives. The project required more time and financial resources than initially anticipated and spent a year in a no-cost extension working to accomplish the Statement of Project Objectives. The original goal was to create an Industry Related Apprenticeship Program (IRAP). The development of this apprenticeship presented challenges due to the lack of existing programs for reference and the absence of relevant industry classification codes by the Department of Labor (DOL). Notably, the role of a commercial building energy analyst is not recognized by the DOL. The SIC (industry codes) do not have a good description of this job. There are many that may fall into related categories, but none are the actual duties of an energy analyst. Discussions with the DOL indicated that substantial groundwork was necessary before a national apprenticeship program could be implemented, causing delays in the program’s commencement. As a result, students experienced longer wait times before starting their apprenticeship component. The apprenticeship program officially launched on September 14, 2021. The success of the State of Oregon’s apprenticeship program, the first of its kind in the state, underscored the flexibility and effectiveness of local initiatives compared to federal efforts. The COVID-19 pandemic also significantly impacted the project’s success. Beginning in March 2020, the pandemic led to widespread closures of schools and colleges by fall 2020. By September 2021, when the apprenticeship option became available, enrollment in colleges and universities nationwide had decreased, affecting student participation in the program. Moreover, as employers transitioned their employees to remote work, there was limited interaction with external personnel, influencing the willingness of training agents (employers) to integrate additional workers into their teams. This paper addresses several challenges encountered during the project, with the hope that future workforce development efforts will benefit from these experiences. We Final Technical Report 4 | Page encourage others to engage with state and federal agencies to enhance and update pathways for workforce development and apprenticeship programs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

An Architectural Survey of the REECo Maintenance Compound, Area 6, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) plans to install a 26.45-mile-long 138-kilovolt (kV) transmission line on the Nevada National Security Site (NNSS) in Nye County, Nevada. This new transmission line will upgrade the electrical transmission system and provide reliable power between Mercury Switching Station in Area 23 and the U1a Facility in Area 1. The proposed upgrade to the power transmission system constitutes an undertaking subject to review under Section 106 of the National Historic Preservation Act (NHPA) (54 United States Code [USC] § 306101) and its implementing regulations, 36 Code of Federal Regulations (CFR) Part 800. A portion of this new transmission line will cross the western perimeter of the Reynolds Electrical and Engineering Company (REECo) Maintenance Compound located in Area 6 of the NNSS. This compound with its trade shops, storage sheds, and yards served as a general construction facility that supported nuclear testing activities on the NNSS from 1967 to 1992. Although three architectural resources in the compound have previously been recorded and evaluated for the National Register of Historic Places (NRHP), other resources within it have not, nor has the compound been recorded and evaluated as a potential district. The State Historic Preservation Officer (SHPO) concurred with NNSA/NFO’s determination that the unevaluated REECo Maintenance Compound will be adversely affected by the proposed undertaking (Reed 2021). The NNSA/NFO, in consultation with the SHPO, then developed the Memorandum of Agreement DE-GM58-22NA25553 between the U.S. Department of Energy and the Nevada State Historic Preservation Officer Regarding Installation of a 138-kilovolt Transmission Line from the Mercury Switching Station to the U1a Facility and the Removal of the Historic 138-kilovolt Transmission Line from the Mercury Switching Station to the U1a Facility in Areas 1, 3, 5, 6, and 23 of the Nevada National Security Site, Nye County, hereafter referred to as the MOA. This architectural survey report was prepared in accordance with MOA Stipulation III.B. It describes the origins, history, layout, and functions of the REECo Maintenance Compound during the Cold War and identifies contributing and noncontributing resources. The report defines a district boundary based on archival research and the field survey and concludes with an appendix that presents digital color images of the compound with descriptions and a map key showing image viewpoints and directions. Although none of the architectural resources are recommended individually eligible, the district evaluation concludes the REECo Maintenance Compound is eligible as a historic district for listing in the NRHP under the Secretary of the Interior’s Significance Criteria A and C at the local level. The historic district retains all seven aspects of integrity and conveys its significance under the abovementioned criteria.

138 kV↗

Sagebrush Flat Wildlife Area 2008 Annual Report.

The Sagebrush Flat Wildlife Area is a 12,718 acre complex located in Douglas County, Washington. Four distinct management units make up the area: Bridgeport, Chester Butte, Dormaier and Sagebrush Flat. The four Units are located across a wide geographic area within Douglas County. The Units are situated roughly along a north/south line from Bridgeport in the north to the Douglas/Grant county line in the south, 60 miles away. The wildlife area was established to conserve and enhance shrubsteppe habitat for the benefit shrubsteppe obligate and dependent wildlife species. In particular, the Sagebrush Flat Wildlife Area is managed to promote the recovery of three state-listed species: Columbian sharp-tailed grouse (threatened), greater sage grouse (threatened) and the pygmy rabbit (endangered). The US Fish and Wildlife Service also list the pygmy rabbit as endangered. Wildlife area staff seeded 250 acres of old agricultural fields located on the Sagebrush Flat, Dormaier and Chester Butte units. This has been a three project to reestablish high quality shrubsteppe habitat on fields that had either been abandoned (Dormaier) or were dominated by non-native grasses. A mix of 17 native grasses and forbs, most of which were locally collected and grown, was used. First year maintenance included spot spraying Dalmatian toadflax on all sites and mowing annual weeds to reduce competition. Photo points were established and will be integral to long term monitoring and evaluation. Additional monitoring and evaluation will come from existing vegetation transects. This year weed control efforts included spot treatment of noxious weeds, particularly Dalmatian toadflax, in previously restored fields on the Bridgeport Unit (150 acres). Spot treatment also took place within fields scheduled for restoration (40 acres) and in areas where toadflax infestations are small and relatively easily contained. Where toadflax is so widespread that chemical treatment would be impractical, we use the bioagent Mecinus janthinus, available through Professor Gary Piper of Washington State University. This year we released 4,000 M. janthinus on the Bridgeport Unit at 6 separate locations. Since 2002 we have released approximately 14,400 of these insects, 80% of these on the Bridgeport Unit. Additional weed control activities included mowing and spot spraying more than 32 miles of roads, cutting and removal of annual weeds within fenced deer exclosures. We upgraded the solar powered irrigation system that supplies water to a stand of water birch trees planted in 2002. Wildlife area staff designed and built a new solar array and installed a higher capacity pump. The increased capacity will ensure that these trees receive adequate water through the hot summer months and allow us to create at least one additional stand. This project is an important part in our effort to expand the available winter habitat for sharp-tailed grouse on the Bridgeport Unit. Maintenance of fences, parking areas and roads continued during throughout the year. Two parking areas, at Chester Butte and Bridgeport, were graded and additional gravel added. Roads on the Bridgeport Unit were graded and repaired following spring runoff. Trespass and dumping issues have increased in recent years on the Bridgeport Unit. To address these problems we constructed four steel gates at access points on this unit. Each gate is tubular steel attached to 8-inch diameter steel posts, 10 feet long that are cemented into the ground. Two gates allow access to BPA substation facilities and power-line right-of ways so placement, construction and locking issues had to be coordinated with BPA's Real Estate staff in Spokane. Environmental Compliance Documentation issues were addressed again this year. This process has the potential to cause delays the completion of projects within the fiscal year. With this in mind and an eye toward the future, we requested that several projects planned for the coming years be surveyed this year. Beginning in August of 2007, area staff worked with BPA staff to identify work elements that had the potential to disturb cultural resources. Subsequently, in April of 2008, BPA staff archaeologists surveyed numerous sites and several miles of fence line. Final clearance to proceed was granted in August of 2008. This year we submitted and were awarded a grant from the state Recreation and Conservation Office. This grant will provide funding to restore native shrubsteppe habitat on 335 acres of old CRP fields located on the Bridgeport Unit. These fields were planted to non-native grasses in 1988 and currently have marginal habitat values for shrubsteppe obligate and dependent wildlife. Assuming that the state legislature allocates the funds, which, given the state's financial condition is not a sure thing, work on this project can begin late in the summer of 2009.

13 HYDRO ENERGY↗

The use of commercial and industrial waste in energy recovery systems - A UK preliminary study

Highlights: > Commercial and industrial waste samples collected. > Samples analysed for calorific value, moisture, ash and elemental composition. > Values similar to those of municipal solid waste and refuse derived fuel. > Sampled waste could be used in current energy recovery systems with minimal retrofitting. > Sampled waste could account 6.5% towards the UK's 2020 renewable electricity target if all qualifying waste is used. - Abstract: With 2020 energy targets set out by the EU fast approaching, the UK is trying to source a higher proportion of its energy from renewable resources. Coupled with this, a growing population and increasing trends in consumer demand have resulted in national waste loads increasing. A possible solution to both issues is energy-from-waste (EfW) technologies. Many studies have focused on municipal solid waste (MSW) as a potential feedstock, but appear to overlook the potential benefits of commercial and industrial waste (C and IW). In this study, samples of C and IW were collected from three North West waste management companies and Lancaster University campus. The samples were tested for their gross and net calorific value, moisture content, ash content, volatile matter, and also elemental composition to determine their suitability in EfW systems. Intra-sample analysis showed there to be little variation between samples with the exception two samples, from waste management site 3, which showed extensive variation with regards to net calorific value, ash content, and elemental analysis. Comparisons with known fuel types revealed similarities between the sampled C and IW, MSW, and refuse derived fuel (RDF) thereby justifying its potential for use in EfW systems. Mean net calorific value (NCV) was calculated as 9.47 MJ/kg and concentrations of sulphur, nitrogen, and chlorine were found to be below 2%. Potential electrical output was calculated using the NCV of the sampled C and IW coupled with four differing energy generation technologies. Using a conventional incinerator with steam cycle, total electrical output was calculated as 24.9 GWh, based on a plant operating at 100,000 tpa. This value rose to 27.0 GWh when using an integrated gasification combined cycle. A final aspect of this study was to deduce the potential total national electrical output if all suitable C and IW were to be used in EfW systems. Using incineration coupled with a steam turbine, this was determined to be 6 TWh, 1.9% of the national demand thereby contributing 6.5% towards the UK's 2020 renewable electricity target.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Evaluation of Building 23-702, Los Alamos Scientific Laboratory H-8 Foil Handling Building, Mercury, Area 23, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE) National Nuclear Security Administration Nevada Field Office (NNSA/NFO) plans to demolish Building 23-702, the Los Alamos Scientific Laboratory (LASL) H-8 Foil Handling Building (Nevada State Historic Preservation Office [SHPO] Resource No. B15278) at the Nevada National Security Site (NNSS) in Nye County, Nevada. The NNSA/NFO is implementing a long-term project to modernize the town of Mercury for future mission needs. The project is considered an undertaking subject to review under Title 54 of United States Code (USC) § 306108, commonly known as Section 106 of the National Historic Preservation Act, Title 54 USC § 300101, et seq., and its implementing regulations, Title 36 of the Code of Federal Regulations (36 CFR) Part 800. In 2018, Desert Research Institute (DRI) completed an architectural survey of the town of Mercury. This effort resulted in the identification, recordation, and evaluation of the Mercury Historic District (MHD, SHPO Resource No. D230), including the identification of its contributing elements (Reno et al. 2018). The MHD was recommended eligible for listing in the National Register of Historic Places (NRHP, National Register) under the Secretary of the Interior’s (SOI) Significance Criteria A and C, as defined in 36 CFR Part 60.4, as a significant concentration of buildings and structures with a direct and important association with Cold War-era nuclear testing from 1951 through 1992. As part of the modernization program for Mercury, the NNSA/NFO and the SHPO executed the 2018 Programmatic Agreement Between the National Nuclear Security Administration Nevada Field Office and the Nevada State Historic Preservation Officer Regarding Modernization and Operational Maintenance of the Nevada National Security Site, at Mercury in Nye County, Nevada (Mercury PA). The Mercury PA includes streamlined Section 106 procedures for undertakings in the MHD based on contributing element categories. Building 23-702 is identified in Appendix C of the Mercury PA as a Category I contributing element, indicating that it might be individually eligible for the NRHP. It is a historic property for the purposes of Section 106 compliance and subject to the stipulations of the Mercury PA. Per Stipulation VI of the Mercury PA, when the Area of Potential Effect (APE) for an undertaking includes Category I elements, the NNSA/NFO must evaluate the Category I elements for individual NRHP eligibility under all of the SOI Significance Criteria prior to initiating any activity that may affect the elements. The purpose of this report is to evaluate Building 23-702 as a potential individually eligible historic property in fulfillment of Stipulation VI of the Mercury PA. The evaluation detailed herein concludes that Building 23-702 is not individually eligible for listing in the NRHP. Although it retains aspects of integrity and continues to contribute to the MHD, it is not individually significant under any of the SOI Significance Criteria.

54 ENVIRONMENTAL SCIENCES↗

Emigration of Natural and Hatchery Naco x (Chinook salmon; Oncorhynchus tshawytscha) and Heeyey (Steelhead; Oncorhynchus mykiss) Smolts from the Imnaha River, Oregon from 5 October 2006 to 21 June 2007, Annual Report 2007.

This report summarizes the Nez Perce Tribe (NPT) Department of Fisheries Resources Management (DFRM) results for the Lower Snake River Compensation Plan (LSRCP) Hatchery Evaluation studies and the Imnaha River Smolt Monitoring Program (SMP) for the 2007 smolt migration from the Imnaha River, Oregon. These studies are closely coordinated and provide information about juvenile natural and hatchery spring/summer Naco x (Chinook Salmon; Oncorhynchus tshawytscha) and Heeyey (steelhead; O. mykiss) biological characteristics, emigrant timing, survival, arrival timing and travel time to the Snake River dams and McNary Dam (MCD) on the Columbia River. These studies provide information on listed Naco x (Chinook salmon) and Heeyey (steelhead) for the Federal Columbia River Power System (FCRPS) Biological Opinion (NMFS 2000). The Lower Snake River Compensation Plan program's goal is to maintain a hatchery production program of 490,000 Naco x (Chinook salmon) and 330,000 Heeyey (steelhead) for annual release in the Imnaha River (Carmichael et al. 1998, Whitesel et al. 1998). These hatchery releases occur to compensate for fish losses due to the construction and operation of the four lower Snake River hydroelectric facilities. One of the aspects of the LSRCP hatchery evaluation studies in the Imnaha River is to determine natural and hatchery Naco x (Chinook salmon) and Heeyey (steelhead) smolt performance, emigration characteristics and survival (Kucera and Blenden 1998). A long term monitoring effort was established to document smolt emigrant timing and post release survival within the Imnaha River, estimate smolt survival downstream to McNary Dam, compare natural and hatchery smolt performance, and collect smolt-to-adult return information. This project collects information for, and is part of, a larger effort entitled Smolt Monitoring by Federal and Non-Federal Agencies (BPA Project No. 198712700). This larger project provides data on movement of smolts out of major drainages and past dams on the Snake River and Columbia River. In season indices of migration strength and migration timing are provided for the run-at large at key monitoring sites. Marked smolts are utilized to measure travel time and estimate survival through key index reaches. Fish quality and descaling measures are recorded at each monitoring site and provide indicators of the health of the run. Co-managers in the Imnaha River subbasin (Ecovista 2004) have identified the need to collect information on life history, migration patterns, juvenile emigrant abundance, reach specific smolt survivals, and Smolt-to-Adult Return rates (SAR's) for both Heeyey (steelhead) and Naco x (Chinook salmon) smolts. The current study provides information related to the majority of the high priority data needs. Current funding does not allow for determination of a total (annual) juvenile emigrant abundance and lack of adult passive integrated transponder (PIT) tag detectors at the mouth of the Imnaha River results in the inability to calculate tributary specific SAR's. Information is shared with the Fish Passage Center (FPC) on a real time basis during the spring emigration period. The Bonneville Power Administration (BPA) and the United States Fish and Wildlife Service (USFWS) contracted the NPT to monitor emigration timing and tag up to 19,000 emigrating natural and hatchery Naco x (Chinook salmon) and Heeyey (steelhead) smolts from the Imnaha River with passive integrated transponder (PIT) tags. The completion of trapping in the spring of 2007 marked the 16th year of emigration studies on the Imnaha River, and the 14th year of participating in the FPC smolt monitoring program. Monitoring and evaluation objectives were to: (1) Evaluate effects of flow, temperature and other environmental factors on juvenile migration timing. (2) Determine emigration timing, travel time, and in-river survival of PIT tagged hatchery Naco x (Chinook salmon) smolts released at the Imnaha River acclimation facility to the Imnaha River juvenile migration trap. (3) Monitor the daily catch and biological characteristics of juvenile Naco x (Chinook salmon) and Heeyey (steelhead) smolts collected at the Imnaha River screw trap. (4) Determine spring emigration timing of Naco x (Chinook salmon) and Heeyey (steelhead) smolts collected at the Imnaha River juvenile migration trap. (5) Compare emigration characteristics and survival rates of natural fall and spring tagged juvenile Naco x (Chinook salmon). (6) Determine arrival timing, travel time and estimated survival of PIT tagged natural and hatchery Naco x (Chinook salmon) and natural and hatchery Heeyey (steelhead) smolts from the Imnaha River to Snake and Columbia River dams.

13 HYDRO ENERGY↗

Phase I Microgrid Cost Study: Data Collection and Analysis of Microgrid Costs in the United States

The U.S. Department of Energy (DOE) Office of Electricity Microgrid Cost Study project is looking at identifying the costs of components, integration and installation of U.S. microgrids and project cost improvements and technical accelerators over the next 5 years and beyond. This information could then be used by the DOE among others, to develop R&D agendas for the development of the next generation microgrids that provide cost effective, reliable and clean energy solutions. Microgrids are gaining in popularity because of their adaptability and flexible expandability, the need for increased electricity reliability, the increased affordability of distributed energy resources (DERs) and grid intelligence devices, goals to reduce greenhouse gas emissions, and other factors. The U.S. Department of Energy commissioned the National Renewable Energy Laboratory to complete a microgrid cost study and develop a microgrid cost model. The goal is to elucidate the variables that have the highest impact on costs as well as potential areas for cost reduction. This study consists of two phases. Phase I comprises the collection and analysis of data from microgrid projects built in the United States and is the subject of this report. In Phase II, NREL will assess current barriers facing the industry and identify potential solutions with help from industry representatives. Microgrid components are classified as follows in the form used to collect cost data from industry representatives for NREL's microgrid cost database: DERs: diesel, natural gas, combined heat and power (CHP), biofuel, solar photovoltaic (PV), wind, and fuel cell and energy storage; microgrid controller: primary, secondary, or tertiary; additional infrastructure: distribution system infrastructure, information technology communications upgrades, metering, etc.; soft costs: engineering, construction, commissioning, and regulatory. The purposes of Phase I are to better determine the contribution of individual components to total project size and to identify cost differences in projects within the same market segment. Phase II will use the results of Phase I to have an initial indication of the costs that might be driving the cost of development the most.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Using Electric Vehicles to Meet Balancing Requirements Associated with Wind Power

Many states are deploying renewable generation sources at a significant rate to meet renewable portfolio standards. As part of this drive to meet renewable generation levels, significant additions of wind generation are planned. Due to the highly variable nature of wind generation, significant energy imbalances on the power system can be created and need to be handled. This report examines the impact on the Northwest Power Pool (NWPP) region for a 2019 expected wind scenario. One method for mitigating these imbalances is to utilize plug-in hybrid electric vehicles (PHEVs) or battery electric vehicles (BEVs) as assets to the grid. PHEVs and BEVs have the potential to meet this demand through both charging and discharging strategies. This report explores the usage of two different charging schemes: V2GHalf and V2GFull. In V2GHalf, PHEV/BEV charging is varied to absorb the additional imbalance from the wind generation, but never feeds power back into the grid. This scenario is highly desirable to automotive manufacturers, who harbor great concerns about battery warranty if vehicle-to-grid discharging is allowed. The second strategy, V2GFull, varies not only the charging of the vehicle battery, but also can vary the discharging of the battery back into the power grid. This scenario is currently less desirable to automotive manufacturers, but provides an additional resource benefit to PHEV/BEVs in meeting the additional imbalance imposed by wind. Key findings in the report relate to the PHEV/BEV population required to meet the additional imbalance when comparing V2GHalf to V2GFull populations, and when comparing home-only-charging and work-and-home-charging scenarios. Utilizing V2GFull strategies over V2GHalf resulted in a nearly 33% reduction in the number of vehicles required. This reduction indicates fewer vehicles are needed to meet the unhandled energy, but they would utilize discharging of the vehicle battery into the grid. This practice currently results in the voiding of automotive manufacturer's battery warranty, and is not feasible for many customers. The second key finding is the change in the required population when PHEV/BEV charging is available at both home and work. Allowing 10% of the vehicle population access to work charging resulted in nearly 80% of the grid benefit. Home-only charging requires, at best, 94% of the current NWPP light duty vehicle fleet to be a PHEV or BEV. With the introduction of full work charging availability, only 8% of the NWPP light duty vehicle fleet is required. Work charging has primarily been associated with mitigating range anxiety in new electric vehicle owners, but these studies indicate they have significant potential for improving grid reliability. The V2GHalf and V2GFull charging strategies of the report utilize grid frequency as an indication of the imbalance requirements. The introduction of public charging stations, as well as the potential for PHEV/BEVs to be used as a resource for renewable generation integration, creates conditions for additional products into the ancillary services market. In the United Kingdom, such a capability would be bid as a frequency product in the ancillary services market. Such a market could create the need for larger, third-party aggregators or services to manage the use of electric vehicles as a grid resource. Ultimately, customer adoption, usage patterns and habits, and feedback from the power and automotive industries will drive the need.

17 WIND ENERGY↗

Consolidation and Centralization of Waste Operations Business Systems - 12319

This abstract provides a comprehensive plan supporting the continued development and integration of all waste operations and waste management business systems. These include existing systems such as ATMS (Automated Transportation Management System), RadCalc, RFITS (Radio Frequency Identification Transportation System) Programs as well as incorporating key components of existing government developed waste management systems and COTS (Computer Off The Shelf) applications in order to deliver a truly integrated waste tracking and management business system. Some of these existing systems to be integrated include IWTS at Idaho National Lab, WIMS at Sandia National Lab and others. The aggregation of data and consolidation into a single comprehensive business system delivers best practices in lifecycle waste management processes to be delivered across the Department of Energy facilities. This concept exists to reduce operational costs to the federal government by combining key business systems into a centralized enterprise application following the methodology that as contractors change, the tools they use to manage DOE's assets do not. IWITS is one efficient representation of a sound architecture currently supporting multiple DOE sites from a waste management solution. The integration of ATMS, RadCalc and RFITS and the concept like IWITS into a single solution for DOE contractors will result in significant savings and increased efficiencies for DOE. Building continuity and solving collective problems can only be achieved through mass collaboration, resulting in an online community that DOE contractors and subcontractors access common applications, allowing for the collection of business intelligence at an unprecedented level. This is a fundamental shift from a solely 'for profit' business model to a 'for purpose' business model. To the conventional-minded, putting values before profit is an unfamiliar and unnatural way for a contractor to operate - unless however; your objective is to build a strong, strategic alliance across the enterprise in order to execute an unprecedented change in waste management, transportation and logistical operations. The success of such an initiative can be achieved by creating a responsible framework by enabling key individuals to 'own' the sustainability of the program. This includes the strategic collaboration of responsible revolutionaries covering application developers, information owners and federal stakeholders to ensure compliance, security and risk management are 'baked' into the process and sustainability is fostered through continued innovation by both technology and application functionality. This ensures that working software can adapt to changing circumstances and is the principle measure of the success of the program. The consolidation of waste management business systems must be achieved in order to realize efficiencies in information technology portfolio management, data integrity, business intelligence and the lifecycle management of hazardous materials within the DOE enterprise architecture. By identifying best practices across the enterprise and aggregating computational and application development resources, you can provide a unified, holistic solution serviceable from a single location while being accessed from anywhere. The business impact of integrating and delivering a unified solution would reduce costs to the Department of Energy within the first year of deployment with increased savings annually. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Report Series: Evaluation, Finding Of Effect, And Mitigation Documentation For Building 23-109, Mercury, Area 23, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE) National Nuclear Security Administration Nevada Field Office (NNSA/NFO) plans to demolish Building 23-109, the Mercury Fire Station/Maintenance/Housing Office (Nevada State Historic Preservation Office [SHPO] Resource No. B15235) at the Nevada National Security Site (NNSS) in Nye County, Nevada. The NNSA/NFO is implementing a long-term project to modernize the town of Mercury for future mission needs. The project is considered an undertaking subject to review under Title 54 of United States Code (USC) § 306108, commonly known as Section 106 of the National Historic Preservation Act, Title 54 USC § 300101, et seq., and its implementing regulations, Title 36 of the Code of Federal Regulations (36 CFR) Part 800. In 2018, Desert Research Institute (DRI) completed an architectural survey of the town of Mercury. This effort resulted in the identification, recordation, and evaluation of the Mercury Historic District (MHD, SHPO Resource No. D230), including the identification of its contributing elements (Reno et al. 2018). The MHD was recommended eligible for listing in the National Register of Historic Places (NRHP, National Register) under the Secretary of the Interior’s (SOI) Significance Criteria A and C, as defined in 36 CFR Part 60.4, as a significant concentration of buildings and structures with a direct and important association with Cold War-era nuclear testing from 1951 through 1992. It has not been evaluated under Criteria B and D to date. As part of a larger modernization program for Mercury, the NNSA/NFO and the SHPO executed the 2018 Programmatic Agreement between the National Nuclear Security Administration Nevada Field Office and the Nevada State Historic Preservation Officer regarding Modernization and Operational Maintenance of the Nevada National Security Site, at Mercury in Nye County, Nevada (Mercury PA). The Mercury PA includes streamlined Section 106 procedures for undertakings in the MHD based on contributing element categories. Building 23-109 is identified in Appendix C of the Mercury PA as a Category I contributing element, indicating that it might be individually eligible for the NRHP. It is a historic property for the purposes of Section 106 compliance and subject to the stipulations of the Mercury PA. Per Stipulation VI of the Mercury PA, when the Area of Potential Effect (APE) for an undertaking includes Category I elements, the NNSA/NFO must evaluate the Category I elements for individual NRHP eligibility under all of the SOI Significance Criteria prior to initiating any activity that may affect the elements. The purpose of this report is to evaluate Building 23-109 as a potential individually eligible historic property in fulfillment of Stipulation VI of the Mercury PA. The evaluation detailed herein concludes that Building 23-109 is not individually eligible for listing in the NRHP. Although it retains some aspects of integrity and continues to contribute to the MHD, it is not individually significant under any of the SOI Significance Criteria.

54 ENVIRONMENTAL SCIENCES↗

Evaluation of Building 23-620, Los Alamos Scientific Laboratory J-3 Office, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE) National Nuclear Security Administration Nevada Field Office (NNSA/NFO) plans to demolish Building 23-620, the Los Alamos Scientific Laboratory (LASL) J-3 Office Building (Nevada State Historic Preservation Office [SHPO] Resource No. B15283) at the Nevada National Security Site (NNSS) in Nye County, Nevada. The NNSA/NFO is implementing a long-term project to modernize the town of Mercury for future mission needs. The project is considered an undertaking subject to review under Title 54 of United States Code (USC) § 306108, commonly known as Section 106 of the National Historic Preservation Act, Title 54 USC § 300101, et seq., and its implementing regulations, Title 36 of the Code of Federal Regulations (36 CFR) Part 800. In 2018, Desert Research Institute (DRI) completed an architectural survey of the town of Mercury. This effort resulted in the identification, recordation, and evaluation of the Mercury Historic District (MHD, SHPO Resource No. D230), including the identification of its contributing elements (Reno et al. 2018). The MHD was recommended eligible for listing in the National Register of Historic Places (NRHP, National Register) under the Secretary of the Interior’s (SOI) Significance Criteria A and C, as defined in 36 CFR Part 60.4, as a significant concentration of buildings and structures with a direct and important association with Cold War-era nuclear testing from 1951 through 1992. It has not been evaluated under Criteria B and D to date. As part of a larger modernization program for Mercury, the NNSA/NFO and the SHPO executed the 2018 Programmatic Agreement between the National Nuclear Security Administration Nevada Field Office and the Nevada State Historic Preservation Officer regarding Modernization and Operational Maintenance of the Nevada National Security Site, at Mercury in Nye County, Nevada (Mercury PA). The Mercury PA includes streamlined Section 106 procedures for undertakings in the MHD based on contributing element categories. Building 23-620 is identified in Appendix C of the Mercury PA as a Category I contributing element, indicating that it might be individually eligible for the NRHP. It is a historic property for the purposes of Section 106 compliance and subject to the stipulations of the Mercury PA. Per Stipulation VI of the Mercury PA, when the Area of Potential Effect (APE) for an undertaking includes Category I elements, the NNSA/NFO must evaluate the Category I elements for individual NRHP eligibility under all of the SOI Significance Criteria prior to initiating any activity that may affect the elements. The purpose of this report is to evaluate Building 23-620 as a potential individually eligible historic property in fulfillment of Stipulation VI of the Mercury PA. The evaluation detailed herein concludes that Building 23-620 is not individually eligible for listing in the NRHP. Although it retains aspects of integrity and continues to contribute to the MHD, it is not individually significant under any of the SOI Significance Criteria.

54 ENVIRONMENTAL SCIENCES↗