Search NASA⌕ Search

SEARCH · Search NASA

Results for “Launch Processing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,711 records · Page 95

EXPLAINING THE MOST ENERGETIC SUPERNOVAE WITH AN INEFFICIENT JET-FEEDBACK MECHANISM

We suggest that the energetic radiation from core-collapse super-energetic supernovae (SESNe) is due to a long-lasting accretion process onto the newly born neutron star (NS), resulting from an inefficient operation of the jet-feedback mechanism (JFM). The jets that are launched by the accreting NS or black hole maintain their axis due to a rapidly rotating pre-collapse core and do not manage to eject core material from near the equatorial plane. The jets are able to eject material from the core along the polar directions and reduce the gravity near the equatorial plane. The equatorial gas expands, and part of it falls back over a timescale of minutes to days to prolong the jet-launching episode. According to the model for SESNe proposed in the present paper, the principal parameter that distinguishes between the different cases of core-collapse supernova (CCSN) explosions, such as between normal CCSNe and SESNe, is the efficiency of the JFM. This efficiency, in turn, depends on the pre-collapse core mass, envelope mass, core convection, and, most of all, the angular momentum profile in the core. One prediction of the inefficient JFM for SESNe is the formation of a slow equatorial outflow in the explosion. The typical velocity and mass of this outflow are estimated to be v {sub eq} ≈ 1000 km s{sup −1} and M {sub eq} ≳ 1 M {sub ⊙}, respectively, though quantitative values will have to be checked in future hydrodynamic simulations.

79 ASTRONOMY AND ASTROPHYSICS↗

Modular thrust subsystem approaches to solar electric propulsion module design

Three approaches are presented for packaging the elements of a 30 cm ion thruster subsystem into a modular thrust subsystem. The individual modules, when integrated into a conceptual solar electric propulsion module are applicable to a multimission set of interplanetary flights with the space shuttle interim upper stage as the launch vehicle. The emphasis is on the structural and thermal integration of the components into the modular thrust subsystems. Thermal control for the power processing units is either by direct radiation through louvers in combination with heat pipes or an all heat pipe system. The propellant storage and feed system and thruster gimbal system concepts are presented. The three approaches are compared on the basis of mass, cost, testing, interfaces, simplicity, reliability, and maintainability.

Cake, J. E.↗

Modular thrust subsystem approaches to solar electric propulsion module design

Three approaches are presented for packaging the elements of a 30 cm ion thrustor subsystem into a modular thrust subsystem. The individual modules, when integrated into a conceptual solar electric propulsion module are applicable to a multimission set of interplanetary flights with the Space Shuttle/Interim Upper Stage as the launch vehicle. The emphasis is on the structural and thermal integration of the components into the modular thrust subsystems. Thermal control for the power processing units is either by direct radiation through louvers in combination with heat pipes of an all heat pipe system. The propellant storage and feed system and thrustor gimbal system concepts are presented. The three approaches are compared on the basis of mass, cost, testing, interfaces, simplicity, reliability, and maintainability.

Cake, J. E.↗

A scientific operations plan for the large space telescope

The paper describes an LST ground system which is compatible with the operational requirements of the LST. The goal of the approach is to minimize the cost of post launch operations without seriously compromising the quality and total throughput of LST science. Attention is given to cost constraints and guidelines, the telemetry operations processing systems (TELOPS), the image processing facility, ground system planning and data flow, and scientific interfaces.

West, D. K.↗

On the development of earth observation satellite systems

Subsequent to the launching of the first LANDSAT by NASA, Japan has recognized the importance of data from earth observation satellites, has conducted studies, and is preparing to develop an independent system. The first ocean observation satellite will be launched in 1983, the second in 1985. The first land observation satellite is scheduled to be launched in 1987 and by 1990 Japan intends to have both land and ocean observation systems in regular operation. The association reception and data processing systems are being developed.

Source record↗

The Nimbus 6 data catalog, volume 12: Data orbits 9227 through 10043

Nimbus 6 was successfully launched from the Western Test Range, Vandenberg Air Force Base, California at 08 hr. 12 min. 00 sec. GMT on 12 June 1975. The orbit was nearly circular at 1093 x 1105 km. Satellite operations from launch through 14 July (orbit 425) consisted of engineering evaluation of all spacecraft systems. As a result of that effort, data reception, accountability and processing were intermittent during that period. This volume reflects the operational changes that occurred to each individual subsystem on a bi-monthly basis. Also this volume incorporates significant findings and various subsystem summaries as detailed by the respective experimenter. During orbit 9793 (12 June 1977) Nimbus 6 successfully completed two years of operations.

Source record↗

Optimal technology investment strategies for a reusable launch vehicle

Within the present budgetary environment, developing the technology that leads to an operationally efficient space transportation system with the required performance is a challenge. The present research focuses on a methodology to determine high payoff technology investment strategies. Research has been conducted at Langley Research Center in which design codes for the conceptual analysis of space transportation systems have been integrated in a multidisciplinary design optimization approach. The current study integrates trajectory, propulsion, weights and sizing, and cost disciplines where the effect of technology maturation on the development cost of a single stage to orbit reusable launch vehicle is examined. Results show that the technology investment prior to full-scale development has a significant economic payoff. The design optimization process is used to determine strategic allocations of limited technology funding to maximize the economic payoff.

Moore, A. A.↗

Just in Time in Space or Space Based JIT

Our satellite systems are mega-buck items. In today's cost conscious world, we need to reduce the overall costs of satellites if our space program is to survive. One way to accomplish this would be through on-orbit maintenance of parts on the orbiting craft. In order to accomplish maintenance at a low cost I advance the hypothesis of having parts and pieces (spares) waiting. Waiting in the sense of having something when you need it, or just-in-time. The JIT concept can actually be applied to space processes. Its definition has to be changed just enough to encompass the needs of space. Our space engineers tell us which parts and pieces the satellite systems might be needing once in orbit. These items are stored in space for the time of need and can be ready when they are needed -- or Space Based JIT. When a system has a problem, the repair facility is near by and through human or robotics intervention, it can be brought back into service. Through a JIT process, overall system costs could be reduced as standardization of parts is built into satellite systems to facilitate reduced numbers of parts being stored. Launch costs will be contained as fewer spare pieces need to be included in the launch vehicle and the space program will continue to thrive even in this era of reduced budgets. The concept of using an orbiting parts servicer and human or robotics maintenance/repair capabilities would extend satellite life-cycle and reduce system replacement launches. Reductions of this nature throughout the satellite program result in cost savings.

VanOrsdel, Kathleen G.↗

MagLifter Site Investigation and Implementation Strategies

MagLifter, as defined here, is an advanced, earth-bound catapult system to provide the initial lift for earth orbiting vehicles to reduce or eliminate the need for multistage propulsion, thus reducing the cost of orbital space flight. It is presumed that magnetic levitation will catapult the vehicle to a desired initial velocity sufficient for reaching orbit with the vehicles own engines. Of necessity, the system must be located on and around a mountain with sufficient relief to allow the catapult to accelerate the launch vehicle to a sufficient speed in the desired direction to allow it to reach orbit. Such a mountain site must meet criteria consistent with current and future space launch needs and conditions. It is the purpose of this report to set forth preliminary criteria for choosing a suitable maglifter site. The report is divided into four major sections: (1) Assumed Launch System and Flight Vehicle Characteristics; (2) Task 1.A - Initial Site Selection Criteria; (3) Conclusions; and (4) Appendix - Phases of the Site Selection Process.

Burke, Pamela↗

Comparison of plasma probes in the lower ionosphere

The instrumentation and the observations performed by four identically instrumented sounding rockets, designed to investigate the mesosphere and lower thermosphere, are reported. The four sounding rockets were launched from the Brazilian equatorial range Alcantara in August 1994. The instruments were capable of determining ion and electron densities. The results of data processing showed discrepancies hitherto unnoticed by other experiments.

Friedrich, M.↗

Industrial Engineering Lifts Off at Kennedy Space Center

When the National Aeronautics and Space Administration (NASA) began the Space Shuttle Program, it did not have an established industrial engineering (IE) capability for several probable reasons. For example, it was easy for some managers to dismiss IE principles as being inapplicable at NASA's John F. Kennedy Space Center (KSC). When NASA was formed by the National Aeronautics and Space Act of 1958, most industrial engineers worked in more traditional factory environments. The primary emphasis early in the shuttle program, and during previous human space flight programs such as Mercury and Apollo, was on technical accomplishments. Industrial engineering is sometimes difficult to explain in NASA's highly technical culture. IE is different in many ways from other engineering disciplines because it is devoted to process management and improvement, rather than product design. Images of clipboards and stopwatches still come to the minds of many people when the term industrial engineering is mentioned. The discipline of IE has only recently begun to gain acceptance and understanding in NASA. From an IE perspective today, the facilities used for flight hardware processing at KSC are NASA's premier factories. The products of these factories are among the most spectacular in the world: safe and successful launches of shuttles and expendable vehicles that carry tremendous payloads into space.

Barth, Tim↗

Macro Level Simulation Model Of Space Shuttle Processing

The contents include: 1) Space Shuttle Processing Simulation Model; 2) Knowledge Acquisition; 3) Simulation Input Analysis; 4) Model Applications in Current Shuttle Environment; and 5) Model Applications for Future Reusable Launch Vehicles (RLV's). This paper is presented in viewgraph form.

Source record↗

An Integrated Approach to Thermal Management of International Space Station Logistics Flights, Improving the Efficiency

The efficiency of re-useable aerospace systems requires a focus on the total operations process rather than just orbital performance. For the Multi-Purpose Logistics Module this activity included special attention to terrestrial conditions both pre-launch and post-landing and how they inter-relate to the mission profile. Several of the efficiencies implemented for the MPLM Mission Engineering were NASA firsts and all served to improve the overall operations activities. This paper will provide an explanation of how various issues were addressed and the resulting solutions. Topics range from statistical analysis of over 30 years of atmospheric data at the launch and landing site to a new approach for operations with the Shuttle Carrier Aircraft. In each situation the goal was to "tune" the thermal management of the overall flight system for minimizing requirement risk while optimizing power and energy performance.

Holladay, Jon↗

NASA Langley Trajectory Simulation Capabilities for Mars Reconnaissance Orbiter

Mars Reconnaissance Orbiter will launch in August 2005 and will achieve Mars Orbit Insertion in March of 2006. It will then take approximately six months to use the process of aerobraking to shape its orbit into the desired science mapping orbit. This six-month period is arguably the phase of the Mars Reconnaissance Orbiter mission with the highest risk to the spacecraft, dipping to within 100 km of the planet. This process requires enough atmospheric drag to slow the spacecraft and circularize the orbit while remaining high enough in the Mars atmosphere as to not risk thermal degradation of spacecraft components. This paper will discuss the trajectory simulation and several analyses performed at NASA Langley Research Center to support a successful aerobraking phase of the Mars Reconnaissance Orbiter mission.

Prince, Jill L. Hanna↗

Combustion Module 1: Spacelab Racks Integrated at the Lewis Research Center for the First Time

The Combustion Module-1 (CM-1), NASA's largest (over 1800 lb) and one of the most sophisticated combustion experiments ever to fly on the Spacelab, will be carried on the first Microgravity Science Laboratory (MSL-1) mission aboard the space shuttle flight STS-84 in April 1997. The CM-1 project is a stepping stone to the space station era, because the hardware can support multiple investigators on the same mission and can be integrated at user locations and shipped to the launch site. CM-1 is being developed to accommodate microgravity combustion experiments that are designed to help explain and predict the behavior of combustion processes. Although the two principal investigators for CM-1 are both studying combustion processes, their investigations are quite different. Professor Paul D. Ronney of the University of Southern California will examine the Structures of Flame Balls at Low Lewis Numbers (SOFBALL), in which a variety of fuel-lean gaseous mixtures fill the combustion chamber and are ignited. Professor Gerard M. Faeth of the University of Michigan will investigate Laminar Soot Processes (LSP) by studying the key properties of burning gas jets of fuel, employing different fuels and nozzle sizes.

Source record↗

Hydrogen Sensors Demonstrated on the Shuttle

Microelectromechanical-systems- (MEMS-) based hydrogen sensor technology developed by the NASA Glenn Research Center at Lewis Field and Case Western Reserve University was demonstrated on shuttle missions STS-95 (Senator Glenn s mission) and STS-96. These smart sensors, commercialized by Makel Engineering Inc., were part of an "Integrated Vehicle Health Monitoring HEDS Technology Demonstration" series conducted at the NASA Kennedy Space Center. The experiments were designed to demonstrate the effect of technological upgrades on shuttle performance. The hydrogen sensors were micro-fabricated for minimal size, weight, and power consumption. A temperature detector and heater were included on the sensor for temperature control. Two palladium chrome (PdCr) hydrogen detection devices were included in each sensor package: a Schottky diode for low concentrations and a resistor for high concentrations. These sensor designs allow operation in inert environments. "Smart" electronics developed by Makel Engineering were integrated with the sensors to control the sensor temperature and process the output of the various sensors. This complete hydrogen detection system (two sensors on a chip with smart electronics) flew on STS-95 (launched October 1998) and STS-96 (launched May 1999). It was installed in the aft compartment of the shuttle and used to monitor the hydrogen concentration in that region. Up to this time, a mass spectrometer had monitored the hydrogen concentration in the aft compartment before launch, and "grab" bottles had been used after launch. The inside of these bottles is at vacuum. During flight, the grab bottles are pyrotechnically opened for a brief period, and the gas in the aft compartment is captured in the bottle. Several of these bottles are opened at different times during takeoff, and their contents are used to determine the time profile of the gases in the aft chamber. However, this information is not available until after the flight. On the launch pad, results from the new sensor technology paralleled the responses of the mass spectrometer with, in some cases, a quicker response time. In flight, data from the new sensors agreed with those derived from analyzing the contents of the grab bottles. Moreover, this microsensor can monitor the aft compartment continuously and, in principle, could monitor the health of the vehicle in real time during flight.

Hunter, Gary W.↗

Optimal Sensor Selection for Health Monitoring Systems

Sensor data are the basis for performance and health assessment of most complex systems. Careful selection and implementation of sensors is critical to enable high fidelity system health assessment. A model-based procedure that systematically selects an optimal sensor suite for overall health assessment of a designated host system is described. This procedure, termed the Systematic Sensor Selection Strategy (S4), was developed at NASA John H. Glenn Research Center in order to enhance design phase planning and preparations for in-space propulsion health management systems (HMS). Information and capabilities required to utilize the S4 approach in support of design phase development of robust health diagnostics are outlined. A merit metric that quantifies diagnostic performance and overall risk reduction potential of individual sensor suites is introduced. The conceptual foundation for this merit metric is presented and the algorithmic organization of the S4 optimization process is described. Representative results from S4 analyses of a boost stage rocket engine previously under development as part of NASA's Next Generation Launch Technology (NGLT) program are presented.

Santi, L. Michael↗

Quality Interaction Between Mission Assurance and Project Team Members

Mission Assurance independent assessments started during the development cycle and continued through post launch operations. In operations, Health and Safety of the Observatory is of utmost importance. Therefore, Mission Assurance must ensure requirements compliance and focus on process improvements required across the operational systems including new/modified products, tools, and procedures. The deployment of the interactive model involves three objectives: Team member Interaction, Good Root Cause Analysis Practices, and Risk Assessment to avoid reoccurrences. In applying this model, we use a metric based measurement process and was found to have the most significant effect, which points to the importance of focuses on a combination of root cause analysis and risk approaches allowing the engineers the ability to prioritize and quantify their corrective actions based on a well-defined set of root cause definitions (i.e. closure criteria for problem reports), success criteria and risk rating definitions.

quality↗