Search NASA⌕ Search

SEARCH · Search NASA

Results for “Programming Practices”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,711 records · Page 95

Lithium-Ion Battery Demonstrated for NASA Desert Research and Technology Studies

Lithium-ion batteries have attractive performance characteristics that are well suited to a number of NASA applications. These rechargeable batteries produce compact, lightweight energy-storage systems with excellent cycle life, high charge/discharge efficiency, and low self-discharge rate. NASA Glenn Research Center's Electrochemistry Branch designed and produced five lithium-ion battery packs configured to power the liquid-air backpack (LAB) on spacesuit simulators. The demonstration batteries incorporated advanced, NASA-developed electrolytes with enhanced low-temperature performance characteristics. The objectives of this effort were to (1) demonstrate practical battery performance under field-test conditions and (2) supply laboratory performance data under controlled laboratory conditions. Advanced electrolyte development is being conducted under the Exploration Technology Development Program by the NASA Jet Propulsion Laboratory. Three field trials were successfully completed at Cinder Lake from September 10 to 12, 2007. Extravehicular activities of up to 1 hr and 50 min were supported, with residual battery capacity sufficient for 30 min of additional run time. Additional laboratory testing of batteries and cells is underway at Glenn s Electrochemical Branch.

Bennett, William R.↗

Framework for NASA Space Relay Satellite Services over the Next Decade: “Development and Demonstration of the Commercial Successors to TDRS “

The United States National Space Policy provides guidance and directives for U.S. Government agencies to purchase commercial space services and capabilities to the maximum extent practical. In alignment with this guidance, the Agency has no plans to replenish the Tracking and Data Relay Satellite System (TDRSS) fleet operated by the Space Communication and Navigation Program (SCaN) and will instead pursue commercial services for communications with spacecraft in near-Earth orbit. The Communication Services Project (CSP) at GRC is leading this commercialization effort and in May 2022 it awarded six contracts to commercial SATCOM companies to demonstrate and validate commercial SATCOM capabilities for future NASA missions. The responses from the vendors indicated a strong interest in providing commercial services to NASA’s missions, and included a wide range of proposed architectures and demonstrations ideas. Overall, the responses indicated that a mature and healthy competitive environment exists with traditional satellite operators and constellation developers to provide NASA with commercial communication services in the next five years. This paper will present an overview of the proposed capability coverages, risk spread and US domestic market stimulation along with common themes and conclusions. The result of these demonstrations will serve as the basis for acquisition and provision of operational SATCOM services for NASA missions.

George F Haddad↗

Framework for NASA Space Relay Satellite Services Over the Next Decade: “Development and Demonstration of the Commercial Successors to TDRS "

The United States National Space Policy provides guidance and directives for U.S. Government agencies to purchase commercial space services and capabilities to the maximum extent practical. In alignment with this guidance, the Agency has no plans to replenish the Tracking and Data Relay Satellite System (TDRSS) fleet operated by the Space Communication and Navigation Program (SCaN) and will instead pursue commercial services for communications with spacecraft in near-Earth orbit. The Communications Services Project (CSP) at GRC is leading this commercialization effort and in May 2022 it awarded six contracts to commercial SATCOM companies to demonstrate and validate commercial SATCOM capabilities for future NASA and near space user missions. The responses from the vendors indicated a strong interest in providing commercial services to NASA’s missions and included a wide range of proposed architectures and demonstrations concepts. Overall, the responses indicated that a mature and healthy competitive environment exists with traditional satellite operators and constellation developers to provide NASA and future near space users with commercial communication services in the next five years. This paper will present an overview of the proposed capability coverages, risk spread, and US domestic market stimulation, along with common themes and conclusions. The result of these demonstrations will serve as the basis for acquisition and provision of operational SATCOM services for NASA missions.

SATCOM↗

Building America Case Study: Compact Buried Ducts in a Hot-Humid Climate House, Lady's Island, South Carolina

A system of compact, buried ducts provides a high-performance and cost-effective solution for delivering conditioned air throughout the building. This report outlines research activities that are expected to facilitate adoption of compact buried duct systems by builders. The results of this research would be scalable to many new house designs in most climates and markets, leading to wider industry acceptance and building code and energy program approval. The primary research question with buried ducts is potential condensation at the outer jacket of the duct insulation in humid climates during the cooling season. Current best practices for buried ducts rely on encapsulating the insulated ducts with closed-cell spray polyurethane foam insulation to control condensation and improve air sealing. The encapsulated buried duct concept has been analyzed and shown to be effective in hot-humid climates. The purpose of this project is to develop an alternative buried duct system that performs effectively as ducts in conditioned space - durable, energy efficient, and cost-effective - in a hot-humid climate (IECC warm-humid climate zone 3A) with three goals that distinguish this project: 1) Evaluation of design criteria for buried ducts that use common materials and do not rely on encapsulation using spray foam or disrupt traditional work sequences, 2) Establishing design criteria for compact ducts and incorporate those with the buried duct criteria to further reduce energy losses and control installed costs, and 3) Developing HVAC design guidance for performing accurate heating and cooling load calculations for compact buried ducts.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The Distributed Energy Resource Cybersecurity Framework

For facilities with distributed energy resources (DERs), cybersecurity must be considered holistically, across system architectures and down to individual components. It's hard to know where to start. That's why the National Renewable Energy Laboratory (NREL) has developed an assessment tool for organizations with DERs to understand and improve their cybersecurity. With support from the U.S. Department of Energy's Federal Energy Management Program, the Distributed Energy Resource Cybersecurity Framework (DER-CF) provides a holistic evaluation of a facility's DER cybersecurity and makes customized recommendations that follow widely recognized best practices for cybersecurity. The DER-CF is available at no cost as an interactive web tool (dercf.nrel.gov).

cybersecurity↗

Salt Waste Processing Facility Project (SWPF) project management improvements: Working under a cost cap contract - 15523

The Salt Waste Processing Facility (SWPF), located at the Savannah River Site (SRS) in Aiken, South Carolina, is a multi-billion dollar LRW processing facility that represents the keystone for the U.S. Department of Energy (DOE)-EM clean-up mission at SRS. In June 2013, DOE and Parsons agreed to Contract Modification 0116 that definitized the remaining work to achieve Construction Complete with a target schedule and a cost cap contract structure. The SWPF project is currently 85 percent complete with construction, and approximately 10 percent complete with commissioning. To date there have been numerous lessons learned with regard to contract and project management, procurement, construction, safety and quality assurance approaches (both good practices and mistakes). These lessons learned are considered to be of significant value in improving the state of major project execution within the DOE-EM clean-up program as well as to the wider DOE complex. An overview of the current SWPF project status is provided, along with challenges associated with operating under a cost cap environment within a cost-plus contract structure. Key lessons learned will be discussed including contract management, baseline development and acceptance under DOE O 413.3, Program and Project Management for the Acquisition of Capital Assets requirements, cost and schedule control, change management and risk strategies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Subtask 1.3 – Integrated Carbon Capture and Storage for North Dakota Ethanol Production

The Energy & Environmental Research Center (EERC), in partnership with Red Trail Energy, LLC (RTE), a North Dakota ethanol producer; the North Dakota Industrial Commission (NDIC) Renewable Energy Program (REP); and the U.S. Department of Energy (DOE), conducted a feasibility and implementation study for a commercial carbon capture and storage (CCS) effort. This subtask provided technical support and developed recommended practices of how small-scale industrial CO2 emitters (<1,000,000 tonnes of CO2 emitted annually) may economically deploy CCS. The 64-million-gallon dry mill RTE ethanol facility, emitting an average 180,000 tonnes of CO2 annually, was the subject of the case study. The positive outcome of this research, which shows technical and economic potential for ethanol–CCS in North Dakota, has resulted in RTE acquiring an approved Permit to Drill on December 2, 2019, for a stratigraphic test well in early 2020, a necessary step toward a North Dakota CO2 Storage Facility Permit (SFP) for the RTE CCS effort. Outcomes include 1) validating the Broom Creek Formation as a regional target for CCS, 2) determining the full carbon life cycle of an industrial fuel production facility with CCS, 3) developing a field implementation plan (FIP) for small-scale CCS, and 4) determining the validity and pathway for using CCS to meet low-carbon fuel (LCF) standards. The technical team included the EERC, RTE, Trimeric Corporation, Schlumberger Carbon Services, and Computer Modelling Group (CMG). Findings from activities conducted November 2016 – May 2020 are summarized as follows. Several key steps have been accomplished toward validating the Broom Creek Formation as a CO2 injection and storage target at the RTE CCS site, including verification of the presence and structure of sandstone layers that may comprise the potential CO2 storage reservoir and the several thousand feet of overlying confining zone. Work included site characterization using existing data, interpretation of seismic data within the study area, and geologic modeling simulation of CO2 injection. Interpreted results estimate 3000 feet of confining zone between the Broom Creek Formation (storage target) and the lowermost underground source of drinking water (e.g., the Fox Hills Formation). The thickness of the Broom Creek injection target varies 230–420 ft within the survey area. Results were used to inform the location of a stratigraphic test well and associated characterization test program. No impediments were identified within the targeted CO2 storage complex that would prevent the project from moving forward. A stratigraphic test well is the next step to validate these results and to acquire remaining data necessary to develop a North Dakota CO2 SFP application. The EERC generated full carbon life cycle estimates for CCS integration with the RTE ethanol facility. Results indicated that an average 40% reduction in CO2 emissions is possible through CCS implementation. Approximately half of the carbon in the overall life cycle for a dry mill ethanol plant is generated through the fermentation process and emitted to the atmosphere; this is the CO2 stream targeted for CCS. The remaining carbon is attributed to corn feedstock farming (diesel, fertilizer), energy for fuel processing (natural gas, electricity), and transportation (diesel) of the fuel product. Life cycle carbon estimates are also affected by the anticipated energy consumption of a potential capture facility, which depend on the type of CO2 product generated. For example, a 30%–40% net CO2 emission reduction is estimated if a liquefied CO2 facility were incorporated compared to a 40%–50% net CO2 reduction if a supercritical “injection-grade” CO2 product is generated; i.e., more energy is required to further refine the CO2 stream, affecting the full carbon life cycle estimates. A CCS FIP was developed and initiated at the RTE CCS site, resulting in the development of several guidance documents: a CO2 Capture Process Design Package, a North Dakota CO2 geologic Storage Permits Template, and a Public Outreach Package for CCS in North Dakota. General FIP components include CO2 capture system, pipeline and well designs; monitoring, verification, and accounting (MVA) plans; geologic characterization and testing programs; and permitting and outreach plans. Vendor bids were also acquired for the CO2 liquefaction facility. Near-surface characterization (groundwater and soil gas sampling) and geologic characterization (seismic survey) were initiated to inform development of a UIC Class VI-compliant MVA plan compliant with a North Dakota CO2 SFP. Designs (well and geologic testing) were completed for a stratigraphic test well compliant with a North Dakota CO2 SFP. In addition, the outreach plan was executed, including community open houses, meetings with city/county/state officials, and development of public materials. Although other entities continued to mature incentive programs in 2019–2020, California and the Internal Revenue Service (IRS) currently provide the most advanced economic opportunities for CCS integrated with fuel production. The California Low-Carbon Fuel Standard (LCFS) adopted a CCS Protocol in January 2019, allowing submittal of a design-based pathway (DBP) application for an approved temporary (not certified) carbon intensity value for a fully engineered facility. An ethanol–CCS DBP application to the California LCFS Program (officially approved February 28, 2020) was developed to show that the RTE CCS effort meets LCFS requirements. The approved DBP provides confidence to advance the project and supports potential investments. Other entities continue to mature incentive programs. The IRS issued guidance in February 2020 that addresses the definition of beginning of construction and revenue procedure on partnerships for the Enhancement of Carbon Dioxide Sequestration Credit (a.k.a. Section 45Q) CCS tax credit program; the IRS anticipates issuing further guidance on issues such as secure geologic storage, utilization qualifications, and recapture of claimed credits. Maturing incentive programs coupled with workable permitting regulations provide confidence to advance CCS projects in North Dakota and support financial investment to proceed with designing, constructing, and implementing CCS projects at small-scale fuel production facilities. The largest hurdles for CCS implementation at small-scale industrial systems are often business/economic-related (i.e., not technical). Market uncertainty already exists for agriculture-based alternative fuels such as corn ethanol, for which production has increased by ~33%, and prices have correspondingly lowered since 2015. Passing the Section 45Q tax credit program improves economic feasibility for CCS but may require external investors for a small business to achieve maximum benefits. Public–private partnerships with NDIC and DOE have resulted in foundational technical and regulatory knowledge, growing stakeholder confidence, and a pathway to implementation that enables similar industrial CCS projects in the region to advance. This subtask was funded through the EERC–DOE Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by NDIC and RTE. The authors would also like to thank CMG, ESRI, IHS, Neuralog, and Schlumberger for allowing the use of their software packages in support of this work.

42 ENGINEERING↗

Advanced dismantling techniques applied in an industrial project for the dismantling of highly activated equipment - 15446

Commissioned in 1958 on the CEA nuclear site of Marcoule (France) and shut down in 1997, the former UP1 plant was dedicated to reprocess the spent fuel from G1, G2 and G3 GCR reactors. Since 1998, a wide program for cleaning-up and dismantling the plant has been developed in order to dismantle the process equipment, eliminate any radiological risk in all buildings concerned and remove all the resulting waste. Major technical challenges are related to the wide range of complex components and equipment in the facilities such as chemical dissolvers, extractor batteries, evaporators, tanks; and to a high risk of exposure, due to the presence of fission products. To address these challenges, CEA led R and D programs to develop advanced tools for complex dismantling projects: immersive virtual reality, laser cutting techniques, special remote-controlled arms combining dexterity and high resistance to irradiation The purpose of this paper is to provide an overview of a practical implementation and to show first results of these advanced techniques on a real case: the dismantling of dissolver's equipment from the dissolution workshop of UP1 plant. ONET Technologies has been chosen by CEA to design, build and operate the overall dismantling and waste treatment system for this project. ONET Technologies designed two main subsystems to meet all the requirements for this project: first, the 'Remotely-Operated Handling and Cutting Unit' and second the 'Waste Extraction and Conditioning Unit' and the combining innovative technologies. During the design phase, the 'Immersive Virtual Reality' has been used to qualify the kinematics in the final environment and the preliminary dismantling scenario. Following a first R and D program of CEA regarding the laser cutting technique applied to nuclear decommissioning, ONET Technologies and CEA realized elementary inactive tests based on a 6 kW Nd-Yag laser source to qualify the cutting performance according to material and thickness. Main objective was to meet the safety criteria and to check the physical characteristics of waste resulting from the laser cutting operation. The Remotely-Operated Handling and Cutting Unit was equipped with a MAESTRO manipulator, resulting from ten years of research and development cooperation between CEA and Cybernetix. This manipulator, a 6 axis hydraulic manipulator-arm specifically designed to work in harsh environment, entered in its industrial phase. ONET Technologies was responsible for the overall system integration, confinement and performance. A comprehensive qualification program in real conditions has been driven during 2014. The dismantling scenario was tested with a mockup at a full scale of dissolver equipment and confirmed at this stage the expected level of performance and safety. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Management of Risks Associated with Application of Novel Materials in Novel Operating Environments in Novel Reactor Designs

There is currently no widely agreed, detailed general method for licensing a novel plant incorporating novel materials (or materials being deployed in novel environments); in many such situations, there are no directly applicable engineering code cases for decision-makers (including regulators) to rely on. This paper discusses a framework for solving this problem that is based on the Reliability and Integrity Management (RIM) approach delineated in ASME BPVC Section XI Division 2. NRC Regulatory Guide 1.246, Rev. 0, endorses, with conditions, the subject portion of the ASME Code. The proposed framework is meant to support development of a licensing case by addressing certain technical challenges. The framework discussed here is compatible with the Licensing Modernization Project, but applying it in a specific case will call for advances in the state of practice, if not the state of the art. The RIM approach calls for applicants to (a) allocate reliability targets to plant structures, systems, and components (SSCs), (b) show that they are able to relate the currently observed physical condition of each SSC in the program to its failure probability well enough to determine whether the target reliability allocations are being satisfied, allowing for uncertainty related to the novelty of the materials/designs/operating environments, and (c) be able to demonstrate that the proposed program of surveillances will reliably detect unacceptable degradation of an SSC before SSC failure occurs. These challenges are discussed in the paper, and a potentially applicable modeling approach based on cumulative damage rather than failure rates is briefly illustrated.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A practical approach to astronomy mission replanning

The schedule editing concept called EDTRON is presented and its features and functions in the overall mission planning scheme and the experience obtained from its first use during the Astro-1 mission are presented. This EDTRON program was designed specifically to edit the astronomy schedules generated by the ASTAR project, but any schedule with the same on/off format can be successfully changed. Though designed for the real-time environment concept, it can also be employed premission for schedule modification in situations where elements of the baseline schedule need to be preserved or when new requirements emerge that cannot be defined in existing scheduling algorithms.

Guffin, O. T.↗

Making Human Spaceflight Practical and Affordable: Spacecraft Designs and their Degree of Operability

As we push toward new and diverse space transportation capabilities, reduction in operations cost becomes increasingly important. Achieving affordable and safe human spaceflight capabilities will be the mark of success for new programs and new providers. The ability to perceive the operational implications of design decisions is crucial in developing safe yet cost competitive space transportation systems. Any human spaceflight program - government or commercial - must make countless decisions either to implement spacecraft system capabilities or adopt operational constraints or workarounds to account for the lack of such spacecraft capabilities. These decisions can benefit from the collective experience that NASA has accumulated in building and operating crewed spacecraft over the last five decades. This paper reviews NASA s history in developing and operating human rated spacecraft, reviewing the key aspects of spacecraft design and their resultant impacts on operations phase complexity and cost. Specific examples from current and past programs - including the Space Shuttle and International Space Station - are provided to illustrate design traits that either increase or increase cost and complexity associated with spacecraft operations. These examples address factors such as overall design performance margins, levels of redundancy, degree of automated failure response, type and quantity of command and telemetry interfaces, and the definition of reference scenarios for analysis and test. Each example - from early program requirements, design implementation and resulting real-time operations experience - to tell the end-to-end "story" Based on these experiences, specific techniques are recommended to enable earlier and more effective assessment of operations concerns during the design process. A formal method for the assessment of spacecraft operability is defined and results of such operability assessments for recent spacecraft designs are provided. Recent experience in applying these techniques to Orion spacecraft development is reviewed to highlight the direct benefits of early operational assessment and collaborative development efforts.

Crocker, Alan R.↗

Shifting agricultural practices to produce sustainable, low carbon intensity feedstocks for biofuel production

The carbon intensity (CI) of biofuel's well-to-pump life cycle is calculated by life cycle analysis (LCA) to account for the energy/material inputs of the feedstock production and fuel conversion stages and the associated greenhouse gas (GHG) emissions during these stages. The LCA is used by the California Air Resources Board's Low Carbon Fuel Standard (LCFS) program to calculate CI and monetary credits are issued based on the difference between a given fuel's CI and a reference fuel's CI. Through the Tier 2 certification program under which individual fuel production facilities can submit their own CIs with their facility input data, the LCFS has driven innovative technologies to biofuel conversion facilities, resulting in substantial reductions in GHG emissions as compared to the baseline gasoline or diesel. A similar approach can be taken to allow feedstock petition in the LCFS so that lower-CI feedstock can be rewarded. Here we examined the potential for various agronomic practices to improve the GHG profiles of corn ethanol by performing feedstock-level CI analysis for the Midwestern United States. Our system boundary covers GHG emissions from the cradle-to-farm-gate activities (i.e. farm input manufacturing and feedstock production), along with the potential impacts of soil organic carbon change during feedstock production. We conducted scenario-based CI analysis of ethanol, coupled with regionalized inventory data, for various farming practices to manage corn fields, and identified key parameters affecting cradle-to-farm-gate GHG emissions. The results demonstrate large spatial variations in CI of ethanol due to farm input use and land management practices. In particular, adopting conservation tillage, reducing nitrogen fertilizer use, and implementing cover crops has the potential to reduce GHG emissions per unit corn produced when compared to a baseline scenario of corn–soybean rotation. This work shows a large potential emission offset opportunity by allowing feedstock producers a path to Tier 2 petitions that reward low-CI feedstocks and further reduce biofuels' CI. The prevalence of significant acreage that has not been optimized for CI suggests that policy changes that incentivize optimization of this parameter could provide significant additionality over current trends in farm efficiency and adoption of conservation practice.

09 BIOMASS FUELS↗

NASA’s Top Human System Research and Technology Needs for Mars

NASA is working with industry and international partners to return humans to the Moon and to eventually enable humans to explore Mars. Within NASA, several organizations work together to identify, prioritize, fund, execute, and operationalize the research and technology development (R&TD) that will be necessary to enable crew health and performance (CHP) during these future missions. These organizations include flight programs, the Health and Medical Technical Authority (HMTA), the Human Research Program, the Space Technology Mission Directorate, System Capability Leadership Teams, and other organizations, many of which existed for several years prior to the creation of the Moon-to-Mars (M2M) Program Office in 2023. A variety of constructs, vocabularies, and processes exist for managing risks and supporting strategic planning across these organizations. For example, M2M objectives, program risks, human system risks, human research gaps, capability gaps, and envisioned futures are all constructs currently used within NASA to identify and prioritize R&TD needs. These strategic planning constructs are evolving to allow M2M objectives and R&TD investments to be aligned and traced at a detailed level. A recognized need exists among stakeholder organizations to identify and communicate the highest CHP R&TD priorities in a unified and digestible way that addresses the perspectives of NASA’s CHP community. To achieve this, the HMTA arranged a series of discussions with representatives of NASA’s CHP community, during which the 8 highest priority CHP capabilities that will enable human missions to Mars, referred to as the “top human system capability needs for Mars”, were identified. The list includes Earth-independent human operations; Mars-duration food system; Mars-duration effects on human physiology; risk mitigations for vehicle atmospheres; computational injury and anthropometric models; exploration exercise countermeasures; individual variability in responses to spaceflight; and sensorimotor countermeasures. Existing tools and processes for strategic planning and risk management were evaluated, as well as the technical practicalities, cost, and schedule feasibility associated with potential R&TD investments in different capability need areas. This capability needs report is not owned by any one NASA organization and does not replace existing strategic or program planning processes; rather it aims to complement and inform them with a unified set of community generated priorities. These top capability needs will be re-evaluated periodically based on R&TD progress and the evolving M2M architecture.

technology gaps↗

NASA’s Top Human System Research and Technology Needs for Mars

NASA is working with industry and international partners to return humans to the Moon and to eventually enable humans to explore Mars. Within NASA, several organizations work together to identify, prioritize, fund, execute, and operationalize the research and technology development (R&TD) that will be necessary to enable crew health and performance (CHP) during these future missions. These organizations include flight programs, the Health and Medical Technical Authority (HMTA), the Human Research Program, the Space Technology Mission Directorate, System Capability Leadership Teams, and other organizations, many of which existed for several years prior to the creation of the Moon-to-Mars (M2M) Program Office in 2023. A variety of constructs, vocabularies, and processes exist for managing risks and supporting strategic planning across these organizations. For example, M2M objectives, program risks, human system risks, human research gaps, capability gaps, and envisioned futures are all constructs currently used within NASA to identify and prioritize R&TD needs. These strategic planning constructs are evolving to allow M2M objectives and R&TD investments to be aligned and traced at a detailed level. A recognized need exists among stakeholder organizations to identify and communicate the highest CHP R&TD priorities in a unified and digestible way that addresses the perspectives of NASA’s CHP community. To achieve this, the HMTA arranged a series of discussions with representatives of NASA’s CHP community, during which the 8 highest priority CHP capabilities that will enable human missions to Mars, referred to as the “top human system capability needs for Mars”, were identified. The list includes Earth-independent human operations; Mars-duration food system; Mars-duration effects on human physiology; risk mitigations for vehicle atmospheres; computational injury and anthropometric models; exploration exercise countermeasures; individual variability in responses to spaceflight; and sensorimotor countermeasures. Existing tools and processes for strategic planning and risk management were evaluated, as well as the technical practicalities, cost, and schedule feasibility associated with potential R&TD investments in different capability need areas. This capability needs report is not owned by any one NASA organization and does not replace existing strategic or program planning processes; rather it aims to complement and inform them with a unified set of community generated priorities. These top capability needs will be re-evaluated periodically based on R&TD progress and the evolving M2M architecture.

technology gaps↗

Beyond Coordination: Joint Planning and Program Execution. The IHPRPT Materials Working Group

"Partnership is more than just coordination," stated then-Commander of the Air Force Research Laboratory (AFRL), Major General Dick Paul (USAF-Ret), at this year's National Space and Missile Materials Symposium. His comment referred to the example of the joint planning and program execution provided by the Integrated High Payoff Rocket Propulsion Technology (IHPRPT) Materials Working Group (IMWG). Most people agree that fiscal pressures imposed by shrinking budgets have made it extremely difficult to build upon our existing technical capabilities. In times of sufficient budgets, building advanced systems poses no major difficulties. However, with today's budgets, realizing enhanced capabilities and developing advanced systems often comes at an unaffordable cost. Overcoming this problem represents both a challenge and an opportunity to develop new business practices that allow us to develop advanced technologies within the restrictions imposed by current funding levels. Coordination of technology developments between different government agencies and organizations is a valuable tool for technology transfer. However, rarely do the newly developed technologies have direct applicability to other ongoing programs. Technology requirements are typically determined up-front during the program planning stage so that schedule risk can be minimized. The problem with this process is that the costs associated with the technology development are often borne by a single program. Additionally, the potential exists for duplication of technical effort. Changing this paradigm is a difficult process but one that can be extremely worthwhile should the right opportunity arise. The IMWG is one such example where NASA, the DoD, and industry have developed joint requirements that are intended to satisfy multiple program needs. More than mere coordination, the organizations comprising the group come together as partners, sharing information and resources, proceeding from a joint roadmap.

Stropki, Michael A.↗

MCTP system model based on linear programming optimization of apertures obtained from sequencing patient image data maps

Purpose: The authors present a hybrid direct multileaf collimator (MLC) aperture optimization model exclusively based on sequencing of patient imaging data to be implemented on a Monte Carlo treatment planning system (MC-TPS) to allow the explicit radiation transport simulation of advanced radiotherapy treatments with optimal results in efficient times for clinical practice. Methods: The planning system (called CARMEN) is a full MC-TPS, controlled through aMATLAB interface, which is based on the sequencing of a novel map, called “biophysical” map, which is generated from enhanced image data of patients to achieve a set of segments actually deliverable. In order to reduce the required computation time, the conventional fluence map has been replaced by the biophysical map which is sequenced to provide direct apertures that will later be weighted by means of an optimization algorithm based on linear programming. A ray-casting algorithm throughout the patient CT assembles information about the found structures, the mass thickness crossed, as well as PET values. Data are recorded to generate a biophysical map for each gantry angle. These maps are the input files for a home-made sequencer developed to take into account the interactions of photons and electrons with the MLC. For each linac (Axesse of Elekta and Primus of Siemens) and energy beam studied (6, 9, 12, 15 MeV and 6 MV), phase space files were simulated with the EGSnrc/BEAMnrc code. The dose calculation in patient was carried out with the BEAMDOSE code. This code is a modified version of EGSnrc/DOSXYZnrc able to calculate the beamlet dose in order to combine them with different weights during the optimization process. Results: Three complex radiotherapy treatments were selected to check the reliability of CARMEN in situations where the MC calculation can offer an added value: A head-and-neck case (Case I) with three targets delineated on PET/CT images and a demanding dose-escalation; a partial breast irradiation case (Case II) solved with photon and electron modulated beams (IMRT + MERT); and a prostatic bed case (Case III) with a pronounced concave-shaped PTV by using volumetric modulated arc therapy. In the three cases, the required target prescription doses and constraints on organs at risk were fulfilled in a short enough time to allow routine clinical implementation. The quality assurance protocol followed to check CARMEN system showed a high agreement with the experimental measurements. Conclusions: A Monte Carlo treatment planning model exclusively based on maps performed from patient imaging data has been presented. The sequencing of these maps allows obtaining deliverable apertures which are weighted for modulation under a linear programming formulation. The model is able to solve complex radiotherapy treatments with high accuracy in an efficient computation time.

60 APPLIED LIFE SCIENCES↗

Integrated Experimental and Modeling Studies of Mineral Carbonation as a Mechanism for Permanent Carbon Sequestration in Mafic/Ultramafic Rocks

A program of laboratory experiments, modeling and fieldwork was carried out at Yale University, University of Maryland, and University of Hawai‘i, under a DOE Award (DE-FE0004375) to study mineral carbonation as a practical method of geologic carbon sequestration. Mineral carbonation, also called carbon mineralization, is the conversion of (fluid) carbon dioxide into (solid) carbonate minerals in rocks, by way of naturally occurring chemical reactions. Mafic and ultramafic rocks, such as volcanic basalt, are natural candidates for carbonation, because the magnesium and iron silicate minerals in these rocks react with brines of dissolved carbon dioxide to form carbonate minerals. By trapping carbon dioxide (CO 2 ) underground as a constituent of solid rock, carbonation of natural basalt formations would be a secure method of sequestering CO 2 captured at power plants in efforts to mitigate climate change. Geochemical laboratory experiments at Yale, carried out in a batch reactor at 200°C and 150 bar (15 MPa), studied carbonation of the olivine mineral forsterite (Mg 2 SiO 4 ) reacting with CO 2 brines in the form of sodium bicarbonate (NaHCO 3 ) solutions. The main carbonation product in these reactions is the carbonate mineral magnesite (MgCO 3 ). A series of 32 runs varied the reaction time, the reactive surface area of olivine grains and powders, the concentration of the reacting fluid, and the starting ratio of fluid to olivine mass. These experiments were the first to study the rate of olivine carbonation under passive conditions approaching equilibrium. The results show that, in a simple batch reaction, olivine carbonation is fastest during the first 24 hours and then slows significantly and even reverses. A natural measure of the extent of carbonation is a quantity called the carbonation fraction, which compares the amount of carbon removed from solution, during a run, to the maximum amount that could have been removed if the olivine initially present had fully dissolved and the cations released had subsequently precipitated in carbonate minerals. The carbonation fractions observed in batch experiments with olivine grains and powders varied significantly, from less than 0.01 (1%) to more than 0.5 (50%). Over time, the carbonation fractions reached an upper limit after about 24 to 72 hours of reaction, then stayed constant or decreased. The peak Final Scientific/Technical Report DE-FE0004275 | Mineral Carbonation | 4 coincided with the appearance of secondary magnesium-bearing silicate minerals, whose formation competes for magnesium ions in solution and can even promote conditions that dissolve magnesite. The highest carbonation fractions resulted from experiments with low ratios of concentrated solution to olivine, during which amorphous silica spheres or meshes formed, instead of secondary silicate minerals. The highest carbonation fractions appear to result from competing effects. Precipitation of silica layers on olivine reduces the reactive surface area and, thus, the rate of olivine dissolution (which ultimately limits the carbonation rate), but these same silica layers can also inhibit the formation of secondary silicate minerals that consume magnesite formed in earlier stages of carbonation. Simulation of these experiments with simple geochemical models using the software program EQ3/6 reproduces the general trends observed—especially the results for the carbonation fraction in short-run experiments. Although further experimentation and better models are needed, this study nevertheless provides a framework for understanding the optimal conditions for sequestering carbon dioxide by reacting CO 2 -bearing fluids with rocks containing olivine minerals. A series of experiments at the Rock Physics Laboratory at the University of Maryland studied the carbonation process during deformation of thermally cracked olivine-rich rock samples (dunite) saturated with CO 2 brines of varying compositions. A goal of these geomechanical experiments was to see if flow and deformation processes, which accompany natural carbonation reactions in underground settings, work to enhance or inhibit the reactions. The experiments involved hydrostatic compaction, followed by deformation at a constant rate of strain. Sample permeability was monitored during the reactions. Comparison of the samples’ volume changes to their axial strains (shortening) during deformation indicates that samples reacted with CO 2 -saturated brines accommodate more axial compaction, before the onset of dilation (a swelling that precedes rock failure), than samples reacted with distilled water. Analyses of the reacted samples with scanning electron microscope (SEM) images indicate, first, that dissolution of olivine occurring in the initial stages of carbonation can provide pathways to fluid flow that sustain the reaction, and, second, that carbonate minerals precipitated along existing fractures in the rocks may serve as asperities, or roughness on a crack’s surface that restricts its closure. Final Scientific/Technical Report DE-FE0004275 | Mineral Carbonation | 5 In a related study undertaken by one of the principal investigators as a spin-off of the main project, a simple model of (magnesite) crystal growth in the pore space of basalts undergoing carbonation was developed. The model suggests that, under a carefully controlled program of CO 2 injection, carbonate mineral growth can harden the rock formation against earthquakes that might otherwise be induced by the injection of large fluid volumes (Yarushina and Bercovici, 2013). The overall conclusion of the research project is that mineral carbonation of underground mafic and ultramafic rock formations is a viable candidate for long-term sequestration of man-made carbon dioxide. No results obtained during the project indicate that the method is inherently intractable in its implementation; moreover, enormous volumes of basalt near Earth’s surface are candidate locations for large-scale injection programs. The geochemical experiments do indicate, however, that there will be significant engineering challenges in maintaining high rates of carbonation, by delaying the onset of chemical conditions that promote formation of secondary silicate minerals and, therefore, slow down, or even reverse, the carbonation process. It remains an open question as to whether carbonation processes can be sustained for many years in an engineered system operating on a large scale—a scale capable of accommodating millions of tons of CO 2 annually. The development of realistic theoretical models that can systematically describe the combined effects of reactive flow, precipitation and geomechanical deformation is a major barrier to further understanding of the practical viability of mineral carbonation as large-scale method of carbon sequestration.

58 GEOSCIENCES↗