Search NASA⌕ Search

SEARCH · Search NASA

Results for “TESTING FACILITY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,711 records · Page 95

Design, fabrication, and testing of a water-cooled tungsten-foam high-heat flux plasma-facing module

Here, we present a comprehensive study detailing the design, fabrication and testing a new modular “finger” component, featuring a hexagonal tungsten foam armor tile bonded to the top surface of the water-cooled finger unit. The mechanical, thermal, and particle transport properties of the tungsten foam armor were determined for a wide range of porosity and cell size, and then combined in an equivalent solid material with “effective” properties suitable for large-scale simulations. A series of 3-D multiphysics simulations for coupled thermal and mechanical behavior of the “finger” module are used to optimize the design before fabrication. The simulation results show that, for the expected experimental conditions, a safe range of heat flux and foam porosity is possible for both water-cooling and helium-cooling. Based on these multiphysics simulations, an optimum finger cooling module has been fabricated at Ultramet, Inc. A series of experiments were designed to study the thermomechanical performance of the “finger” unit under steady-state and transient thermal loading at surface heat flux up to 16 MW/m 2 in the High Energy Flux Test facility (HEFTY) at UCLA. Testing conditions included low-power, steady-state plasma exposure at 6 MW/m 2 , followed by severe high heat flux cycles at 16 MW/m 2 . Results of these tests are explained through comparisons with multiphysics simulations. To eliminate the effects of thermomechanical damage carried out on a module on its thermo-mechanical response on a subsequent test, three different yet identically designed and fabricated finger modules were tested. The results show that the current design is capable of cooling the walls of fusion devices at surface heat flux up to 6 MW/m 2 without failure, and that the failure heat flux limit is below 16 MW/m 2 .

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Measurement of cross sections for the {sup 232}Th(P,4n){sup 229}Pa reaction at low proton energies

The alpha-emitters {sup 225}Ac and {sup 213}Bi are of great interest for alpha-radioimmunotherapy which uses radioisotopes attached to cancer-seeking antibodies to efficiently treat various types of cancers. Both radioisotopes are daughters of the long-lived {sup 229}Th(t{sub 1/2} = 7880y). {sup 229}Th can be produced by proton irradiation of {sup 232}Th and {sup 230}Th, either directly or through production of isobars that beta-decay into {sup 229}Th. To obtain excitation functions, {sup 232}Th and {sup 230}Th have been irradiated at the On-Line Test Facility at the Holifield Radioactive Ion Beam Facility at ORNL. Benchmark tests conducted with Cu and Ni foils show very good agreement with literature results. The experiments with thorium targets were focused on the production of {sup 229}Pa and its daughter {sup 225}Ac from both {sup 232}Th and {sup 230}Th. Differential cross-sections for production of {sup 229}Pa and other Pa isotopes have been obtained.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

The Fermilab CMTF cryogenic distribution remote control system

The Cryomodule Test Facility (CMTF) is able to provide the necessary test bed for measuring the performance of Superconducting Radio Frequency (SRF) cavities in a cryomodule (CM). The CMTF have seven 300 KW screw compressors, two liquid helium refrigerators, and two Cryomodule Test Stands (CMTS). CMTS1 is designed for 1.3 GHz cryomodule operating in a pulsed mode (PM) and CMTS2 is for cryomodule operating in Half-Wave (HW) and Continuous Wave (CW) mode. Based on the design requirement, each subsystem has to be far away from each other and be placed in distant locations. Therefore choosing Siemens Process Control System 7-400, DL205 PLC, Synoptic and Fermilab ACNET are the ideal choices for CMTF cryogenic distribution real-time remote control system. This paper presents a method which has been successfully used by many Fermilab distribution cryogenic real-time remote control systems.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

SECA Coal-Based Systems

This report documents the results of Cooperative Agreement DE-FC26-05NT42613 between Siemens Energy and the U.S. Department of Energy for the period October 1, 2008 through September 30, 2010. The Phase I POCD8R0 stack test was successfully completed as it operated for approximately 5,300 hrs and achieved all test objectives. The stack test article contained twenty-four 75 cm active length Delta8 scandia-stabilized zirconia cells. Maximum power was approximately 10 kWe and the SOFC generator demonstrated an availability factor of 85% at 50% power or greater. The Phase II POCD8R1 stack test operated for approximately 410 hrs before being aborted due to a sudden decrease in voltage accompanied by a rapid increase in temperature. The POCD8R1 test article contained forty-eight 100 cm active length Delta8 scandia-stabilized zirconia cells arranged in an array of six bundles, with each bundle containing eight cells. Cell development activities resulted in an approximate 100% improvement in cell power at 900°C. Cell manufacturing process improvements led to manufacturing yields of greater than 40% for the Delta8 cells. Delta8 cells with an active length of 100 cm were successfully manufactured as were cells with a seamless closed end. A pressurized cell test article was assembled, installed into the pressurized test facility and limited pressurized testing conducted. Open circuit voltage tests were performed at one and three atmospheres at 950°C were in agreement with the theoretical increase in the Nernst potential. Failed guard heaters precluded further testing. The SOFC analytical basis for the baseline system was validated with experimental data. Two system configurations that utilize a pressurized SOFC design with separated anode and cathode streams were analyzed. System efficiencies greater than 60% were predicted when integrating the separated anode and cathode stream module configuration with a high efficiency catalytic gasifier.

01 COAL, LIGNITE, AND PEAT↗

Development of a Low NOx Medium sized Industrial Gas Turbine Operating on Hydrogen-Rich Renewable and Opportunity Fuels (Final Technical Report)

This report presents the accomplishments at the completion of the DOE sponsored project (Contract # DE-FC26-09NT05873) undertaken by Solar Turbines Incorporated. The objective of this 54-month project was to develop a low NOx combustion system for a medium sized industrial gas turbine engine operating on Hydrogen-rich renewable and opportunity Fuels. The work in this project was focused on development of a combustion system sized for 15MW Titan 130 gas turbine engine based on design analysis and rig test results. Although detailed engine evaluation of the complete system is required prior to commercial application, those tasks were beyond the scope of this DOE sponsored project. The project tasks were organized in three stages, Stages 2 through 4. In Stage 2 of this project, Solar Turbines Incorporated characterized the low emission capability of current Titan 130 SoLoNOx fuel injector while operating on a matrix of fuel blends with varying Hydrogen concentration. The mapping in this phase was performed on a fuel injector designed for natural gas operation. Favorable test results were obtained in this phase on emissions and operability. However, the resulting fuel supply pressure needed to operate the engine with the lower Wobbe Index opportunity fuels would require additional gas compression, resulting in parasitic load and reduced thermal efficiency. In Stage 3, Solar characterized the pressure loss in the fuel injector and developed modifications to the fuel injection system through detailed network analysis. In this modification, only the fuel delivery flowpath was modified and the air-side of the injector and the premixing passages were not altered. The modified injector was fabricated and tested and verified to produce similar operability and emissions as the Stage 2 results. In parallel, Solar also fabricated a dual fuel capable injector with the same air-side flowpath to improve commercialization potential. This injector was also test verified to produce 15-ppm NOx capability on high Hydrogen fuels. In Stage 4, Solar fabricated a complete set of injectors and a combustor liner to test the system capability in a full-scale atmospheric rig. Extensive high-pressure single injector rig test results show that 15-ppm NOx guarantee is achievable from 50% to 100% Load with fuel blends containing up to 65% Hydrogen. Because of safety limitations in Solar Test Facility, the atmospheric rig tests were limited to methane-based fuel blends. Further work to validate the durability and installed engine capability would require long-term engine field test.

42 ENGINEERING↗

Advanced accelerator test facility-Final report for the period 9/1/2010 - 8/31/2013

This final report summarizes results achieved in the Beam Physics Laboratory at Yale University during the period 9/1/2010 – 8/31//2013, under DoE grant DE-FG02-07 ER 41504. During the period covered by this report, notable progress in technical consolidation of facilities in the Yale Beam Physics Laboratory has occurred; and theory, design, and fabrication for future experiments have been carried out. In the period covered by this grant, 29 scientific publications based on this work and related topics have appeared in the archival literature. Titles, authors, and citations are listed in Section V of this report.

43 PARTICLE ACCELERATORS↗

Development of a Microchannel High Temperature Recuperator for Fuel Cell Systems

This report summarizes the progress made in development of microchannel recuperators for high temperature fuel cell/turbine hybrid systems for generation of clean power at very high efficiencies. Both Solid Oxide Fuel Cell/Turbine (SOFC/T) and Direct FuelCell/Turbine (DFC/T) systems employ an indirectly heated Turbine Generator to supplement fuel cell generated power. The concept extends the high efficiency of the fuel cell by utilizing the fuel cell’s byproduct heat in a Brayton cycle. Features of the SOFC/T and DFC/T systems include: electrical efficiencies of up to 65% on natural gas, minimal emissions, reduced carbon dioxide release to the environment, simplicity in design, and potential cost competitiveness with existing combined cycle power plants. Project work consisted of candidate material selection from FuelCell Energy (FCE) and Pacific Northwest National Laboratory (PNNL) institutional databases as well as from industrial and academic literature. Candidate materials were then downselected and actual samples were tested under representative environmental conditions resulting in further downselection. A microchannel thermal-mechanical model was developed to calculate overall device cost to be later used in developing a final Tier 1 material candidate list. Specifications and operating conditions were developed for both SOFC/T and DFC/T systems. This development included system conceptualization and progression to process flow diagrams (PFD’s) including all major equipment. Material and energy balances were then developed for the two types of systems which were then used for extensive sensitivity studies that used high temperature recuperator (HTR) design parameters (e.g., operating temperature) as inputs and calculated overall system parameters (e.g., system efficiency). The results of the sensitivity studies determined the final HTR design temperatures, pressure drops, and gas compositions. The results also established operating conditions and specifications for all equipment in the SOFC/T and DFC/T systems. Capital cost and Cost of Electricity (COE) sensitivity analyses have been completed for MW-scale SOFC/T and DFC/T systems. Environmental testing consisted of 1000-hour and 2000-hour dry air oxidation testing on leading candidate materials, used to rank order and, in part, develop a final Tier 1 material candidate list. A thermal-mechanical model was subsequently used to provide material and manufacturing cost estimations for microchannel HTR’s to further refine the Tier 1 candidates. A capital cost and 20-year levelized cost of electricity (COE) was developed for a MW-scale version of the SOFC/T system concept as well as for a MW-scale version of the DFC/T system concept. Test frameworks were established for subsequent long-term materials stability testing, including oxidation resistance and mechanical strength. Mechanical strength testing was then carried out by a third-party test laboratory. Technology demonstration vehicles (TDV’s) were designed and fabricated. Several iterations of TDV’s were fabricated, each improved over the previous build as far as fabrication techniques. Two of three fabricated TDV’s were integrated with the TDV Test Facility for hot-testing at simulated operating conditions. The second of these two was successfully hot-tested for over 1000 hours at simulated temperature and pressure. Post-test leakdown assessment showed negligible leakage at benchtop conditions of 30 psig, a considerable improvement over the previous TDV’s.

30 DIRECT ENERGY CONVERSION↗

Electrochemical Membrane for Carbon Dioxide Capture and Power Generation

FuelCell Energy, Inc. (FCE), in collaboration with AECOM Corporation (formerly URS Corporation) and Pacific Northwest National Laboratory, has been developing a novel Combined Electric Power and Carbon-dioxide Separation (CEPACS) system. The CEPACS system is based on electrochemical membrane (ECM) technology derived from FCE’s carbonate fuel cell products featuring internal (methane steam) reforming and carrying the trade name of Direct FuelCell®. The unique chemistry of carbonate fuel cells offers an innovative approach for separation of CO 2 from existing fossil-fuel power plant exhaust streams (flue gases). The ECM-based CEPACS system has the potential to become a transformational CO 2 -separation technology by working as two devices in one: it separates the CO 2 from the exhaust of other plants such as an existing coal-fired plant and simultaneously produces clean electric power at high efficiency using a supplementary fuel. The development effort was carried out under the U.S. Department of Energy (DOE) cooperative agreement DE-FE0007634. The overall objective of this project was to successfully demonstrate the ability of FCE’s ECM-based CEPACS system technology to separate ≥90% of the CO 2 from a simulated Pulverized Coal (PC) power plant flue gas stream and to compress the captured CO2 to a state that can be easily transported for sequestration or beneficial use. In addition, a key objective was to show, through the technical and economic feasibility study and bench scale testing, that the ECM-based CEPACS system is an economical alternative for CO 2 capture in PC power plants, and that it meets DOE’s objective related to the incremental cost of electricity (COE) for post-combustion CO 2 capture (no more than 35% increase in COE). The project was performed in three budget periods (BP). The specific objective for BP1 was to complete the Preliminary Technical and Economic Feasibility Study. The T&EF study was based on the carbon capture system size suitable for a reference 550 MW PC power plant. The specific objectives for BP2 were to perform (flue gas) contaminant effect evaluation tests, small area membrane tests using clean simulated flue gas, design a flue gas pretreatment system for processing of the gas feed to ECM, update the Technical & Economic Feasibility Study (T&EFS) incorporating results of contaminant effect tests and small area membrane tests, and to prepare a test facility for bench scale testing. The specific objectives for BP3 were to perform bench scale testing (parametric and long-duration testing) of a 11.7 m 2 ECM-based CO 2 capture, purification and compression system, and update (as final) the Technical and Economic Feasibility Study. In addition, an Environmental Health and Safety evaluation (assessment) of the ECM technology was included. This final technical report presents the progress made under the project.

20 FOSSIL-FUELED POWER PLANTS↗

Lambda Plate Seal for HFVMTF Anticryostat

Fermilab is currently designing a High Field Vertical Magnet Test Facility in order to test superconducting cables and magnets. The goal of this project was to analyze the thermal performance of three different seal designs and provide recommendations for the HFVMTF.

Gasior, Brett↗

2022 Los Alamos National Laboratory Test and Analysis Abstracts

The abstracts included in this document are: Responsiveness, Modernization, and Radiography Test at the Centrifuge Test Facility; LANL Hostile Blast Testing Capability Development; Digital Image Correlation Measurement of B61 Center Case Fragmentation Test; and Collaborative Analysis Testing Techniques (CATT) Phase 1.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

An Architectural Survey of the Pluto Test Bunker Facility, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE), in conjunction with the National Nuclear Security Administration Nevada Field Office (NNSA/NFO), proposes to reactivate Building 26-2205 as part of a project to detect foundry-type operations with remote sensing. The project is known as the Signals Exploration Testbed, or SET for short. Building 26-2205 (State Historic Preservation Office [SHPO] Resource No. B11558) is the former Compressor Building for the Pluto Program in Area 26 of the Nevada National Security Site (NNSS). Proposed actions at Building 26-2205 include removal of exterior building and site features, such as fencing, concrete pads, a large steel tank, and visible utilities, as well as interior changes to the building’s floor plan. These activities constitute an undertaking subject to review under Section 106 of the National Historic Preservation Act (NHPA) (54 United States Code [USC] § 306101) and its implementing regulations, 36 Code of Federal Regulations (CFR) Part 800.

54 ENVIRONMENTAL SCIENCES↗

Reducing Methane Emissions with an Engine Fuel Reformer

Southwest Research Institute (SwRI) designed and demonstrated a compact, plasma-based fuel reformer designed to reduce methane leaks from natural-gas engines used in pipeline compression and industrial power applications. The system uses pulsed electrical discharges to convert a small portion of methane (CH4) into hydrogen (H2) and light hydrocarbons, promoting more complete combustion and reducing unburned methane in the exhaust. The reformer was evaluated through bench-scale testing, high-flow facility testing, and engine-integration testing on representative low-speed and high-speed natural-gas engines. Measured methane-leak reductions ranged from 1 to 27 percent, depending on engine type and operating condition, while reformer energy consumption remained below one percent of total engine output. Design refinements addressed thermal and electrical challenges, resulting in reliable operation with minimal impact on engine control systems. The project achieved all performance objectives within budget and schedule, produced a patentable pulsed-power system design, and established a scalable, energy-efficient pathway for mitigating methane leaks from existing natural-gas engine infrastructure.

03 NATURAL GAS↗

Helium recovery system at IB3A

The growing demand for sustainable cryogenic operations at Fermilab has underscored the need to improve helium management, particularly at the Industrial Building 3A (IB3A) test facility. IB3A characterizes and tests superconductors, cables, and coils for projects such as the HL-LHC AUP and Mu2e, yet currently relies on 500 L Dewars whose boil-off is vented to atmosphere, wasting a critical, non-renewable resource and increasing the cost of testing. A project is therefore under way to link IB3A to an existing purification and liquefaction station in a neighboring building through a dedicated pipeline. Captured helium will be transferred, purified, reliquefied, and returned for reuse, cutting losses and operating costs. This paper details the first two project phases: "Design and Engineering" and "Procurement and Installation." The design phase finalizes pipeline specifications, establishes flow-control requirements, and resolves integration challenges with existing cryogenic infrastructure. The procurement and installation phase covers material sourcing, pipeline construction, and deployment of control and monitoring systems to assure reliable, efficient operation. Key technical hurdles-route optimization, pressure drop mitigation, and interface compatibility-are discussed alongside implemented solutions. Implementing the pipeline and upgrading IB3A will dramatically reduce helium consumption and therefore testing cost, strengthening Fermilab's capacity to support frontier science far into the future.

Porwisiak, D. [Fermilab; Wroclaw Tech. U.]↗

Launching of the telstar satellite

The launching of the Telstar satellite from Cape Canaveral is described, with emphasis on the pre-launch testing and test facilities.

LAUNCHING FACILITY↗

Data correlation and analysis of arc tunnel and wind tunnel tests of RSI joints and gaps, phase 2. Volume 1: Technical report

Heat transfer data measured in gaps representative of those being employed for joints in the space shuttle reusable surface insulation (RSI) thermal protection systems (TPS) were assimilated, analyzed, and correlated. Several types of gap were investigated with emphasis on simple butt joints. Gap widths ranged from 0.0 to 0.76 cm and depths ranged from 1 to 6 cm. Laminar, transitional, and turbulent boundary layer flows over the gap opening were investigated. The angle between gap axis and external flow was varied between 0 and pi/2 radians. The contoured cross section gap performed significantly better than all other wide gaps and slightly better than all other narrow gap geometries. Three dimensional heating variations were observed within gaps in the absence of external flow pressure gradients. Interactions between heating within gaps and heating of adjacent top tile surfaces were observed. Gaps aligned with the flow were observed to promote boundary layer transition. Heat transfer correlation equations were obtained for many of the tests. The TPS thickness requirements with and without gaps were computed for a current shuttle entry trajectory. Experimental data employed in the study are summarized. A description of each test facility, run schedule and test conditions, model descriptive information, and heat flux data are included.

Cristensen, H. E.↗

Shuttle being tested at Marshall Center

Ground vibration tests of the space shuttle vehicle performed to evaluate the structural dynamics and their effect on the control system of the shuttle are described. Test results are used to verify the system design and mathematical models that predict how the shuttle's control system will react to the much more severe vibrations expected during launch and flight into orbit. The test configurations, the test facility, and the dynamic test suspension system are among the topics discussed.

Source record↗