Search NASA⌕ Search

SEARCH · Search NASA

Results for “launch control systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,711 records · Page 95

Lunar Reconnaissance Orbiter (LRO) Rapid Thermal Design Development

The Lunar Reconnaissance Orbiter (LRO) project had a rapid development schedule starting with project conception in spring of 2004, instrument and launch vehicle selection late in 2005 and then launch in early 2009. The lunar thermal environment is one of the harshest in our solar system with the heavy infrared loading of the moon due to low albedo, lack of lunar atmosphere, and low effective regolith conduction. This set of constraints required a thermal design which maximized performance (minimized radiator area and cold control heater power) and minimized thermal hardware build at the orbiter level (blanketing, and heater service). The orbiter design located most of the avionics on an isothermalized heat pipe panel called the IsoThermal Panel (ITP). The ITP was coupled by dual bore heat pipes to an Optical Solar Reflector (OSR) covered heat pipe radiator. By coupling all of the avionics to one system, the hardware was simplified. The seven instruments were mainly heritage instruments which resulted in their desired radiators being located by their heritage design. This minimized instrument redesigns and therefore allowed them to be delivered earlier, though it resulted in a more complex orbiter level blanket and heater service design. Three of the instruments were mounted on a tight pointing M55J optical bench that needed to be covered in heaters to maintain pointing. Two were mounted to spacecraft controlled radiators. One was mounted to the ITP Dual Bores. The last was mounted directly to the bus structure on the moon facing panel. The propulsion system utilized four-20 pound insertion thrusters and eight-5 pound attitude control thrusters (ACS) in addition to 1000 kg of fuel in two large tanks. The propulsion system had a heater cylinder and a heated mounting deck for the insertion thrusters which coupled most of the propulsion design together simplifying the heater design. The High Gain Antenna System (HGAS) and Solar Array System (SAS) used dual axis actuator gimbal systems. HGAS required additional boom heaters to cool the approximately 10 W of RF losses thru the rotary joints and wave guides from the 40 W Ka system. By design this module needed a fair amount of heater, blanketing, and radiator complexity. The SAS system required a separate cable wrap radiator to help cool the Solar Array harness which dissipated 30 W thru the actuators and cable wraps. This module also was complex.

Baker, Charles↗

Astrobee On-Orbit Commissioning Manuscript and Presentation

The Astrobee free flying robots operate autonomously inside the International Space Station (ISS) with oversight from a ground operator or ISS crew. They replace the Synchronized Position Hold Engage and Reorient Experimental Satellites (SPHERES) as research platforms for zero-g free-flying robotics. Astrobee can also serve as a mobile camera/sensor platform for flight and payload controllers to improve ISS operations. Development began in late 2014, and flight hardware deployed to the ISS on several launches starting from November 2018 to October 2019. Shortly after the first two robots arrived in April 2019, we began a series of commissioning activities to validate the Astrobee robots. This paper reviews the Astrobee system and describes the on-orbit commissioning activities and results.

ISS↗

Astrobee On-Orbit Commissioning

The Astrobee free flying robots operate autonomously inside the International Space Station (ISS) with oversight from a ground operator or ISS crew. They replace the Synchronized Position Hold Engage and Reorient Experimental Satellites (SPHERES) as research platforms for zero-g free-flying robotics. Astrobee can also serve as a mobile camera/sensor platform for flight and payload controllers to improve ISS operations. Development began in late 2014, and flight hardware deployed to the ISS on several launches starting from November 2018 to October 2019. Shortly after the first two robots arrived in April 2019, we began a series of commissioning activities to validate the Astrobee robots. This paper reviews the Astrobee system and describes the on-orbit commissioning activities and results.

ISS↗

Application and use of Multi Body Dynamic Simulations for In Space Mechanisms

The Thermal and Mechanical Analysis Branch of the Space System Department (ES22) is actively growing and expanding a new mechanical analysis capability. In recent years, there has been an increase in the demand for Multi Body Dynamics (MBD) analysis to support small ESPA ring size spacecraft, cubesats, lunar surface operations and large spacecraft with complex operations or deployables. Requirements can be balanced for both needs to ensure mechanism is verified for launch. Multi-body dynamics is the study of multiple rigid or flexible bodies that are linked together or are in contact and the associated kinematics and dynamics of the system. The typical outputs include performance information, loads, and deflections of mechanical systems. They routinely support the development of robotic mechanisms, deployment mechanisms, landing simulations, control systems, and conops planning.

Multi Body Dynamics Analysis↗

NASA Scout ST-1 Flight-Test Results and Analyses, Launch Operations, and Test Vehicle Description

The first of a series of flight tests for the development of the four-stage, solid-propellant Scout vehicle was conducted at the NASA Wallops Station under the direction of the Langley Research Center. Vehicle designation for the test was NASA Scout ST-1. Performance characteristics of the vehicle and components were recorded during a high-altitude probe mission. Flight-simulation studies are presented and show that the accuracy of the guidance system during the flight was within control-system design specifications. The control system functioned normally during the flight with the exception of an overpowering of the reaction-control roll jets near burnout of the third-stage rocket motor. The resulting roll displacement of the vehicle is shown to have caused the monitor tracking radar which had been erroneously tracking a radar beacon in the vehicle on a side lobe to reorient to the major lobe of the receiving antenna. This tracking switch falsely indicated a violent turning maneuver on the monitor plot board and resulted in a hold-fire decision for the fourth-stage rocket motor. Although data for the final thrusting and coast phase of the flight were not obtained, the majority of the test objectives were achieved. In-flight thrust misalignment angles for the second- and third-stage rocket motors derived from control-system error data and for the first-stage motor determined from flight-simulation studies are presented. All rocket-motor thrust misalignment angles were well within the tolerances used for control-system design. Rocket-motor flight performance is presented, and velocity increments attained from the first three stages substantiated the predicted nominal performance. Operation of the rocket motors was satisfactory with the exception of high-level vibrations which were encountered during third-stage motor burning. Rolling moments which overpowered the reaction-control jets are also attributed to the burning characteristics of the third-stage motor. A discussion of the premature loss of the third-stage heat shield is given and shows that the heat-shield latching mechanism failed from pressure loads as the vehicle entered the transonic speed range. Although venting was provided to relieve the high negative pressures known to exist on the heat shield at these speeds, a field modification of the wiring tunnel had the same effect as opening the inside of the heat shield to ambient pressures. Consequently, the latching mechanism failed from pressure loads which were of about the same magnitude as the latching-mechanism yield loads. Skin temperatures were recorded at several locations on the vehicle and were generally in good agreement with theoretical values. Aerodynamic heating presented no problem during the flight since the maximum temperatures recorded during the flight were only about half the design values because of the high-launch-angle trajectory. Environmental vibrations recorded in the vicinity of the guidance package showed that no significant continuous amplitude levels above the general instrumentation noise level were present during first- and second-stage burning. Large vibration amplitudes were recorded during third-stage burning which coincided with the large roll disturbance experienced by the vehicle near burnout of the third-stage motor.

Scout Launch Vehicle↗

Thermal protection systems for equipment pallets to be launched in Shuttle Orbiter

The thermal insulation for the OSS-1 Orbiter pallet is described and a design concept for future pallets is presented consisting of two independent thermal zones and new thermal insulation approaches. The application of these concepts is expected to reduce the effort required to integrate the payloads to their pallets and thereby reduce dollar costs and shorten time schedules. A stand-off insulation also is described for certain pallet areas to enclose the cabling and fluid lines in a controlled temperature environment. Methods for interfacing the payload and pallet insulations are presented and a number of areas are identified where the introduction of standards in the fabrication of thermal insulation can yield further savings.

Ruccia, F. E.↗

Planning and Estimation of Operations Support Requirements

Life Cycle Cost (LCC) estimates during the proposal and early design phases, as well as project replans during the development phase, are heavily focused on hardware development schedules and costs. Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead to de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Any LCC growth can directly impact the programs' ability to fund new missions, and even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations. The National Aeronautics and Space Administration (NASA) D&NF Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for 5 missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that 4 out of the 5 missions studied had significant overruns at or after launch due to underestimation of the complexity and supporting requirements for operations activities; the fifth mission had not launched at the time of the mission. The drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This paper updates the D&NF LCC study, looking at the operations (phase E) cost drivers in more detail and extending the study to include 2 additional missions and identifies areas for increased emphasis by project management in order to improve the fidelity of operations estimates.

Newhouse, Marilyn E.↗

Ares I-X: First Step in a New Era of Exploration

Since 2005, NASA's Constellation Program has been designing, building, and testing the next generation of launch and space vehicles to carry humans beyond low-Earth orbit (LEO). On October 28, 2009, the Ares Projects successfully launched the first suborbital development flight test of the Ares I crew launch vehicle, Ares I-X, from Kennedy Space Center (KSC). Although the final Constellation Program architecture is under review, data and lessons obtained from Ares I-X can be applied to any launch vehicle. This presentation will discuss the mission background and future impacts of the flight. Ares I is designed to carry up to four astronauts to the International Space Station (ISS). It also can be used with the Ares V cargo launch vehicle for a variety of missions beyond LEO. The Ares I-X development flight test was conceived in 2006 to acquire early engineering, operations, and environment data during liftoff, ascent, and first stage recovery. Engineers are using the test flight data to improve the Ares I design before its critical design review the final review before manufacturing of the flight vehicle begins. The Ares I-X flight test vehicle incorporated a mix of flight and mockup hardware, reflecting a similar length and mass to the operational vehicle. It was powered by a four-segment SRB from the Space Shuttle inventory, and was modified to include a fifth, spacer segment that made the booster approximately the same size as the five-segment SRB. The Ares I-X flight closely approximated flight conditions the Ares I will experience through Mach 4.5, performing a first stage separation at an altitude of 125,000 feet and reaching a maximum dynamic pressure ("Max Q") of approximately 850 pounds per square foot. The Ares I-X Mission Management Office (MMO) was organized functionally to address all the major test elements, including: first stage, avionics, and roll control (Marshall Space Flight Center); upper stage simulator (Glenn Research Center); crew module/launch abort system simulator (Langley Research Center); and ground systems and operations (KSC). Interfaces between vehicle elements and vehicle-ground elements, as well as environment analyses were performed by a systems engineering and integration team at Langley. Experience and lessons learned from these integrated product teams area are already being integrated into the Ares Projects to support the next generation of exploration launch vehicles.

Davis, Stephan R.↗

NASA Near Earth Network (NEN), Deep Space Network (DSN) and Space Network (SN) Support of CubeSat Communications

There has been a historical trend to increase capability and drive down the Size, Weight and Power (SWAP) of satellites and that trend continues today. Small satellites, including systems conforming to the CubeSat specification, because of their low launch and development costs, are enabling new concepts and capabilities for science investigations across multiple fields of interest to NASA. NASA scientists and engineers across many of NASAs Mission Directorates and Centers are developing exciting CubeSat concepts and welcome potential partnerships for CubeSat endeavors. From a communications and tracking point of view, small satellites including CubeSats are a challenge to coordinate because of existing small spacecraft constraints, such as limited SWAP and attitude control, low power, and the potential for high numbers of operational spacecraft. The NASA Space Communications and Navigation (SCaN) Programs Near Earth Network (NEN), Deep Space Network (DSN) and the Space Network (SN) are customer driven organizations that provide comprehensive communications services for space assets including data transport between a missions orbiting satellite and its Mission Operations Center (MOC). The NASA NEN consists of multiple ground antennas. The SN consists of a constellation of geosynchronous (Earth orbiting) relay satellites, named the Tracking and Data Relay Satellite System (TDRSS). The DSN currently makes available 13 antennas at its three tracking stations located around the world for interplanetary communication. The presentation will analyze how well these space communication networks are positioned to support the emerging small satellite and CubeSat market. Recognizing the potential support, the presentation will review the basic capabilities of the NEN, DSN and SN in the context of small satellites and will present information about NEN, DSN and SN-compatible flight radios and antenna development activities at the Goddard Space Flight Center (GSFC) and across industry. The presentation will review concepts on how the SN multiple access capability could help locate CubeSats and provide a low-latency early warning system. The presentation will also present how the DSN is evolving to maximize use of its assets for interplanetary CubeSats. The critical spectrum-related topics of available and appropriate frequency bands, licensing, and coordination will be reviewed. Other key considerations, such as standardization of radio frequency interfaces and flight and ground communications hardware systems, will be addressed as such standardization may reduce the amount of time and cost required to obtain frequency authorization and perform compatibility and end-to-end testing. Examples of standardization that exist today are the NASA NEN, DSN and SN systems which have published users guides and defined frequency bands for high data rate communication, as well as conformance to CCSDS standards. The workshop session will also seek input from the workshop participants to better understand the needs of small satellite systems and to identify key development activities and operational approaches necessary to enhance communication and navigation support using NASA's NEN, DSN and SN.

Telecommunication↗

Human and Robotic Exploration Missions to Phobos Prior to Crewed Mars Surface Missions

Phobos is a scientifically significant destination that would facilitate the development and operation of the human Mars transportation infrastructure, unmanned cargo delivery systems and other Mars surface systems. In addition to developing systems relevant to Mars surface missions, Phobos offers engineering, operational, and public engagement opportunities that could enhance subsequent Mars surface operations. These opportunities include the use of low latency teleoperations to control Mars surface assets associated with exploration science, human landing‐site selection and infrastructure development which may include in situ resource utilization (ISRU) to provide liquid oxygen for the Mars Ascent Vehicle (MAV). A human mission to Mars' moons would be preceded by a cargo predeploy of a surface habitat and a pressurized excursion vehicle (PEV) to Mars orbit. Once in Mars orbit, the habitat and PEV would spiral to Phobos using solar electric propulsion based systems, with the habitat descending to the surface and the PEV remaining in orbit. When a crewed mission is launched to Phobos, it would include the remaining systems to support the crew during the Earth‐Mars transit and to reach Phobos after insertion in to Mars orbit. The crew would taxi from Mars orbit to Phobos to join with the predeployed systems in a spacecraft that is based on a MAV, dock with and transfer to the PEV in Phobos orbit, and descend in the PEV to the surface habitat. A static Phobos surface habitat was chosen as a baseline architecture, in combination with the PEV that was used to descend from orbit as the main exploration vehicle. The habitat would, however, have limited capability to relocate on the surface to shorten excursion distances required by the PEV during exploration and to provide rescue capability should the PEV become disabled. To supplement exploration capabilities of the PEV, the surface habitat would utilize deployable EVA support structures that allow astronauts to work from portable foot restraints or body restrain tethers in the vicinity of the habitat. Prototype structures were tested as part of NEEMO 20. PEVs would contain closed loop guidance and provide life support and consumables for two crew for 2 weeks plus reserves. The PEV has a cabin that uses the exploration atmosphere of 8.2 psi with 34% oxygen, enabling use of suit ports for rapid EVA with minimal oxygen prebreathe as well as dust control by keeping the suits outside the pressurized volume. When equipped with outriggers and control moment gyros, the PEV enables EVA tasks of up to 8 pounds of force application without the need to anchor. Tasks with higher force requirements can be performed with PEV propulsion providing the necessary thrust to react forces. Exploration of Phobos builds heavily from the developments of the cis‐lunar proving ground, and significantly reduces Mars surface risk by facilitating the development and testing of habitats, MAVs, and pressurized rover cabins that are all Mars surface forward. A robotic precursor mission to Phobos and Deimos is also under consideration and would need to launch in 2022 to support a 2031 human Phobos mission.

Gernhardt, Michael L.↗

MiniCarb: a passive, occultation-viewing, 6U CubeSat for observations of CO 2 , CH 4 , and H 2 O

In this report we present the final design, environmental testing, and launch history of MiniCarb, a 6U CubeSat developed through a partnership between NASA Goddard Space Flight Center and Lawrence Livermore National Laboratory. MiniCarb’s science payload, developed at Goddard, was an occultation-viewing, passive laser heterodyne radiometer for observing methane, carbon dioxide, and water vapor in Earth’s atmosphere at ~1.6 µm s -1 . MiniCarb’s satellite, developed at Livermore, implemented their CubeSat Next Generation Bus plug-and-play architecture to produce a modular platform that could be tailored to a range of science payloads. Following the launch on 5 December 2019, MiniCarb traveled to the International Space Station and was set into orbit on 1 February 2020 via Northrop Grumman’s Cygnus capsule which deployed MiniCarb with tipoff rotation of about 20° s (significantly higher than the typical rate of 3° s -1 from prior CubeSats), from which the attitude control system was unable to recover resulting in a loss of power. In spite of this early failure, MiniCarb had many successes including rigorous environmental testing, successful deployment of its solar panels, and a successful test of the radio and communication through the Iridium network. This prior work and enticing cost (approximately $\$2$ M for the satellite and $\$$250 K for the payload) makes MiniCarb an ideal candidate for a low-cost and rapid rebuild as a single orbiter or constellation to globally observe key greenhouse gases.

47 OTHER INSTRUMENTATION↗

Optimization on fixed low latency implementation of the GBT core in FPGA

We present that in the upgrade of ATLAS experiment, the front-end electronics components are subjected to a large radiation background. Meanwhile high speed optical links are required for the data transmission between the on-detector and off-detector electronics. The GBT architecture and the Versatile Link (VL) project are designed by CERN to support the 4.8 Gbps line rate bidirectional high-speed data transmission which is called GBT link. In the ATLAS upgrade, besides the link with on-detector, the GBT link is also used between different off-detector systems. The GBTX ASIC is designed for the on-detector front-end, correspondingly for the off-detector electronics, the GBT architecture is implemented in Field Programmable Gate Arrays (FPGA). CERN launches the GBT-FPGA project to provide examples in different types of FPGA. In the ATLAS upgrade framework, the Front-End LInk eXchange (FELIX) system is used to interface the front end electronics of several ATLAS subsystems. The GBT link is used between them, to transfer the detector data and the timing, trigger, control and monitoring information. The trigger signal distributed in the down-link from FELIX to the front-end requires a fixed and low latency. In this paper, several optimizations on the GBT-FPGA IP core are introduced, to achieve a lower fixed latency. For FELIX, a common firmware will be used to interface different front-ends with support of both GBT modes: the forward error correction mode and the wide mode. The modified GBT-FPGA core has the ability to switch between the GBT modes without FPGA reprogramming. Finally, the system clock distribution of the multi-channel FELIX firmware is also discussed in this paper.

47 OTHER INSTRUMENTATION↗

Apollo 15 Mission Report

A detailed discussion is presented of the Apollo 15 mission, which conducted exploration of the moon over longer periods, greater ranges, and with more instruments of scientific data acquisition than previous missions. The topics include trajectory, lunar surface science, inflight science and photography, command and service module performance, lunar module performance, lunar surface operational equipment, pilot's report, biomedical evaluation, mission support performance, assessment of mission objectives, launch phase summary, anomaly summary, and vehicle and equipment descriptions. The capability of transporting larger payloads and extending time on the moon were demonstrated. The ground-controlled TV camera allowed greater real-time participation by earth-bound personnel. The crew operated more as scientists and relied more on ground support team for systems monitoring. The modified pressure garment and portable life support system provided better mobility and extended EVA time. The lunar roving vehicle and the lunar communications relay unit were also demonstrated.

Source record↗

SERT D spacecraft study

The SERT D (Space Electric Rocket Test - D) study defines a possible spacecraft project that would demonstrate the use of electric ion thrusters for long-term (5 yr) station keeping and attitude control of a synchronous orbit satellite. Other mission objectives included in the study were: station walking to satellite rendezvous and inspection, use of low cost attitude sensing system, use of an advanced solar array orientation and slip ring system, and an ion thruster integrated directly with a solar array power source. The SERT D spacecraft, if launched, will become SERT 3 the third space electric thruster test.

Source record↗

The ion drive program - Comet rendezvous issues for SEPS developers

Preliminary steps have been taken in a joint high-priority project between NASA and the European Space Agency, whereby a Solar Electric Propulsion System (SEPS), using ion drive of a 25-30 kilowatt power level, will be utilized for the first time, as part of the Space Transportation System, in powering a probe to be deployed toward Halley's comet in 1985 and a separate spacecraft which will rendezvous with the Temple 2 comet in 1988 and study it for one year. Unlike ballistically-launched vehicles, an unprecedented long-term interaction between the SEPS, the primary source of power and attitude control, and the spacecraft, responsible for data handling (at a rate of 10-120 kilobits per second), and command and telecommunications to earth (requiring capabilities at both X- and S-band frequencies, for dual-frequency navigational tracking), is required, as mission phases alternate between powered flight and science data-taking. Different design sensitivities are presented graphically.

Atkins, K. L.↗

The Earth Observing System (EOS) SAR ground data system

NASA, in association with ESA and NASDA, will launch the Space Station Freedom in 1993. As a complement to the Space Station, several unmanned Polar-Orbit Platforms (POPs) will be developed, built and launched with suites of instruments devoted to remote-sensing for earth surface and atmosphere observations or to planetary and deep-space studies. Attention is presently given to the POPs-associated Earth Observing System SAR Ground Data System, which encompasses a SAR processor, a postprocessing subsystem, a geophysical processor, and a data management and control subsystem.

Curlander, John C.↗

Minimum Hamiltonian Ascent Trajectory Evaluation (MASTRE) program (update to automatic flight trajectory design, performance prediction, and vehicle sizing for support of Shuttle and Shuttle derived vehicles) engineering manual

The Minimum Hamiltonian Ascent Trajectory Evaluation (MASTRE) program and its predecessors, the ROBOT and the RAGMOP programs, have had a long history of supporting MSFC in the simulation of space boosters for the purpose of performance evaluation. The ROBOT program was used in the simulation of the Saturn 1B and Saturn 5 vehicles in the 1960's and provided the first utilization of the minimum Hamiltonian (or min-H) methodology and the steepest ascent technique to solve the optimum trajectory problem. The advent of the Space Shuttle in the 1970's and its complex airplane design required a redesign of the trajectory simulation code since aerodynamic flight and controllability were required for proper simulation. The RAGMOP program was the first attempt to incorporate the complex equations of the Space Shuttle into an optimization tool by using an optimization method based on steepest ascent techniques (but without the min-H methodology). Development of the complex partial derivatives associated with the Space Shuttle configuration and using techniques from the RAGMOP program, the ROBOT program was redesigned to incorporate these additional complexities. This redesign created the MASTRE program, which was referred to as the Minimum Hamiltonian Ascent Shuttle TRajectory Evaluation program at that time. Unique to this program were first-stage (or booster) nonlinear aerodynamics, upper-stage linear aerodynamics, engine control via moment balance, liquid and solid thrust forces, variable liquid throttling to maintain constant acceleration limits, and a total upgrade of the equations used in the forward and backward integration segments of the program. This modification of the MASTRE code has been used to simulate the new space vehicles associated with the National Launch Systems (NLS). Although not as complicated as the Space Shuttle, the simulation and analysis of the NLS vehicles required additional modifications to the MASTRE program in the areas of providing additional flexibility in the use of the program, allowing additional optimization options, and providing special options for the NLS configuration.

Lyons, J. T.↗

The EUVE proposal database and scheduling system

The proposal database and scheduling system for the Extreme Ultraviolet Explorer will be described. The proposal database has been implemented to take input for approved observations selected by the EUVE Peer Review Panel and output target information suitable for the scheduling system to digest. The scheduling system is a hybrid of the SPIKE program and EUVE software which checks spacecraft constraints, produces a proposed schedule and selects spacecraft orientations with optimal configurations for acquiring star trackers, etc. This system has been used to schedule the In Orbit Calibration activities that took place this summer, following the EUVE launch in early June 1992. The implemented strategy has implications for the selection of approved targets, which have impacted the Peer Review process. In addition, it will be discussed how the proposal database, founded on Sybase, controls the processing of EUVE Guest Observer data.

Christian, C.↗