Improvement of General Electric’s Chilled Ammonia Process with the use of Membrane Technology
General Electric Environmental Control Solutions (formerly Alstom Power Environmental Control Systems) set out to complete the Phase 1 award requirements for a Phase II renewal application for their project selected under DOE-FOA-0001190 “Small and Large Scale Pilots for Reducing the Cost of CO 2 Capture and Compression”. The project focus was to implement several improvement concepts utilizing membrane technology at the recipient’s Chilled Ammonia Process (CAP) CO 2 capture large-scale pilot plant. The goal was to lower the overall cost of technology. During the development of costs for the preliminary techno-economic assessment (TEA), it became clear that the capital and operating costs of this concept were not economically attractive. All work related to a Phase II renewal application at that point was halted as GE made the decision not to submit a Phase II renewal application. Discussions with DOE resulted in a path towards useful information produced from the design and cost work already completed on the project. With the reverse osmosis (RO) unit providing most of the cost issues, GE would provide a sensitivity analysis of the RO unit with respect to project cost. This information would be included with the Techno-Economic Analysis along with the Technology Gap Analysis.