At least 1,729 records · Page 96

FINAL REPORT - Development of High Pressure Hydrogen Storage Tank for Storage and Gaseous Truck Delivery

The “Development of High Pressure Hydrogen Storage Tanks for Storage and Gaseous Truck Delivery” project [DE-FG36-08GO18062] was initiated on 01 July 2008. Hexagon Lincoln (then Lincoln Composites) received grant funding from the U.S. Department of Energy to support the design and development of an improved bulk hauling and storage solution for hydrogen in terms of cost, safety, weight and volumetric efficiency. The development of this capability required parallel development and qualification of large all-composites pressure vessels, a custom ISO container to transport and store said tanks, and performance of trade studies to identify optimal operating pressure for the system. Qualification of the 250 bar TITAN® module was completed in 2009 with supervision from the American Bureau of Shipping [ABS], and the equipment has been used internationally for bulk transportation of fuel gases since 2010. Phase 1 of the project was successfully completed in 2012 with the issuance of USDOT SP 14951, the special permit authorizing the manufacture, marking, sale and use of TITAN® Mobile Pipeline® equipment in the United States. The introduction of tube trailers with light weight composite tankage has meant that 2 to 3 times as much gaseous fuel can be transported with each trip. This increased hauling efficiency offers dramatically reduced operating costs and has enabled a profitable business model for over-the-road compressed natural gas delivery. The economic drivers of this business opportunity vary from country to country and region to region, but in many places gas distribution companies have realized profitable operations. Additional testing was performed in 2015 to characterize hydrogen-specific operating protocols for use of TITAN® systems in CHG service at 250 bar. This program demonstrated that existing compression and decompression methodologies can efficiently and safely fill and unload lightweight bulk hauling systems. Hexagon Lincoln and U.S. DOE agreed to continue into Phase 2 of the project without pursuing the development of higher pressure capabilities as originally planned. At 250 bar, development of equipment for hydrogen transport is supported by strong activity in the adjacent natural gas transportation sector. Trade studies performed since 2011 indicate optimization of hauling efficiency and system cost for hydrogen transport at about 350 bar (5076 psi). However, due to reduced efficiency of compression of natural gas above 250 bar, 350 bar operation is not an attractive option for natural gas transportation. The CHG market is not developed at this time, and it is difficult to forecast the arrival of significant revenues. On the investment side, the cost to fully qualify a large tank module at 350 bar is estimated at $3MM to $5MM. There is insufficient CHG market definition to support a stand-alone business case for this investment without near term revenue in the adjacent CNG transportation market. Therefore development of a 350 bar TITAN® system was deferred and not pursued under this project. Hexagon Lincoln continues to support the development of tankage and equipment for operation at 350 bar and above; with 700 bar vehicle tanks and 950 bar tanks for ground storage applications. Phase 2 activities were focused on reducing system cost, increasing system capacity, increasing system safety and characterization of polymer material performance specific to hydrogen pressure vessel usage. With the successful launch of TITAN® modules and trailers in natural gas transportation, over 600 units have been produced through the end of 2016, resulting in improved purchasing power for raw materials and manufactured components. This has allowed Hexagon Lincoln to approach the current project goals for system cost. At $590/kg of compressed hydrogen delivered, the system cost of the baseline TITAN® module is below the project’s 2015 target of $730/kg H2 delivered, and very close to the project’s 2020 target of $575/kg H2 delivered. [Based on product pricing in 1Q2017.] Emphasis was placed on configuration of larger capacity systems within the vehicle weights and dimensions allowed on federal and state highways in the United States and other countries. These activities resulted in the design and development of integrated tube trailer systems that have increased delivery capacities by 45%. The hydrogen delivery capacity of our largest system is 845 kg, exceeding the project’s 2015 target of 700 kg H2 delivered. Emerging technologies offering improvement of the safety systems used on the equipment were investigated, with particular focus on improving the reliability and cost of the emergency venting system for fire protection. Finally, investment in our materials laboratory improved detection and characterization of hydrogen-induced damage in polymer materials, supporting the development of operational protocols to avoid damage to pressure vessel liners and valve components.

08 HYDROGEN↗

State Technical Assistance - New Mexico Energy and Conservation Management Division Report [Slides]

The New Mexico Energy and Conservation Management Division (ECMD) sought technical assistance to enhance their ability to evaluate program impacts using the Low-Income Energy Affordability Data (LEAD) tool. NLR assisted ECMD in leveraging the LEAD tool to calculate and analyze energy burden across electric utility service areas, enabling them to assess program outcomes more effectively. To meet ECMD's goals, NLR developed a customized methodology to calculate utility-specific energy burden metrics using census tract data and available utility service area information from the Energy Information Administration (EIA). While acknowledging some limitations in the EIA dataset, NLR estimated the percentage of households within each service territory and incorporated relevant filters such as income, housing characteristics, and other demographics from the LEAD tool. The analysis provided ECMD with a new capability to evaluate program success based on energy savings, reductions in energy burden, and other performance indicators. The data and methodology also support discussions with utilities to improve the accuracy of service territory datasets. ECMD can use the outputs to track program effectiveness and plan future initiatives. NLR offered the possibility of follow-on work, including capacity-building for ECMD to repeat the analysis independently and the option to refine the analysis with updated service.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Issue Resolution During the Development of the Performance Assessment for the Savannah River Site Saltstone Disposal Facility - 20125

In 2019, Savannah River Remediation developed a revision to the performance assessment (PA) on behalf of the U.S. Department of Energy (DOE) Savannah River Operations Office (SR) for the near-surface disposal of low-level waste at the Savannah River Site (SRS) Saltstone Disposal Facility (SDF). Soluble waste from SRS Tank Farms undergoes salt processing to remove cesium and other high-activity constituents. The low-activity decontaminated salt solution (DSS) is then immobilized by mixing it into a cementitious waste form known as saltstone. After mixing, the saltstone is poured into leak-tight concrete vaults, known as saltstone disposal units (SDUs), where the waste form cures. By the time of facility closure, the SDF is expected to consist of 15 SDUs with a combined capacity of 1.06 E+09 L (280 Mgal) of cured saltstone. The facility operates under a Disposal Authorization Statement from DOE and a permit from the South Carolina Department of Health and Environmental Control (SCDHEC). Since the start of operations in 1990, the SDF has received almost 6.7 E+07 L (18 Mgal) of DSS, resulting in the safe disposal of 2.7 E+16 Bq (7.3 E+05 Ci) of activity. Due to the radioactive decay of short-lived contaminants, the total remaining activity in the disposed waste is estimated to be approximately 1.4 E+16 Bq (3.9 E+05 Ci), as of September 2018. The Disposal Authorization Statement requires a demonstration that the system of engineered and natural features of the disposal facility will limit releases from the facility and be protective of human health and the environment for at least the next 1,000 years. The long-term performance of the facility was evaluated under the requirements of the DoE's Radioactive Waste Management Manual (US DOE Manual 435.1-1). Simulations were performed to demonstrate that the disposal facility would meet performance objectives specified in the manual. The evaluation was based on numerical models that simulate the releases of contaminants from the saltstone waste form. Contaminants were transported through groundwater and air pathways to points of assessment to evaluate compliance (i.e., 100 m from the SDUs). In addition, the potential consequences of an inadvertent human intrusion (IHI) were also evaluated. A number of issues were overcome during the development of these simulations. These issues were identified as part of internal technical reviews. Simulations are developed by people and people make mistakes, so the internal technical review process is a vital step in PA development. Specific examples of resolved issues include a unit-conversion error, an inappropriate definition for a model boundary condition, a model time-stepping issue, and an error in the calculation for the buildup of contaminants in soil. Actions taken to address these issues resulted in an improved product with a better supported technical basis and more defensible results. The identification and correction of these issues are discussed. By understanding these issues, model developers and technical reviewers working on PAs in the future may avoid repeating these types of mistakes. Transparency with respect to these mistakes builds trust between waste management sites, regulators, and stakeholders. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CarbonSAFE Phase I: Integrated CCS Pre-Feasibility – Northwest Gulf of Mexico (Final Research Performance Progress Report)

Offshore storage achieves two major objectives for the US commercial large scale CCS deployment: 1. Adding large capacity to serve local regional, and potentially broader objectives 2. Lowering risk by providing storage with one public owner, away from population, with no conflict with water resources and reduced concern about induced seismicity. A high-concentration CO 2 source was identified as the top candidate for the project and going forward with the CarbonSAFE Phase II proposal. The top-rated source is the NET Power facility in Houston (La Porte), Texas. A manuscript based on analysis of results from the two-stage survey conducted in eight selected Texas counties was submitted to the International Journal of Greenhouse Gas Control on August 21, 2018. A primary confining interval (seal) is associated with MFS9 (biochronozone Amphistegina B) which can reach a thickness of up to 250 m. However, the Amphistegina B confining interval thins considerably in the onshore direction. Consequently, the most suitable portion of the Miocene section for future CO 2 sequestration in the study area is considered to be the offshore area where Amphistegina B is thickest. Based on three models for capacity assessment, the study proposes a base case for the High Island 10-L Field in which 9 wells operated for 12 years each completed into 4 zones will emplace a total of 150MMT of CO 2 with wells placed in the water leg where all the plume will slowly migrate into the structural trap is feasible in terms of geology and engineering. The 10-L Field was assessed in more detail than other examined oil and gas fields in the study area in order to look at some specifics about how initial future CCS projects might be accomplished in the favorable GoM of the US region and expand the sites to a larger set to experiment with matching all the possible sources to sinks. The 10-L site is large enough to accept CO 2 from multiple sinks; the expanded sinks are estimated to be large enough to accept all the CO 2 from the region plus some from outside the region. A number of uncertainties were identified. The largest and most consequential uncertainty is the cost of offshore pipelines in the study setting, which impacts the conditions where CO 2 transport would be by ship versus the cases where pipeline would be preferred. Ships are preferred for small volumes and short durations; pipelines for larger volumes and long duration. Additional work is needed to advance the maturity of multiple sinks available, to continue outreach to industries and the public, and to develop realistic source opportunities. The study demonstrates that industrial source clusters connected to a transport hub delivering CO 2 to a nearby storage complex is the most cost-effective and improved way to de-carbonize industrial activities, particularly, in an expected low-carbon and increasing carbon price environmental. The feasibility of the new business models should be based on the best use of the existing infrastructure and strategically build on new supporting infrastructure to drive down the costs of large-scale CCS deployment. Assessing the pre-feasibility of the commercial implementation of a CCS cluster and hub in the GoM energy ecosystem, our study links these elements successfully through an optimized combination (minimum cost) of CO 2 sources on land with offshore storage. Offshore storage achieves two major objectives for the US commercial large scale CCS deployment: 1. Adding large capacity to serve local regional, and potentially broader objectives 2. Lowering risk by providing storage with one public owner, away from population, with no conflict with water resources and reduced concern about induced seismicity.

54 ENVIRONMENTAL SCIENCES↗

Widespread detection of chlorine oxyacids in the Arctic atmosphere

Chlorine radicals are strong atmospheric oxidants known to play an important role in the depletion of surface ozone and the degradation of methane in the Arctic troposphere. Initial oxidation processes of chlorine produce chlorine oxides, and it has been speculated that the final oxidation steps lead to the formation of chloric (HClO 3 ) and perchloric (HClO 4 ) acids, although these two species have not been detected in the atmosphere. Here, we present atmospheric observations of gas-phase HClO 3 and HClO 4 . Significant levels of HClO 3 were observed during springtime at Greenland (Villum Research Station), Ny-Ålesund research station and over the central Arctic Ocean, on-board research vessel Polarstern during the Multidisciplinary drifting Observatory for the Study of the Arctic Climate (MOSAiC) campaign, with estimated concentrations up to 7 × 10 6 molecule cm -3 . The increase in HClO 3 , concomitantly with that in HClO 4 , was linked to the increase in bromine levels. These observations indicated that bromine chemistry enhances the formation of OClO, which is subsequently oxidized into HClO 3 and HClO 4 by hydroxyl radicals. HClO 3 and HClO 4 are not photoactive and therefore their loss through heterogeneous uptake on aerosol and snow surfaces can function as a previously missing atmospheric sink for reactive chlorine, thereby reducing the chlorine-driven oxidation capacity in the Arctic boundary layer. Our study reveals additional chlorine species in the atmosphere, providing further insights into atmospheric chlorine cycling in the polar environment.

54 ENVIRONMENTAL SCIENCES↗

A Method for Measuring Coupled Individual and Social Vulnerability to Environmental Hazards

Although models of social vulnerability to environmental hazards are commonly developed to support policy interventions in emergencies and disasters, their utility is hindered by a lack of contextual information on individuals exposed to and affected by hazards. We develop a novel approach to model social vulnerability that couples individuals and their varying forms of protective capacity with the social fabric of the communities in which they reside. The backbone of our model is the Public-Use Microdata Sample (PUMS), a product of the U.S. Census Bureau that preserves a representative sample of completed responses to the American Community Survey (ACS). The PUMS enables us to understand the full range of individual protective capacities against a hazard in an exposed area, which we term individual vulnerability profiles (IVPs). In this case, we examine IVPs in the Coney Island-Brighton Beach section of New York City, which suffered severe impacts during Hurricane Sandy in 2012. To manage the large number of unique IVPs in Coney Island-Brighton Beach, we perform a segmentation analysis to generalize them into thematic cohort vulnerability profiles (CVPs) representing a typology of vulnerable people in Coney Island-Brighton Beach during Sandy. From synthetic populations of CVPs, we then estimate how individuals in varying housing types were coexposed to Sandy at the census tract level by classifying these areas into community social vulnerability profiles (SVPs). Our results provide a topology of social vulnerability that simultaneously links individual, community, and population-wide concerns, enabling a more holistic understanding of resources and interventions beneficial to human security during events like Sandy than is attainable with area-level metrics.

54 ENVIRONMENTAL SCIENCES↗

An Integrated Feasibility Study of Reservoir Thermal Energy Storage (RTES) in Portland, OR, USA

In regions with long cold overcast winters and sunny summers, Deep Direct-Use (DDU) can be coupled with Reservoir Thermal Energy Storage (RTES) technology to take advantage of pre-existing subsurface permeability to save summer heat for later use during cold seasons. Many aquifers worldwide are underlain by permeable regions (reservoirs) containing brackish or saline groundwater that has limited beneficial use due to poor water quality. We investigate the utility of these relatively deep, slow flowing reservoirs for RTES by conducting an integrated feasibility study in the Portland Basin, Oregon, USA, developing methods and obtaining results that can be widely applied to RTES systems elsewhere. As a case study, we have conducted an economic and social cost-benefit analysis for the Oregon Health and Science University (OHSU), a teaching hospital that is recognized as critical infrastructure in the Portland Metropolitan Area. Our investigation covers key factors that influence feasibility including 1) the geologic framework, 2) heat and fluid flow modeling, 3) capital and maintenance costs, 4) the regulatory framework, and 5) operational risks. By pairing a model of building seasonal heat demand with an integrated model of RTES resource supply, we determine that the most important factors that influence RTES efficacy in the study area are operational schedule, well spacing, the amount of summer heat stored (in our model, a function of solar array size), and longevity of the system. Generally, heat recovery efficiency increases as the reservoir and surrounding rocks warm, making RTES more economical with time. Selecting a base-case scenario, we estimate a levelized cost of heat (LCOH) to compare with other sources of heating available to OHSU and find that it is comparable to unsubsidized solar and nuclear, but more expensive than natural gas. Additional benefits of RTES include energy resiliency in the event that conventional energy supplies are disrupted (e.g., natural disaster) and a reduction in fossil fuel consumption resulting in a smaller carbon footprint. Key risks include reservoir heterogeneity and a possible reduction in permeability through time due to scaling (mineral precipitation). Lastly, a map of thermal energy storage capacity for the Portland Basin yields a total of 43,400 GWh, suggesting tremendous potential for RTES in the Portland Metropolitan Area.

14 SOLAR ENERGY↗

Closed-Loop Pumped Storage Hydropower Resource Assessment for the United States. Final Report on HydroWIRES Project D1: Improving Hydropower and PSH Representations in Capacity Expansion Models

Pumped storage hydropower represents the bulk of the United States' current energy storage capacity: 23 gigawatts (GW) of the 24-GW national total (Denholm et al. 2021). This capacity was largely built between 1960 and 1990. PSH is a mature and proven method of energy storage with competitive round-trip efficiency and long life spans. These qualities make PSH a very attractive potential solution to energy storage needs, particularly for longer-duration storage (8 hours or more); such storage will be crucial to bridge gaps in electricity production as variable wind and solar production continue to comprise an ever-larger portion of the United States' energy portfolio (Cole et al. 2021; Frazier et al. 2021). However, it is unclear how much potential the United States has for the development of new PSH. No new large PSH has been constructed in the United States since the 1990s, and attempts to quantify technical potential capacity from PSH project applications to the Federal Energy Regulatory Commission (FERC) suffer from inconsistent site and cost evaluation methodologies and likely are not representative of all PSH opportunities. This study seeks to better under understand the technical potential for PSH development in the United States by developing a national-scale resource assessment for closed-loop PSH. Individual sites are not modeled in sufficient detail for project-level development, but they do provide valuable insights into potential resource areas across the United States, including the ability to provide estimates for a range of long-term development scenarios.

13 HYDRO ENERGY↗

Measurements of extragalactic background light from the far UV to the far ir from deep ground- and space-based galaxy counts

We combine wide and deep galaxy number-count data from the Galaxy And Mass Assembly, COSMOS/G10, Hubble Space Telescope (HST) Early Release Science, HST UVUDF, and various near-, mid-, and far-IR data sets from ESO, Spitzer, and Herschel. The combined data range from the far UV (0.15 μm) to far-IR (500 μm), and in all cases the contribution to the integrated galaxy light (IGL) of successively fainter galaxies converges. Using a simple spline fit, we derive the IGL and the extrapolated IGL in all bands. We argue that undetected low-surface-brightness galaxies and intracluster/group light are modest, and that our extrapolated-IGL measurements are an accurate representation of the extragalactic background light (EBL). Our data agree with most earlier IGL estimates and with direct measurements in the far IR, but disagree strongly with direct estimates in the optical. Close agreement between our results and recent very high-energy experiments (H.E.S.S. and MAGIC) suggests that there may be an additional foreground affecting the direct estimates. The most likely culprit could be the adopted model of zodiacal light. Finally we use a modified version of the two-component model to integrate the EBL and obtain measurements of the cosmic optical background (COB) and cosmic infrared background of 24{sub −4}{sup +4} nW m{sup −2} sr{sup −1} and 26{sub −5}{sup +5} nW m{sup −2} sr{sup −1} respectively (48%:52%). Over the next decade, upcoming space missions such as Euclid and the Wide Field Infrared Space Telescope will have the capacity to reduce the COB error to <1%, at which point comparisons to the very high-energy data could have the potential to provide a direct detection and measurement of the reionization field.

79 ASTRONOMY AND ASTROPHYSICS↗

Demonstration of an Ultra-Stable Cryogenic Platform with 25 pK/root-Hz Stability

Existing paramagnetic susceptibility thermometers used in fundamental physics experiments near 2.2 K are capable of measuring temperature changes with a precision of about 100 pK in a one-hertz measurement bandwidth, with a demonstrated drift stability of about a nK per day. Commercial electrical heater controllers are only able to control power dissipation to a precision of about ten parts per million (ppm), with an open loop drift of about 50 ppm per day. We have developed an ultra-stable temperature platform with a demonstrated noise of 25 pK in a one-hertz bandwidth, and we have identified the physical source of this residual noise. We used an array of RF-biased Josephson junctions to precisely control the electrical power dissipation in a heater resistor mounted on this thermally isolated cryogenic platform to well beyond our ability to measure, which we estimate is stable to better than a part in 10(exp 12). This Josephson heater controller may be used in a new synchronous demodulation circuit to maintain absolute temperature stability of the stage to about the same level as the demonstrated noise, provided that the He-4 superfluid transition temperature is fundamentally stable at this level. This work may provide a blackbody temperature reference for use in space radiometry applications that is considerably more stable than the temperature of the cosmic background radiation itself. This new technology may enable critical heat capacity measurements in He-4 within a weightless laboratory to a reduced temperature of about 10(exp -11), where the critical fluctuation lengths would be about a cm, and the fluctuation rates would be measurable within the bandwidth of the thermometry.

Green, Colin J.↗

A Baseline Load Schedule for the Manual Calibration of a Force Balance

A baseline load schedule for the manual calibration of a force balance is defined that takes current capabilities at the NASA Ames Balance Calibration Laboratory into account. The chosen load schedule consists of 18 load series with a total of 194 data points. It was designed to satisfy six requirements: (i) positive and negative loadings should be applied for each load component; (ii) at least three loadings should be applied between 0 % and 100 % load capacity; (iii) normal and side force loadings should be applied at the forward gage location, aft gage location, and the balance moment center; (iv) the balance should be used in "up" and "down" orientation to get positive and negative axial force loadings; (v) the constant normal and side force approaches should be used to get the rolling moment loadings; (vi) rolling moment loadings should be obtained for 0, 90, 180, and 270 degrees balance orientation. In addition, three different approaches are discussed in the paper that may be used to independently estimate the natural zeros, i.e., the gage outputs of the absolute load datum of the balance. These three approaches provide gage output differences that can be used to estimate the weight of both the metric and non-metric part of the balance. Data from the calibration of a six-component force balance will be used in the final manuscript of the paper to illustrate characteristics of the proposed baseline load schedule.

Ulbrich, N.↗

Update to the Performance Assessment for the Savannah River Site Saltstone Disposal Facility - 20124

In 2019, Savannah River Remediation developed a revision to the performance assessment (PA) on behalf of the U.S. Department of Energy (DOE) Savannah River Operations Office (SR) for the near-surface disposal of low-level waste at the Savannah River Site (SRS) Saltstone Disposal Facility (SDF). Soluble waste from SRS Tank Farms undergoes salt processing to remove cesium and other high activity constituents. The low-activity decontaminated salt solution (DSS) is then immobilized by mixing it into a cementitious waste form known as saltstone. After mixing, the saltstone is poured into leak-tight concrete vaults, known as saltstone disposal units (SDUs), where the waste form cures. By the time of facility closure, the SDF is expected to consist of 15 SDUs with a combined capacity of 1.06 E+09 L (280 Mgal) of cured saltstone. The facility operates under a Disposal Authorization Statement (DAS) from DOE and a permit from the South Carolina Department of Health and Environmental Control (SCDHEC). Since the start of operations in 1990, the SDF has received almost 6.7 E+07 L (18 Mgal) of DSS, resulting in the safe disposal of 2.7 E+16 Bq (7.3 E+05 Ci) of activity. Due to the radioactive decay of short-lived contaminants, the total remaining activity in the disposed waste is estimated to be approximately 1.4 E+16 Bq (3.9 E+05 Ci), as of September 2018. The Disposal Authorization Statement requires a demonstration that the system of engineered and natural features of the disposal facility will limit releases from the facility and be protective of human health and the environment for at least the next 1,000 years. The long-term performance of the facility was evaluated under the requirements of the DoE's Radioactive Waste Management Manual (US DOE Manual 435.1-1). Simulations were performed to demonstrate that the disposal facility would meet performance objectives specified in the manual. The evaluation was based on numerical models that simulate the releases of contaminants from the saltstone waste form. Contaminants were transported through groundwater and air pathways to points of assessment to evaluate compliance. In addition, the potential consequences of an inadvertent human intrusion (IHI) were also evaluated. In accordance with the guidance and recommendations in US DoE's technical standard for DAS, deterministic and probabilistic analyses were performed to demonstrate the SDF system, which includes the engineered cover system, the SDUs, the waste form, and the natural features of the site, provides a reasonable expectation that saltstone disposal will meet performance objectives. Post-closure doses to future members of the public (MOP) were evaluated; dose estimates from the air pathway were well below the 1.0 E-04 Sv/yr (10 mrem/yr) performance objective within 1,000 years, and the calculated doses to the MOP from all exposure pathways, including the groundwater and air pathways, were well below the 2.5 E-04 Sv/yr (25 mrem/yr) performance objective within 1,000 years. Doses following an assumed intrusion event within the facility boundaries were well below the IHI performance objectives, where the acute IHI dose was below the acute IHI dose performance objective of 5.0 E-03 Sv (500 mrem) and the chronic IHI dose was below the chronic IHI dose performance objective of 1.0 E-03 Sv/yr (100 mrem/yr) within 1,000 years. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Feedback from International Decommissioning Planning Projects - 20269

Decommissioning of Nuclear Power Plants is an increasing reality in many countries with nuclear power. Already many years before final shutdown, planning of the decommissioning work is usually started in order to understand for example the costs, waste volume capacity and licensing work needed. In many countries it is required to have a final decommissioning plan before any decommissioning work is allowed to start. Westinghouse has been involved in international decommissioning planning for more than 30 years, where the first 20 years was mostly funding and preliminary plans due to that decommissioning was many years away. However, as many more plants are now moving into decommissioning, the focus has shifted to final decommissioning plans with budgets instead of funding plans, strategic decisions instead of choices, waste volume specifications instead of estimates and a defined approach instead of what ifs. Westinghouse has developed a methodology based on the planning and execution of many decommissioning projects in Europe, America and Asia. That international experience and understanding helps the customers to adopt a systematic planning process where strategy development is done with the end state in mind, where the goals are clearly outlined and the starting point described. The process and steps to reach the desired end state need to be clearly defined and all options/alternatives evaluated from a cost/benefit point of view. This is followed by a thorough and quantitative risk analysis in order to give solid recommendations and credible conclusions. One important feedback has been that real decommissioning experience from reference projects is invaluable for an efficient and timely progress in order not to spend unnecessary time and effort on understanding the barriers and links between different activities in decommissioning. Skilled project managers or engineers can drive the project forward, but without decommissioning experience previously gained, valuable lessons learned are not used and the same mistakes can be made again. Many utilities have invested in knowledge transfer from other decommissioning projects through site visits, exchange programs and supplier meetings, which is a valuable asset and way of implementing lessons learned from performed decommissioning projects into the planning process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Setting cost targets for zero-emission electricity generation technologies

Clean energy deployment scenarios typically assume a diverse mix of low-emission generation. However, because of historically low natural gas prices and cost reductions for onshore wind and photovoltaic technologies, recent new capacity deployment, especially in the United States, has come largely from these three generation sources. Here, we quantify competitive cost targets for three less-common zero-emission generation technologies -- nuclear, concentrating solar, and offshore wind -- under a range of future conditions. We determine the cost targets based on the technologies' system value, such that technology value equals or exceeds its cost. Using a capacity expansion model that develops system-wide, economically optimal generation scenarios of the United States power sector, we find that nuclear, concentrating solar, and offshore wind would need to attain levelized cost ranges of $53-84/MWh, $65-91/MWh, and $39-77/MWh, respectively, to achieve 1% additional grid penetration. We refer to this metric as the 'required cost,' which is a technology's levelized cost of energy needed to achieve a specific penetration level. Higher penetrations lead to lower required costs as lower-cost generation is displaced. We estimate that to reach 10% penetration, the required cost for nuclear declines to $45-76/MWh. Because of resource variability and increased transmission needs for concentrating solar power and offshore wind, even lower costs are needed to reach higher penetrations: required cost ranges to achieve 10% penetration are estimated to be $30-56/MWh and $18-40/MWh for these two technologies respectively. Our analysis informs research and development priorities and the design of policies supporting clean technologies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Economic Impact of Closing the Nuclear Fuel Cycle

This report estimates the economic impact of closing the United States nuclear fuel cycle. Several different fuel cycle scenarios are analyzed. These scenarios include a baseline analysis of the existing fuel cycle conditions, a hypothetical scenario where all fuel cycle operations are preformed domestically, a scenario where all reactors are replaced with sodium fast reactors, and finally a scenario that uses a mix of fast reactors and light water reactors operating on mixed oxide fuel. Each scenario modeled is assumed to be operating at equilibrium and producing electricity at a 100 GWe-yr capacity. Impacts are calculated for normal operations and do not include construction or infrastructure expansion impacts.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Thermal Protection Requirements for Near-Earth Aeroassisted Orbital Transfer Vehicle Missions

The thermal protection required for decelerating and maneuvering spacecraft by aerodynamic forces is determined for return missions from geosynchronous to low Earth orbits. The effect of vehicle configuration on surface heating rates and selection of heat shield materials is analyzed. The effects of the current widespread estimates in the structure of atmospheric density are also evaluated. It is shown that nonequilibrium radiation can be a major source of surface heating during atmospheric entry and a significant factor for heat shielding requirements. It is also demonstrated that drag-brake concepts have application to a broad range of orbital transfer missions because of the favorable tradeoffs with aeromaneuvering vehicles in volumetric efficiency, retrothrust plane-change capability, and heat protection requirements. In addition, the results of this study indicate that the aeroassist technique produces acceptable penalties in vehicle payload capacity for drag-brake concepts, because of the system's heat protection requirements, and is highly attractive relative to all-propulsive orbital change maneuvers.

Menees, Gene P.↗

On the Path to Energy Independence and a Clean Power Future – LED Lighting Retrofit and Solar Power Generation for the CTUIR Science and Engineering Laboratory and Public Transit Center (Rev.1)

This project supports the goals of the Energy Policy for the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) through the implementation of an energy efficiency measure (LED lighting retrofit) and construction of a fixed rack (stationary) ground-mounted solar photovoltaic (PV) array energy generation system. The project objective was to eliminate the net demand for grid-based utility energy at two tribal facilities: the CTUIR Field Station and the Public Transit Center (consisting of bus barn and maintenance shop buildings). A total of 332 lighting fixtures were retrofitted with high efficiency LEDs at the three buildings within the project scope. The solar PV array constructed adjacent to the Field Station (46330 Timine Way, Pendleton, OR 97801) has a nameplate capacity of 97.98 kW DC . The project was managed by staff from the CTUIR Energy & Environmental Sciences Program within the Department of Natural Resources and the final budget was $\$ $288,206. Data was collected during a 12 month monitoring period following construction of the aptly named Ántukš–Tín̓qapapt Solar PV Array and assessed to determine project results. During this time, the solar PV system generated 125,580 kWh of energy according to SolrenView solar PV system monitoring service. In contrast, the total realized utility energy and cost savings due to the project were estimated by comparing 24 months of consecutive utility billing data. Results of this comparison indicate that grid-based utility energy demand was reduced by 121,280 kWh, or roughly 80% of the total electricity consumed by both facilities. The cost savings associated with this energy demand reduction were $\$ $11,104 and a payback period of 5.7 years was estimated for recovering the CTUIR’s investment. However, it should be noted that these figures are not representative of the savings that could be obtained under normal, error-free (i.e. faultless) conditions. Several undesirable events occurred during the 12 month monitoring and evaluation period, the effects of which were quantified using available data so that results under a “Faultless Scenario” could be estimated. Annual energy and cost savings estimated for the Faultless Scenario were approximately 166,289 kWh and $\$ $15,225, respectively. These figures should prove to be more representative of the long-term average annual results achieved in response to the project and suggest a payback period closer to 4.5 years for the CTUIR.

14 SOLAR ENERGY↗

Global soil consumption of atmospheric carbon monoxide: an analysis using a process-based biogeochemistry model

Carbon monoxide (CO) plays an important role in controlling the oxidizing capacity of the atmosphere by reacting with OH radicals that affect atmospheric methane (CH 4 ) dynamics. We develop a process-based biogeochemistry model to quantify the CO exchange between soils and the atmosphere with a 5 min internal time step at the global scale. The model is parameterized using the CO flux data from the field and laboratory experiments for 11 representative ecosystem types. The model is then extrapolated to global terrestrial ecosystems using monthly climate forcing data. Global soil gross consumption, gross production, and net flux of the atmospheric CO are estimated to be from -197 to -180, 34 to 36, and -163 to -145 Tg CO yr -1 (1 Tg = 10 12 g), respectively, when the model is driven with satellite-based atmospheric CO concentration data during 2000–2013. Tropical evergreen forest, savanna and deciduous forest areas are the largest sinks at 123 Tg CO yr -1 . The soil CO gross consumption is sensitive to air temperature and atmospheric CO concentration, while the gross production is sensitive to soil organic carbon (SOC) stock and air temperature. By assuming that the spatially distributed atmospheric CO concentrations (~ 128 ppbv) are not changing over time, the global mean CO net deposition velocity is estimated to be 0.16–0.19 mm s -1 during the 20th century. Under the future climate scenarios, the CO deposition velocity will increase at a rate of 0.0002–0.0013 mm s -1 yr -1 during 2014–2100, reaching 0.20–0.30 mm s -1 by the end of the 21st century, primarily due to the increasing temperature. Areas near the Equator, the eastern US, Europe and eastern Asia will be the largest sinks due to optimum soil moisture and high temperature. The annual global soil net flux of atmospheric CO is primarily controlled by air temperature, soil temperature, SOC and atmospheric CO concentrations, while its monthly variation is mainly determined by air temperature, precipitation, soil temperature and soil moisture.