At least 1,729 records · Page 96

Completion of Level 2 Milestone – M2AT 19IN030401044, Complete construction of the gas and moisture supply systems and receive the custom-designed tube furnace from the vendor

The Advanced Gas Reactor (AGR) program has designed and is now constructing the Air/Moisture Ingress Experiment (AMIX) facility to test irradiated tristructural isotropic (TRISO) fuels under air or moisture-ingress accidents postulated for high-temperature gas-cooled reactors. AMIX will ultimately be installed in the Fuel Conditioning Facility at the Materials and Fuels Complex (MFC) at Idaho National Laboratory. AMIX consists of a gas supply (capable of supplying mixtures of air/helium and steam/helium), a tube furnace capable of accepting samples up to 6 cm in diameter and heating them to 1650°C, gamma detectors for measuring the release of condensable, gamma-emitting fission products, and cold traps with gamma detectors for measuring the release of fission gases. Data obtained from AMIX experiments will be used to qualify this new generation of TRISO fuels with the U.S. Nuclear Regulatory Commission, and inform models and simulations of TRISO fuel accident performance and source term.

42 ENGINEERING↗

Development of a polysilicon process based on chemical vapor deposition (phase 1)

A dichlorosilane-based reductive chemical vapor deposition (CVD) process demonstrated is capable of producing, at low cost, high quality polycrystalline silicon. Testing of decomposition reactor heat shields to insure that the shield provides adequate personnel protection assuming a worst case explosion was completed. Minor modifications to a production reactor heat shield provided adequate heat shield integrity. Construction of the redesigned PDU (Process Development Unit) to accommodate all safety related information proceeded on schedule. Structural steel work was completed as is the piping and instrumentation design work. Major pieces of process equipment were received and positioned in the support structure and all transfer piping and conduits to the PDU were installed. Construction was completed on a feed system for supplying DCS to an intermediate sized reactor. The feed system was successfully interfaced with a reactor equipped with a modified heat shield. Reactor checkout was completed.

Mccormick, J.↗

Evolutionary Design and Simulation of a Tube Crawling Inspection Robot

The Space Robotics Assembly Team Simulation (SpaceRATS) is an expansive concept that will hopefully lead to a space flight demonstration of a robotic team cooperatively assembling a system from its constitutive parts. A primary objective of the SpaceRATS project is to develop a generalized evolutionary design approach for multiple classes of robots. The portion of the overall SpaceRats program associated with the evolutionary design and simulation of an inspection robot's morphology is the subject of this paper. The vast majority of this effort has concentrated on the use and modification of Darwin2K, a robotic design and simulation software package, to analyze the design of a tube crawling robot. This robot is designed for carrying out inspection duties in relatively inaccessible locations within a liquid rocket engine similar to the SSME. A preliminary design of the tube crawler robot was completed, and the mechanical dynamics of the system were simulated. An evolutionary approach to optimizing a few parameters of the system was utilized, resulting in a more optimum design.

Craft, Michael↗

Subtask 1.3 – Integrated Carbon Capture and Storage for North Dakota Ethanol Production

The Energy & Environmental Research Center (EERC), in partnership with Red Trail Energy, LLC (RTE), a North Dakota ethanol producer; the North Dakota Industrial Commission (NDIC) Renewable Energy Program (REP); and the U.S. Department of Energy (DOE), conducted a feasibility and implementation study for a commercial carbon capture and storage (CCS) effort. This subtask provided technical support and developed recommended practices of how small-scale industrial CO2 emitters (<1,000,000 tonnes of CO2 emitted annually) may economically deploy CCS. The 64-million-gallon dry mill RTE ethanol facility, emitting an average 180,000 tonnes of CO2 annually, was the subject of the case study. The positive outcome of this research, which shows technical and economic potential for ethanol–CCS in North Dakota, has resulted in RTE acquiring an approved Permit to Drill on December 2, 2019, for a stratigraphic test well in early 2020, a necessary step toward a North Dakota CO2 Storage Facility Permit (SFP) for the RTE CCS effort. Outcomes include 1) validating the Broom Creek Formation as a regional target for CCS, 2) determining the full carbon life cycle of an industrial fuel production facility with CCS, 3) developing a field implementation plan (FIP) for small-scale CCS, and 4) determining the validity and pathway for using CCS to meet low-carbon fuel (LCF) standards. The technical team included the EERC, RTE, Trimeric Corporation, Schlumberger Carbon Services, and Computer Modelling Group (CMG). Findings from activities conducted November 2016 – May 2020 are summarized as follows. Several key steps have been accomplished toward validating the Broom Creek Formation as a CO2 injection and storage target at the RTE CCS site, including verification of the presence and structure of sandstone layers that may comprise the potential CO2 storage reservoir and the several thousand feet of overlying confining zone. Work included site characterization using existing data, interpretation of seismic data within the study area, and geologic modeling simulation of CO2 injection. Interpreted results estimate 3000 feet of confining zone between the Broom Creek Formation (storage target) and the lowermost underground source of drinking water (e.g., the Fox Hills Formation). The thickness of the Broom Creek injection target varies 230–420 ft within the survey area. Results were used to inform the location of a stratigraphic test well and associated characterization test program. No impediments were identified within the targeted CO2 storage complex that would prevent the project from moving forward. A stratigraphic test well is the next step to validate these results and to acquire remaining data necessary to develop a North Dakota CO2 SFP application. The EERC generated full carbon life cycle estimates for CCS integration with the RTE ethanol facility. Results indicated that an average 40% reduction in CO2 emissions is possible through CCS implementation. Approximately half of the carbon in the overall life cycle for a dry mill ethanol plant is generated through the fermentation process and emitted to the atmosphere; this is the CO2 stream targeted for CCS. The remaining carbon is attributed to corn feedstock farming (diesel, fertilizer), energy for fuel processing (natural gas, electricity), and transportation (diesel) of the fuel product. Life cycle carbon estimates are also affected by the anticipated energy consumption of a potential capture facility, which depend on the type of CO2 product generated. For example, a 30%–40% net CO2 emission reduction is estimated if a liquefied CO2 facility were incorporated compared to a 40%–50% net CO2 reduction if a supercritical “injection-grade” CO2 product is generated; i.e., more energy is required to further refine the CO2 stream, affecting the full carbon life cycle estimates. A CCS FIP was developed and initiated at the RTE CCS site, resulting in the development of several guidance documents: a CO2 Capture Process Design Package, a North Dakota CO2 geologic Storage Permits Template, and a Public Outreach Package for CCS in North Dakota. General FIP components include CO2 capture system, pipeline and well designs; monitoring, verification, and accounting (MVA) plans; geologic characterization and testing programs; and permitting and outreach plans. Vendor bids were also acquired for the CO2 liquefaction facility. Near-surface characterization (groundwater and soil gas sampling) and geologic characterization (seismic survey) were initiated to inform development of a UIC Class VI-compliant MVA plan compliant with a North Dakota CO2 SFP. Designs (well and geologic testing) were completed for a stratigraphic test well compliant with a North Dakota CO2 SFP. In addition, the outreach plan was executed, including community open houses, meetings with city/county/state officials, and development of public materials. Although other entities continued to mature incentive programs in 2019–2020, California and the Internal Revenue Service (IRS) currently provide the most advanced economic opportunities for CCS integrated with fuel production. The California Low-Carbon Fuel Standard (LCFS) adopted a CCS Protocol in January 2019, allowing submittal of a design-based pathway (DBP) application for an approved temporary (not certified) carbon intensity value for a fully engineered facility. An ethanol–CCS DBP application to the California LCFS Program (officially approved February 28, 2020) was developed to show that the RTE CCS effort meets LCFS requirements. The approved DBP provides confidence to advance the project and supports potential investments. Other entities continue to mature incentive programs. The IRS issued guidance in February 2020 that addresses the definition of beginning of construction and revenue procedure on partnerships for the Enhancement of Carbon Dioxide Sequestration Credit (a.k.a. Section 45Q) CCS tax credit program; the IRS anticipates issuing further guidance on issues such as secure geologic storage, utilization qualifications, and recapture of claimed credits. Maturing incentive programs coupled with workable permitting regulations provide confidence to advance CCS projects in North Dakota and support financial investment to proceed with designing, constructing, and implementing CCS projects at small-scale fuel production facilities. The largest hurdles for CCS implementation at small-scale industrial systems are often business/economic-related (i.e., not technical). Market uncertainty already exists for agriculture-based alternative fuels such as corn ethanol, for which production has increased by ~33%, and prices have correspondingly lowered since 2015. Passing the Section 45Q tax credit program improves economic feasibility for CCS but may require external investors for a small business to achieve maximum benefits. Public–private partnerships with NDIC and DOE have resulted in foundational technical and regulatory knowledge, growing stakeholder confidence, and a pathway to implementation that enables similar industrial CCS projects in the region to advance. This subtask was funded through the EERC–DOE Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by NDIC and RTE. The authors would also like to thank CMG, ESRI, IHS, Neuralog, and Schlumberger for allowing the use of their software packages in support of this work.

42 ENGINEERING↗

The MELISSA pilot plant facility as as integration test-bed for advanced life support systems

The different advances in the Micro Ecological Life Support System Alternative project (MELISSA), fostered and coordinated by the European Space Agency, as well as in other associated technologies, are integrated and demonstrated in the MELISSA Pilot Plant laboratory. During the first period of operation, the definition of the different compartments at an individual basis has been achieved, and the complete facility is being re-designed to face a new period of integration of all these compartments. The final objective is to demonstrate the potentiality of biological systems such as MELISSA as life support systems. The facility will also serve as a test bed to study the robustness and stability of the continuous operation of a complex biological system. This includes testing of the associated instrumentation and control for a safe operation, characterization of the chemical and microbial safety of the system, as well as tracking the genetic stability of the microbial strains used. The new period is envisaged as a contribution to the further development of more complete biological life support systems for long-term manned missions, that should be better defined from the knowledge to be gained from this integration phase. This contribution summarizes the current status of the Pilot Plant and the planned steps for the new period. c2004 COSPAR. Published by Elsevier Ltd. All rights reserved.

Waste Management/instrumentation/methods↗

Dawn's final mission at Ceres: navigation and mission design experience

On Oct. 31st, 2018, the Dawn spacecraft completed its space journey covering more than 11 years including exploration of Vesta and Ceres, two protoplanets in the main asteroid belt. After successfully completing its prime mission at the dwarf planet Ceres, the Dawn mission was extended twice to pursue new scientific objectives. The second extended mission at Ceres, and the final mission for Dawn, presented a series of challenges that were new to the experienced and accomplished Dawn navigation team. This paper discusses mission design and navigational experiences and challenges during Dawn’s final transfer and orbit at Ceres. Topics include reference orbit design of the final science orbit, mission design and planning for the transfer, periapsis targeting over a surface feature, and analysis for planetary protection requirements.

Karimi, Reza↗

PHEV Real World Driving Cycle Energy and Fuel and Consumption Reduction Potential for Connected and Automated Vehicles

This paper presents real-world driving energy and fuel consumption results for the second-generation Chevrolet Volt plug-in hybrid electric vehicle (PHEV). A drive cycle, local to Michigan Technological University, was designed to mimic urban and highway driving test cycles in terms of distance, transients and average velocity, but with significant elevation changes to establish an energy intensive real-world driving cycle for assessing potential energy savings for connected and automated vehicle (CAV) control. The investigation began by establishing baseline and repeatability of energy consumption at various battery states of charge. It was determined that drive cycle energy consumption under a randomized set of boundary conditions varied within 3.6% of mean energy consumption regardless of initial battery state of charge. After completing 30 baseline drive cycles, a design for six sigma (DFSS) L18 array was designed to look at sensitivity of a range of parameters to energy consumption as related to connected and automated vehicles to target highest return on engineering development effort. The parameters explored in the DFSS array that showed the most sensitivity, in order of importance, were battery state of charge, vehicle mass, propulsion system thermal conditioning, HVAC setting and driver behavior. Each of these areas are explored for energy savings and discussed briefly in the context of CAV control opportunity for energy savings potential.

33 ADVANCED PROPULSION SYSTEMS↗

Advanced EVA Suit Camera System Development Project

The National Aeronautics and Space Administration (NASA) at the Johnson Space Center (JSC) is developing a new extra-vehicular activity (EVA) suit known as the Advanced EVA Z2 Suit. All of the improvements to the EVA Suit provide the opportunity to update the technology of the video imagery. My summer internship project involved improving the video streaming capabilities of the cameras that will be used on the Z2 Suit for data acquisition. To accomplish this, I familiarized myself with the architecture of the camera that is currently being tested to be able to make improvements on the design. Because there is a lot of benefit to saving space, power, and weight on the EVA suit, my job was to use Altium Design to start designing a much smaller and simplified interface board for the camera's microprocessor and external components. This involved checking datasheets of various components and checking signal connections to ensure that this architecture could be used for both the Z2 suit and potentially other future projects. The Orion spacecraft is a specific project that may benefit from this condensed camera interface design. The camera's physical placement on the suit also needed to be determined and tested so that image resolution can be maximized. Many of the options of the camera placement may be tested along with other future suit testing. There are multiple teams that work on different parts of the suit, so the camera's placement could directly affect their research or design. For this reason, a big part of my project was initiating contact with other branches and setting up multiple meetings to learn more about the pros and cons of the potential camera placements we are analyzing. Collaboration with the multiple teams working on the Advanced EVA Z2 Suit is absolutely necessary and these comparisons will be used as further progress is made for the overall suit design. This prototype will not be finished in time for the scheduled Z2 Suit testing, so my time was also spent creating a case for the original interface board that is already being used. This design is being done by use of Creo 2. Due to time constraints, I may not be able to complete the 3-D printing portion of this design, but I was able to use my knowledge of the interface board and Altium Design to help in the task. As a side project, I assisted another intern in selecting and programming a microprocessor to control linear actuators. These linear actuators will be used to move various increments of polyethylene for controlled radiation testing. For this, we began the software portion of the project using the Arduino's coding environment to control an Arduino Due and H-Bridge components. Along with the obvious learning of computer programs such as Altium Design and Creo 2, I also acquired more skills with networking and collaborating with others, being able to multi-task because of responsibilities to work on various projects, and how to set realistic goals in the work place. Like many internship projects, this project will be continued and improved, so I also had the chance to improve my organization and communication skills as I documented all of my meetings and research. As a result of my internship at JSC, I desire to continue a career with NASA, whether that be through another internship or possibly a co-op. I am excited to return to my university and continue my education in electrical engineering because of all of my experiences at JSC.

Mock, Kyla↗

Scheme for Low Energy Beam Transport with a Non-Neutralized Section

A typical Low Energy Beam Transport (LEBT) design relies on dynamics with nearly complete beam space charge neutralization over the entire length of the LEBT. This paper argues that, for a beam with modest perveance and uniform current density distribution when generated at the source, a downstream portion of the LEBT can be un-neutralized without significant emittance growth.

43 PARTICLE ACCELERATORS↗

Trace chemical contaminant generation rates for spacecraft contamination control system design

A spacecraft presents a unique design challenge with respect to providing a comfortable environment in which people can live and work. All aspects of the spacecraft environmental design including the size of the habitable volume, its temperature, relative humidity, and composition must be considered to ensure the comfort and health of the occupants. The crew members and the materials selected for outfitting the spacecraft play an integral part in designing a habitable spacecraft because material offgassing and human metabolism are the primary sources for continuous trace chemical contaminant generation onboard a spacecraft. Since these contamination sources cannot be completely eliminated, active control processes must be designed and deployed onboard the spacecraft to ensure an acceptably clean cabin atmosphere. Knowledge of the expected rates at which contaminants are generated is very important to the design of these processes. Data from past spacecraft missions and human contaminant production studies have been analyzed to provide this knowledge. The resulting compilation of contaminants and generation rates serve as a firm basis for past, present, and future contamination control system designs for space and aeronautics applications.

Perry, J. L.↗

SU-C-304-04: A Compact Modular Computational Platform for Automated On-Board Imager Quality Assurance

Purpose: Traditionally, the assessment of X-ray tube output and detector positioning accuracy of on-board imagers (OBI) has been performed manually and subjectively with rulers and dosimeters, and typically takes hours to complete. In this study, we have designed a compact modular computational platform to automatically analyze OBI images acquired with in-house designed phantoms as an efficient and robust surrogate. Methods: The platform was developed as an integrated and automated image analysis-based platform using MATLAB for easy modification and maintenance. Given a set of images acquired with the in-house designed phantoms, the X-ray output accuracy was examined via cross-validation of the uniqueness and integration minimization of important image quality assessment metrics, while machine geometric and positioning accuracy were validated by utilizing pattern-recognition based image analysis techniques. Results: The platform input was a set of images of an in-house designed phantom. The total processing time is about 1–2 minutes. Based on the data acquired from three Varian Truebeam machines over the course of 3 months, the designed test validation strategy achieved higher accuracy than traditional methods. The kVp output accuracy can be verified within +/−2 kVp, the exposure accuracy within 2%, and exposure linearity with a coefficient of variation (CV) of 0.1. Sub-millimeter position accuracy was achieved for the lateral and longitudinal positioning tests, while vertical positioning accuracy within +/−2 mm was achieved. Conclusion: This new platform delivers to the radiotherapy field an automated, efficient, and stable image analysis-based procedure, for the first time, acting as a surrogate for traditional tests for LINAC OBI systems. It has great potential to facilitate OBI quality assurance (QA) with the assistance of advanced image processing techniques. In addition, it provides flexible integration of additional tests for expediting other OBI quality assurance tests, such as 2D/3D image quality, making completely automated QA possible. Research Funding from Varian Medical Systems Inc. . Dr. Sasa Mutic receives compensation for providing patient safety training services from Varian Medical Systems, the sponsor of this study.

60 APPLIED LIFE SCIENCES↗

Overcoming challenges to support US resumption of high specific activity cobalt-60

Domestic production of high specific activity 60 Co was halted after a target rupture in 2012 at the Advanced Test Reactor (ATR). The Isotope Program (IP) within the US Department of Energy (DOE) Office of Science tasked a multilaboratory team of researchers and managers from Oak Ridge and Idaho National Laboratories with the redesign the radioisotope capsule. The objective of this effort was to create a more robust and reliable design, compared to the pre-2012 target. The team successfully completed this task to produce the DOE-IP cobalt (Co) production capsule design. Furthermore, 66 capsules were successfully fabricated by Oak Ridge National Laboratory (ORNL) and delivered to Idaho National Laboratory (INL) for irradiation in the ATR between January 2014 and October 2016. This paper describes the efforts of the team to prepare and disposition the two initial DOE-IP Co production capsules that were processed in March 2020. These efforts include performing accurate production predictions, experimentally validating predictions with assay measurements, shipping with the Orano-furnished Battelle Energy Alliance Research Reactor shipping package, and disassembling capsules at the isotope vendor site.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Front End Engineering Design of Linde-BASF Advanced Post-Combustion CO 2 Capture Technology at a Southern Company Natural Gas-Fired Power Plant (Final Scientific/Technical Report)

This document details the execution of Cooperative Agreement DE-FE0031847, “Front End Engineering Design of Linde-BASF Advanced Post-Combustion Carbon Dioxide (CO 2 ) Capture Technology at a Southern Company Natural Gas-Fired Power Plant” during the period of 10/1/2019 to 6/30/2022. The project was funded by the U.S. Department of Energy’s Office of Fossil Energy and Carbon Management (FECM) and managed by the National Energy Technology Laboratory (NETL). Southern Company Services, Inc. (SCS) was the prime recipient and led the project team. Other members of the project team included Linde, Inc. (Linde), Linde Engineering – Dresden (LED), and BASF. The overall goal of the project was to complete a front-end engineering design (FEED) study for installing the Linde-BASF post-combustion capture (PCC) technology at an existing domestic natural gas-fired combined cycle (NGCC) power plant within Southern Company’s portfolio of assets. The CO 2 capture plant was to be of commercial scale (at least 375 MWe) and include process units for pre-conditioning of the flue gas system, the CO 2 capture plant island, storage vessels, the CO 2 compression train, and any necessary components for integration into the NGCC plant. Mississippi Power’s Plant Daniel Unit #4 was chosen as the host site for the FEED with the target of capturing 90% of CO 2 emissions from the existing combustion turbines. The information produced by the FEED was used to develop a cost estimate of +/- 15% accuracy. Capital costs, excluding financing, are estimated at approximately $\$752$ million dollars (2021). The execution of a project based on this FEED study has an estimated duration of almost five years.

03 NATURAL GAS↗

An Initial Assessment of the Design Margins of Different ASME Section III, Division 5 Design Rules

This report develops a method for assessing the design margin of the ASME Section III, Division 5 Class A design rules, focusing on a definition of margin as the ratio between the actual, expected component life and the ASME design life. Full inelastic finite element simulations with a complete damage model capturing the available creep, creep-fatigue, fatigue, and tension test failure data produce the expected component lives, which can then be compared to corresponding ASME design calculations. The focus of this particular work is on Alloy 617 and the ASME creep-fatigue design rules, but the approach is general and could be applied to other design limits and to other materials. A margin assessment of a representative Alloy 617 component shows the ASME creep-fatigue design rules applied to this component have a margin of 10 on design life. The report describes several challenges in completing a more comprehensive margin assessment of the ASME rules, in particular challenges in developing probabilistic assessment methods for high temperature structural components. The report details these challenge and discusses the immediate possibilities of the deterministic margin assessment method developed here.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

SU-E-J-35: Clinical Performance Evaluation of a Phase II Proton CT Scanner

Purpose: To develop the methodology to evaluate the clinical performance of a Phase II Proton CT scanner Methods: Range errors on the order of 3%-5% constitute a major uncertainty in current charged particle treatment planning based on Hounsfield Unit (HU)-relative stopping power (RSP) calibration curves. Within our proton CT collaboration, we previously developed and built a Phase I proton CT scanner that provided a sensitive area of 9 cm (axial) × 18 cm (in-plane). This scanner served to get initial experience with this new treatment planning tool and to incorporate lessons learned into the next generation design. A Phase II scanner was recently completed and is now undergoing initial performance testing. It will increase the proton acquisition rate and provide a larger detection area of 9 cm x 36 cm. We are now designing a comprehensive evaluation program to test the image quality, imaging dose, and range uncertainty associated with this scanner. The testing will be performed along the lines of AAPM TG 66. Results: In our discussion of the evaluation protocol we identified the following priorities. The image quality of proton CT images, in particular spatial resolution and low-density contrast discrimination, will be evaluated with the Catphan600 phantom. Initial testing showed that the Catphan uniformity phantom did not provide sufficient uniformity; it was thus replaced by a cylindrical water phantom. The imaging dose will be tested with a Catphan dose module, and compared to a typical cone beam CT dose for comparable image quality. Lastly, we developed a dedicated dosimetry range phantom based on the CIRS pediatric head phantom HN715. Conclusion: A formal evaluation of proton CT as a new tool for proton treatment planning is an important task. The availability of the new Phase II proton CT scanner will allow us to perform this task. This research is supported by the National Institute of Biomedical Imaging and Bioengineering of the NIH under award number R01EB013118. The content is solely the responsibility of the authors and does not necessarily represent the official views of the NIH.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Performance of preproduction model cesium beam frequency standards for spacecraft applications

A cesium beam frequency standards for spaceflight application on Navigation Development Satellites was designed and fabricated and preliminary testing was completed. The cesium standard evolved from an earlier prototype model launched aboard NTS-2 and the engineering development model to be launched aboard NTS satellites during 1979. A number of design innovations, including a hybrid analog/digital integrator and the replacement of analog filters and phase detectors by clocked digital sampling techniques are discussed. Thermal and thermal-vacuum testing was concluded and test data are presented. Stability data for 10 to 10,000 seconds averaging interval, measured under laboratory conditions, are shown.

Levine, M. W.↗

VLBI System (BLK I) If-video down Conversion Design

The prototype intermediate frequency video down converter of the Deep Space Network (BLK 1) Very Long Base Interferometry system, a hybrid of analog and digital circuits, was completed and tested. The initial results met all design specifications, establishing a milestone in new design technology for such devices. This device has uses in other similar applications and can form the basis for expanded design and applications.

Ham, N. C.↗