Search NASA⌕ Search

SEARCH · Search NASA

Results for “DOCUMENTATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,729 records · Page 96

Annual Transuranic Waste Inventory Report – 2018 (Data Cutoff Date 12/31/2017)

The purpose of this Annual Transuranic Waste Inventory Report – 2018 (ATWIR-2018) is to document the inventory estimate of transuranic (TRU) waste reported by the TRU waste generator sites as of December 31, 2017. This report also notes major changes to the inventory used for the Annual Transuranic Waste Inventory Report – 2017 (ATWIR-2017) (U.S. DOE 2017a) that had a cutoff date of December 31, 2016. This updated inventory information is provided to the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) and is available to the DOE TRU waste complex, Waste Isolation Pilot Plant (WIPP) stakeholders, and regulators. The TRU waste inventory information is used for strategic planning, and supports DOE/CBFO’s input into documents (e.g., WIPP Documented Safety Analysis and National Environmental Policy Act analyses), planned changes, and other design changes that may take place in the repository. The DOE/CBFO has determined this report will provide the basis for the Performance Assessment Inventory Report for development of the 2019 Compliance Recertification Application (CRA) deferred performance assessment (PA) (Shrader 2018).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Transuranic Waste Inventory Report – 2020 (Data Cutoff Date 12/31/2019)

The purpose of this Annual Transuranic Waste Inventory Report (ATWIR) – 2020 is to document the inventory estimate of transuranic (TRU) waste reported by the TRU waste generator sites as of December 31, 2019. This report also notes major changes to the inventory used for the ATWIR-2019 that had a data cutoff date of December 31, 2018. This updated inventory information is available to the U.S. Department of Energy (DOE) TRU waste complex, Waste Isolation Pilot Plant (WIPP) stakeholders, and regulators. The TRU waste inventory information is used for strategic planning, and supports the DOE Carlsbad Field Office (CBFO) input into documents (e.g., WIPP Documented Safety Analysis and National Environmental Policy Act analyses), planned changes, and other design changes as needed for the WIPP project.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Transuranic Waste Inventory Report – 2021 (Data Cutoff Date 12/31/2020)

The purpose of this Annual Transuranic Waste Inventory Report (ATWIR) – 2021 is to document the inventory estimate of transuranic (TRU) waste reported by the TRU waste generator sites as of December 31, 2020. This report also notes major changes to the inventory used for the ATWIR-2020 that had a data cutoff date of December 31, 2019. This updated inventory information is available to the U.S. Department of Energy (DOE) TRU waste complex, Waste Isolation Pilot Plant (WIPP) stakeholders, and regulators. The TRU waste inventory information is used for strategic planning, and supports the DOE Carlsbad Field Office (CBFO) input into documents (e.g., WIPP Documented Safety Analysis and National Environmental Policy Act analyses), planned changes, and other design changes as needed for the WIPP project.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Transuranic Waste Inventory Report – 2022 (Data Cutoff Date 12/31/2021)

The purpose of this Annual Transuranic Waste Inventory Report (ATWIR) – 2022 is to document the inventory estimate of transuranic (TRU) waste reported by the TRU waste generator sites as of December 31, 2021. This report also notes major changes to the inventory since the ATWIR-2021, which had a data cutoff date of December 31, 2020. This updated inventory information is available to the U.S. Department of Energy (DOE) TRU waste complex, Waste Isolation Pilot Plant (WIPP) stakeholders, and regulators. The TRU waste inventory information is used for strategic planning, and supports the DOE Carlsbad Field Office (CBFO) input into documents (e.g., WIPP Documented Safety Analysis and National Environmental Policy Act evaluations), performance assessments, planned changes, and other design changes as needed for the WIPP project.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FAST-1.1: A Computer Code for Thermal-Mechanical Nuclear Fuel Analysis under Steady-state and Transients (Developed under NQA-1-2017)

Fuel Analysis under Steady-state and Transients (FAST) is the U.S. Nuclear Regulatory Commission (NRC)’s computer code that calculates the steady-state and transient response of nuclear reactor fuel rods during long-term in-reactor burnup, anticipated operational occurrences (AOOs), design basis accidents (DBAs), and dry storage conditions. The code calculates the temperature, pressure, and deformation of a fuel rod as functions of time-dependent fuel rod power and coolant boundary conditions. The phenomena modeled by the code include: * heat conduction through the fuel and other materials * heat transfer from the cladding-to-coolant * cladding elastic and plastic deformation, including creep * fuel-cladding mechanical interaction * fission gas release from the fuel * rod internal pressure and void volume * cladding oxidation The code contains necessary material and coolant properties, as well as clad-to-coolant heat transfer correlations, for normal operation through postulated accidents and AOOs for today’s U.S.-based light water reactor (LWR) fuel designs. FAST-1.1 also contains preliminary materials and models for new LWR fuel concepts, such as accident tolerant fuel (ATF), and non-LWR fuel concepts such as metallic fuels for sodium fast reactors (SFRs). FAST has been developed for use on Windows and Linux operating systems. This document describes FAST-1.1 and is one of a series of documents on the code; the other documents detail the material properties used by FAST as well as its integral assessment to experiments and commercial data.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

FECM/NETL Hydrogen Pipeline Cost Model (2024): Description and User’s Manual

The FECM/NETL Hydrogen Pipeline Cost Model (H2_P_COM) estimates costs for transporting gaseous hydrogen in a pipeline from a source, such as a hydrogen production facility, to a final destination which may be a user of the hydrogen or a distribution center where hydrogen in the pipeline is diverted to multiple end users. This document provides two main functions. First, the document describes the equations and algorithms that are used by the model to calculate technical quantities (such as the minimum inner pipe diameter needed to transport a user-specified H 2 mass flow rate a specified distance) and engineering-economic quantities (such as capital costs, operating costs, and cash flows). Second, the document is a user’s manual for the model that describes the procedures the user must follow to run the model. The model can be accessed at this URL: https://www.netl.doe.gov/energy-analysis/details?id=db897190-8e26-40b1-9535-ee78ac934193

08 HYDROGEN↗

Regulations, Codes, and Standards Review for Underground Hydrogen Storage

Hydrogen continues to show promise as a viable contributor to achieving energy storage goals such as energy security and decarbonization in the United States. However, many new and expanded hydrogen use applications will require identifying methods of larger-scale storage than the solutions that currently exist for smaller storage applications. One possibility is to store large quantities of gaseous hydrogen below ground level. Underground storage of other fuels such as natural gas is already currently utilized, so much of the infrastructure and basic technologies can be used as a basis for underground hydrogen storage (UHS). A few commercial UHS facilities currently exist in the United States, including salt caverns owned and operated by Air Liquide, Linde, and Conoco Philips, but UHS is still a relatively new concept that has not been widely deployed. It is necessary to understand the safety risks and hazards associated with UHS before its use can be expanded and accepted more broadly. Many of these risks are addressed through regulations, codes, and standards (RCS) issued by governing bodies and organizations with expertise in certain hazards. This report is a review of RCS documents relevant to UHS, with a particular lens on potential technical gaps in existing guidance. These gaps may be specific to the physical properties of hydrogen or due to the different technologies relevant for hydrogen vs. natural gas storage. This is meant to be a high-level review to identify relevant documents and potential gaps. Formally addressing the individual gaps identified here within the codes and standards themselves would involve a more intensive analysis and differ based on the code or standard revision processes of the various publishing organizations. Therefore, presenting specific recommendations for revising the verbiage of the documents for UHS applications is left for future work and other publications.

08 HYDROGEN↗

Federal Facility Agreement and Consent Order: Nevada National Security Site Use Restriction Management Plan with ROTC 1

This Use Restriction Management Plan (URMP) provides the information needed to create, modify, and manage use restrictions (URs) for sites on the Nevada National Security Site (NNSS), and sites accessed through the NNSS main gate, that were closed using the corrective action alternative (CAA) of closure in place under the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended). (Note: This pertains to those FFACO sites not managed by the U.S. Department of Energy [DOE], Legacy Management.) The closure in place alternative is used for sites closed with residual contamination at levels requiring corrective action as determined using the FFACO process. The URs contain and control all requirements for long-term monitoring. This URMP also serves as the single repository of the URs implemented under the FFACO that identify use restricted areas and contain the current requirements for inspections, maintenance, and monitoring of the UR. The requirements in these URs replace all requirements listed in previous documentation. This consolidates post-closure monitoring requirements into a single source that ensures completeness and consistency of UR requirements and information. Standardized UR forms were developed to clearly document post-closure requirements that are consistent with current protocols and to ensure consistent information is contained in the URs. Standard notification, summary, and site controls statements were developed for all URs with provisions to insert site-specific options in the text. Current protocols for Industrial Sites and Soils URs are defined in this document and in the Soils Risk-Based Corrective Action (RBCA) Evaluation Process (DOE/EMNV, 2018). The standardized UR forms that have been approved to date are listed in Appendix A. Additional UR forms will be added once the review and approval process has been completed.

54 ENVIRONMENTAL SCIENCES↗

Community Planning for Solar: Compiling a Community Solar Action Plan

This document provides an annotated outline for a Community Solar Action Plan. This document is designed to assist community officials, volunteers, and regional planning agency staff in preparing a draft Community Solar Action Plan for a municipality, community, or other jurisdiction. Preparing a Community Solar Action Plan is the fifth step in the Community Planning for Solar process (ag.umass.edu/solarplanning). The plan is intended to be the culmination of the planning process. The contents of the plan will include summaries of information gathered as part of foregoing steps in the process, including completion of a Solar Resource and Infrastructure Assessment, administering of a Community Solar Survey, interpretation of survey results, and review of Solar Financing and Ownership Options and tools. Once the Community Solar Action Plan has been drafted, it should be reviewed by municipal board and commission members and presented at an open community forum. Any important comments or revisions can be incorporated before the final Community Solar Action Plan is approved and implemented. The approved Community Solar Action Plan is a living document that guides community solar planning action over time. As conditions change, new information becomes available, or actions progress over the life of the plan, adjustments may be necessary to maintain the plan's relevance. The Monitoring, Evaluating, and Updating Your Community Solar Action Plan fact sheet (Step 6, Item a) describes some things to consider when updating the Community Solar Action Plan over time.

14 SOLAR ENERGY↗

Independent Review of Non-Destructive Assay for the K-25/K-27 D&D Project: November 30-December 3, 2004, Oak Ridge, TN

The DOE with concurrence from the D&D contractor has chartered an assessment of the methods and procedures used to obtain the original NDA results of holdup deposits at the K-25 and K-27 uranium gaseous diffusion facilities in Oak Ridge. The assessment has been performed by an external review team with the participation of the D&D contractor, DOE, and DOE/OR. This document is the final report for the assessment. The DOE provided the charter for this review. The review team spent a week in Oak Ridge attending meetings and participating in discussions with expert contractor staff. Substantial additional input for the review came from numerous written materials, unpublished and published. This final report of observations, findings, and recommendations in areas defined by the charter is based on information from the meetings, discussions, and documents. The assessment of the Review Team is that the DOE/OR and BJC approach in using historical NDA data for the D&D of K-25 and K-27 is appropriate and generally acceptable. Resolving issues, addressing findings, and implementing the recommendations documented in this report will reconcile specific technical concerns.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

U.S. Average Corn Ethanol Production Baseline for 45Q Life Cycle Analysis Version 1.0 (2018-2022)

U.S. Average Benchmark life cycle inventory documentation for ethanol production for calendar years 2018 - 2022. The documentation includes a technical report describing data sources and statistical methods used and an Excel file showing calculations. The calculations performed are used in the 45Q benchmark json-ld dataset, compatible with the NETL CO2U LCA Guidance Toolkit. Summary impact results will be included in the NETL CO2U LCA Documentation Spreadsheet within the Toolkit. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=55ab21f1-9238-4b63-9a7a-ae1a4cfa7b05.

09 BIOMASS FUELS↗

Income Verification Strategies for Income-Based Solar Programs

The Inflation Reduction Act has created substantial new programs that support adoption of solar power by low-income households, including the $7 billion Solar For All program and the Low-Income Communities Bonus Credit Program, which increases the investment tax credit for certain types of deployment. In addition, a growing number of states are using solar programs to reduce energy burdens and create energy justice opportunities for low-income households and disadvantaged communities. Verifying the income of participating customers is an important component of these programs. Program managers are seeking strategies to verify a large number of subscribing customers in an accurate, timely, and cost-efficient manner. To help inform program managers, Berkeley Lab investigated how a number of energy and non-energy programs manage income verification. The most common approach is to require proof through tax documents, pay stubs, or other formal income documentation, which can pose an impediment to enrolling eligible customers and create a paperwork burden for administrators. In order to reduce the burden for both the applicant and the program manager, some programs use alternative methods. We identify three common alternative verification methods: -Categorical eligibility: Customers enrolled in other, similar income-verified assistance programs are automatically eligible for enrollment in other income-qualified programs. -Geographic eligibility: Eligibility is based on the customer’s location within a specified area, typically a low-income or disadvantaged community or census tract, and; -“Self-attestation”: The participant claims eligibility with or without further documentation. We describe these options, their pros and cons, give examples of how they are used, and explore how some low-income programs address administrative issues, audits, or other quality control measures. Finally, we explore the risk of mistaken verifications (finding a participant eligible when they are not) in the different strategies. While this memo was initiated by a request relating to income-based community solar programs, the methods are applicable to any program with income eligibility requirements in the energy or non-energy sector. Funding was provided for this research by the Solar Energy Technologies Office of the US Department of Energy, through the National Community Solar Partnership.

14 SOLAR ENERGY↗

Implementation of High Temperature and Pressure fluid property interpolation tables

This document describes the use of module property_interpolate by John Doherty (Doherty,2006). The document “Fast Lookup of CO 2 Properties” describes the numerical details associated with lookup table. Rajeh Pawar modified property_interpolate for easier implementation in the FEHM code. George Zyvoloski modified the package to produce tables for water and air at very high temperatures and pressures. He also modified the auxiliary codes(drivers) to use newer datasets from the National Institute of Standards and Technology. We note here that within the files associated with FEHM there three property_interpolate modules. They are interpolate_2a.f90 (water), interpolate_2b.f90 (air) , and interpolate_2c.f90(CO 2 ). The interpolate_2c module is different than the earlier module produced by Rajeh Pawar in that it includes high temperature and pressure data. While FEHM has a number of fluid physics modules, this document will describe only the software and algorithms associated with water, water vapor, and heat (WH).

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Sierra/SolidMechanics 5.20 Verification Tests Manual

Presented in this document is a small portion of the tests that exist in the Sierra/SolidMechanics (Sierra/SM) verification test suite. Most of these tests are run nightly with the Sierra/SM code suite, and the results of the test are checked versus the correct analytical result. For each of the tests presented in this document, the test setup, a description of the analytic solution, and comparison of the Sierra/SM code results to the analytic solution is provided. Mesh convergence is also checked on a nightly basis for several of these tests. This document can be used to confirm that a given code capability is verified or referenced as a compilation of example problems. Additional example problems are provided in the Sierra/SM Example Problems Manual. Note, many other verification tests exist in the Sierra/SM test suite, but have not yet been included in this manual.

97 MATHEMATICS AND COMPUTING↗

Sierra/Aria Verification Manual – 5.18 Version

Presented in this document is a portion of the tests that exist in the Sierra Thermal/Fluids verification test suite. Each of these tests is run nightly with the Sierra/TF code suite and the results of the test checked under mesh refinement against the correct analytic result. For each of the tests presented in this document the test setup, derivation of the analytic solution, and comparison of the code results to the analytic solution is provided. This document can be used to confirm that a given code capability is verified or referenced as a compilation of example problems.

97 MATHEMATICS AND COMPUTING↗

Sierra/SolidMechanics 5.18 Verification Tests Manual

Presented in this document is a small portion of the tests that exist in the Sierra/SolidMechanics (Sierra/SM) verification test suite. Most of these tests are run nightly with the Sierra/SM code suite, and the results of the test are checked versus the correct analytical result. For each of the tests presented in this document, the test setup, a description of the analytic solution, and comparison of the Sierra/SM code results to the analytic solution is provided. Mesh convergence is also checked on a nightly basis for several of these tests. This document can be used to confirm that a given code capability is verified or referenced as a compilation of example problems. Additional example problems are provided in the Sierra/SM Example Problems Manual. Note, many other verification tests exist in the Sierra/SM test suite, but have not yet been included in this manual.

97 MATHEMATICS AND COMPUTING↗

Sierra/SolidMechanics 5.16 Verification Tests Manual

Presented in this document is a small portion of the tests that exist in the Sierra/SolidMechanics (Sierra/SM) verification test suite. Most of these tests are run nightly with the Sierra/SM code suite, and the results of the test are checked versus the correct analytical result. For each of the tests presented in this document, the test setup, a description of the analytic solution, and comparison of the Sierra/SM code results to the analytic solution is provided. Mesh convergence is also checked on a nightly basis for several of these tests. This document can be used to confirm that a given code capability is verified or referenced as a compilation of example problems. Additional example problems are provided in the Sierra/SM Example Problems Manual. Note, many other verification tests exist in the Sierra/SM test suite, but have not yet been included in this manual.

97 MATHEMATICS AND COMPUTING↗

A guide on modeling electrostatics of semiconductor detectors in COMSOL Multiphysics ® for DRiFT

Adding a new semiconductor detector into the detector response function toolkit (DRiFT) requires a model of the electric potential and the electric field. To get an accurate electrostatics model, the geometry of the detector should be modeled as closely to the real geometry as feasible, including the semiconductor materials, doping layers and concentrations, and contacts. Since the electric field and potential are used to calculate the induced signal, the results of the detector response functions are largely influenced by the electrostatics models. Initial electrostatics models were completed using Silvaco, however, this document provides guidance on using COMSOL Mulitphysics ® (COMSOL) to model the detectors to give users additional flexibility. Guidance on using COMSOL and its user interface are mostly left out of this document, but best practices for geometry, modeling methods, and data format/exporting are included to help users generate models that are compatible with DRiFT, prevents bugs, issues, and inaccuracies during charge collection calculations. The following summary provides an overview of the document.

42 ENGINEERING↗